Natural gas differential pressure power generation system
By using a gas turbine to preheat natural gas and recover cold energy in the natural gas pressure differential power generation system, combined with turbine expander technology, the problems of pressure energy waste and ice blockage in traditional pressure reduction methods are solved, and the maximum pressure energy and cold energy of natural gas are achieved The use of power generation efficiency and energy utilization has been improved.
Patent Information
- Application Number
- CN202420942452.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-30
AI Technical Summary
The traditional method of reducing pressure of natural gas through the throttle valve will waste a lot of pressure energy, and the heat absorption during the gas pressure reduction process will cause a temperature drop, which may cause ice blockage, affect transportation, and the cold energy cannot be effectively utilized.
Design a natural gas pressure differential power generation system, use the waste heat of the gas turbine power generation system to preheat the natural gas, and recover cold energy through the circulating power generation system, combine with the turbine expander to maximize the utilization of pressure and cold energy, avoid ice blockage, and at the same time Achieve natural gas pressure reduction and power generation.
It has increased the overall power generation, realized the recycling of natural gas pressure energy and cold energy, reduced energy consumption, and has significant energy saving, environmental protection and economic benefits.
Smart Images

Figure CN222045886U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a power generation system, more precisely a natural gas pressure difference power generation system. Background Art
[0002] Natural gas is mostly transported by pipeline at high pressure, and the pipeline contains huge pressure energy. However, end users generally use medium and low pressure natural gas, so natural gas gate stations, pressure regulating stations and other stations need to reduce the pressure of natural gas transported by high-pressure pipelines. The traditional way of reducing pressure is to use throttle valves to regulate pressure, which will waste a lot of pressure energy. If the traditional throttle valve can be replaced by a turbine expander, it can not only achieve the purpose of reducing pressure, but also recover pressure energy for power generation. On the other hand, since natural gas absorbs heat during the pressure reduction process, the temperature of natural gas drops sharply. In this case, ice blockage often occurs in the pipeline, and even when the temperature is lower than the dew point temperature of natural gas, hydrates are generated to block the pipeline, affecting the normal transportation of natural gas. But at the same time, this also generates a lot of cold energy. If the originally wasted pressure energy and cold energy can be recycled, it can not only reduce energy consumption, have energy-saving and environmental protection benefits, but also generate considerable economic benefits. Summary of the invention
[0003] The purpose of the utility model is to provide a natural gas pressure difference power generation system, which can add a natural gas pressure difference power generation system on the basis of the traditional pressure regulating valve pressure reduction, and realize the conversion of pressure energy into electrical energy while completing the pressure reduction. In order to avoid the influence of hydrates and "ice blocking" caused by the expansion and cooling of natural gas. The waste heat of the gas turbine power generation system is used to preheat the natural gas, and the effect of power generation is also achieved, which increases the power generation of the whole system. At the same time, the circulation power generation system is used to recover the cold energy of the natural gas, and this part of the cold energy is used to participate in the circulation, and the power generation work is carried out again, which further increases the power generation of the whole system. The utility model, while completing the natural gas pressure reduction work, recovers the natural gas pressure energy for power generation, utilizes the waste heat of the gas turbine, and recovers the cold energy of the natural gas at the same time, fully demonstrating the maximum utilization of energy.
[0004] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:
[0005] A natural gas pressure difference power generation system comprises a high-pressure natural gas pipeline, a low-pressure natural gas pipeline, an original pressure regulating pipeline, a bypass pipeline, a gas turbine system, a first heat exchanger, a first turbine expander, a second turbine expander, a third heat exchanger, and a second heat exchanger. The two ends of the original pressure regulating pipeline are respectively connected to the high-pressure natural gas pipeline and the low-pressure natural gas pipeline, the two ends of the bypass pipeline are respectively connected to the high-pressure natural gas pipeline and the low-pressure natural gas pipeline, the low-pressure natural gas pipeline is connected to the gas supply pipeline, the combustion chamber of the gas turbine system is respectively connected to the air pipeline and the gas supply pipeline, the high-temperature flue gas chamber of the gas turbine system is respectively connected to the two hot zone pipelines of the first heat exchanger through two pipelines, the two cold zone pipelines of the first heat exchanger are respectively connected to the high-pressure natural gas pipeline and the inlet of the first turbine expander, the outlet of the first turbine expander and the low-pressure natural gas pipeline are respectively connected to the two hot zone pipelines of the second heat exchanger, the two cold zone pipelines of the second heat exchanger are respectively connected to the outlet of the second turbine expander and the inlet of a circulating pump, and the inlet of the second turbine expander and the outlet of the circulating pump are respectively connected to the two hot zone pipelines of the third heat exchanger.
