Steel bar truss floor support plate production line
By designing an automated steel bar truss floor bearing plate production line, and automatically clamping and moving steel bar trusses with sliding and pneumatic devices, the problems of large workload and low production efficiency caused by manual placement in the prior art are solved, and efficient automated production is achieved.
Patent Information
- Application Number
- CN202420609324.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-27
AI Technical Summary
The prior art requires manual placement of steel bar truss and formwork when producing steel bar truss bearing plates, resulting in large workload and low production efficiency.
A steel bar truss floor bearing plate production line is designed, including conveying line, first bracket, first screw rod, sliding table, gas rod, jaw and push plate and other components. The steel bar truss is automatically clamped and moved through sliding and pneumatic devices. , realize a production process without manual placement.
Automatic production of steel bar trusses and templates without manual placement is realized, which improves production efficiency and reduces manual operation.
Smart Images

Figure CN222060711U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of floor deck production, in particular to a steel bar truss floor deck production line. Background Art
[0002] Steel truss floor decking usually uses cement board as the bottom formwork, and the cement board is directly used as the roof instead of the traditional formwork, which simplifies the construction. There is no need to remove the bottom formwork, which saves time and effort. During production, the truss and the cement board are connected by screws that penetrate the cement board and the truss. Because nailing is prone to nailing and increasing product automation problems, most of them still use the method of manually placing the truss in the mold for casting cement board, placing it on the conveyor belt, and casting it uniformly through the cement slurry outlet placed above the conveyor belt. When the cement slurry solidifies and takes shape, it becomes a whole with the truss. This technology requires manual placement of steel trusses and formworks during production, which is labor-intensive and inefficient, and very inconvenient. Utility Model Content
[0003] In view of this, the purpose of the utility model is to propose a steel truss floor deck production line to solve the problem that the prior art still requires manual placement of steel trusses and templates when producing steel truss floor decks.
[0004] The cam is an assembly line of a plurality of movable lids, each of which is provided with a plurality of movable lids, and the movable lids are provided with a plurality of movable lids at a plurality of positions.
[0005] As a preferred technical solution of the utility model, a first synchronous wheel is fixedly installed at the same end of the two first screw rods, a first synchronous belt is rotatably sleeved between the first synchronous wheels, a positioning plate is fixedly installed on the first bracket near one of the first synchronous wheels, a first motor is fixedly installed on the positioning plate by bolts, and a driving end of the first motor is coaxially fixedly connected to the first synchronous wheel near the first motor.
[0006] As a preferred technical solution of the utility model, the bottom ends of the two second screw rods are coaxially fixed with second synchronous wheels, a second synchronous belt is rotatably sleeved between the two second synchronous wheels, a positioning bracket is fixedly installed on the side of the frame close to the top end of one of the second screw rods, a second motor is fixedly installed on the positioning bracket by bolts, a first transmission wheel is fixedly installed on the driving end of the second motor and the top end of the second screw rod close to the second motor, and a first transmission belt is rotatably sleeved on the two first transmission wheels.
[0007] As a preferred technical solution of the utility model, a second bracket is provided in the middle of the conveying line, a slurry tank is fixedly installed on the second bracket, discharge pipes are symmetrically fixedly installed at the bottom of the slurry tank, valves are fixedly installed at the bottom of the two discharge pipes, and the bottom ends of the two valves are fixedly connected to guide pipes, and a feed port is opened at the top of the slurry tank.
[0008] As an optimal technical solution of the utility model, a stirring shaft is rotatably mounted in the middle of the slurry tank, a positioning chassis is coaxially fixedly mounted on one end of the slurry tank, a third motor is fixedly mounted on the positioning chassis by bolts, and the driving end of the third motor is clamped with the stirring shaft.
[0009] As a preferred technical solution of the utility model, a first positioning hole is provided on both sides of the frame, a positioning bolt is provided in the first positioning hole, a threaded hole for cooperating with the positioning bolt is provided at the end of the first bracket away from the conveyor belt, the positioning bolt is threadedly connected to the threaded hole, and a second positioning hole is provided at the bottom of the operating table.
