Bridge deck girder erection crane
By designing an inverted trapezoidal frame structure and a bridge beam crane for sliding sky trucks, the problem of high construction costs in the existing technology is solved, lightweight design and cost savings are achieved, and the lifting range is improved.
Patent Information
- Application Number
- CN202420449015.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-08
AI Technical Summary
The construction cost of existing bridge deck beam cranes is high, mainly due to the large chassis weight, which increases the weight of the entire machine, and requires more components to be fixed to the bridge deck, which increases the construction cost.
A bridge beam crane was designed, and a frame structure was used to have two ends of the transport passage along the length of the bridge. The outer contour was inverted trapezoidal shape, and the van slid along the length of the car to lift the components, reducing the machine. The weight of the frame structure and the number of fixed components achieve a lightweight design.
On the premise of meeting safety requirements, the number of components fixed to the bridge deck is reduced, the construction cost is reduced, and the range of beam lifting is increased.
Smart Images

Figure CN222063934U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge erection, in particular to a bridge deck beam erecting crane. Background Art
[0002] At present, bridge deck beam erecting cranes are special equipment for bridge erection construction. When constructing bridges in high mountain canyons or busy waterways, since the conditions for removing beams and erecting them under the bridge deck are not met, full-revolving cranes are often used to first remove beams from the bridge deck and then rotate them to the steel beam installation position for erection.
[0003] In the prior art, a full-revolving crane includes a boom, a tripod, a turntable, a slewing bearing, a chassis and a winch system. In order to ensure the stability of the turntable during rotation, the weight of the chassis is generally large, which will result in a large deadweight of the full-revolving crane. Therefore, more components are required to fix the full-revolving crane to the bridge deck, which in turn increases the construction cost accordingly. Utility Model Content
[0004] The utility model provides a bridge deck beam erecting crane to solve or at least partially alleviate the problem of relatively high construction cost of the bridge deck beam erecting crane in the related technology.
[0005] In order to solve the above problems, the utility model provides a bridge deck beam erecting crane, including a frame structure and a crane, the frame structure is used to be fixed to the bridge deck of a bridge, the frame structure is provided with a transport channel with openings at both ends along a first direction, the outer contour of the projection of the frame structure on a vertical plane perpendicular to the second direction is in an inverted trapezoidal shape, and the outer contour is respectively inclined downward at both ends along the first direction, the first direction and the second direction are perpendicular to each other, the crane is slidably arranged on the frame structure along the first direction, and is used for lifting components into or out of the transport channel.
[0006] Optionally, an inclination angle of one end of the outer contour shape along the first direction is greater than an inclination angle of the other end of the outer contour shape along the first direction.
[0007] Optionally, the frame structure includes a top frame, a bottom frame and a connecting rod assembly, the top frame and the bottom frame are spaced apart, the upper end of the connecting rod assembly is connected to the top frame, the lower end of the connecting rod assembly is connected to the bottom frame, and the top frame, the bottom frame and the connecting rod assembly together form the transport channel.
[0008] Optionally, the top frame includes two longitudinal beams that are parallel and spaced apart along the second direction, the connecting rod assembly includes a first diagonal brace rod and a second diagonal brace rod, one end of the longitudinal beam and the bottom frame along the first direction are connected by the first diagonal brace rod, and the other end of the longitudinal beam and the bottom frame along the first direction are connected by the second diagonal brace rod, and the first diagonal brace rod and the second diagonal brace rod correspondingly arranged along the first direction are in an inverted figure eight shape.
[0009] Optionally, the bridge deck beam erecting crane further comprises a longitudinal movement platform, the two ends of the longitudinal movement platform along the second direction are respectively slidably connected to the two longitudinal beams, and the overhead travelling crane is slidably disposed on the longitudinal movement platform between the two longitudinal beams.
[0010] Optionally, the frame structure further includes a vertical support rod, and each of the longitudinal beams and the base frame is vertically connected with the vertical support rod.