[0006] In order to further achieve the purpose of the utility model, the following technical solutions can also be adopted:
[0007] A first valve is installed in the middle of the original pressure regulating pipeline, and a second valve is installed in the middle of the bypass pipeline.
[0008] A third valve is installed in the middle of the gas supply pipeline.
[0009] The two cold zone pipes of the third heat exchanger are respectively connected to the inlet and outlet of the low-pressure heat source.
[0010] The first heat exchanger, the second heat exchanger and the third heat exchanger are all cleanable heat exchange devices, and the cleanable heat exchange device includes a cylindrical heat exchange shell, which is a cylindrical shell structure. The middle part of the cylindrical heat exchange shell is connected to a heat exchange metal plate, and the side circumference of the heat exchange metal plate is connected to the side circumference of the inner wall of the cylindrical heat exchange shell. The heat exchange metal plate divides the internal space of the cylindrical heat exchange shell into a cold zone space and a hot zone space. One side of the cylindrical heat exchange shell is connected to two cold zone pipes, and the two cold zone pipes are connected to the cold zone space. The other side of the cylindrical heat exchange shell is connected to two hot zone pipes, and the two hot zone pipes are connected to the inside of the hot zone space. A motor is installed on the outside of the cylindrical heat exchange shell, and the outer shell of the motor is connected to the cylindrical heat exchange shell. The output shaft of the motor is connected to the shaft, and a first sealed bearing is installed in the middle of the heat exchange metal plate. The outer ring of the first sealed bearing is connected to the heat exchange metal plate. The heat exchanger is connected, the inner ring of the first sealed bearing is plugged into the shaft, the second sealed bearing is installed on one side of the cylindrical heat exchange shell, the outer ring of the second sealed bearing is connected to the cylindrical heat exchange shell, the inner ring of the second sealed bearing is plugged into the shaft, two sets of sweepers are installed on the shaft, the two sets of sweepers are respectively located inside the cold zone space and inside the hot zone space, the sweeper includes two square metal frames, one side of the square metal frame is connected to the shaft, the side of the square metal frame is connected to the first wire brush, one side of the square metal frame is connected to the second wire brush, and the other side of the square metal frame is connected to the third wire brush. The first wire brush and the second wire brush are both fitted with the inner wall of the cylindrical heat exchange shell, the third wire brush is fitted with the heat exchange metal plate, the bottom of the cylindrical heat exchange shell is connected to the guide cover, the inlet of the guide cover is matched with the cylindrical heat exchange shell, the outlet of the guide cover is installed with an ash discharge valve, and the inlet of the ash discharge valve is connected to the inside of the guide cover.