[0010] The beneficial effects of the utility model are as follows: the utility model is provided with a first slide on the first bracket through the sliding of the first screw rod, the clamping claw can be lifted and installed on the first slide, the bottom of the first bracket is provided with a liftable second support plate and a liftable first support plate, which can replenish materials in time, the clamping claw clamps the steel truss, moves and places it on the template, and the push plate is installed on the operating table, which can push the template onto the conveyor line, achieving the effect of placing the steel truss on the template and then pushing it to the conveyor line without manual labor, solving the problem that the prior art still needs to manually place the steel truss and the template in the production of steel truss floor decking. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only for the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0012] Figure 1It is a schematic diagram of the structure of the utility model.
[0013] Figure 2 It is a schematic diagram of the structure after being split in the utility model.
[0014] Figure 3 It is a schematic diagram of the connection structure between the first screw rod and the first bracket in the utility model.
[0015] Figure 4 It is a schematic diagram of the connection structure between the clamping claw and the base plate in the utility model.
[0016] Figure 5 It is a schematic diagram of the connection structure between the stirring shaft and the third motor in the utility model.
[0017] Figure 6 It is a schematic diagram of the connection structure between the pneumatic slide table and the operating table in the utility model.
[0018] Figure 7 It is a schematic diagram of the connection structure between the second screw rod and the frame in the utility model.
[0019] The markings in the figure are: 1, conveyor line; 2, first bracket; 21, first screw rod; 22, first slide; 23, first gas rod; 24, bottom plate; 25, claw; 26, double-axis gas rod; 27, first synchronous wheel; 28, first synchronous belt; 29, first motor; 291, positioning plate; 3, frame; 31, second screw rod; 32, first support plate; 33, second synchronous wheel; 34, second synchronous belt; 35, positioning bracket; 36, second motor; 37. First transmission wheel; 38. First transmission belt; 39. First positioning hole; 391. Positioning bolt; 392. Threaded hole; 4. Operating table; 41. Second gas rod; 42. Second support plate; 43. Pneumatic slide; 44. Push plate; 45. Second positioning hole; 5. Second bracket; 51. Slurry tank; 52. Discharge pipe; 53. Valve; 54. Guide pipe; 55. Feed inlet; 56. Agitator shaft; 57. Positioning chassis; 58. Third motor. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.
[0021] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0022] like Figure 1-7As shown in the figure, the utility model provides a production line for steel bar truss floor slabs, including a conveyor line 1. One end of the conveyor line 1 is provided with a first support 2. One end of the first support 2 is placed above one end of the conveyor line 1 and is vertically arranged with the conveyor line 1. The first support 2 is symmetrically and rotatably clamped with first lead screws 21. The first lead screws 21 are symmetrically and rotatably clamped at the top of the first support 2. A first slide 22 is threadedly connected to the two first lead screws 21. By rotating the two first lead screws 21, the first slide 22 can slide on the top of the two first supports 2. A first air cylinder 23 is fixedly installed on the first slide 22. The bottom end of the first air cylinder 23 is fixedly installed with a bottom plate 24. There are four first air cylinders 23, which are all fixedly installed at the four corners of the bottom plate 24. By starting the first air cylinders 23, the bottom plate 24 can be driven to rise and fall at the bottom of the first slide 22. Claws 25 are symmetrically and slidably clamped on the bottom plate 24. There are chutes on the bottom plate 24, and the claws 25 are symmetrically and slidably clamped in the chutes. A double-axis air cylinder 26 is fixedly installed on the bottom plate 24. The two ends of the double-axis air cylinder 26 are respectively fixedly connected to the two claws 25. The