[0011] Optionally, the frame structure further includes a reinforcing connecting rod, and the reinforcing connecting rod is connected between two of the vertical supporting rods correspondingly arranged along the second direction.
[0012] Optionally, the frame structure further includes a first auxiliary connecting rod, and two ends of the first auxiliary connecting rod are respectively connected to the vertical support rod and the reinforcing connecting rod;
[0013] And / or, the frame structure further includes a second auxiliary connecting rod, wherein the second auxiliary connecting rod is connected between the reinforcing connecting rod and the base frame.
[0014] Optionally, the bridge deck beam erecting crane further comprises an anchoring device, and the anchoring device is used to connect the base frame and the bridge.
[0015] Optionally, the bridge deck beam erecting crane further includes a running device, and the running device is arranged at the lower part of the base frame.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] The frame structure is provided with a transport channel with openings at both ends along a first direction, such as the length direction of the bridge. On a vertical plane perpendicular to a second direction, such as the width direction of the bridge, the outer contour of the projection of the frame structure is an inverted trapezoid, and the outer contour is inclined downward at both ends along the first direction. That is to say, the frame structure as a whole is in the form of a double cantilever structure, and the overhead crane is slidably arranged on the frame structure along the first direction for lifting components into or out of the transport channel. In this way, when the bridge deck beam erecting crane is working, the frame structure is first positioned on the bridge deck of the erected bridge, and the inclined part of one end of the frame structure is caused to extend beyond the shore or the bridge deck of the erected bridge along the length direction of the bridge, and then the frame structure is fixed to the bridge deck, and then the overhead crane is driven to move to the end of the frame structure above the bridge deck to lift the component, and finally the overhead crane lifts the component through the transport channel to the other end of the frame structure, and the position is adjusted for erection. Compared with existing full-revolving cranes with the same lifting capacity and lifting width, the bridge deck beam crane of the utility model does not need to deliberately increase the weight of components such as the frame structure. It can be designed to be lightweight while meeting safety requirements, thereby correspondingly reducing the number of components fixing the frame structure to the bridge deck, thereby saving construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a structural schematic diagram of a bridge deck beam erecting crane according to an embodiment of the utility model;
[0019] Figure 2 It is a structural schematic diagram of the frame structure of an embodiment of the utility model;
[0020] Figure 3 This is a diagram of the use state of the bridge deck beam erecting crane according to an embodiment of the utility model;
[0021] Figure 4 for Figure 3 Partial schematic diagram of the AA in the middle;
[0022] Figure 5 for Figure 4 A partial enlarged view of point I in the middle.
[0023] Description of reference numerals:
[0024] 1. Frame structure; 11. Top frame; 111. Longitudinal beam; 112. Cross beam; 12. Base frame; 121. Sliding seat; 13. Connecting rod assembly; 131. First diagonal support rod; 132. Second diagonal support rod; 133. Vertical support rod; 134. Strengthening connecting rod; 135. First auxiliary connecting rod; 136. Second auxiliary connecting rod; 14. Transport channel; 2. Overhead crane; 3. Longitudinal moving platform; 4. Anchoring device; 41. Anchor rod; 42. Double-ear plate frame; 5. Traveling device; 6. Bridge; 61. Anchoring lug; 62. Traveling track. DETAILED DESCRIPTION
[0025] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present utility model and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the utility model described herein can be implemented in an order other than those illustrated or described herein.
[0027] like Figure 1 As shown, an embodiment of the utility model provides a bridge deck beam erecting crane, including a frame structure 1 and an overhead travelling crane 2. The frame structure 1 is used to be fixed on the bridge deck of a bridge 6. The frame structure 1 is provided with a transport passage 14 with openings at both ends along a first direction. On a vertical plane perpendicular to a second direction, the outer contour of the projection of the frame structure 1 is in an inverted trapezoidal shape, and the outer contour is inclined downward at both ends along the first direction. The first direction and the second direction are perpendicular to each other. The overhead travelling crane 2 is slidably arranged on the frame structure 1 along the first direction, and is used to lift components into or out of the transport passage 14.