[0011] The advantages of the utility model are as follows: on the basis of the pressure reduction of the traditional pressure regulating valve, the utility model adds a natural gas pressure difference power generation system, which realizes the conversion of pressure energy into electrical energy while completing the pressure reduction. In order to avoid the influence of hydrates and the "ice blockage" phenomenon caused by the expansion and cooling of natural gas. The waste heat of the gas turbine power generation system is used to preheat the natural gas, and the effect of power generation is also achieved, which increases the power generation of the entire system. At the same time, the circulating power generation system is used to recover the cold energy of the natural gas, and this part of the cold energy is used to participate in the circulation, and the power generation work is carried out again, which further increases the power generation of the entire system. The utility model, while completing the natural gas pressure reduction work, recovers the natural gas pressure energy for power generation, utilizes the waste heat of the gas turbine, and recovers the cold energy of the natural gas at the same time, fully demonstrating the maximum utilization of energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0013] Figure 1 It is a schematic diagram of the structure of the utility model;
[0014] Figure 2 This is a schematic diagram of the structure of the cleanable heat exchange device of the utility model;
[0015] Figure 3 for Figure 2 Schematic diagram of the A-direction enlarged structure. DETAILED DESCRIPTION
[0016] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. Embodiment 1:
[0017] A natural gas pressure difference power generation system, such as Figure 1-Figure 3 As shown, it includes a high-pressure natural gas pipeline 14, a low-pressure natural gas pipeline 15, an original pressure regulating pipeline 16, a bypass pipeline 17, a gas turbine system 6, a first heat exchanger 4, a first turbine expander 7, a second turbine expander 10, a third heat exchanger 13, and a second heat exchanger 9. Both ends of the original pressure regulating pipeline 16 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. Both ends of the bypass pipeline 17 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. The low-pressure natural gas pipeline 15 is connected to the gas supply pipeline 18. The combustion chamber of the gas turbine system 6 is respectively connected to the air pipeline 19 and the gas supply pipeline 18. The high-temperature flue gas chamber of the gas turbine system 6 is connected to the two hot zone pipes of the first heat exchanger 4 through two pipes respectively. The two cold zone pipes of the first heat exchanger 4 are connected to the high-pressure natural gas pipeline 14 and the inlet of the first turbine expander 7 respectively. The outlet of the first turbine expander 7 and the low-pressure natural gas pipeline 15 are connected to the two hot zone pipes of the second heat exchanger 9 respectively. The two cold zone pipes of the second heat exchanger 9 are connected to the outlet of the second turbine expander 10 and the inlet of the circulation pump 12 respectively. The inlet of the second turbine expander 10 and the outlet of the circulation pump 12 are connected to the two hot zone pipes of the third heat exchanger 13 respectively.
[0018] On the basis of the traditional pressure regulating valve pressure reduction, the utility model adds a natural gas pressure difference power generation system, which realizes the conversion of pressure energy into electrical energy while completing the pressure reduction. In order to avoid the influence of hydrates and "ice blocking" caused by the expansion and cooling of natural gas. The waste heat of the gas turbine power generation system is used to preheat the natural gas, and the power generation effect is also achieved, which increases the power generation of the whole system. At the same time, the circulation power generation system is used to recover the cold energy of the natural gas, and this part of the cold energy is used to participate in the cycle, and the power generation work is performed again, which further increases the power generation of the whole system. The utility model recovers the natural gas pressure energy for power generation while completing the natural gas pressure reduction work, utilizes the waste heat of the gas turbine, and recovers the cold energy of the natural gas at the same time, which fully demonstrates the maximum utilization of energy. Material selection and feasibility analysis for specific implementation: The samples we actually made use the drawings in the specification as drawings, and are implemented according to the proportions and matching methods of each component in the drawings in the specification. The connection is a common connection method such as strong adhesive connection, welding, riveting, flange connection, and one-piece molding connection. In actual production, the corresponding connection method, thickness and strength of the connection point can be creatively selected according to the actual connection strength requirements. The output end of the first turbine expander 7 is connected to the input end of the second generator 8, and the output end of the gas turbine system 6 is connected to the input end of the first generator 5. The output end of the second turbine expander 10 is connected to the input end of the third generator 11. A driving fan is installed on the connecting pipe between the first generator 5 and the first heat exchanger 4, and the driving fan can drive the airflow in the pipe. The second heat exchanger 9 is a condenser. The third heat exchanger 13 is an evaporator. On the basis of the traditional pressure regulating valve pressure reduction, the utility model adds a natural gas pressure difference power generation system, which realizes the conversion of pressure energy into electrical energy while completing the pressure reduction. In order to avoid the influence of hydrates and the "ice blockage" phenomenon caused by the expansion and cooling of natural gas. The waste heat of the gas turbine power generation system is used to preheat the natural gas, and the effect of power generation is also achieved, which increases the power generation of the whole system. At the same time, the organic Rankine cycle power generation system is used to recover the cold energy of natural gas, and this part of the cold energy is used to participate in the organic Rankine cycle, and power generation is performed again, which further increases the power generation of the whole system. The utility model, while completing the natural gas pressure reduction work, recovers the natural gas pressure energy to generate electricity, utilizes the waste heat of the gas turbine, and recovers the cold energy of the natural gas at the same time, fully demonstrating the maximum utilization of energy. In this system, the original pipeline pressure regulating system is characterized in that the original pipeline pressure regulating system serves as a temporary standby and pressure regulating function.