two ends of the double-axis air cylinder 26 move synchronously. Starting the double-axis air cylinder 26 can clamp the truss. A frame 3 is arranged below the first support 2. The frame 3 is square and is placed below the claws 25. Second lead screws 31 are symmetrically and rotatably clamped on the frame 3. The second lead screws 31 are symmetrically and rotatably clamped on both sides of the frame 3. A first support plate 32 is threadedly connected to the two second lead screws 31. The first support plate 32 is placed in the middle of the frame 3. There are positioning grooves on the frame 3 for positioning the truss tray to avoid misalignment when the claws 25 clamp the truss due to deviation in the placement position. An operating table 4 is arranged below the first support 2. The operating table 4 is in a "U" shape. A second air cylinder 41 is fixedly installed on the operating table 4. The second air cylinder 41 is a four-section hydraulic rod and is installed at the four corners of the upper surface of the bottom of the operating table 4. The driving end of the second air cylinder 41 is fixedly installed with a second support plate 42. The second support plate 42 is placed in the middle of the operating table 4 and has the same width as the size of the formwork for casting the cement slab of the steel bar truss floor slab. Pneumatic slides 43 are symmetrically and fixedly installed on the top of the operating table 4. A push plate 44 is fixedly installed between the two pneumatic slides 43. The push plate 44 is fixedly installed on the sliders of the two pneumatic slides 43. The bottom end of the push plate 44 is the thickness of one formwork downwards from the operating table 4. When the pneumatic slides 43 are started, the sliders on the pneumatic slides 43 will drive the push plate 44 to push the formwork onto the conveyor line 1.
[0023] As an optional implementation, a first synchronous wheel 27 is fixedly installed on the same end of the two first screw rods 21, a first synchronous belt 28 is rotatably sleeved between the first synchronous wheels 27, a positioning plate 291 is fixedly installed on the first bracket 2 near one of the first synchronous wheels 27, a first motor 29 is fixedly installed on the positioning plate 291 by bolts, a driving end of the first motor 29 is coaxially fixedly connected with the first synchronous wheel 27 near the first motor 29, the first motor 29 is started to drive a first synchronous wheel 27 near the first motor 29 to rotate, the other first synchronous wheel 27 rotates synchronously through the first synchronous belt 28, the two first screw rods 21 rotate with the two first synchronous wheels 27 to make the first slide 22 slide in the middle of the two first screw rods 21.
[0024] As an optional embodiment, the bottom ends of the two second screw rods 31 are coaxially fixedly installed with a second synchronous wheel 33, and a second synchronous belt 34 is rotatably sleeved between the two second synchronous wheels 33. Since the two second synchronous wheels 33 are respectively installed at the bottom ends of the two second screw rods 31, the two second screw rods 31 can be rotated synchronously by sleeved between the two second synchronous wheels 33 through the second synchronous belt 34. The frame 3 is fixedly installed with a positioning bracket 35 on one side close to the top of one of the second screw rods 31. The positioning bracket 35 is vertically installed with the frame 3, and the positioning bracket 35 is fixed by bolts. A second motor 36 is fixedly installed, and the driving end of the second motor 36 is at the same horizontal position as the top end of the second screw rod 31. The driving end of the second motor 36 and the top end of the second screw rod 31 close to the second motor 36 are fixedly installed with a first transmission wheel 37. A first transmission belt 38 is rotatably sleeved on the two first transmission wheels 37. Starting the second motor 36 can drive one of the second screw rods 31 to rotate through the first transmission belt 38 sleeved on the two first transmission wheels 37. The two second screw rods 31 rotate synchronously through the second synchronous belt 34 to make the first support plate 32 slide up and down in the middle of the two second screw rods 31.
