Three-phase three-wire electric energy meter auxiliary wiring device

Through the modular wiring device, the wiring posts and positioning snaps of the plug-in power meter, the acquisition terminal and the joint junction box are used, and the integrated line of the plastic sealing core and the lead sealing hole are combined to solve the complexity of the installation of the power meter and the potential for power theft. The problem is that fast, safe and reliable electrical connections are achieved, improving work efficiency and safety.

CN222070705UActive Publication Date: 2024-11-26LANZHOU YINENG ELECTRICITY GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420308378.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-11-26
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

The installation process of existing power meters is complex, the wiring is difficult, and it is prone to irregular or misconnection, which leads to inaccurate power measurement and potential risks of electricity theft, which increases operation and maintenance costs and safety risks.

Method used

Design a three-phase three-wire electrical energy meter auxiliary wiring device, adopting plug-in modular wiring method, and quickly connect through lantern-shaped elastic plug and positioning snap. Combining the integrated line of plastic sealing core and lead sealing holes, simplifying the wiring process and avoiding Screw fixation to improve installation efficiency and safety.

Benefits of technology

It greatly improves work efficiency, reduces human errors, reduces operation and maintenance costs, enhances the standardization and safety of wiring, effectively prevents power theft, and saves time and human resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222070705U_ABST
    Figure CN222070705U_ABST
Patent Text Reader

Abstract

The utility model discloses an auxiliary wiring device for a three-phase three-wire electric energy meter, and the device comprises a plug-in type electric energy meter wiring module which comprises a first binding post connected with the electric energy meter; the plug-in acquisition terminal wiring module comprises a second binding post connected with the acquisition terminal; the plug-in type combined junction box wiring module comprises a third binding post connected with the combined junction box; the first connecting wire harness flat cable is connected with the plug-in type electric energy meter wiring module and the plug-in type combined wiring box wiring module; and the second connecting wire harness flat cable is connected with the plug-in type acquisition terminal wiring module and the plug-in type combined junction box wiring module. When in use, wiring among the electric energy meter, the metering acquisition terminal and the combined junction box is managed in a modularized, unified and standardized manner, and dismounting and mounting can be realized through direct plugging and unplugging, so that the working efficiency is greatly improved, the cost is saved, and the investment of human capital is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of electric power equipment, in particular to an auxiliary wiring device for a three-phase three-wire electric energy meter. Background Art

[0002] In recent years, with the development of the economy and society, the investment in power infrastructure has been strengthened, rural power grid transformation and urban power grid have been continuously upgraded, and smart meters have basically covered the electricity consumption of the entire population. However, the installation process of electricity meters has high requirements and it is difficult to correctly wire them on site.

[0003] At present, the installation of energy meters, metering and collection terminals and transformers mainly relies on wire connection. The staff needs to connect the wires phase by phase by screw fastening, which leads to a large workload of on-site installation. In addition, due to the limited space in the meter box, the installation positions of the energy meter, metering and collection terminal and joint junction box are not uniform. The operator can only wire on-site according to the actual situation on site. When wiring, the reserved wires are coiled and placed in a hidden place behind the cabinet for later maintenance. Although the front of the meter box is relatively neat, the hidden wiring harness on the back has great hidden dangers. After a period of use, the meter box will cause the reserved wiring harness to be entangled, damaged, and leaked due to meter replacement, maintenance, rewiring, pulling, aging of the wiring harness, and entry of foreign objects. The longer the meter box is used, the more serious the hidden dangers are, and it is easy to have problems such as irregular wiring or wrong connection and missing connection, which leads to inaccurate energy metering. In addition, the wires are exposed outside, and some illegal users often take advantage of the loose wiring in the meter box to damage the connection points and use wire short-circuiting to steal electricity, which brings great safety hazards to operation and maintenance, and also increases the operation and maintenance costs.

[0004] It may take about 1 hour to connect a new energy meter, metering terminal and junction box on site. If there is a problem with the meter, it will take more than 2 hours from disassembly to installation to wiring. 70% of the meter installation work is wiring work, which has low work efficiency and high labor costs.