[0019] The natural gas pressure difference power generation system is characterized in that the pressure energy of the natural gas in the pipeline is recovered by using the first turbine expander and the second generator, and converted into electrical energy.
[0020] The gas turbine power generation system is characterized in that it can use the gas turbine and the first generator to provide electricity, and can also use the waste heat generated by the gas turbine to preheat the natural gas through the first heat exchanger. The fuel of the gas turbine is provided by a low-pressure natural gas pipeline, and an air inlet is set to mix the natural gas with air for combustion.
[0021] The characteristic of the organic Rankine cycle power generation system is that the cold energy generated by the cooling of natural gas after the expander is used as the cold source required by the organic Rankine cycle power generation system, and heat is exchanged with the organic working fluid in the cycle through the second heat exchanger, so that the organic Rankine cycle power generation system can operate normally, on the one hand, the cold energy can be recovered, and on the other hand, the organic Rankine cycle power generation system can be used to generate electricity. The low-temperature heat source is industrial waste heat resources, solar energy, geothermal energy, etc. with a temperature of 80℃~250℃.
[0022] The utility model is further described below in conjunction with the accompanying drawings.
[0023] The utility model discloses a natural gas pressure difference power generation process system considering the cogeneration of cooling and electricity, including an original pipeline pressure regulating system, a natural gas pressure difference power generation system, a gas turbine power generation system, and an organic Rankine cycle power generation system. The original pipeline pressure regulating system is used to prevent the failure of the natural gas pressure difference power generation system from affecting the normal transportation of natural gas, and plays a role of temporary standby. It can also be used for diversion and pressure regulation when the gas transmission volume of the upstream pipeline is too large. The natural gas pressure difference power generation system uses the pressure energy in the natural gas pipeline to expand and generate electricity. A part of the pressure energy in the pipeline is converted into mechanical energy to drive the generator connected to the turbine expander to generate electricity. The other part of the pressure energy is converted into cold energy after passing through the expander, in order to recycle and utilize the generated cold energy, and also to prevent the "ice blockage" phenomenon caused by the temperature drop and the formation of hydrates in natural gas, which affects the normal transportation. On the one hand, the natural gas is preheated by the gas turbine power generation system, and on the other hand, the organic Rankine cycle power generation system is used to exchange heat with the low-temperature natural gas. This system improves the power generation efficiency and realizes the full utilization of energy.
[0024] The working process of this utility model:
[0025] Under normal transportation conditions, the actual transportation flow, pressure and temperature do not exceed the rated design parameters, and the first valve 1 of the original pressure regulating pipeline and the second valve 2 of the bypass pipeline are both in a closed state. The high-pressure natural gas first passes through the first heat exchanger 4 to exchange heat with the waste heat generated by the gas turbine to increase the transportation temperature of the natural gas and prevent the occurrence of hydrates and "ice blockage". The natural gas after heat exchange enters the first turbine expander 7 for expansion, and its mechanical energy is used to drive the second generator 8 to generate electricity, and obtain low-pressure and low-temperature natural gas, which is transported downstream for users to use.
[0026] The fuel of the gas turbine power generation system 6 is low-pressure natural gas. The low-pressure natural gas after heat exchange in the second heat exchanger 9 passes through the third valve 3 and enters the gas turbine power generation system 6 together with the air to be burned and generate mechanical energy and thermal energy. The mechanical energy is used to drive the first generator 5 to generate electricity, and the thermal energy is used to preheat the natural gas through the first heat exchanger 4.
[0027] The organic working fluid in the organic Rankine cycle power generation system is pressurized and transported by the circulation pump 12 into the third heat exchanger 13, where it absorbs the heat energy of the low-temperature heat source and is vaporized into gas. It then enters the second turbine expander 10 to expand and do work, driving the third generator 11 to generate electricity. The expanded natural gas is then sent to the second heat exchanger 9, where it is condensed into liquid by the low-temperature natural gas and then sent to the circulation pump 12 to complete the cycle.
