Reusable temporary pilot tunnel supporting system

By designing a reusable pilot tunnel temporary support system, which utilizes telescopic hydraulic cylinders and tracks to achieve rapid support, the problem of non-recoverable support in the construction of large-section tunnels has been solved, improving construction efficiency and safety and reducing resource waste.

CN222066800UActive Publication Date: 2024-11-26CHINA RAILWAY 15TH BUREAU GROUP CORPORATION LIMITED
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420112140.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-11-26
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

In the manual excavation of large-section and extra-large-section tunnels, the existing support structures are difficult to construct safely, quickly, and economically, and cannot be recycled, leading to problems such as support damage and failure, which affect the construction progress and safety.

Method used

Design a reusable temporary support system for a pilot tunnel, including a reaction frame, support components, and a leading support component. The system utilizes telescopic hydraulic cylinders and rails to achieve rapid support and can be recycled as a whole.

Benefits of technology

It enables rapid support for pilot tunnels, improves construction efficiency, adapts to any slope, and the support system is reusable, reducing resource waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066800U_ABST
    Figure CN222066800U_ABST
Patent Text Reader

Abstract

The reusable temporary pilot tunnel supporting system comprises a reaction frame, a supporting assembly, a front guide supporting assembly and a track, the supporting assembly and the front guide supporting assembly are installed on the track, the supporting assembly comprises a plurality of supporting pipes, the supporting pipes are connected through telescopic hydraulic cylinders, a pilot tunnel opening is formed in a reaction wall of the reaction frame, and the pilot tunnel opening is connected with the track. The front side of the counter-force wall is connected with the backmost supporting pipe of the supporting assembly through a counter-force hydraulic cylinder, the forefront supporting pipe of the supporting assembly is connected with the front guide supporting pipe of the front guide supporting assembly through a telescopic hydraulic cylinder, and sliding blocks matched with the rails are installed at the bottoms of the supporting pipes and the bottoms of the front guide supporting pipes. The temporary pilot tunnel supporting system has the advantages that the temporary pilot tunnel supporting system can be customized, and the whole temporary pilot tunnel supporting system can be recycled; each supporting pipe has an independent hydraulic telescopic function and is provided with a rail, it is guaranteed that friction resistance between the pilot tunnel and the supporting pipes is small, rapid supporting of the pilot tunnel after excavation is facilitated, and the supporting construction efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to a reusable temporary guide tunnel support system. Background Art

[0002] With the rapid development of major infrastructure construction such as high-speed railways, rapid passenger dedicated lines, heavy-duty railways, highways, and urban subways in various countries around the world, more and more large-section and extra-large-section tunnels are being constructed by manual dark excavation. The support is difficult and has many problems. In particular, serious problems such as support damage and failure often occur, resulting in frequent surrounding rock extrusion, arching, landslides, and roof falls. This not only significantly affects the construction progress and increases the project cost, but also may induce safe construction. In recent years, the above-mentioned engineering problems or accidents often occur in the construction of tunnel projects such as high-speed railways, rapid passenger dedicated lines, and urban subways in my country, resulting in a series of large losses of life, production, and property and damage to existing buildings. However, there has been a lack of reliable technical means at home and abroad to effectively solve the engineering problems of manual dark excavation of large-section and extra-large-section tunnels. For the construction of extra-large-section tunnels, in order to achieve safe, fast, and economical construction, pilot tunnels are usually used for excavation. After the pilot tunnel is excavated, steel mesh, steel arch frame, and shotcrete are used for support, which cannot be recycled and causes great waste. It is very necessary to study what kind of support structure to use for temporary pilot tunnels. Summary of the invention

[0003] The purpose of the utility model is to provide a reusable temporary support system for a guide tunnel in accordance with the above-mentioned deficiencies of the prior art. By arranging a support assembly that can move along the track and a leading support assembly, and each support pipe of the support assembly is equipped with a telescopic hydraulic cylinder, it is convenient for rapid support of the guide tunnel after excavation, and the whole system can be recycled.

[0004] The purpose of this utility model is achieved by the following technical solutions:

[0005] A reusable guide hole temporary support system, characterized in that it includes a reaction frame, a support assembly, a leading support assembly and a track, the reaction frame, the support assembly and the leading support assembly are connected in sequence, the support assembly and the leading support assembly are installed on the track, the support assembly includes a plurality of support pipes, the support pipes are connected by a telescopic hydraulic cylinder, a guide hole opening is opened on the reaction wall of the reaction frame, the front side of the reaction wall is connected to the support pipe at the rear of the support assembly through a reaction hydraulic cylinder, the support pipe at the front of the support assembly is connected to the leading support pipe of the leading support assembly through the telescopic hydraulic cylinder, and sliders matching the track are installed at the bottom of the support pipe and the leading support pipe.

