Full-hydraulic three-arm drill jumbo

Through the design of a full hydraulic three-arm rock drilling trolley, the traditional drilling and blasting method has solved the problems of many manual configurations, high energy consumption and low construction efficiency in tunnel excavation, and achieved a significant reduction in the number and time of workers and reduced safety Risk and labor intensity, and improve construction efficiency and project quality.

CN222066743UActive Publication Date: 2024-11-26CHINA RAILWAY 15TH BUREAU GROUP CORPORATION LIMITED +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420218593.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-11-26
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

Traditional drilling and blasting methods require a lot of manual configuration in tunnel excavation, resulting in uneconomical construction energy consumption and high labor intensity, and it is difficult to achieve full-section coverage and efficient drilling operations of multiple hole types.

Method used

A fully hydraulic three-arm rock drilling trolley was designed. By setting three articulated drilling arms and working platform arms at the front end of the trolley, and equipped with a propulsion mechanism, a hydraulic pushing mechanism and a wire rope main transmission device, multiple drilling arms are achieved. Dimensional direction adjustment and axial thrust reduce the amount of labor and construction time.

Benefits of technology

The number of workers has been reduced from 18 to 3, and the operating time has been reduced from 4.5 hours to 3 hours, reducing safety risks and labor intensity, improving construction efficiency and project quality, and effectively covering all sections and drilling various types. hole type.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066743U_ABST
    Figure CN222066743U_ABST
Patent Text Reader

Abstract

The utility model discloses a full-hydraulic three-arm drill jumbo which comprises a jumbo body, three drill arms hinged to the front end of the jumbo body and a working platform arm. A pushing mechanism is hinged to the front end of the drill arm and comprises a rotating platform, a main beam, a hydraulic pushing mechanism, a sliding rail, a fixing base, a rock drill, a rear moving tray, a steel wire rope and a steel wire rope main transmission device. The hydraulic pushing mechanism is fixed on the rotating platform, and the front end of a pushing rod drives the main beam to move back and forth; the sliding rail is fixed on the main beam, the fixing seat is slidably assembled on the sliding rail, the rock drill and the rear moving tray are fixed on the fixing seat, the steel wire rope is wound on the rear moving tray, two ends of the steel wire rope extend to the front end along the sliding rail, and two ends of the steel wire rope are connected with the steel wire rope main transmission device and are driven by the steel wire rope main transmission device. The three-arm drilling machine has the advantages that through the arrangement of the three drilling arms and multi-dimensional direction adjustment, full-section coverage can be achieved, and construction efficiency is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to a full hydraulic three-arm rock drilling trolley. Background Art

[0002] The most widely used drilling and blasting method for tunnel excavation in rocky rock formations is the traditional drilling and blasting method, which uses manual pneumatic drills to drill holes. The total input power of a rock drilling rig is 190kw, while conventional manual handheld pneumatic drills require four 110kw air compressors under the same construction conditions. The rock drilling rig only requires two managers and seven drillers (who also load explosives), which greatly reduces the 25 personnel required for pneumatic drill excavation. Obviously, the rock drilling rig is more economical in energy consumption.

[0003] The rock drilling rig is a kind of rock drilling equipment used in tunnel and underground engineering by drilling and blasting method. It can move and support multiple rock drills to perform drilling operations at the same time. It is mainly composed of rock drill, drill arm (support, positioning and propulsion mechanism of rock drill), steel structure frame, running mechanism and other necessary auxiliary equipment, and equipment added according to engineering needs. When the drilling and blasting method is used to excavate tunnels, favorable conditions for the use of rock drilling rigs are provided. The combination of rock drilling rigs and ballast loading equipment can speed up construction, improve labor productivity, and improve working conditions. Summary of the invention

[0004] The purpose of the utility model is to provide a fully hydraulic three-arm rock drilling trolley based on the deficiencies of the above-mentioned prior art. The fully hydraulic three-arm rock drilling trolley sets three drill arms at the front end of the trolley and drills different positions of the tunnel rock surface through the rock drill on the propulsion mechanism. The pitch adjustment hydraulic cylinder set can realize the pitch angle adjustment of the drill arm, the hydraulic jacking mechanism set can realize the front and rear telescopic movement of the main beam, and the wire rope and wire rope main transmission device that drive the rock drill to move can give the rock drill a certain axial thrust when drilling.

[0005] The purpose of this utility model is achieved by the following technical solutions:

[0006] A fully hydraulic three-arm rock drilling trolley, characterized in that the three-arm rock drilling trolley comprises a trolley, three drill arms hinged at the front end of the trolley and a working platform arm hinged at the front end of the trolley, the front end of the drill arm is hinged with a propulsion mechanism, the propulsion mechanism comprises a rotating platform, a main beam, a hydraulic jacking mechanism, a slide rail, a fixed seat, a rock drill, a rear movable tray, a wire rope and a wire rope main transmission device, the rotating platform is hinged to the front end of the drill arm, the main beam can be slidably assembled on the rotating platform, the hydraulic jacking mechanism is fixed on the rotating platform, the front end of the jacking rod of the hydraulic jacking mechanism is fixed to the main beam to drive the main beam to move forward and backward; the slide rail is fixed on the main beam, the fixed seat is slidably assembled on the slide rail, the rock drill and the rear movable tray are fixed on the fixed seat, the wire rope is wound around the rear movable tray and both ends extend to the front end along the slide rail, and both ends of the wire rope are connected to the wire rope main transmission device and driven by the wire rope main transmission device.

