Material purging device of cross sieve blanking bin
By installing a high-pressure air source and an alternating purging control circuit in the cross-screen hopper, the problem of coal adhesion to the inner wall of the hopper was solved, and stable material conveying and long-term operation of the equipment were achieved.
Patent Information
- Application Number
- CN202420437554.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-07
AI Technical Summary
In coal transportation systems, coal tends to adhere to the inner wall of the hopper of cross-type fine-particle roller screens, leading to overcurrent faults and shutdowns, increasing the labor intensity of workers, and affecting material transportation.
Design a material blowing device for a cross-screen hopper. Utilize a high-pressure air source and an alternating blowing control circuit to alternately blow the inner wall of the hopper through the first and second blowing pipes and the jet pipe to remove adhering materials.
It effectively removes materials adhering to the inner wall of the silo, avoids overcurrent shutdown of cross-screens, reduces damage to the silo wall, ensures normal material conveying, and reduces the frequency of manual cleaning.
Smart Images

Figure CN222058390U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a material blowing device for a cross-screen silo, which can effectively remove materials such as coal adhered to the inner wall of the silo and belongs to the technical field of transportation equipment. Background Art
[0002] In the coal transportation system, the cross-type fine-grained roller screen (cross screen) is installed above the belt. Its main function is to screen out most of the coal with a particle size less than 4.5 mm, and the screened coal enters the lower transportation belt through the silo. In actual use, the transportation belt and the cross screen are started at the same time. Due to the large silo and fine coal, the silo wall vibrator is not effective. The coal often adheres to the silo wall and accumulates upwards. Once the accumulated coal enters the cross roller, the cross screen will cause an overcurrent fault and trip and stop. After that, it will restart after manually cleaning the silo wall. This situation occurs frequently, which not only increases the labor intensity of the workers, but also seriously affects the normal transportation of materials. Therefore, it is very necessary to design a device that can timely and effectively remove the materials adhering to the inner wall of the silo. Utility Model Content
[0003] The utility model aims to solve the drawbacks of the prior art and provide a material blowing device for a cross-screen silo to effectively remove the material adhered to the inner wall of the silo and ensure the normal transportation of the material.
[0004] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0005] A material purging device for a cross-screen bin comprises a high-pressure gas source, a first purging pipe, a second purging pipe, a first solenoid valve, a second solenoid valve and an alternating purging control circuit, wherein the first purging pipe and the second purging pipe are installed on the bin walls on both sides of the cross-screen bin of a coal material transportation system, the lower ends of the first purging pipe and the second purging pipe are blocked, and a plurality of jet pipes are installed on both sides, the upper end of the first purging pipe is connected to the high-pressure gas source through the first solenoid valve, the upper end of the second purging pipe is connected to the high-pressure gas source through the second solenoid valve, and the control coil of the first solenoid valve and the control coil of the second solenoid valve are connected to the alternating purging control circuit.
[0006] The material purging device of the cross-screen under-bin mentioned above, the alternating purging control circuit includes a circuit breaker, a conversion switch, a first time relay, a second time relay, a first intermediate relay and a second intermediate relay, the control coil of the first time relay is connected in series with the normally closed contact of the conversion switch and the normally closed contact of the second intermediate relay in sequence and then connected to the power supply through the circuit breaker; the normally open contact of the conversion switch is connected in series with the auxiliary normally open contact of the cross-screen contactor and then connected to the normally closed contact of the conversion switch; the control coil of the first intermediate relay is connected in series with the delayed disconnection normally closed contact of the first time relay and then connected in parallel with the control coil of the first time relay; one end of the control coil of the second time relay It is connected between the control coil of the first time relay and the circuit breaker, and the other end is connected between the normally closed contact of the second intermediate relay and the normally closed contact of the conversion switch through the auxiliary normally open contact of the second intermediate relay. The delayed closing normally open contact of the first time relay is connected in parallel with the auxiliary normally open contact of the second intermediate relay. The control coil of the second intermediate relay is connected in series with the delayed opening normally closed contact of the second time relay and then connected in parallel with the control coil of the second time relay; the control coil of the first solenoid valve is connected in series with the main normally open contact of the first intermediate relay and then connected to the power supply through the circuit breaker; the control coil of the second solenoid valve is connected in series with the normally open contact of the second intermediate relay and then connected to the power supply through the circuit breaker.
[0007] The material purging device of the above-mentioned cross-screen silo, the high-pressure gas source includes a gas storage tank, a main gas valve and a main gas pipe, the main gas pipe is connected to the gas storage tank through the main gas valve, the upper end of the first purge pipe is connected to the main gas pipe through the first solenoid valve, and the upper end of the second purge pipe is connected to the main gas pipe through the second solenoid valve.
