Jacking device of tower crane

By introducing top positioning mechanism, bottom positioning mechanism and hoisting auxiliary mechanism into the tower crane, power adjustment is performed using auxiliary cylinder seats and cylinder clamps, the problem of unbalanced force of the hoisting oil cylinder in large tonnage tower cranes is solved, and the problem of unbalanced force of the hoisting oil cylinder in large tonnage tower cranes is improved. Efficiency and safety of the lifting.

CN222063949UActive Publication Date: 2024-11-26浙江省建设工程机械集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420880118.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2024-11-26
Estimated Expiration
2034-04-26

AI Technical Summary

Technical Problem

In large tonnage tower cranes, the lifting cylinders of traditional lifting systems are subject to uneven stress, which poses safety hazards and cannot effectively support the work needs of height variation.

Method used

By introducing a top positioning mechanism, a bottom positioning mechanism and a hoisting auxiliary mechanism into the hoisting device of the tower crane, the auxiliary cylinder between the auxiliary cylinder seat and the cylinder clamp is used for control and adjustment, providing additional power assisted hoisting.

Benefits of technology

It improves the power assistance when tower crane is lifted, enhances the balance of stress, reduces safety hazards, and adapts to work needs at different heights.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222063949U_ABST
    Figure CN222063949U_ABST
Patent Text Reader

Abstract

The utility model discloses a jacking device of a tower crane, which comprises a top positioning mechanism positioned between an upper jacking cross beam and a jacking oil cylinder and connected with the upper jacking cross beam and the jacking oil cylinder through a pin shaft; the bottom surface positioning mechanism is positioned between the lower jacking cross beam and the jacking oil cylinder and is connected through a pin shaft; the jacking auxiliary mechanism is located on the outer side of the lower portion of the jacking oil cylinder, and the bottom of the jacking auxiliary mechanism is arranged on the upper end face of the middle of the stock transverse web member. The oil cylinder hoop is connected to the lower part of the jacking oil cylinder; the lower portion of the auxiliary oil cylinder is connected to the auxiliary oil cylinder base through a first pin shaft, the upper portion of the auxiliary oil cylinder is connected with the oil cylinder hoop through a second pin shaft, and the auxiliary oil cylinder connected between the auxiliary oil cylinder base and the jacking oil cylinder hoop is controlled and adjusted, so that extra power can be provided during jacking of the tower crane.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tower cranes, in particular to a jacking device of a tower crane. Background Art

[0002] The tower crane jacking system is a very important component on the tower crane, which is used to support the jacking of the entire tower crane so that the tower crane can be raised to adapt to work requirements at different heights.

[0003] The lifting structure usually includes components such as a lifting cylinder, a lifting frame, a movable support, and a fixed support. During the lifting process, the lifting cylinder lifts the tower crane to a certain height, and then connects the tower body and the frame together through the fixed support and the movable support, thereby increasing the height of the tower crane. During the lifting process, the piston rod of the hydraulic cylinder is connected to the lifting frame through the ear plate. When the piston rod is extended and retracted, it will drive the lifting frame to move up and down. In this way, the tower crane can be lifted and lowered.

[0004] The jacking cylinder of the traditional jacking system is connected to the upper and lower beams by a pin shaft respectively, and there is no auxiliary jacking mechanism to assist in jacking. This jacking method can be used normally when facing a small tower crane, but when jacking in a large-tonnage tower crane, the standard section has a large volume and weight, and the jacking cylinder is subjected to the force of one component as a whole, the local force is large, the force distribution is unbalanced, and there is a safety hazard. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a jacking device for a tower crane, which can provide additional power when the tower crane is jacking by controlling and adjusting the auxiliary cylinder connected between the auxiliary cylinder seat and the jacking cylinder clamp.

[0006] The utility model adopts the following technical solutions:

[0007] A jacking device for a tower crane comprises: a top positioning mechanism, located between an upper jacking crossbeam and a jacking cylinder, connected by a pin shaft; a bottom positioning mechanism, located between a lower jacking crossbeam and a jacking cylinder, connected by a pin shaft; a jacking auxiliary mechanism, located outside the lower part of the jacking cylinder, with its bottom arranged on the upper end surface of the middle part of the cross web rod of the sleeve frame, comprising: an auxiliary cylinder seat; a cylinder clamp, connected to the lower part of the jacking cylinder; an auxiliary cylinder, the lower part of which is connected to the auxiliary cylinder seat by a first pin shaft, and the upper part is connected to the cylinder clamp by a second pin shaft.

[0008] Preferably, the auxiliary oil cylinder seat comprises a square steel tube, a connecting ear plate is provided at the outer end of the square steel tube, and the inner end is fixed to the upper end ear plate of the middle part of the transverse web by two connecting pins passing through the square steel tube.

[0009] Preferably, the cylinder clamp is detachably connected to the lower part of the lifting cylinder by means of hexagonal bolts.

[0010] Preferably, the oil cylinder clamp is further provided with reinforcing ribs.

[0011] Preferably, the oil cylinder clamp is formed by connecting two clamp half frames.