[0006] The reaction wall is installed on a base, the base is anchored by anchor rods, and the rear side of the reaction wall is connected to the base by a diagonal brace.

[0007] The diagonal braces are arranged on both sides of the guide hole of the reaction wall.

[0008] A blade is installed on the front side of the leading support pipe, and a fixed cable hole for fixing the cable is opened on the blade; a cable hole allowing the cable to pass through is opened on the reaction wall; one end of the cable is fixed in the fixed cable hole by an anchor, and the other end passes through the cable hole of the reaction wall.

[0009] The fixed cable holes are arranged on both sides of the blade, and the cable holes are arranged on both sides of the guide hole of the reaction wall.

[0010] The track is in an I-shape, and a T-shaped groove matching with the top of the track is provided at the bottom of the slider.

[0011] The reaction force hydraulic cylinder is arranged along the circumference of the guide hole of the reaction force wall, and the telescopic hydraulic cylinder is arranged along the circumference of the support pipe.

[0012] The advantages of the utility model are:

[0013] (1) The temporary support system of the pilot tunnel can be customized and recycled as a whole;

[0014] (2) Each support pipe is equipped with independent hydraulic expansion and contraction function and track setting to ensure low friction resistance between the guide tunnel and the support pipe, which is convenient for rapid support of the guide tunnel after excavation and high support construction efficiency;

[0015] (3) It has a high degree of mechanization and can adapt to the rapid support of tunnels with any slope. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the reusable temporary support system for the guide tunnel in the utility model;

[0017] Figure 2 for Figure 1 Cross-section of the middle AA;

[0018] Figure 3 for Figure 1 Cross-section of the middle BB;

[0019] Figure 4 for Figure 1 Cross-section of the middle CC;

[0020] Figure 5 for Figure 1 Cross-section of DD.

[0021] like Figures 1 to 5, the marks in the figure are:

[0022] 1. reaction frame, 2. support assembly, 3. leading support assembly, 4. track;

[0023] 11. Base, 12. Reaction wall, 13. Diagonal brace, 14. Reaction hydraulic cylinder, 15. Cable hole, 16. Guide hole, 17. Anchor rod;

[0024] 21. Support pipe, 22. Telescopic hydraulic cylinder, 23. Sliding block;

[0025] 31. Leading support pipe, 32. Blade, 33. Cable, 34. Fixed cable hole, 35. Anchor. DETAILED DESCRIPTION

[0026] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:

[0027] Example: Figures 1 to 5 As shown, the present embodiment specifically relates to a reusable temporary support system for a guide tunnel, which mainly includes a reaction frame 1, a support assembly 2, a leading support assembly 3 and a track 4. The reaction frame 1, the support assembly 2 and the leading support assembly 3 are connected in sequence, and the support assembly 2 and the leading support assembly 3 are installed on the track 4. The support assembly 2 and the leading support assembly 3 can be moved along the extension direction of the track 4 to achieve rapid support for a guide tunnel of any slope.

[0028] like Figures 1 to 5 As shown, the reaction frame 1 includes a base 11, a reaction wall 12, a diagonal brace 13, a reaction hydraulic cylinder 14, a cable hole 15, a guide hole 16 and an anchor rod 17. The guide hole 16 is opened on the reaction wall 12, and the reaction wall 12 is installed on the base 11. The base 11 is anchored by the anchor rod 17. The rear side of the reaction wall 12 is connected to the base 11 through the diagonal brace 13. The diagonal brace 13 is arranged on both sides of the guide hole 16 of the reaction wall 12 to ensure the overall stability of the reaction frame 1. In addition, a reaction hydraulic cylinder 14 is installed on the front side of the reaction wall 14. The reaction hydraulic cylinder 14 is arranged circumferentially along the guide hole 16 of the reaction wall 12, and the reaction hydraulic cylinder 14 is connected to the support assembly 2; the reaction wall 12 is provided with a cable hole 15 for allowing the cable 33 to pass through, and the cable hole 15 is arranged on both sides of the guide hole 16 of the reaction wall 12.