[0008] In the material purging device of the cross-screen silo, a first manual valve is provided between the first solenoid valve and the main air pipe, and a second manual valve is provided between the second solenoid valve and the main air pipe.
[0009] In the material blowing device of the cross-screen silo, one end of the air jet pipe is connected to the first blowing pipe or the second blowing pipe, and the other end is inclined downward.
[0010] The utility model utilizes a blowing pipe to directly blow away the area on the silo wall where material is easily accumulated. Compared with the traditional vibrator cleaning method, it not only reduces the damage caused by the violent vibration of the silo wall, but also can effectively remove the material adhered to the inner wall of the silo, eliminates the hidden danger of cross-screening overcurrent shutdown, and ensures the normal transportation of materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0012] Figure 1 It is a structural schematic diagram of the utility model;
[0013] Figure 2 It is an electrical schematic diagram of the utility model.
[0014] The numbers in the figure are as follows: 1, gas storage tank, 2, main gas valve, 3, main gas pipe, 4, first manual valve, 5, second manual valve, 6, first solenoid valve, 7, second solenoid valve, 8, silo, 9, first purge pipe, 10, second purge pipe, 11, jet pipe;
[0015] QF, circuit breaker, SA, transfer switch, KA, auxiliary normally open contact of cross screen contactor, KT1, first time relay, KT2, second time relay, KA1, first intermediate relay, KA2, second intermediate relay, YV1, control coil of first solenoid valve, YV2, control coil of second solenoid valve, KT1-1, delayed closing normally open contact of first time relay, KT1-2, delayed disconnecting normally closed contact of first time relay, KT2-1, delayed disconnecting normally closed contact of second time relay, KA1-1, main normally open contact of first intermediate relay, KA1-1, normally open contact of first intermediate relay, KA2-1, normally open contact of second intermediate relay, KA2-2, auxiliary normally open contact of second intermediate relay, KA2-3, normally closed contact of second intermediate relay. DETAILED DESCRIPTION
[0016] The utility model provides a material blowing device for a cross-screen under-bin used in a coal transportation system. The device has two control modes, manual and automatic, and can timely and effectively remove coal and other materials adhered to the inner wall of the bin to avoid jamming of the cross-screen rollers, and has stable and reliable performance.
[0017] See also Figure 1 and Figure 2 The utility model mainly includes a gas storage tank 1, a main gas valve 2, a main gas pipe 3, a first manual valve 4, a second manual valve 5, a first solenoid valve 6, a second solenoid valve 7, a first purge pipe 9, a second purge pipe 10, an injection pipe 11, a circuit breaker QF, a conversion switch SA, a cross-screen contactor auxiliary normally open contact KA, a first time relay KT1, a second time relay KT2, a first intermediate relay KA1 and a second intermediate relay KA2.
[0018] The gas storage tank 1, the main gas valve 2 and the main gas pipe 3 constitute a high-pressure gas source, which is used to increase the high-pressure gas (such as compressed air) for blowing materials. The gas storage tank 1 is used to store high-pressure gas, and the main gas pipe 3 is connected to the gas storage tank 1 through the main gas valve 2.
[0019] The first purge pipe 9 and the second purge pipe 10 are installed on the silo wall of the cross-screen silo 8 of the coal transportation system. The lower ends of the two are blocked, and holes are opened on both sides and multiple air injection pipes 11 are welded and installed to form a fishbone shape. One end of each air injection pipe 11 is connected to the first purge pipe 9 or the second purge pipe 10, and the other end is tilted downward at an angle of 60 degrees.
[0020] The upper end of the first purge pipe 9 is connected to the main gas pipe 3 through the first solenoid valve 6 and the first manual valve 4 in sequence, and the upper end of the second purge pipe 10 is connected to the main gas pipe 3 through the second solenoid valve 7 and the second manual valve 5 in sequence.
[0021] The first purge pipe 9 and the second purge pipe 10 are DN15 stainless steel pipes, and the jet pipe 11 is a DN8 stainless steel pipe.
[0022] The circuit breaker QF, the switching switch SA, the auxiliary normally open contact KA of the cross screen contactor, the first time relay KT1, the second time relay KT2, the first intermediate relay KA1 and the second intermediate relay KA2 constitute an alternating purge control circuit, which is used to control the alternating purge of the first purge pipe 9 and the second purge pipe 10.