[0028] In this embodiment, the frame structure 1 is a truss structure. The frame structure 1 is provided with a transport channel 14 with openings at both ends along a first direction, such as the length direction of the bridge 6. On a vertical plane perpendicular to a second direction, such as the width direction of the bridge 6, the outer contour of the projection of the frame structure 1 is in an inverted trapezoidal shape, and the outer contour is inclined downward at both ends along the first direction. That is to say, the frame structure 1 is in the form of a double cantilever structure as a whole. The overhead crane 2 is slidably arranged on the frame structure 1 along the first direction, and is used to lift components into or out of the transport channel 14. In this way, when the bridge deck beam erecting crane is working, the frame structure 1 is first positioned on the bridge deck of the erected bridge 6, and the inclined part of one end of the frame structure 1 is caused to extend beyond the shore or the bridge deck of the erected bridge 6 along the length direction of the bridge 6, and then the frame structure 1 is fixed to the bridge deck, and then the overhead crane 2 is driven to move to the end of the frame structure 1 located above the bridge deck to lift the component, and finally the overhead crane 2 lifts the component through the transport channel 14 to the other end of the frame structure 1, and the position is adjusted and then erected.
[0029] Compared with the existing full-revolving cranes with the same lifting capacity and lifting width, the bridge deck beam crane of the utility model does not need to deliberately increase the weight of components such as the frame structure 1. It can be designed to be lightweight while meeting safety requirements, thereby reducing the number of components fixing the frame structure 1 to the bridge deck accordingly, thereby saving construction costs.
[0030] Optionally, an inclination angle of one end of the outer contour shape along the first direction is greater than an inclination angle of the other end of the outer contour shape along the first direction.
[0031] In this embodiment, Figure 1 As shown, the inclination angle α of the outer contour shape of the projection of the frame structure 1 at one end along the direction where the X-axis is located is 60 degrees, and the inclination angle of the outer contour shape of the projection of the frame structure 1 at the other end along the direction where the X-axis is located is 41 degrees, that is, the inclination angle of the outer contour shape at one end along the direction where the X-axis is located is greater than the inclination angle of the outer contour shape at the other end along the direction where the X-axis is located.
[0032] In this way, when a bridge deck beam erecting crane is used, the end of the frame structure 1 with a larger inclination angle can be extended beyond the shore or the bridge deck of the erected bridge 6, so as to have a larger beam erecting and lifting width.
[0033] It should be noted that the inclination angles of the projected outer contour of the frame structure 1 at both ends along the X-axis direction need to be tested during design to meet the full load requirements and avoid deformation or damage due to the load.
[0034] Optionally, the frame structure 1 includes a top frame 11, a bottom frame 12 and a connecting rod assembly 13, the top frame 11 and the bottom frame 12 are arranged at intervals, the upper end of the connecting rod assembly 13 is connected to the top frame 11, and the lower end of the connecting rod assembly 13 is connected to the bottom frame 12, and the top frame 11, the bottom frame 12 and the connecting rod assembly 13 together form a transportation channel.
[0035] In this embodiment, the top frame 11 and the bottom frame 12 are respectively a U-shaped frame structure, such as Figure 2 As shown, the two are spaced apart in the vertical direction, and the connecting rod assembly 13 is arranged between the top frame 11 and the bottom frame 12, wherein the upper end of the connecting rod assembly 13 is detachably connected to the top frame 11, and the lower end of the connecting rod assembly 13 is detachably connected to the bottom frame 12. After the frame structure 1 is installed, the top frame 11, the bottom frame 12 and the connecting rod assembly 13 are combined to form a transport channel 14 with openings at both ends in the direction of the X-axis.
[0036] In this way, when assembling the frame structure 1, first fix the base frame 12, and then install the connecting rod assembly 13 on the base frame 12. After the connecting rod assembly 13 is installed, lift the top frame 11 to the top of the connecting rod assembly 13, and finally connect the top frame 11 to the connecting rod assembly 13 to achieve the installation of the frame structure 1. Due to the modular assembly method, not only the transportation efficiency is higher, but also it is easy to disassemble and replace.