[0005] Therefore, how to provide an auxiliary wiring device for an electric energy meter to achieve electrical connection quickly, safely and reliably is a technical problem that needs to be solved urgently by those skilled in the art. Utility Model Content

[0006] In view of this, the purpose of the utility model is to provide a three-phase three-wire electric energy meter auxiliary wiring device to address the deficiencies of the prior art, which includes:

[0007] A plug-in electric energy meter wiring module, comprising a first wiring post connected to the electric energy meter, wherein the position of the first wiring post is arranged corresponding to a connection point of the electric energy meter;

[0008] A plug-in collection terminal wiring module, comprising a second wiring post connected to the collection terminal, wherein the position of the second wiring post is arranged corresponding to the connection position of the collection terminal;

[0009] A plug-in type joint junction box wiring module, comprising a third terminal connected to the joint junction box, wherein the position of the third terminal is arranged corresponding to the connection position of the joint junction box;

[0010] A first connection harness connecting the plug-in electric energy meter wiring module and the plug-in joint junction box wiring module;

[0011] A second connection harness is arranged to connect the plug-in acquisition terminal wiring module and the plug-in joint junction box wiring module.

[0012] In certain embodiments, in the three-phase three-wire electric energy meter auxiliary wiring device, the first wiring post, the second wiring post and the third wiring post are lantern-type spring plugs.

[0013] In certain embodiments, in the three-phase three-wire electric energy meter auxiliary wiring device, a lead sealing hole is provided on the wiring module of the plug-in combined junction box.

[0014] In certain embodiments, in the three-phase three-wire electric energy meter auxiliary wiring device, a first positioning buckle is provided on the upper end surface of the plug-in electric energy meter wiring module; when the plug-in electric energy meter wiring module is connected to the electric energy meter, the first positioning buckle is clamped on the frame of the electric energy meter wiring box.

[0015] In certain embodiments, in the three-phase three-wire electric energy meter auxiliary wiring device, a second positioning buckle is provided on the upper end surface of the plug-in acquisition terminal wiring module; when the plug-in acquisition terminal wiring module is connected to the acquisition terminal, the second positioning buckle is clamped on the frame of the acquisition terminal wiring box.

[0016] In certain embodiments, in the three-phase three-wire electric energy meter auxiliary wiring device, a voltage collection port is provided on the plug-in electric energy meter wiring module.

[0017] In certain embodiments, in the three-phase three-wire electric energy meter auxiliary wiring device, the first connecting wire harness wiring harness adopts a plastic-sealed 7-core integrated wiring harness.

[0018] In certain embodiments, in the three-phase three-wire electric energy meter auxiliary wiring device, the second connecting wire harness wiring harness adopts a plastic-sealed 3-core integrated wiring harness.

[0019] The beneficial effects of the utility model are:

[0020] 1. The utility model discloses an auxiliary wiring device for a three-phase three-wire electric energy meter, which performs modular, unified and standardized management on the wiring between the electric energy meter, the metering and collection terminal and the joint junction box. Disassembly and installation can be achieved by direct plugging and unplugging, and there is no need to directly insert the wires into the wire interface of the electric meter and then fix them with screws. The installation and maintenance are very convenient, the work process is simplified, and the unified and refined management of meter installation and power connection is implemented, which greatly improves work efficiency, saves costs, and reduces the investment in human capital.

[0021] 2. The three-phase three-wire electric energy meter auxiliary wiring device described in the utility model reduces the time for workers to install the meter and connect the electricity. The plug-in wiring method effectively prevents the occurrence of wrong wiring, reduces metering errors caused by human responsibility, and can ensure that electricity charges are collected accurately. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a structural schematic diagram of the auxiliary wiring device of the three-phase three-wire electric energy meter described in the utility model;

[0023] Figure 2 It is a structural schematic diagram of a plug-in type electric energy meter wiring module in the three-phase three-wire electric energy meter auxiliary wiring device of the utility model;

[0024] Figure 3 It is a structural schematic diagram of a plug-in type joint junction box wiring module in the auxiliary wiring device of a three-phase three-wire electric energy meter described in the utility model;

[0025] Figure 4 It is a structural schematic diagram of a plug-in type acquisition terminal wiring module in the auxiliary wiring device of the three-phase three-wire electric energy meter described in the utility model;

[0026] Figure 5 It is a structural schematic diagram of the first terminal, the second terminal or the third terminal in the auxiliary wiring device of the three-phase three-wire electric energy meter described in the utility model.

