Bridge UHPC encircling sleeve pouring formwork

By designing the bridge UHPC enclosure casting formwork and using the combination of fixing mechanism and articulated casting baffle, the problem of material degradation of concrete piers of the cross-sea bridge in harsh environments is solved, and the durability and safety of the bridge are improved.

CN222065220UInactive Publication Date: 2024-11-26SHENYANG JIANZHU UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420718648.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The concrete piers of the cross-sea bridge are prone to material degradation in harsh marine environments, resulting in durability problems and threatening bridge safety. It is difficult for the existing technology to effectively solve this problem.

Method used

A bridge UHPC enclosure casting formwork is designed, including a fixing mechanism consisting of a first clamping base plate and a second clamping base plate. The outer wall of the bridge pier is fixed by hinged fixing and rotating the locking plate, combining friction pads and hinged casting baffles, Suitable for different bridge structures.

Benefits of technology

The UHPC enclosure is efficiently poured on the outer wall of the bridge pier, which improves the durability and safety of the bridge and avoids the degradation of concrete materials in harsh environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065220U_ABST
    Figure CN222065220U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of UHPC encircling sleeves, and discloses a bridge UHPC encircling sleeve pouring formwork which comprises a fixing mechanism, the fixing mechanism is formed by combining a first clamping bottom plate and a second clamping bottom plate, the first clamping bottom plate and the second clamping bottom plate are fixed in a hinged mode, and fixing grooves are formed in the opposite sides of the first clamping bottom plate and the second clamping bottom plate; according to the bridge UHPC encircling sleeve pouring formwork, the fixing mechanisms are opened firstly, the first clamping bottom plate and the second clamping bottom plate are placed on the two sides of a bridge pier needing to be poured respectively, the first clamping bottom plate and the second clamping bottom plate are fixedly installed on the upper surface of the first clamping bottom plate and the upper surface of the second clamping bottom plate, and the two pouring baffles are fixed in a hinged mode. And then the first clamping bottom plate and the second clamping bottom plate are closed together, the bridge pier is fixed through the fixing groove, so that the fixing mechanism is fixed to the outer wall of the bridge pier, mixed UHPC is poured into a gap between the pouring baffle and the bridge pier, and pouring of the UHPC encircling sleeve can be completed after the UHPC is solidified and then the fixing mechanism is removed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of UHPC casings, in particular to a UHPC casing casting template for a bridge. Background Art

[0002] Ultra-high performance concrete, referred to as UHPC (Ultra-High Performance Concrete), is the most innovative cement-based engineering material in the past three decades, achieving a great leap in the performance of engineering materials. UHPC is the most durable engineering material. The mechanical properties of properly reinforced UHPC are close to those of steel structures. At the same time, UHPC has excellent wear resistance and explosion resistance. With the development of engineering construction, the construction of cross-sea bridges has also made great progress. Cross-sea bridges span straits and bays, and have brought great convenience to transportation through the connection of different regions. However, cross-sea bridges face severe durability problems, especially the piers of concrete structures. The material properties of concrete will degrade under the harsh marine environment. Severe durability problems may even threaten the safety of bridge projects. In order to prevent the degradation of concrete performance, UHPC sleeves are generally cast on the outer wall of the piers.

[0003] In the prior art, the pier casing is generally constructed and cast at the same time as the pier. For an existing bridge that has existed for a long time, a corresponding casting template is required to cast the casing on the outer wall of the pier. Utility Model Content

[0004] The purpose of the utility model is to provide a UHPC casing casting template for a bridge in order to solve the above problems.

[0005] The technical solution adopted by the utility model is as follows: a UHPC casing casting template for a bridge, comprising:

[0006] The fixing mechanism is composed of a first clamping base plate and a second clamping base plate, wherein the first clamping base plate and the second clamping base plate are fixed by hinges, and fixing grooves are provided on opposite sides of the first clamping base plate and the second clamping base plate;

[0007] The pouring baffle is fixedly mounted on the upper surfaces of the first clamping base plate and the second clamping base plate, and the two pouring baffles are fixed by hinges.

[0008] Through the above technical solution, when it is necessary to cast the UHPC jacket for the pier, the fixing mechanism is first opened, and the first clamping base plate and the second clamping base plate are respectively placed on both sides of the pier to be cast, and then the first clamping base plate and the second clamping base plate are closed together, and the pier is fixed through the fixing groove, so that the fixing mechanism is fixed to the outer wall of the pier, and the mixed UHPC is poured into the gap between the casting baffle and the pier, and the UHPC is waited for to solidify before the fixing mechanism is removed to complete the casting of the UHPC jacket.

[0009] In a preferred embodiment, a locking plate is rotatably connected to an upper surface of one side of the first clamping base plate, a locking hole is opened on one side of the locking plate, and a boss is fixedly installed on the upper surface of the casting baffle.

[0010] Through the above technical solution, when the first clamping base plate and the second clamping base plate are closed, the locking hole on one side of the locking plate is clamped on the outer wall of the boss by rotating the locking plate, thereby fixing the first clamping base plate and the second clamping base plate.

[0011] In a preferred embodiment, the two fixing grooves are combined into a circular structure, and the radius of the circle is the same as the radius of the bridge pier.

[0012] In a preferred embodiment, the radius of the circle formed by the two casting baffles is greater than the radius of the circle formed by the two fixing grooves.

[0013] In a preferred embodiment, a friction pad is fixedly mounted on the outer wall of the fixing groove.

[0014] Through the above technical solution, the friction between the fixing mechanism and the bridge pier is increased by the friction pad, thereby preventing the fixing mechanism from moving during the pouring process.

[0015] In a preferred embodiment, the casting baffle is one of semicircular and rectangular.