[0037] Furthermore, the top frame 11 and the bottom frame 12 may also be spliced together, that is, the entire frame structure 1 may be formed by assembling a plurality of rods.
[0038] Optionally, the top frame 11 includes two longitudinal beams 111 arranged in parallel and at intervals along the second direction, the connecting rod assembly 13 includes a first diagonal support rod 131 and a second diagonal support rod 132, the longitudinal beam 111 and the bottom frame 12 are connected at one end along the first direction through the first diagonal support rod 131, and the longitudinal beam 111 and the bottom frame 12 are connected at the other end along the first direction through the second diagonal support rod 132, and the first diagonal support rod 131 and the second diagonal support rod 132 correspondingly arranged along the first direction are in an inverted eight shape.
[0039] In this embodiment, the top frame 11 includes two longitudinal beams 111 arranged parallel and spaced apart along the Y-axis direction. Figure 1 , 2 As shown, the connecting rod assembly 13 includes a first diagonal support rod 131 and a second diagonal support rod 132, and one end of the longitudinal beam 111 and the base frame 12 along the direction of the X-axis is detachably connected through the first diagonal support rod 131, and the other end of the longitudinal beam 111 and the base frame 12 along the direction of the X-axis is connected through the second diagonal support rod 132, and the first diagonal support rod 131 and the second diagonal support rod 132 correspondingly arranged along the direction of the X-axis are in an inverted eight shape.
[0040] In this way, the first diagonal support rod 131 and the second diagonal support rod 132 correspondingly arranged along the direction of the X-axis are in an inverted eight-shape, which not only allows the frame structure 1 to form a double cantilever structure, but also when the two longitudinal beams 111 are subjected to a downward force, the two can stably transfer the force to the base frame 12 through the first diagonal support rod 131 and the second diagonal support rod 132.
[0041] In this embodiment, the connection method of the first diagonal brace rod 131 and the second diagonal brace rod 132 to the longitudinal beam 111 and the bottom frame 12 includes but is not limited to flange connection or sleeve connection. There is no limitation here, and it depends on actual needs.
[0042] In this embodiment, the top frame 11 further includes two cross beams 112 which are parallel and spaced apart along the X-axis direction. The two cross beams 112 and the two longitudinal beams 111 together form a U-shaped frame structure.
[0043] Optionally, the bridge deck beam erecting crane further comprises a longitudinal moving platform 3 , the two ends of the longitudinal moving platform 3 along the second direction are respectively slidably connected to the two longitudinal beams 111 , and the overhead travelling crane 2 is slidably disposed on the longitudinal moving platform 3 between the two longitudinal beams 111 .
[0044] In this embodiment, Figure 1 , 3As shown in Figures 4 and 5, the longitudinal moving platform 3 is supported on the top of the top frame 11, and its two ends along the Y-axis direction are respectively slidably connected with the two longitudinal beams 111. Specifically, the top walls of the two longitudinal beams 111 are provided with guide rails along the direction of the X-axis, and the bottoms of the two ends of the longitudinal moving platform 3 along the Y-axis direction are respectively provided with two driving structures, the driving structures include a reduction motor and wheels driven by the reduction motor, the circumferential side walls of the wheels are provided with annular grooves matching the guide rails, and the longitudinal moving platform 3 is slidably set on the two longitudinal beams 111 through the wheels and the guide rails; the overhead crane 2 includes a winch, a rope and a hook, the winch is slidably set on the longitudinal moving platform 3, and its driving mode is the same as that of the longitudinal moving platform 3 traveling on the two longitudinal beams 111, one end of the rope is wound around the winch, and the other end passes through the longitudinal moving platform 3 and is connected with the hook.