[0012] Compared with the prior art, the utility model has the following advantages: the utility model provides a jacking device for a tower crane, including a top positioning mechanism, a bottom positioning mechanism and a jacking auxiliary mechanism, and by controlling and adjusting the auxiliary cylinder connected between the auxiliary cylinder seat and the jacking cylinder clamp, additional power can be provided when the tower crane is jacked. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a front view schematic diagram of the overall structure of the jacking device of the utility model connected with the tower crane;

[0014] Figure 2 This is a front view schematic diagram of the overall structure of the jacking device of the utility model;

[0015] Figure 3 It is a side view schematic diagram of the connection structure of the jacking device of the utility model;

[0016] Figure 4 It is a cross-sectional view of the top structure of the jacking device of the utility model;

[0017] Figure 5 It is a side view and a cross-sectional view of the auxiliary oil cylinder seat of the utility model device;

[0018] Figure 6 for Figure 5 sectional view of .

[0019] Figure 7 It is a structural schematic diagram of the oil cylinder clamp of the utility model.

[0020] In the figure, the lifting cylinder 1, the lower lifting beam 2, the auxiliary cylinder 3, the upper end face ear plate 4, the auxiliary cylinder seat 5, the cylinder clamp 6, the connecting ear plate 7, the connecting pin 8, the square steel pipe 9, the sleeve cross web rod 10, the first pin 11, the second pin 12, the hexagonal bolt 13, the clamp half frame 14, the reinforcing rib 15, and the upper lifting beam 16. DETAILED DESCRIPTION

[0021] In order to facilitate the understanding of the technical solution of the utility model, a detailed description is given below in conjunction with the accompanying drawings and specific embodiments.

[0022] like Figure 1-7 As shown, a jacking device for a tower crane comprises: a top positioning structure, a bottom positioning mechanism, and a jacking auxiliary mechanism;

[0023] The top positioning mechanism is located between the upper lifting beam 16 and the lifting cylinder 1, connected by a pin shaft and fixed by a cotter pin;

[0024] The bottom surface positioning mechanism is located between the lower lifting beam 2 and the lifting cylinder 1, connected by a pin shaft and fixed by a cotter pin;

[0025] The jacking auxiliary mechanism is located outside the lower part of the jacking cylinder 1, and the bottom is arranged on the upper end surface of the middle part of the sleeve frame transverse web rod 10;

[0026] Specifically, the lifting auxiliary mechanism includes:

[0027] The auxiliary oil cylinder seat 5 has a connecting ear plate 7 at the outer end of the square steel tube 9, and the inner end is connected to the ear plate 4 on the upper end surface of the middle part of the transverse web rod 35 through a connecting pin 8 passing through the square steel tube 9; in addition, both ends of the square steel tube 9 are welded and sealed by steel plates to enhance the force strength of the auxiliary oil cylinder seat 5.

[0028] The auxiliary cylinder 3 is connected to the auxiliary cylinder seat 5 at the lower part through the first pin shaft 11, and is connected to the cylinder clamp 6 at the upper part through the second pin shaft 12. The angle between the auxiliary cylinder 3 and the lifting cylinder 1 can be adjusted by manually changing the position of the cylinder clamp 6.

[0029] The cylinder clamp 6 is connected to the lower part of the lifting cylinder 1 by four identical hexagonal bolts 13, and a reinforcing rib 15 is provided at the bolt connection to improve the fixing ability of the clamp and prevent the clamp from falling off and loosening; the cylinder clamp 6 is connected to the lower part of the lifting cylinder 1 by two clamp half frames 14 through four identical hexagonal bolts 13; and a reinforcing rib 15 is provided inside the clamp half frame 14.

[0030] By adjusting the auxiliary oil cylinder 3 connected between the auxiliary oil cylinder seat 5 and the oil cylinder clamp 6, additional power can be applied to assist the jacking during jacking, thereby improving the jacking efficiency.

[0031] The above are only preferred embodiments of the present invention. The protection scope of the present invention shall be based on the scope defined by the claims. Several improvements and modifications made by those skilled in the art without departing from the spirit and scope of the present invention shall also be regarded as the protection scope of the present invention.

Claims

1. A lifting device for a tower crane, characterized in that: include: The top positioning mechanism is located between the upper lifting beam and the lifting cylinder and is connected by a pin shaft; The bottom surface positioning mechanism is located between the lower lifting beam and the lifting cylinder and is connected by a pin shaft; The lifting auxiliary mechanism is located outside the lower part of the lifting cylinder, and the bottom is set on the upper end surface of the middle part of the cross-web rod of the sleeve frame, including: Auxiliary cylinder seat; The cylinder clamp is connected to the lower part of the lifting cylinder; The auxiliary oil cylinder is connected to the auxiliary oil cylinder seat through a first pin at the lower part, and is connected to the oil cylinder clamp through a second pin at the upper part.

2. A lifting device for a tower crane according to claim 1, characterized in that: The auxiliary oil cylinder seat comprises a square steel pipe, a connecting ear plate is provided at one end of the square steel pipe close to the outside, and two connecting pins are passed through the square steel pipe and the upper end face ear plate of the middle part of the transverse web at the inner end to fix it.

3. The jacking device of a tower crane according to claim 1, characterized in that: The cylinder clamp is detachably connected to the lower part of the lifting cylinder by means of hexagonal bolts.

4. The jacking device of a tower crane according to claim 1, characterized in that: The oil cylinder clamp is also provided with reinforcing ribs.

5. The jacking device of a tower crane according to claim 1, characterized in that: The oil cylinder clamp is formed by connecting two clamp half frames.