[0007] The drill arms are respectively a left drill arm, a middle drill arm and a right drill arm, and the three are hinged to the front end of the trolley at intervals; a pitch adjustment hydraulic cylinder is arranged between the drill arms and the trolley.

[0008] A middle drill support is arranged at the middle position of the slide rail, a front drill clamp is arranged at the front end of the slide rail, a drill rod is mounted on the rock drill, and the drill rod passes through the middle drill support and the front drill clamp in sequence.

[0009] The rotating shaft of the wire rope main transmission device drives a drum to rotate forward and reversely, and the two ends of the wire rope are wound and fixed on the drum so that the wire rope forms a closed rope loop.

[0010] A pitch adjustment hydraulic cylinder is arranged between the working platform arm and the front end surface of the trolley, and a hanging basket working platform is arranged at the front end of the working platform arm.

[0011] The advantages of the utility model are:

[0012] (1) Compared with traditional technology, the use of a fully hydraulic three-arm drilling rig can reduce the number of excavation workers from 18 to 3, and the operation time from 4.5 hours to 3 hours. At the same time, it reduces construction errors, thereby effectively reducing the safety risks of in-tunnel operations and the labor intensity of workers, improving construction production efficiency, and ensuring project quality;

[0013] (2) The three-drill arm setting and multi-dimensional direction adjustment can achieve full cross-section coverage;

[0014] (3) It can realize the drilling of tunnel blasting holes, pipe shed holes, anchor holes and grouting holes. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a structural schematic diagram of a fully hydraulic three-arm rock drilling trolley in the utility model;

[0016] Figure 2 A three-dimensional view of the propulsion mechanism in the utility model

[0017] Figure 3 It is a schematic diagram of a wire rope driven rock drill in the propulsion mechanism of the utility model. DETAILED DESCRIPTION

[0018] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:

[0019] like Figure 1-3 The marks in the figure are: trolley 1, left drill arm 2, middle drill arm 3, right drill arm 4, work platform arm 5, propulsion mechanism 6, main beam 61, slide rail 62, fixed seat 63, rear movable tray 64, rock drill 65, wire rope 66, travel limit switch 67, middle drill support 68, front end drill clamp 69, hanging basket working platform 7, drill rod 8.

[0020] Example: Figure 1 , 2 As shown in Figures 3 and 4, the present embodiment specifically relates to a fully hydraulic three-arm rock drilling trolley, which includes a trolley 1, three drill arms hinged to the front end of the trolley 1, and a working platform arm 5 hinged to the front end of the trolley 1, wherein the three drill arms are a left drill arm 2, a middle drill arm 3, and a right drill arm 4, respectively, and a propulsion mechanism 6 is installed on each drill arm, which serves as an actuator for the drilling operation.

[0021] like Figure 1 , 2 As shown in FIG. 3 , each drill arm and the trolley 1 are articulated and the pitch angle is adjusted through a pitch adjustment hydraulic cylinder. The propulsion mechanism 6 is articulated at the front end of the drill arm, and the propulsion mechanism 6 includes a rotating platform, a hydraulic jacking mechanism, a main beam 61, a slide rail 62, a fixed seat 63, a rear movable tray 64, a rock drill 65, a wire rope 66, a travel limit switch 67, an intermediate fiber support 68, and a front fiber clamp 69.

[0022] like Figure 1 , 2As described in , 3, the rotating platform is hinged to the front end of the drill arm through a pitch adjustment mechanism. The pitch angle of the rotating platform can be adjusted accordingly by driving the pitch adjustment mechanism. The upper surface of the rotating platform has a guide rail on which the main beam 61 can be slidably assembled. The main beam 61 serves as the main body of the propulsion mechanism 6 and is slidably assembled on the guide rail on the upper surface of the rotating platform. A hydraulic jacking mechanism is fixedly arranged on the rotating platform. The front end of the jacking rod of the hydraulic jacking mechanism is fixed on the main beam 61. The front and rear extension of the jacking rod is used to drive the main beam 61 to move forward and backward.