[0045] In this way, when it is necessary to lift a component, the overhead crane 2 moves to the end of the frame structure 1 above the bridge deck, the winch lowers the hook through the rope to lift the component on the bridge deck, and then the winch pulls the hook upward to lift the component to a position at the same height as the transportation channel 14. Finally, the overhead crane 2 lifts the component through the transportation channel 14 to the other end of the frame structure 1, and the winch lowers the hook through the rope to the installation position for erection.
[0046] Optionally, the frame structure 1 further includes a vertical support rod 133 , and a vertical support rod 133 is vertically connected between each longitudinal beam 111 and the base frame 12 .
[0047] In this embodiment, Figure 1 , 2 As shown, two vertical support rods 133 are respectively connected between each longitudinal beam 111 and the bottom frame 12, wherein the bottom end of one vertical support rod 133 is vertically connected to one end of the bottom frame 12 in the direction of the X-axis, and the bottom end of the other vertical support rod 133 is vertically connected to the other end of the bottom frame 12 in the direction of the X-axis. In this way, under the support of the vertical support rods 133, the probability of deformation of the top frame 11 can be effectively reduced.
[0048] Optionally, the frame structure 1 further includes a reinforcing connecting rod 134 , and the reinforcing connecting rod 134 is connected between two vertical supporting rods 133 correspondingly arranged along the second direction.
[0049] In this embodiment, Figure 3 , 4 As shown, a reinforcing connecting rod 134 is connected between the lower parts of the two vertical support rods 133 correspondingly arranged along the direction of the Y-axis. The connection method between the reinforcing connecting rod 134 and the vertical support rod 133 includes but is not limited to flange connection or socket connection, which is not limited here and depends on actual needs.
[0050] Optionally, the frame structure 1 further includes a first auxiliary connecting rod 135, both ends of which are respectively connected to the vertical support rod 133 and the reinforcing connecting rod 134; and / or, the frame structure 1 further includes a second auxiliary connecting rod 136, which is connected between the reinforcing connecting rod 134 and the base frame 12.
[0051] In this embodiment, Figure 4 As shown, the first auxiliary connecting rod 135 is arranged to intersect with the vertical support rod 133 and the reinforcing connecting rod 134, wherein the upper end of the first auxiliary connecting rod 135 is connected to the vertical support rod 133, and the lower end of the first auxiliary connecting rod 135 is connected to the reinforcing connecting rod 134. In this way, the strength between the vertical support rod 133 and the reinforcing connecting rod 134 can be enhanced.
[0052] Optionally, the bridge deck beam erecting crane further includes an anchoring device 4 , which is used to connect the base frame 12 and the bridge 6 .
[0053] In this embodiment, two running rails 62 are provided on the bridge deck, and anchoring lugs 61 are provided on both sides of each running rail 62; the anchoring device 4 is provided in a number corresponding to the number of anchoring lugs 61, and the anchoring device 4 includes an anchor rod 41 and a double-ear plate frame 42, the upper end of the anchor rod 41 passes through the base frame 12 and is locked by a nut, the lower end of the anchor rod 41 is connected to the double-ear plate frame 42, and the double-ear plate frame 42 is connected to the corresponding anchoring lug 61 by a pin shaft. In this way, the whole machine is fixed on the bridge deck.
[0054] Optionally, the bridge deck beam erecting crane further includes a running device 5 , which is disposed at the lower portion of the base frame 12 .
[0055] In this embodiment, Figure 4 , 5 As shown, two running rails 62 are provided on the bridge deck, a sliding seat 121 is provided at the bottom of the base frame 12, and the sliding seat 121 is provided with a groove structure matched with the running rail 62. The running device 5 includes a rail clamp and a hydraulic cylinder provided on the rail clamp, the rail clamp is clamped on the running rail 62, and the telescopic end of the hydraulic cylinder is connected to the sliding seat 121. In this way, the rail clamp is clamped on the running rail 62, and the hydraulic cylinder is extended and retracted to drive the whole machine to run. After the whole machine is fixed on the bridge deck, the rail clamp releases the running rail 62, and the hydraulic cylinder retracts, thereby driving the rail clamp to move to a suitable position.