[0028] When the actual delivery flow, pressure, and temperature exceed the rated design parameters or the system shuts down due to a fault under abnormal delivery conditions, and when the upstream gas delivery volume is much higher than the rated design flow of the first turbine expander 7, the third valve 3 of the bypass line can be used for diversion and pressure regulation. When the system shuts down due to a fault, the system can be delivered through the first valve 1 of the original pressure regulating line to ensure the normal use of downstream natural gas users.
[0029] The utility model utilizes a natural gas pressure difference power generation system in combination with a gas turbine power generation system and an organic Rankine cycle power generation system, which can simultaneously reduce the pressure of high-pressure natural gas to meet the pressure requirements of downstream users, while utilizing the generators of the three systems to generate electricity; at the same time, the waste heat of the gas turbine is recovered to preheat the natural gas, and the cold energy of the natural gas is recovered for utilization, thereby maximizing energy utilization, having high energy-saving and environmental protection benefits and considerable economic benefits. Embodiment 2:
[0030] A natural gas pressure difference power generation system, such as Figure 1-Figure 3As shown, it includes a high-pressure natural gas pipeline 14, a low-pressure natural gas pipeline 15, an original pressure regulating pipeline 16, a bypass pipeline 17, a gas turbine system 6, a first heat exchanger 4, a first turbine expander 7, a second turbine expander 10, a third heat exchanger 13, and a second heat exchanger 9. Both ends of the original pressure regulating pipeline 16 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. Both ends of the bypass pipeline 17 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. The low-pressure natural gas pipeline 15 is connected to the gas supply pipeline 18. The combustion chamber of the gas turbine system 6 is respectively connected to the air pipeline 19 and the gas supply pipeline 18. The high-temperature flue gas chamber of the gas turbine system 6 is connected to the two hot zone pipelines of the first heat exchanger 4 through two pipelines, the two cold zone pipelines of the first heat exchanger 4 are connected to the high-pressure natural gas pipeline 14 and the inlet of the first turbine expander 7, the outlet of the first turbine expander 7 and the low-pressure natural gas pipeline 15 are connected to the two hot zone pipelines of the second heat exchanger 9, the two cold zone pipelines of the second heat exchanger 9 are connected to the outlet of the second turbine expander 10 and the inlet of the circulation pump 12, the inlet of the second turbine expander 10 and the outlet of the circulation pump 12 are connected to the two hot zone pipelines of the third heat exchanger 13. The first valve 1 is installed in the middle of the original pressure regulating pipeline 16, and the second valve 2 is installed in the middle of the bypass pipeline 17.
[0031] The second valve 2 of the utility model can control the on-off of the airflow inside the bypass pipe 17, and the first valve 1 can control the on-off of the airflow inside the original pressure regulating pipe 16. Embodiment 3:
[0032] A natural gas pressure difference power generation system, such as Figure 1-Figure 3As shown, it includes a high-pressure natural gas pipeline 14, a low-pressure natural gas pipeline 15, an original pressure regulating pipeline 16, a bypass pipeline 17, a gas turbine system 6, a first heat exchanger 4, a first turbine expander 7, a second turbine expander 10, a third heat exchanger 13, and a second heat exchanger 9. Both ends of the original pressure regulating pipeline 16 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. Both ends of the bypass pipeline 17 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. The low-pressure natural gas pipeline 15 is connected to the gas supply pipeline 18. The combustion chamber of the gas turbine system 6 is respectively connected to the air pipeline 19 and the gas supply pipeline 18. The high-temperature flue gas chamber of the gas turbine system 6 is connected to the two hot zone pipes of the first heat exchanger 4 through two pipes, respectively. The two cold zone pipes of the first heat exchanger 4 are connected to the high-pressure natural gas pipeline 14 and the inlet of the first turbine expander 7, respectively. The outlet of the first turbine expander 7 and the low-pressure natural gas pipeline 15 are connected to the two hot zone pipes of the second heat exchanger 9, respectively. The two cold zone pipes of the second heat exchanger 9 are connected to the outlet of the second turbine expander 10 and the inlet of the circulation pump 12, respectively. The inlet of the second turbine expander 10 and the outlet of the circulation pump 12 are connected to the two hot zone pipes of the third heat exchanger 13. The third valve 3 is installed in the middle of the gas supply pipe 18.
