Uninterrupted discharge structure with high inlet and low inlet

By designing an uninterrupted discharge structure with high and low imports in water conservancy and hydropower projects, using the combination of drain pipes and open-load pipelines in the diversion tunnel, the failure of the down discharge structure in the existing technology to seamlessly connect and low water level is solved. The problem of drainage achieves uninterrupted flow discharge during construction and operation, simplifies maintenance, and improves the reliability and environmental protection of the system.

CN222065382UActive Publication Date: 2024-11-26POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420752319.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2024-11-26
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

The drainage structures in existing water conservancy and hydropower projects cannot be seamlessly connected during construction, and the uninterrupted drainage flow cannot be guaranteed when operating at low water levels, which affects ecological restoration and production and life, and is complex in maintenance, making it difficult to meet environmental protection and review requirements.

Method used

Design an uninterrupted discharge structure with high and low imports. By pre-built the discharge pipe in the diversion hole, high and low water inlets are set, the outlet of the discharge pipe extends to the back of the concrete plug, and the installation of the clear filling is installed. Pipelines, control valves and flowmeters ensure that the flow rate is self-flowing and leaking from the reservoir water level and simplifies maintenance.

Benefits of technology

It achieves seamless connection and uninterrupted drainage during construction and low water level operation, saves costs, relies on gravity self-flow to save energy and environmental protection, and improves the reliability and maintenance convenience of the discharge structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065382U_ABST
    Figure CN222065382U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of water conservancy and hydropower engineering, in particular to an uninterrupted discharge structure with a high inlet and a low inlet. According to the technical scheme, the uninterrupted discharge structure with the high inlet and the low inlet comprises a discharge pipe pre-buried in a concrete lining layer of a diversion tunnel, the inlet of the discharge pipe extends to the front end of a gate of the diversion tunnel and is provided with a high-position water inlet and a low-position water inlet, the high-position water inlet is arranged above the silt elevation of a reservoir, and the low-position water inlet is arranged below the silt elevation of the reservoir. The low-position water inlet is formed in the upper side of an inlet bottom plate of the diversion tunnel, and an outlet of the discharge pipe extends to the rear side of a concrete plug of the diversion tunnel. The drainage pipe is arranged through the diversion tunnel, a channel does not need to be excavated independently, permanent and temporary combination is achieved, comprehensive utilization is achieved, and cost is saved. The inlet elevation of the diversion tunnel is lower than the lowest operation water level of the reservoir, so that the flow discharge is not influenced by the reservoir water level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy and hydropower engineering, in particular to an uninterrupted discharge structure with high and low inlets. Background Art

[0002] The water conservancy and hydropower industries need to build dams to form reservoirs. Dams intercept natural runoff for power generation or irrigation. In order to meet environmental protection requirements, uninterrupted discharge of flow is required around the clock to meet environmental protection, water conservation, and downstream production and life needs. Previous discharge structures often cause riverbed interruptions, and cannot guarantee seamless discharge during construction, nor can they guarantee uninterrupted discharge during low water levels during operation. Reliable discharge of flow is not only related to the ecological restoration and conservation of downstream rivers, as well as the normal production and life of the people, but also to whether the water conservancy and hydropower projects themselves can pass the review and acceptance smoothly. For this reason, it is necessary to design an uninterrupted discharge structure to solve practical engineering problems. Utility Model Content

[0003] The utility model aims to overcome the deficiencies of the prior art and provide an uninterrupted discharge structure with high and low inlets, which is safe and reliable, simple in structure, completely self-flowing and easy to maintain.

[0004] The technical solution adopted by the utility model is as follows:

[0005] An uninterrupted discharge structure with high and low inlets comprises a discharge pipe pre-buried in the concrete lining layer of a diversion tunnel, the inlet of the discharge pipe extends to the front end of the gate of the diversion tunnel, and is provided with a high-level water inlet and a low-level water inlet, the high-level water inlet is arranged above the silt elevation of the reservoir, the low-level water inlet is arranged on the upper side of the inlet bottom plate of the diversion tunnel, and the outlet of the discharge pipe extends to the rear side of the concrete plug of the diversion tunnel.

[0006] A further technical solution of the utility model is that the outlet of the discharge pipe is an exposed pipeline behind the concrete plug of the diversion tunnel, fixed by a concrete anchor, and a control valve is installed on the exposed pipeline.

[0007] A further technical solution of the utility model is that the exposed pipeline is also equipped with a flow meter.

[0008] A further technical solution of the utility model is that both the high-position water inlet and the low-position water inlet are provided with filtering components.

[0009] A further technical solution of the utility model is: the high-position water inlet is an elbow structure.

[0010] The utility model has the following beneficial effects:

[0011] 1. Use the diversion tunnel to arrange the discharge pipe, without excavating a separate channel, combining permanent and temporary, comprehensive utilization, and saving costs. The inlet elevation of the diversion tunnel is lower than the lowest operating water level of the reservoir, which can ensure that the flow discharge is not affected by the reservoir water level.

[0012] 2. The high and low inlet of the discharge pipe are set up. The low inlet can meet the seamless connection between the discharge of ecological flow and the closure of the gate to intercept the flow, avoiding the need to take measures to pump and discharge ecological flow during the construction period. The high inlet is located above the reservoir silt elevation to ensure the uninterrupted discharge of flow during the reservoir operation period.