[0023] like Figure 2 As shown, the control coil of the first time relay KT1 is connected in series with the normally closed contact of the conversion switch SA and the normally closed contact KA2-3 of the second intermediate relay, and then connected to the power supply through the circuit breaker QF; the normally open contact of the conversion switch SA is connected in series with the auxiliary normally open contact KA of the cross screen contactor and then connected to the normally closed contact of the conversion switch SA; the control coil of the first intermediate relay KA1 is connected in series with the delayed disconnecting normally closed contact KT1-2 of the first time relay and then connected in parallel with the control coil of the first time relay KT1; one end of the control coil of the second time relay KT2 is connected between the control coil of the first time relay KT1 and the circuit breaker QF, and the other end is connected through the auxiliary normally open contact KA2-2 of the second intermediate relay. Connected between the normally closed contact KA2-3 of the second intermediate relay and the normally closed contact of the conversion switch SA, the delayed closing normally open contact KT1-1 of the first time relay is connected in parallel with the auxiliary normally open contact KA2-2 of the second intermediate relay, the control coil of the second intermediate relay KA2 is connected in series with the delayed opening normally closed contact KT2-1 of the second time relay and then connected in parallel with the control coil of the second time relay KT2; the control coil YV1 of the first solenoid valve is connected in series with the main normally open contact KA1-1 of the first intermediate relay and then connected to the power supply through the circuit breaker QF; the control coil YV2 of the second solenoid valve is connected in series with the normally open contact KA2-1 of the second intermediate relay and then connected to the power supply through the circuit breaker QF.
[0024] The working process of the utility model is as follows:
[0025] Close the circuit breaker QF, when the transfer switch SA is in the automatic state (the normally open contact of the transfer switch SA is closed, and the normally closed contact is open), after the auxiliary normally open contact KA of the cross screen contactor, or when the transfer switch SA is in the manual state (the normally open contact of the transfer switch SA is open, and the normally closed contact is closed), the normally closed contact KA2-3 of the second intermediate relay and the delayed disconnecting normally closed contact KT1-2 of the first time relay are closed, the control coil of the first intermediate relay KA1 is energized, the main normally open contact KA1-1 of the first intermediate relay is closed, the control coil YV1 of the first solenoid valve is energized, the first solenoid valve 6 is opened, and the corresponding first purge pipe 9 starts to purge. At the same time, the first time relay KT1 starts timing, and the timing time is set to 5s;
[0026] After the first 5s, the first time relay KT1 acts, the delayed opening normally closed contact KT1-2 of the first time relay opens, the control coil of the first intermediate relay KA1 loses power, the main normally open contact KA1-1 of the first intermediate relay opens, the control coil YV1 of the first solenoid valve loses power, the first solenoid valve 6 opens, and the first purge pipe 9 stops purging; at the same time, the delayed closing normally open contact KT1-1 of the first time relay closes, and at this time the delayed opening normally closed contact KT2-1 of the second time relay is still in the closed state, so the control coil of the second intermediate relay KA2 is The normally open contact KA2-1 of the second intermediate relay and the auxiliary normally open contact KA2-2 of the second intermediate relay are closed, the normally closed contact KA2-3 of the second intermediate relay is disconnected, the control coil YV2 of the second solenoid valve is energized, the second solenoid valve 7 is opened, and the corresponding second purge pipe 10 starts to purge. At the same time, the control coil of the first time relay KT1 is de-energized, the delayed closed normally open contact KT1-1 of the first time relay is disconnected, the delayed disconnected normally closed contact KT1-2 of the first time relay is closed, and the second time relay KT2 starts timing, and the timing time is set to 5s.
[0027] After the second 5s, the second time relay KT2 is actuated, the delayed disconnect normally closed contact KT2-1 of the second time relay is disconnected, the control coil of the second intermediate relay KA2 is de-energized, the normally open contact KA2-1 of the second intermediate relay and the auxiliary normally open contact KA2-2 of the second intermediate relay are disconnected, the control coil YV2 of the second solenoid valve is de-energized, the second solenoid valve 7 is closed, the corresponding second purge pipe 10 stops purge, the normally closed contact KA2-3 of the second intermediate relay is closed, the control coil of the first intermediate relay KA1 is energized, and the first purge pipe 9 starts purge. At the same time, the first time relay KT1 starts timing and enters the next control cycle.
[0028] The first time relay KT1 and the second time relay KT2 will be alternately energized and disconnected every 5 seconds. Correspondingly, the first purge pipe 9 and the second purge pipe 10 will be alternately purged every 5 seconds, repeating the cycle until the auxiliary normally open contact KA of the cross-screen contactor or the circuit breaker QF is disconnected, and the purge action stops.