[0033] The third valve 3 of the present invention can control the on-off of the air flow inside the air supply pipeline 18 . Embodiment 4:
[0034] A natural gas pressure difference power generation system, such as Figure 1-Figure 3 As shown, it includes a high-pressure natural gas pipeline 14, a low-pressure natural gas pipeline 15, an original pressure regulating pipeline 16, a bypass pipeline 17, a gas turbine system 6, a first heat exchanger 4, a first turbine expander 7, a second turbine expander 10, a third heat exchanger 13, and a second heat exchanger 9. Both ends of the original pressure regulating pipeline 16 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. Both ends of the bypass pipeline 17 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. The low-pressure natural gas pipeline 15 is connected to the gas supply pipeline 18. The combustion chamber of the gas turbine system 6 is respectively connected to the air pipeline 19 and the gas supply pipeline 18. The high-temperature flue gas chamber of the gas turbine system 6 is connected to the two hot zone pipes of the first heat exchanger 4 through two pipes, respectively. The two cold zone pipes of the first heat exchanger 4 are connected to the high-pressure natural gas pipeline 14 and the inlet of the first turbine expander 7, respectively. The outlet of the first turbine expander 7 and the low-pressure natural gas pipeline 15 are connected to the two hot zone pipes of the second heat exchanger 9, respectively. The two cold zone pipes of the second heat exchanger 9 are connected to the outlet of the second turbine expander 10 and the inlet of the circulation pump 12, respectively. The inlet of the second turbine expander 10 and the outlet of the circulation pump 12 are connected to the two hot zone pipes of the third heat exchanger 13. The two cold zone pipes of the third heat exchanger 13 are connected to the inlet and outlet of the low-pressure heat source 20, respectively.
[0035] The low-pressure heat source 20 of the present invention can exchange heat through the third heat exchanger 13 . Embodiment 5:
[0036] A natural gas pressure difference power generation system, such as Figure 1-Figure 3As shown, it includes a high-pressure natural gas pipeline 14, a low-pressure natural gas pipeline 15, an original pressure regulating pipeline 16, a bypass pipeline 17, a gas turbine system 6, a first heat exchanger 4, a first turbine expander 7, a second turbine expander 10, a third heat exchanger 13, and a second heat exchanger 9. Both ends of the original pressure regulating pipeline 16 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. Both ends of the bypass pipeline 17 are respectively connected to the high-pressure natural gas pipeline 14 and the low-pressure natural gas pipeline 15. The low-pressure natural gas pipeline 15 is connected to the gas supply pipeline 18. The combustion chamber of the gas turbine system 6 is respectively connected to the air pipeline 19 and the gas supply pipeline 18. The high-temperature flue gas chamber of the gas turbine system 6 is connected to the two hot zone pipes of the first heat exchanger 4 through two pipes respectively. The two cold zone pipes of the first heat exchanger 4 are connected to the high-pressure natural gas pipeline 14 and the inlet of the first turbine expander 7 respectively. The outlet of the first turbine expander 7 and the low-pressure natural gas pipeline 15 are connected to the two hot zone pipes of the second heat exchanger 9 respectively. The two cold zone pipes of the second heat exchanger 9 are connected to the outlet of the second turbine expander 10 and the inlet of the circulation pump 12 respectively. The inlet of the second turbine expander 10 and the outlet of the circulation pump 12 are connected to the two hot zone pipes of the third heat exchanger 13 respectively.The first heat exchanger 4, the second heat exchanger 9, and the third heat exchanger 13 are all cleanable heat exchange devices, and the cleanable heat exchange devices include a cylindrical heat exchange shell 31, and the cylindrical heat exchange shell 31 is a cylindrical shell structure. The middle part of the cylindrical heat exchange shell 31 is connected to a heat exchange metal plate 39, and the side circumference of the heat exchange metal plate 39 is connected to the side circumference of the inner wall of the cylindrical heat exchange shell 31. The heat exchange metal plate 39 divides the internal space of the cylindrical heat exchange shell 31 into a cold zone space 35 and a hot zone space 36. The cylindrical heat exchange shell 31 is a cylindrical shell structure. One side of the cylindrical heat exchange shell 31 is connected to two cold zone pipes 34, and the two cold zone pipes 34 are connected to the cold zone space 35. The other side of the cylindrical heat exchange shell 31 