[0023] like Figure 1 , 2 3, the slide rail 62 is arranged along the longitudinal direction of the main beam 61. Based on the travel requirement of the rock drill 65, the specific length of the slide rail 62 is selected. In this embodiment, the slide rail 62 is half the length of the main beam 61. A travel limit switch 67 is provided near the end of the slide rail 62 to limit the sliding range of the rock drill 65. The fixed seat 63 is slidably mounted on the slide rail 62, and the rear movable tray 64 and the rock drill 65 are also fixedly arranged on the fixed seat 63 and can move forward and backward on the slide rail 62 with it. The rear movable tray 64 has a circular cylindrical structure, and the wire rope 66 is wound around it for multiple turns, and then both ends extend longitudinally along the slide rail 62. The two ends of the longitudinally extended wire rope 66 are connected to the wire rope main transmission device (packaged under the main beam 61, not shown in the figure). The wire rope main transmission device adopts a hydraulic motor as the power, and a drum is arranged on its transmission shaft. Both ends of the wire rope 66 are wound around the drum to form a closed rope ring, so that the entire closed wire rope system generates a tension thrust. The hydraulic motor of the wire rope main transmission device drives the drum to rotate forward and reverse, so that friction is generated between the wire rope 66 wound on the drum and the surface of the drum, which is then converted into a tensioning transportation force when the wire rope 66 is transported. This transportation force causes the wire rope 66 to pull the rock drill 65 to move forward and backward along the slide rail 62.

[0024] like Figure 2 , 3 As shown, a drill rod 8 is provided at the front end of the rock drill 65, an intermediate drill support 68 is provided at the middle position of the main beam 61, and a front drill clamp 69 is provided at the front end position of the main beam 62. The drill rod 8 passes through the intermediate drill support 68 and the front drill clamp 69 in sequence. When the rock drill 65 moves forward and backward along the slide rail, the intermediate drill support 68 and the front drill clamp 69 can limit and guide the drill rod 8, and when the drill rod 8 no longer moves forward and backward, it can be clamped and fixed by the front drill clamp 69. When preparing to drill a hole, the rock drill 65 can quickly move toward the working surface (or retreat), and a certain axial thrust is given to the rock drill 65 through the wire rope 66 during drilling. The axial thrust and propulsion speed generated by the propeller should be adjusted arbitrarily so that the rock drill 65 works in the optimal axial thrust state.

[0025] like Figure 1As shown, the work platform arm 5 is hinged with the trolley 1 through a pitch adjustment hydraulic cylinder and the pitch angle is adjusted. A hanging basket work platform 7 is arranged at the front end of the work platform arm 5, and the hanging basket work platform 7 is used for workers to charge charges into the borehole.

[0026] The advantages of the utility model are:

[0027] (1) Compared with traditional technology, the use of a fully hydraulic three-arm drilling rig can reduce the number of excavation workers from 18 to 3, and the operation time from 4.5 hours to 3 hours. At the same time, it reduces construction errors, thereby effectively reducing the safety risks of in-tunnel operations and the labor intensity of workers, improving construction production efficiency, and ensuring project quality;

[0028] (2) The three-drill arm setting and multi-dimensional direction adjustment can achieve full cross-section coverage;

[0029] (3) It can realize the drilling of tunnel blasting holes, pipe shed holes, anchor holes and grouting holes.

Claims

1. A fully hydraulic three-arm drilling rig, characterized in that The three-arm rock drilling trolley comprises a trolley, three drilling arms hinged at the front end of the trolley and a working platform arm hinged at the front end of the trolley, the front end of the drilling arm is hinged with a propulsion mechanism, the propulsion mechanism comprises a rotating platform, a main beam, a hydraulic jacking mechanism, a slide rail, a fixed seat, a rock drill, a rear movable tray, a wire rope and a wire rope main transmission device, the rotating platform is hinged to the front end of the drilling arm, the main beam can be slidably mounted on the rotating platform, the hydraulic jacking mechanism is fixed on the rotating platform, the front end of the jacking rod of the hydraulic jacking mechanism is fixed to the main beam to drive the main beam to move forward and backward; the slide rail is fixed on the main beam, the fixed seat is slidably mounted on the slide rail, the rock drill and the rear movable tray are fixed on the fixed seat, the wire rope is wound around the rear movable tray and both ends extend to the front end along the slide rail, and both ends of the wire rope are connected to the wire rope main transmission device and driven by the wire rope main transmission device.

2. A fully hydraulic three-arm drilling rig according to claim 1, characterized in that The drill arms are respectively a left drill arm, a middle drill arm and a right drill arm, and the three are hinged to the front end of the trolley at intervals; a pitch adjustment hydraulic cylinder is arranged between the drill arms and the trolley.

3. The fully hydraulic three-arm drilling rig according to claim 1, characterized in that A middle drill support is arranged at the middle position of the slide rail, a front drill clamp is arranged at the front end of the slide rail, a drill rod is mounted on the rock drill, and the drill rod passes through the middle drill support and the front drill clamp in sequence.

4. The fully hydraulic three-arm drilling rig according to claim 1, characterized in that The rotating shaft of the wire rope main transmission device drives a drum to rotate forward and reversely, and the two ends of the wire rope are wound and fixed on the drum so that the wire rope forms a closed rope loop.

5. The fully hydraulic three-arm drilling rig according to claim 1, characterized in that A pitch adjustment hydraulic cylinder is arranged between the working platform arm and the front end surface of the trolley, and a hanging basket working platform is arranged at the front end of the working platform arm.

Citation Information

Cited By

  • Charging engineering truck for tunnel construction