[0016] Through the above technical solution, the casting formwork is applicable to different bridge structures.

[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are as follows: the utility model proposes a UHPC casing casting template for a bridge.

[0018] When it is necessary to cast the UHPC casing for the pier, first open the fixing mechanism, place the first clamping base plate and the second clamping base plate on both sides of the pier to be cast respectively, then close the first clamping base plate and the second clamping base plate together, fix the pier through the fixing groove, and thus fix the fixing mechanism to the outer wall of the pier, pour the mixed UHPC into the gap between the casting baffle and the pier, wait for the UHPC to solidify, and then remove the fixing mechanism to complete the casting of the UHPC casing. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the structure of the utility model;

[0020] Figure 2 It is a structural schematic diagram of the second clamping bottom plate and the pouring baffle in the utility model;

[0021] Figure 3 This is a state diagram of the utility model when it is fixed to the bridge.

[0022] Markings in the figure: 1-fixing mechanism; 11-first clamping base plate; 12-second clamping base plate; 13-fixing groove; 14-locking plate; 15-boss; 16-locking hole; 17-friction pad; 2-casting baffle. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model will be clearly and completely described below in combination with the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] The following will be combined Figure 1-3 A UHPC casing casting template for a bridge according to an embodiment of the utility model is described in detail.

[0025] Example:

[0026] A UHPC casing casting template for a bridge, comprising:

[0027] The fixing mechanism 1 is composed of a first clamping bottom plate 11 and a second clamping bottom plate 12. The first clamping bottom plate 11 and the second clamping bottom plate 12 are fixed by hinges. A locking plate 14 is rotatably connected to the upper surface of one side of the first clamping bottom plate 11. A locking hole 16 is provided on one side of the locking plate 14. A boss 15 is fixedly installed on the upper surface of the casting baffle 2. When the first clamping bottom plate 11 and the second clamping bottom plate 12 are closed, the locking hole 16 on one side of the locking plate 14 is clamped on the outer wall of the boss 15 by rotating the locking plate 14, thereby fixing the first clamping bottom plate 11 and the second clamping bottom plate 12;

[0028] The first clamping bottom plate 11 and the second clamping bottom plate 12 are provided with fixing grooves 13 on opposite sides. The two fixing grooves 13 are combined into a circular structure, and the circular radius is the same as the radius of the bridge pier. The outer wall of the fixing groove 13 is fixedly installed with a friction pad 17. The friction pad 17 is used to increase the friction between the fixing mechanism 1 and the bridge pier to prevent the fixing mechanism 1 from moving during the pouring process. The fixing mechanism 1 is first opened, and the first clamping bottom plate 11 and the second clamping bottom plate 12 are respectively placed on both sides of the bridge pier to be poured, and then the first clamping bottom plate 11 and the second clamping bottom plate 12 are closed together, and the bridge pier is fixed through the fixing groove 13, so that the fixing mechanism 1 is fixed to the outer wall of the bridge pier.

[0029] The casting baffle 2 is fixedly mounted on the upper surface of the first clamping base plate 11 and the second clamping base plate 12. The two casting baffles 2 are fixed by hinges. The radius of the circle formed by the two casting baffles 2 is greater than the radius of the circle formed by the two fixing grooves 13. The casting baffle 2 is one of a semicircular shape and a rectangular shape, so that the casting template is suitable for different bridge structures. The mixed UHPC is poured into the gap between the casting baffle 2 and the bridge pier, and the UHPC is waited to solidify before the fixing mechanism 1 is removed to complete the casting of the UHPC casing.

[0030] Working principle:

[0031] When it is necessary to cast the UHPC casing for the pier, the fixing mechanism 1 is first opened, and the first clamping base plate 11 and the second clamping base plate 12 are respectively placed on both sides of the pier to be cast, and then the first clamping base plate 11 and the second clamping base plate 12 are closed together, and the pier is fixed through the fixing groove 13, so that the fixing mechanism 1 is fixed to the outer wall of the pier, and the mixed UHPC is poured into the gap between the casting baffle 2 and the pier, and the UHPC is waited for to solidify before the fixing mechanism 1 is removed to complete the casting of the UHPC casing.

[0032] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A bridge UHPC casing casting formwork, Features: include: A fixing mechanism (1) is composed of a first clamping base plate (11) and a second clamping base plate (12), wherein the first clamping base plate (11) and the second clamping base plate (12) are fixed by hinge connection, and fixing grooves (13) are provided on opposite sides of the first clamping base plate (11) and the second clamping base plate (12); A pouring baffle (2) is fixedly mounted on the upper surfaces of the first clamping base plate (11) and the second clamping base plate (12), and the two pouring baffles (2) are fixed by hinge connection.

2. A UHPC casing casting formwork for a bridge as claimed in claim 1, Features: A locking plate (14) is rotatably connected to an upper surface of one side of the first clamping bottom plate (11), a locking hole (16) is provided on one side of the locking plate (14), and a boss (15) is fixedly mounted on an upper surface of the pouring baffle (2).

3. A UHPC casing casting formwork for a bridge as claimed in claim 1, Features: The two fixing grooves (13) are combined into a circular structure, and the radius of the circle is the same as the radius of the bridge pier.

4. A UHPC casing casting formwork for a bridge as claimed in claim 1, Features: The radius of the circle formed by the two casting baffles (2) is greater than the radius of the circle formed by the two fixing grooves (13).

5. A UHPC casing casting formwork for a bridge as claimed in claim 1, Features: A friction pad (17) is fixedly mounted on the outer wall of the fixing groove (13).

6. A UHPC casing casting formwork for a bridge as claimed in claim 1, Features: The pouring baffle (2) is in the shape of a semicircle or a rectangle.