is connected to two hot zone pipes 44, and the two hot zone pipes 44 are connected to the inside of the hot zone space 36. A motor 43 is installed on the outside of the cylindrical heat exchange shell 31, and the shell of the motor 43 is connected to the cylindrical heat exchange shell 31. The output shaft of the motor 43 is connected to the shaft 41. A first sealed bearing 40 is installed in the middle of the heat exchange metal plate 39, and the outer ring of the first sealed bearing 40 is connected to the heat exchange metal plate 39. The inner ring of the first sealed bearing 40 is plugged into the shaft 41, a second sealed bearing 42 is installed on one side of the cylindrical heat exchange shell 31, the outer ring of the second sealed bearing 42 is connected to the cylindrical heat exchange shell 31, the inner ring of the second sealed bearing 42 is plugged into the shaft 41, two sets of sweepers are installed on the shaft 41, the two sets of sweepers are respectively located inside the cold zone space 35 and inside the hot zone space 36, the sweepers include two square metal frames 33, one side of the square metal frame 33 is connected to the shaft 41, and the side of the square metal frame 33 is connected to the first A wire brush 32 is provided, and a second wire brush 37 is connected to one side of the square metal frame 33, and a third wire brush 38 is connected to the other side of the square metal frame 33. The first wire brush 32 and the second wire brush 37 are both in contact with the inner wall of the cylindrical heat exchange shell 31, and the third wire brush 38 is in contact with the heat exchange metal plate 39. The bottom of the cylindrical heat exchange shell 31 is connected to the air guide cover 46, and the inlet of the air guide cover 46 cooperates with the cylindrical heat exchange shell 31. The outlet of the air guide cover 46 is installed with an ash discharge valve 47, and the inlet of the ash discharge valve 47 is connected to the interior of the air guide cover 46.
[0037] During daily operation of the cylindrical heat exchange shell 31 of the utility model, dust will accumulate on the inner wall of the cylindrical heat exchange shell 31, and too much dust will affect the heat exchange efficiency. After the dust accumulates on the surface of the first valve 1 and the heat exchange metal plate 39, the personnel can turn on the motor 43 of the utility model, and the motor 43 can drive the two sets of sweepers to rotate, so that the square metal frame 33 can drive the first wire brush 32, the second wire brush 37, and the third wire brush 38 to brush the inner wall of the cylindrical heat exchange shell 31 and the surface of the heat exchange metal plate 39, thereby cleaning the dust attached to the inner wall of the cylindrical heat exchange shell 31 and the surface of the heat exchange metal plate 39, and avoiding excessive dust from reducing the heat exchange efficiency.
[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention.
Claims
1. A natural gas pressure difference power generation system, characterized in that: The invention comprises a high-pressure natural gas pipeline (14), a low-pressure natural gas pipeline (15), an original pressure regulating pipeline (16), a bypass pipeline (17), a gas turbine system (6), a first heat exchanger (4), a first turbine expander (7), a second turbine expander (10), a third heat exchanger (13), and a second heat exchanger (9). The two ends of the original pressure regulating pipeline (16) are respectively connected to the high-pressure natural gas pipeline (14) and the low-pressure natural gas pipeline (15). The two ends of the bypass pipeline (17) are respectively connected to the high-pressure natural gas pipeline (14) and the low-pressure natural gas pipeline (15). The low-pressure natural gas pipeline (15) is connected to the gas supply pipeline (18). The combustion chamber of the gas turbine system (6) is respectively connected to the air pipeline (19), The high-temperature flue gas chamber of the gas turbine system (6) is connected to the two hot zone pipes of the first heat exchanger (4) through two pipes respectively; the two cold zone pipes of the first heat exchanger (4) are connected to the high-pressure natural gas pipe (14) and the inlet of the first turbine expander (7) respectively; the outlet of the first turbine expander (7) and the low-pressure natural gas pipe (15) are connected to the two hot zone pipes of the second heat exchanger (9) respectively; the two cold zone pipes of the second heat exchanger (9) are connected to the outlet of the second turbine expander (10) and the inlet of the circulation pump (12) respectively; the inlet of the second turbine expander (10) and the outlet of the circulation pump (12) are connected to the two hot zone pipes of the third heat exchanger (13) respectively.