[0025] As an optional implementation, a second bracket 5 is provided in the middle of the conveying line 1, and a slurry tank 51 is fixedly installed on the second bracket 5. The slurry tank 51 is used to store cement slurry. A discharge pipe 52 is symmetrically fixedly installed at the bottom of the slurry tank 51. By setting two discharge pipes 52, the effect of fast and uniform discharge can be achieved, and the cement slurry can be quickly self-leveled in the template. Valves 53 are fixedly installed at the bottom of the two discharge pipes 52. The valve 53 is a solenoid valve. By controlling the valve 53, the discharge speed of the cement slurry and the start and stop of the discharge can be controlled. The bottom ends of the two valves 53 are fixedly connected with a guide pipe 54. The outlet of the guide pipe 54 is inclined to avoid splashing when the cement slurry falls on the template. A feed port 55 is provided at the top of the slurry tank 51. The feed port 55 is connected to the slurry making equipment and is used to transport cement slurry to the slurry tank 51.
[0026] As an optional implementation, a stirring shaft 56 is rotatably mounted in the middle of the slurry tank 51. The stirring shaft 56 is coaxially mounted in the middle of the slurry tank 51. The stirring shaft 56 rotates inside the slurry tank 51 to stir the cement slurry to prevent the cement slurry from settling and affecting its quality. A positioning chassis 57 is coaxially fixedly mounted at one end of the slurry tank 51. A third motor 58 is fixedly mounted on the positioning chassis 57 by bolts. The driving end of the third motor 58 is engaged with the stirring shaft 56, and the stirring shaft 56 can be driven to rotate by driving the third motor 58.
[0027] Preferably, a first positioning hole 39 is provided on both sides of the frame 3, a positioning bolt 391 is provided in the first positioning hole 39, a threaded hole 392 for cooperating with the positioning bolt 391 is provided at the end of the first bracket 2 away from the conveyor belt, the positioning bolt 391 is threadedly connected to the threaded hole 392, and the positioning bolt 391 passes through the first positioning hole 39 and is threadedly connected to the first bracket 2 to fix the frame 3, and a second positioning hole 45 is provided at the bottom of the operating platform 4. The bolt passes through the second positioning hole 45 to fix the operating platform 4 on the ground to avoid position displacement during use and operational errors.
[0028] Working principle: When the utility model is in use, firstly, the templates of the stacked multiple steel truss cement slabs are placed on the second support plate 42, and the second gas rod 41 is started to drive the second support plate 42 to rise, so that the top template is at the same horizontal position as the conveyor belt of the conveyor line 1, and the multiple layers of steel trusses stacked on the pallet are placed on the first support plate 32, and the second motor 36 is started to drive the first support plate 32 to rise, so that the steel trusses on the top layer are placed in the position to be clamped, and the mixed cement slurry is transported to the slurry tank 51 through the feed port 55, and the third motor 58 is started to drive the stirring shaft 56 to stir the cement slurry to prevent precipitation, and the conveyor belt of the conveyor line 1 is started to rotate toward the slurry tank 51, and then the first motor 29 is started to drive the claw 25 to move to the top of the steel truss, and the first gas rod 23 is started to drive the claw 25 to descend, and then the double-axis gas rod 26 is started to drive the claws 25 on both sides to move toward the steel truss to clamp the steel truss, and the first gas rod 23 drives the steel bar truss to rise, and at the same time, the first support plate 32 rises to the height of a steel bar truss to wait for the next clamping, and the first motor 29 is started to drive the steel bar truss to move to the top of the template, and the first gas rod 23 is started to lower the steel bar truss to the position on the template, and the double-axis gas rod 26 is started to release the claw 25, and the first gas rod 23 is reset, and the pneumatic slide 43 is started to drive the push plate 44 to push the template with the steel bar truss placed on the top layer to the conveyor belt of the conveyor line 1, and the pneumatic slide 43 drives the push plate 44 to reset, and the second support plate 42 rises to the height of a template, and at the same time drives the clamping claw to repeat the clamping and placement, and then repeatedly pushes the template with the steel bar truss placed to the conveyor belt of the conveyor line 1. When the conveyor belt transports the template with the steel bar truss placed to the other end and passes under the guide pipe 54, the valve 53 is opened, and the cement slurry in the slurry tank 51 will flow into the template along the guide pipe 54, and the valve 53 is closed after the cement slurry is poured, waiting for the next template to continue pouring.