[0029] like Figures 1 to 5As shown, the support assembly 2 includes a support pipe 21, a telescopic hydraulic cylinder 22 and a slider 23, and the leading support assembly 3 includes a leading support pipe 31, a blade 32, a cable 33, a fixed cable hole 34 and an anchor 35. The support pipes 21 are connected to each other through the telescopic hydraulic cylinder 22, the rearmost support pipe 21 of the support assembly 2 is connected to the front side of the reaction wall 12 through the reaction hydraulic cylinder 14, and the frontmost support pipe 21 of the support assembly 2 is connected to the leading support pipe 31 of the leading support assembly 3 through the telescopic hydraulic cylinder 22. The telescopic movement of the reaction hydraulic cylinder 14 drives the support assembly 2 to move, and the telescopic movement of the telescopic hydraulic cylinder 22 drives the support assembly 2 and the leading support assembly 3 to move. The telescopic hydraulic cylinder 22 is arranged along the circumference of the support pipe 21, and a blade 32 is installed on the front side of the leading support pipe 31. The blade 32 is provided with a fixed cable hole 34 for fixing the cable 33, and the fixed cable holes 34 are arranged on both sides of the blade 32. One end of the cable 33 is fixed in the fixed cable hole 34 by an anchor 35, and the other end passes through the cable hole 15 of the reaction wall 12. The cable 33 can play a guiding and traction role to ensure that the support assembly 2 and the leading support assembly 3 are smoothly moved out of the guide hole.

[0030] like Figures 1 to 5 As shown, a slider 23 matching the track 4 is installed at the bottom of the support tube 21 and the leading support tube 31, wherein the track 4 is I-shaped, and a T-shaped groove matching the top (T-shaped) of the track 4 is provided at the bottom of the slider 23 to ensure smooth movement of the support tube 21 and the leading support tube 31.

[0031] The advantages of this embodiment are:

[0032] (1) The temporary support system of the pilot tunnel can be customized and recycled as a whole;

[0033] (2) Each support pipe is equipped with independent hydraulic expansion and contraction function and track setting to ensure low friction resistance between the guide tunnel and the support pipe, which is convenient for rapid support of the guide tunnel after excavation and high support construction efficiency;

[0034] (3) It has a high degree of mechanization and can adapt to the rapid support of tunnels with any slope.

[0035] Inspired by the above ideal embodiments of the utility model, through the above description, relevant personnel can make various changes and modifications within the scope of the technical concept of the utility model. The technical scope of the utility model is not limited to the content in the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A reusable temporary support system for the pilot tunnel. Features It includes a reaction frame, a support assembly, a leading support assembly and a track. The reaction frame, the support assembly and the leading support assembly are connected in sequence. The support assembly and the leading support assembly are installed on the track. The support assembly includes a plurality of support pipes. The support pipes are connected by a telescopic hydraulic cylinder. A guide hole is opened on the reaction wall of the reaction frame. The front side of the reaction wall is connected to the support pipe at the rear of the support assembly through a reaction hydraulic cylinder. The support pipe at the front of the support assembly is connected to the leading support pipe of the leading support assembly through the telescopic hydraulic cylinder. Sliders matching the track are installed at the bottom of the support pipe and the leading support pipe.

2. A reusable temporary support system for a pilot tunnel according to claim 1, Features The reaction wall is installed on a base, the base is anchored by anchor rods, and the rear side of the reaction wall is connected to the base by a diagonal brace.

3. A reusable temporary support system for a guide tunnel according to claim 2, Features The diagonal braces are arranged on both sides of the guide hole of the reaction wall.

4. A reusable pilot tunnel temporary support system according to claim 1, Features A blade is installed on the front side of the leading support pipe, and a fixed cable hole for fixing the cable is opened on the blade; a cable hole allowing the cable to pass through is opened on the reaction wall; one end of the cable is fixed in the fixed cable hole by an anchor, and the other end passes through the cable hole of the reaction wall.

5. A reusable pilot tunnel temporary support system according to claim 4, Features The fixed cable holes are arranged on both sides of the blade, and the cable holes are arranged on both sides of the guide hole of the reaction wall.

6. A reusable pilot tunnel temporary support system according to claim 1, Features The track is in an I-shape, and a T-shaped groove matching with the top of the track is provided at the bottom of the slider.

7. A reusable temporary support system for a pilot tunnel according to claim 1, Features The reaction force hydraulic cylinder is arranged along the circumference of the guide hole of the reaction force wall, and the telescopic hydraulic cylinder is arranged along the circumference of the support pipe.