2. A natural gas pressure difference power generation system according to claim 1, characterized in that: A first valve (1) is installed in the middle of the original pressure regulating pipeline (16), and a second valve (2) is installed in the middle of the bypass pipeline (17).
3. A natural gas pressure difference power generation system according to claim 1, characterized in that: A third valve (3) is installed in the middle of the gas supply pipeline (18).
4. A natural gas pressure difference power generation system according to claim 1, characterized in that: The two cold zone pipes of the third heat exchanger (13) are respectively connected to the inlet and outlet of the low-pressure heat source (20).
5. A natural gas pressure difference power generation system according to claim 1, characterized in that: The first heat exchanger (4), the second heat exchanger (9), and the third heat exchanger (13) are all cleanable heat exchange devices, and the cleanable heat exchange devices include a cylindrical heat exchange shell (31), the cylindrical heat exchange shell (31) is a cylindrical shell structure, the middle of the cylindrical heat exchange shell (31) is connected to a heat exchange metal plate (39), the side circumference of the heat exchange metal plate (39) is connected to the side circumference of the inner wall of the cylindrical heat exchange shell (31), the heat exchange metal plate (39) divides the internal space of the cylindrical heat exchange shell (31) into a cold zone space (35) and a hot zone space (36), and one side of the cylindrical heat exchange shell (31) The two cold zone pipes (34) are connected, and the two cold zone pipes (34) are connected to the cold zone space (35). The other side of the cylindrical heat exchange shell (31) is connected to the two hot zone pipes (44), and the two hot zone pipes (44) are connected to the inside of the hot zone space (36). A motor (43) is installed on the outside of the cylindrical heat exchange shell (31), and the outer shell of the motor (43) is connected to the cylindrical heat exchange shell (31). The output shaft of the motor (43) is connected to the shaft (41). A first sealed bearing (40) is installed in the middle of the heat exchange metal plate (39), and the outer ring of the first sealed bearing (40) is connected to the heat exchange metal plate (39). The inner ring of the sealing bearing (40) is plugged into the shaft (41), a second sealing bearing (42) is installed on one side of the cylindrical heat exchange shell (31), the outer ring of the second sealing bearing (42) is connected to the cylindrical heat exchange shell (31), the inner ring of the second sealing bearing (42) is plugged into the shaft (41), two sets of cleaners are installed on the shaft (41), the two sets of cleaners are respectively located inside the cold zone space (35) and inside the hot zone space (36), the cleaners include two square metal frames (33), one side of the square metal frame (33) is connected to the shaft (41), and the side of the square metal frame (33) is connected to the first wire brush ( 32), one side of the square metal frame (33) is connected to the second wire brush (37), and the other side of the square metal frame (33) is connected to the third wire brush (38), the first wire brush (32) and the second wire brush (37) are both in contact with the inner wall of the cylindrical heat exchange shell (31), the third wire brush (38) is in contact with the heat exchange metal plate (39), the bottom of the cylindrical heat exchange shell (31) is connected to the air guide cover (46), the inlet of the air guide cover (46) is matched with the cylindrical heat exchange shell (31), and the outlet of the air guide cover (46) is installed with an ash discharge valve (47), and the inlet of the ash discharge valve (47) is connected to the inside of the air guide cover (46).
Citation Information
Cited By
Urea high-adjusting device waste heat coupling natural gas pressure difference power generation system and operation method
CN121024716A
A urea high - tuning device waste heat coupling natural gas differential pressure power generation system and operation method
CN121024716B