[0056] The reader should understand that in the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples without contradiction.
[0057] Although the utility model is disclosed as above, the protection scope of the utility model is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the utility model, and these changes and modifications will fall within the protection scope of the utility model.
Claims
1. A bridge deck beam erecting crane, characterized in that: The invention comprises a frame structure (1) and an overhead travelling crane (2), wherein the frame structure (1) is used to be fixed on the deck of a bridge (6), the frame structure (1) is provided with a transport passage (14) with openings at both ends along a first direction, the outer contour of the projection of the frame structure (1) on a vertical plane perpendicular to a second direction is in the shape of an inverted trapezoid, and the outer contour is arranged to be inclined downward at both ends along the first direction, the first direction and the second direction are perpendicular to each other, and the overhead travelling crane (2) is slidably arranged on the frame structure (1) along the first direction, and is used to lift components into or out of the transport passage (14).
2. The bridge deck beam erecting crane according to claim 1, characterized in that: An inclination angle of one end of the outer contour shape along the first direction is greater than an inclination angle of the other end of the outer contour shape along the first direction.
3. The bridge deck beam erecting crane according to claim 1, characterized in that: The frame structure (1) comprises a top frame (11), a bottom frame (12) and a connecting rod assembly (13); the top frame (11) and the bottom frame (12) are arranged at an interval; the upper end of the connecting rod assembly (13) is connected to the top frame (11); the lower end of the connecting rod assembly (13) is connected to the bottom frame (12); the top frame (11), the bottom frame (12) and the connecting rod assembly (13) together form the transport channel (14).
4. The bridge deck beam erecting crane according to claim 3, characterized in that: The top frame (11) comprises two longitudinal beams (111) arranged in parallel and at intervals along a second direction, the connecting rod assembly (13) comprises a first diagonal support rod (131) and a second diagonal support rod (132), one end of the longitudinal beam (111) and the bottom frame (12) along the first direction are connected via the first diagonal support rod (131), and the other end of the longitudinal beam (111) and the bottom frame (12) along the first direction are connected via the second diagonal support rod (132), and the first diagonal support rod (131) and the second diagonal support rod (132) correspondingly arranged along the first direction are in an inverted figure eight shape.
5. The bridge deck beam erecting crane according to claim 4, characterized in that: It also comprises a longitudinal movement platform (3), the two ends of the longitudinal movement platform (3) along the second direction are respectively slidably connected to two longitudinal beams (111), and the overhead crane (2) is slidably arranged on the longitudinal movement platform (3) between the two longitudinal beams (111).
6. The bridge deck beam erecting crane according to claim 4, characterized in that: The frame structure (1) further comprises a vertical support rod (133), and each of the longitudinal beams (111) and the base frame (12) is respectively vertically connected with the vertical support rod (133).
7. The bridge deck beam erecting crane according to claim 6, characterized in that: The frame structure (1) further comprises a reinforcing connecting rod (134), wherein the reinforcing connecting rod (134) is connected between two vertical supporting rods (133) correspondingly arranged along the second direction.
8. The bridge deck beam erecting crane according to claim 7, characterized in that: The frame structure (1) further comprises a first auxiliary connecting rod (135), wherein two ends of the first auxiliary connecting rod (135) are respectively connected to the vertical support rod (133) and the reinforcing connecting rod (134); And / or, the frame structure (1) further comprises a second auxiliary connecting rod (136), wherein the second auxiliary connecting rod (136) is connected between the reinforcing connecting rod (134) and the base frame (12).
9. The bridge deck beam erecting crane according to claim 3, characterized in that: It also comprises an anchoring device (4), wherein the anchoring device (4) is used to connect the base frame (12) and the bridge (6).
10. The bridge deck beam erecting crane according to claim 3, characterized in that: It also includes a running device (5), and the running device (5) is arranged at the lower part of the base frame (12).