Infant roadway passing supporting column mechanism

By using protective nets, reinforced strap structures with belts and pumped strap structures in coal mine mining, the safety hazards caused by the advance pressure of the empty tunnel section during coal mine mining are solved, and the safety and pushing speed of the support structure are achieved. Improvement.

CN222066797UActive Publication Date: 2024-11-26SHAANXI COAL IND CHEM GRP SUN JIACHA LONGHUA MINING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420828879.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-22
Publication Date
2024-11-26
Estimated Expiration
2034-04-22

AI Technical Summary

Technical Problem

During the coal mining process, the advance pressure in the empty tunnel section is relatively high, and there are great safety hazards. The existing single hydraulic pillars and hydraulic brackets have large engineering volume, long time and affect the efficiency of the working face.

Method used

The pillar mechanism is adopted that includes a protective net structure, a reinforced belt structure and a pumped support structure. The protective net structure and a reinforced belt structure are connected to the inner wall of the pass-through tunnel. The pumped support structure consists of steel columns and filling membrane bags, and is passed through the support column and the top end. Connect to the bottom end to form an annular accommodating groove to achieve support.

Benefits of technology

The safety and reliability of the support structure are achieved, on-site operations are simplified, the speed of work surface pushing and mining is improved, and safety hazards are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066797U_ABST
    Figure CN222066797U_ABST
Patent Text Reader

Abstract

The utility model provides an empty roadway passing supporting column mechanism, and relates to the technical field of empty roadway passing supporting. Comprising a protective net structure, a reinforcing band structure and a plurality of pumping strut structures, the protective net structure is fixedly arranged on the to-be-supported gob-side entry in a sighting mode, the reinforcing band structure is arranged on the protective net structure and connected with the inner wall of the to-be-supported gob-side entry, and the pumping strut structures are arranged in the to-be-supported gob-side entry and connected with the inner wall of the to-be-supported gob-side entry in a sighting mode. The top end of the pumping supporting column structure abuts against the top end of the interior of the empty roadway to be supported so as to achieve supporting protection, the structure is simple, the design is reasonable, due to the arrangement of the protective net structure, the reinforcing belt structure and the pumping supporting column structure, field operation is convenient, supporting safety is good, reliability is achieved, and the pushing and mining speed can be effectively increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of empty tunnel support, and in particular to an empty tunnel support mechanism. Background Art

[0002] During the mining process, coal mines often need to use support devices to support the roof of the coal mine to ensure the stability of the mine tunnel, prevent the mine tunnel from collapsing, and play a stabilizing role. In the empty tunnel of the working face of coal mining, affected by relevant geological factors such as the overlying thin bedrock, the leading pressure of the working face when mining to this section is relatively large, which poses a major safety hazard and affects the safe production of the working face.

[0003] The use of single hydraulic props, hydraulic supports, etc. for auxiliary support of empty tunnels is, on the one hand, a large amount of work and time-consuming; on the other hand, it is not conducive to on-site operations, affects the efficiency of working face mining, and has many unsafe factors during mining.

[0004] In view of this, the present application aims to provide a support mechanism for passing through an empty lane to better solve the above-mentioned technical problems. Summary of the invention

[0005] The purpose of the embodiments of the present application is to provide a support mechanism for an empty lane, which can solve the technical safety problem of supporting an empty lane.

[0006] An embodiment of the present application provides a support structure for an empty tunnel, comprising a protective net structure, a reinforcing belt structure and a plurality of pumping pillar structures. The protective net structure is fixedly arranged on the empty tunnel to be supported, the reinforcing belt structure is arranged on the protective net structure and connected to the inner wall of the empty tunnel to be supported, and the plurality of pumping pillar structures are respectively arranged in the empty tunnel to be supported, and the top end of the pumping pillar structure abuts against the top end inside the empty tunnel to be supported to achieve support protection.

[0007] Furthermore, the protection net structure is configured as an aiming net cable, and the aiming net cable is fixedly arranged in the empty tunnel to be supported.

[0008] Furthermore, the reinforcing belt structure is configured as a steel belt, and a plurality of the steel belts are provided. The plurality of steel belts are distributed in the protective net structure at intervals and connected to the inner wall of the empty tunnel to be supported.

[0009] Furthermore, the pumping support structure includes a support column and a filling film bag, and the support column is provided in plurality, and the two ends of the plurality of support columns are respectively connected to the bottom and top of the empty tunnel to be supported, and the plurality of support columns are distributed in a ring shape and are arranged to form a receiving groove, and the filling film bag is arranged in the receiving groove.

[0010] Furthermore, the support column is configured as a steel bar column.

[0011] Furthermore, a plurality of the filling film bags are provided, and the plurality of the filling film bags are stacked in sequence to match the height of the containing groove for filling support.

[0012] Furthermore, the filling film bag is made of a flexible material, and is provided with a grouting port and a lifting lug.

[0013] Beneficial effects of the utility model:

[0014] The utility model provides an empty tunnel support mechanism, including a protective net structure, a reinforcing belt structure and a plurality of pumping support structures. The protective net structure is fixedly arranged on the empty tunnel to be supported, the reinforcing belt structure is arranged on the protective net structure and connected to the inner wall of the empty tunnel to be supported, and the plurality of pumping support structures are respectively arranged in the empty tunnel to be supported, and the top of the pumping support structure abuts against the top of the inside of the empty tunnel to be supported to achieve support protection. The utility model has a simple structure and a reasonable design. By arranging the protective net structure, the reinforcing belt structure and the pumping support structure, on-site operation is convenient, the support is safe and reliable, and the mining speed can be effectively improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a schematic diagram of the structure of some embodiments of the utility model;

[0017] Figure 2 It is a schematic structural diagram of a filling film bag in some embodiments of the utility model.