[0029] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present invention (including the claims) is limited to these examples. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity.
[0030] The utility model is intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the scope of protection of the utility model.
Claims
1. Steel bar truss floor deck production line, characterized by: The invention comprises a conveyor line (1), wherein one end of the conveyor line (1) is provided with a first bracket (2), a first screw rod (21) is symmetrically rotatably clamped on the first bracket (2), two first screw rods (21) are threadedly connected with a first slide (22), a first gas rod (23) is fixedly installed on the first slide (22), a bottom plate (24) is fixedly installed at the bottom end of the first gas rod (23), a claw (25) is symmetrically slidably clamped on the bottom plate (24), a double-axis gas rod (26) is fixedly installed on the bottom plate (24), and the two ends of the double-axis gas rod (26) are respectively connected to the two claws (25). ) are fixedly connected, a frame (3) is provided below the first bracket (2), a second screw rod (31) is symmetrically rotatably provided on the frame (3), two second screw rods (31) are threadedly connected with a first support plate (32), an operating table (4) is provided below the first bracket (2), a second gas rod (41) is fixedly installed on the operating table (4), a second support plate (42) is fixedly installed on the driving end of the second gas rod (41), a pneumatic slide (43) is symmetrically fixedly installed on the top of the operating table (4), and a push plate (44) is fixedly installed between the two pneumatic slides (43).
2. The steel bar truss floor deck production line according to claim 1 is characterized in that: A first synchronous wheel (27) is fixedly mounted on the same end of the two first screw rods (21); a first synchronous belt (28) is rotatably sleeved between the first synchronous wheels (27); a positioning plate (291) is fixedly mounted on the first bracket (2) near one of the first synchronous wheels (27); a first motor (29) is fixedly mounted on the positioning plate (291) by bolts; a driving end of the first motor (29) is coaxially fixedly connected to the first synchronous wheel (27) near the first motor (29).
3. The steel bar truss floor deck production line according to claim 1 is characterized in that: The bottom ends of the two second screw rods (31) are coaxially fixedly mounted with a second synchronous wheel (33), a second synchronous belt (34) is rotatably sleeved between the two second synchronous wheels (33), a positioning bracket (35) is fixedly mounted on the frame (3) at one side close to the top end of one of the second screw rods (31), a second motor (36) is fixedly mounted on the positioning bracket (35) by bolts, a first transmission wheel (37) is fixedly mounted on the driving end of the second motor (36) and the top end of the second screw rod (31) close to the second motor (36), and a first transmission belt (38) is rotatably sleeved on the two first transmission wheels (37).
4. The steel bar truss floor deck production line according to claim 1 is characterized in that: A second bracket (5) is provided in the middle of the conveying line (1), a slurry tank (51) is fixedly mounted on the second bracket (5), discharge pipes (52) are symmetrically fixedly mounted at the bottom of the slurry tank (51), valves (53) are fixedly mounted at the bottom of the two discharge pipes (52), and the bottom ends of the two valves (53) are fixedly connected to flow guide pipes (54), and a feed inlet (55) is provided at the top of the slurry tank (51).
5. The steel bar truss floor deck production line according to claim 4 is characterized in that: A stirring shaft (56) is rotatably mounted in the middle of the slurry tank (51), a positioning chassis (57) is coaxially fixedly mounted on one end of the slurry tank (51), a third motor (58) is fixedly mounted on the positioning chassis (57) by bolts, and a driving end of the third motor (58) is clamped with the stirring shaft (56).
6. The steel bar truss floor deck production line according to claim 1, characterized in that: The frame (3) is provided with a first positioning hole (39) on both sides, a positioning bolt (391) is provided in the first positioning hole (39), a threaded hole (392) for cooperating with the positioning bolt (391) is provided at the end of the first bracket (2) away from the conveyor belt, the positioning bolt (391) is threadedly connected to the threaded hole (392), and a second positioning hole (45) is provided at the bottom of the operating table (4).