[0029] The rated voltages of the circuit breaker QF, the first solenoid valve, the second solenoid valve 7, the first time relay KT1, the second time relay KT2, the first intermediate relay KA1 and the second intermediate relay KA2 are all 220V. The two time relays are power-on delay relays with a set time of 5s. The circuit breaker QF is 2P with a rated current of 10A. The transfer switch SA is a two-position transfer switch.
[0030] The utility model installs purge pipes on both sides of the inner silo under the cross screen of the coal transportation system, so that the areas on the silo wall where materials are easily accumulated can be directly purged. Compared with the traditional vibrator cleaning method, the damage caused by the violent vibration of the silo wall is reduced, the coal accumulation phenomenon on the silo wall can be prevented, and the hidden danger of shutdown due to overcurrent of the cross screen is eliminated, thereby ensuring the long-term stable operation of the equipment.
[0031] The utility model has the functions of automatic and manual switching and purge time adjustment, which provides convenience for post personnel. The utility model has the advantages of simple structure, stable performance, reliable operation, easy manufacture and convenient use, and is suitable for promotion and application in cross-screening silos.
Claims
1. A material purge device for a cross-screen silo, characterized in that: The invention comprises a high-pressure gas source, a first purge pipe (9), a second purge pipe (10), a first solenoid valve (6), a second solenoid valve (7) and an alternating purge control circuit, wherein the first purge pipe (9) and the second purge pipe (10) are installed on the silo walls on both sides of the interior of a cross-screen silo (8) of a coal material transportation system, the lower ends of the first purge pipe (9) and the second purge pipe (10) are blocked, and a plurality of air injection pipes (11) are installed on both sides, the upper end of the first purge pipe (9) is connected to the high-pressure gas source through the first solenoid valve (6), the upper end of the second purge pipe (10) is connected to the high-pressure gas source through the second solenoid valve (7), and the control coil (YV1) of the first solenoid valve and the control coil (YV2) of the second solenoid valve are connected to the alternating purge control circuit.
2. A material blowing device for a cross-screen silo according to claim 1, characterized in that: The alternating purge control circuit comprises a circuit breaker (QF), a conversion switch (SA), a first time relay (KT1), a second time relay (KT2), a first intermediate relay (KA1) and a second intermediate relay (KA2); the control coil of the first time relay (KT1) is connected in series with the normally closed contact of the conversion switch (SA) and the normally closed contact (KA2-3) of the second intermediate relay in sequence, and then connected to the power supply through the circuit breaker (QF); the normally open contact of the conversion switch (SA) is connected in series with the auxiliary normally open contact (KA) of the cross screen contactor and then connected to the normally closed contact of the conversion switch (SA); the control coil of the first intermediate relay (KA1) is connected in series with the delayed disconnecting normally closed contact (KT1-2) of the first time relay and then connected in parallel with the control coil of the first time relay (KT1); one end of the control coil of the second time relay (KT2) is connected to the first time relay (KT1); 1) between the control coil and the circuit breaker (QF), and the other end is connected between the normally closed contact (KA2-3) of the second intermediate relay and the normally closed contact of the conversion switch (SA) through the auxiliary normally open contact (KA2-2) of the second intermediate relay, the delayed closing normally open contact (KT1-1) of the first time relay is connected in parallel with the auxiliary normally open contact (KA2-2) of the second intermediate relay, the control coil of the second intermediate relay (KA2) is connected in series with the delayed opening normally closed contact (KT2-1) of the second time relay and then connected in parallel with the control coil of the second time relay (KT2); the control coil (YV1) of the first solenoid valve is connected in series with the main normally open contact (KA1-1) of the first intermediate relay and then connected to the power supply through the circuit breaker (QF); the control coil (YV2) of the second solenoid valve is connected in series with the normally open contact (KA2-1) of the second intermediate relay and then connected to the power supply through the circuit breaker (QF).
3. A material blowing device for a cross-screen silo according to claim 1 or 2, characterized in that: The high-pressure gas source comprises a gas storage tank (1), a main gas valve (2) and a main gas pipe (3); the main gas pipe (3) is connected to the gas storage tank (1) via the main gas valve (2); the upper end of the first purge pipe (9) is connected to the main gas pipe (3) via a first solenoid valve (6); and the upper end of the second purge pipe (10) is connected to the main gas pipe (3) via a second solenoid valve (7).
4. A material blowing device for a cross-screen silo according to claim 3, characterized in that: A first manual valve (4) is provided between the first solenoid valve (6) and the main gas pipe (3), and a second manual valve (5) is provided between the second solenoid valve (7) and the main gas pipe (3).
5. A material blowing device for a cross-screen silo according to claim 4, characterized in that: One end of the air jet pipe (11) is connected to the first purge pipe (9) or the second purge pipe (10), and the other end is inclined downward.