[0018] The reference numerals are:

[0019] Protective net structure 1, reinforcing belt structure 2, pumping support structure 3, supporting column 4, filling film bag 5, grouting port 6, lifting ear 7. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0021] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0022] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0023] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the application is usually placed when in use. They are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0024] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0025] In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0026] See also Figure 1-Figure 2 As shown, the empty tunnel pillar mechanism described in this embodiment includes a protective net structure 1, a reinforcing belt structure 2 and a plurality of pumping pillar structures 3. The protective net structure 1 is fixedly arranged on the empty tunnel to be supported, the reinforcing belt structure 2 is arranged on the protective net structure 1 and connected to the inner wall of the empty tunnel to be supported, and the plurality of pumping pillar structures 3 are respectively arranged in the empty tunnel to be supported, and the top end of the pumping pillar structure 3 is abutted against the top end inside the empty tunnel to be supported to achieve support protection.

[0027] This embodiment has a simple structure and a reasonable design. By setting up a protective net structure 1, a reinforcing belt structure 2 and a plurality of pumping support structures 3, on-site operations are convenient, the support is safe and reliable, and the mining speed can be effectively improved.

[0028] Specifically, compared with other support methods such as hydraulic supports and single hydraulic pillars, this embodiment is easy to operate, fast, and has strong targeted application, which improves the speed of mining on the working face and ensures safe mining.

[0029] In some specific embodiments, the protective net structure 1 is configured as an aiming net cable, and the aiming net cable is fixedly arranged in the empty tunnel to be supported.

[0030] In this embodiment, by specifically adopting aiming net cables, during the support process, the anchor net cables are used to support and strengthen the shear compression resistance of the rock strata in a certain range of the tunnel roof, forming a reinforced pressure arch to resist the deformation of the tunnel surrounding rock, thereby achieving the purpose of supporting and maintaining the tunnel, thereby effectively improving the protection reliability.

[0031] In some specific embodiments, the reinforcing belt structure 2 is configured as a steel belt, and a plurality of the steel belts are provided. The plurality of steel belts are distributed in the protective net structure 1 at intervals and connected to the inner wall of the empty tunnel to be supported.

[0032] In this embodiment, a steel belt is specifically used as a reinforcement structure, which has a simple structure and a good reinforcement effect, and can further improve the stability of the protection.

[0033] In some specific embodiments, the pumping support structure 3 includes a support column 4 and a filling film bag 5, and the support column 4 is provided in plurality, and the two ends of the plurality of support columns 4 are respectively connected to the bottom and top of the empty tunnel to be supported, and the plurality of support columns 4 are distributed in a ring shape and are arranged to form a receiving groove, and the filling film bag 5 is arranged in the receiving groove.

[0034] Specifically, the support column 4 is configured as a steel bar column.

[0035] In this embodiment, it is specifically shown that the pumping pillar structure 3 is composed of a steel column and a filling film bag 5. Its structure is simple, and other auxiliary supports can be eliminated during the application process to reduce costs. At the same time, the steel column and the filling film bag 5 mode is adopted, which has high strength, fire resistance, high tensile strength, and high elongation. The construction process is simple and reliable, which can effectively improve the pushing and mining speed and has strong practicality.

[0036] Specifically, a plurality of the filling film bags 5 are provided, and the plurality of filling film bags 5 are stacked in sequence to match the height of the containing groove for filling support.

[0037] This embodiment specifically shows that a plurality of filling film bags 5 are stacked in sequence and matched with support columns 4 to provide support, and the structure is simple, the ductility is good, and the reliability is high.

[0038] In some specific embodiments, the filling film bag 5 is made of a flexible material, and the filling film bag 5 is provided with a grouting port 6 and a lifting lug 7 .

[0039] The present embodiment specifically shows the structural arrangement of the filling film bag 5. The grouting liquid port is provided to facilitate grouting filling, while the ear is provided to facilitate the moving and transportation of the filling film bag 5. The structure is simple and practical.

[0040] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A support mechanism for passing an empty lane, characterized in that: It includes a protective net structure, a reinforcing belt structure and multiple pumping pillar structures. The protective net structure is fixedly installed on the empty tunnel to be supported. The reinforcing belt structure is installed on the protective net structure and connected to the inner wall of the empty tunnel to be supported. Multiple pumping pillar structures are respectively arranged in the empty tunnel to be supported, and the top of the pumping pillar structure is abutted against the top of the inside of the empty tunnel to be supported to achieve support protection.

2. The empty lane support mechanism according to claim 1, characterized in that: The protective net structure is configured as an aiming net cable, and the aiming net cable is fixedly arranged in the empty tunnel to be supported.

3. The empty lane support mechanism according to claim 1, characterized in that: The reinforcing belt structure is configured as a steel belt, and a plurality of the steel belts are provided. The plurality of steel belts are distributed in the protective net structure at intervals and are connected to the inner wall of the empty tunnel to be supported.

4. The empty lane support mechanism according to claim 1, characterized in that: The pumping support structure includes a support column and a filling film bag. There are multiple support columns, and the two ends of the multiple support columns are respectively connected to the bottom and top of the empty tunnel to be supported. The multiple support columns are distributed in a ring shape and are surrounded to form a receiving groove. The filling film bag is arranged in the receiving groove.

5. The empty lane support mechanism according to claim 4, characterized in that: The support column is configured as a steel bar column.

6. The empty lane support mechanism according to claim 4, characterized in that: A plurality of the filling film bags are provided, and the plurality of the filling film bags are stacked in sequence to match the height of the containing groove for filling support.

7. The empty lane support mechanism according to claim 6, characterized in that: The filling film bag is made of flexible material and is provided with a grouting port and a lifting lug.