[0013] 3. By utilizing the slope of the discharge pipe and the head difference between the inlet and outlet, the flow is discharged completely by gravity, without the need for external power, which is energy-saving, environmentally friendly and highly reliable.

[0014] 4. The control valve and flow meter of the discharge pipe are installed behind the concrete plug of the diversion tunnel, which is not affected by the reservoir water and is easy to operate and maintain. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic cross-sectional structure diagram of an embodiment of the utility model.

[0016] Figure numerals: reservoir bank mountain 1, high-level water inlet 2, grate 3, gate 4, low-level water inlet 5, discharge pipe 6, diversion tunnel 7, concrete lining 8, concrete plug 9, concrete anchor pier 10, control valve 11, flow meter 12, exposed pipeline 13. DETAILED DESCRIPTION

[0017] In order to enable ordinary technicians in the field to more clearly understand the purpose, technical solutions and advantages of the utility model, the utility model is further explained below in conjunction with the accompanying drawings and embodiments, but the utility model is not limited to the following embodiments.

[0018] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0019] Reference Figure 1 The present embodiment provides an uninterrupted discharge structure with high and low inlets, comprising a diversion tunnel 7, a gate 4, a concrete lining 8, a concrete plug 9, a discharge pipe 6, a grate 3, a concrete anchor 10, a control valve 11, and a flow meter 12.

[0020] The diversion tunnel 7 is arranged in the reservoir bank mountain 1 and is built to meet the diversion needs during the reservoir construction. The inlet of the diversion tunnel 7 is located in the reservoir, and the inlet elevation is lower than the lowest operating water level of the reservoir.

[0021] The discharge pipe 6 is embedded in the concrete lining 8 of the diversion tunnel 7. The inlet of the discharge pipe 6 is located before the gate 4 of the diversion tunnel 7, and the outlet is located after the concrete plug 9 of the diversion tunnel 7, which can ensure that the flow discharge is not affected by the closing of the gate 4 of the diversion tunnel 7 and the blocking of the concrete plug 9. The discharge pipe 6 is embedded in the concrete lining 8, which does not affect or occupy the diversion section of the diversion tunnel 7 during the construction period, and also avoids the possibility of damage to the pipeline. The discharge pipe 6 as a whole gradually decreases in height downstream along the bottom plate of the diversion tunnel 7, and the diameter of the discharge pipe 6 is determined according to the size of the downstream flow.

[0022] The inlet of the discharge pipe 6 adopts a high and low inlet arrangement, and the low-level water inlet 5 is slightly higher than the inlet bottom plate of the diversion tunnel 7, ensuring that when the gate 4 of the diversion tunnel 7 is closed, the flow can be discharged through the discharge pipe 6. The high-level water inlet 2 is higher than the hundred-year silt elevation of the reservoir, ensuring the uninterrupted discharge of ecological flow during the operation period of the reservoir. The high-level water inlet 2 and the low-level water inlet 5 are both provided with filtering components, such as a grate 3, to prevent water debris from entering the pipeline and causing blockage. At the same time, the high-level water inlet 2 is provided with a downward elbow structure to further enhance the anti-blockage effect. The water of the reservoir enters the discharge pipe 6 from the high and low-level water inlets 5 and is discharged downstream of the concrete plug 9.

[0023] After the concrete plug 9 is constructed, the outlet section of the discharge pipe 6 is connected to an open pipeline 13, which is fixed with a concrete anchor 10, and a control valve 11 and a flow meter 12 are installed on the open pipeline 13. The control valve 11 can adjust the size of the downstream flow, and the flow meter 12 monitors and ensures that the size of the downstream flow meets the requirements of environmental protection and downstream production and life. Installing the valve and flow meter 12 after the construction of the concrete plug 9 will not affect the flow during the construction period, and can also ensure that the dry land construction is not affected by the reservoir water level.

[0024] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An uninterrupted discharge structure with high and low inlets, characterized in that: The invention comprises a discharge pipe (6) pre-buried in a concrete lining (8) layer of a diversion tunnel (7), the inlet of the discharge pipe (6) extending to the front end of a gate (4) of the diversion tunnel (7), and being provided with a high-position water inlet (2) and a low-position water inlet (5), the high-position water inlet (2) being arranged above the silt elevation of the reservoir, the low-position water inlet (5) being arranged on the upper side of the inlet bottom plate of the diversion tunnel (7), and the outlet of the discharge pipe (6) extending to the rear side of a concrete plug (9) of the diversion tunnel (7).

2. The uninterrupted discharge structure with high and low inlets according to claim 1, characterized in that: The outlet of the discharge pipe (6) is an exposed pipeline (13) behind the concrete plug (9) of the diversion tunnel (7), fixed by a concrete anchor (10), and a control valve (11) is installed on the exposed pipeline (13).

3. The uninterrupted discharge structure with high and low inlets according to claim 2, characterized in that: The exposed pipeline (13) is also equipped with a flow meter (12).

4. The uninterrupted discharge structure with high and low inlets according to claim 1, characterized in that: The high-position water inlet (2) and the low-position water inlet (5) are both provided with filtering components.

5. An uninterrupted discharge structure with high and low inlets according to any one of claims 1 to 4, characterized in that: The high-position water inlet (2) is an elbow structure.