[0027] In the figure: 1-plug-in electric energy meter wiring module, 2-first terminal, 3-plug-in acquisition terminal wiring module, 4-second terminal, 5-plug-in joint junction box wiring module, 6-third terminal, 7-first connecting wire harness cable, 8-second connecting wire harness cable, 9-lead sealing hole, 10-first positioning buckle, 11-second positioning buckle, 12-voltage acquisition port. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention.

[0029] like Figures 1 to 5As shown, a three-phase three-wire electric energy meter auxiliary wiring device comprises:

[0030] A plug-in electric energy meter connection module 1, comprising a first connection post 2 connected to the electric energy meter, wherein the position of the first connection post 2 is arranged corresponding to the connection point of the electric energy meter;

[0031] A plug-in acquisition terminal wiring module 3, comprising a second terminal 4 connected to the acquisition terminal, wherein the position of the second terminal 4 is arranged corresponding to the connection position of the acquisition terminal;

[0032] A plug-in joint junction box wiring module 5, comprising a third terminal 6 connected to the joint junction box, wherein the position of the third terminal 6 is arranged corresponding to the connection position of the joint junction box;

[0033] A first connection harness cable 7 connecting the plug-in electric energy meter wiring module 1 and the plug-in joint junction box wiring module 5;

[0034] A second connection harness cable 8 is provided to connect the plug-in acquisition terminal wiring module 3 and the plug-in joint junction box wiring module 5 .

[0035] like Figure 5 As shown, in the above scheme, the first terminal 2, the second terminal 4 and the third terminal 6 are lantern-shaped elastic plugs. The first terminal 2, the second terminal 4 and the third terminal 6 adopt interference fit, which saves a lot of work in screwing screws. In order to adapt to the different specifications of the terminal socket sizes of the electric energy meter, the metering and collection terminal and the joint junction box, the terminals with different heights and diameters are designed to be able to cooperate with the terminal sockets conveniently and quickly, which are specifically:

[0036] Specification 1: head Φ4.5*21.0mm / seat 18.5*6.8 (inner hole 5mm);

[0037] Specification 2: head Φ4.5*27.5mm / seat 18.5*6.8 (inner hole 5mm);

[0038] Specification 3: Head Φ5.3*27.5mm / Seat 18.5*6.8 (inner hole 5mm).

[0039] The first terminal 2, the second terminal 4 and the third terminal 6 are correspondingly inserted into the energy meter, the collection terminal and the joint junction box to complete the connection safely and efficiently, eliminating the tedious operation procedures such as wire preparation, wiring, wire stripping, wiring, and screwing. The installer only needs to carry auxiliary wiring tools and screwdrivers to complete all the work. The on-site manual work is transformed into a modular and standardized product, so that there is no need to screw, wire or arrange cables on site.

[0040] In the above solution, the plug-in type joint junction box wiring module 5 is provided with a lead sealing hole 9. The lead sealing hole 9 is used to fix the plug-in type joint junction box wiring module 5.

[0041] In the above solution, the upper end surface of the plug-in electric energy meter wiring module 1 is provided with a first positioning buckle 10;

[0042] When the plug-in electric energy meter wiring module 1 is connected to the electric energy meter, the first positioning buckle 10 is clamped on the frame of the electric energy meter wiring box.

[0043] After the first terminal 2 is correspondingly inserted into the electric energy meter and pushed to the fixed position, the first positioning buckle 10 is clamped on the frame of the electric energy meter junction box to complete the fixed connection of the plug-in electric energy meter wiring module 1. The plug-in electric energy meter wiring module 1 is closely matched with the size of the electric energy meter. After the upper cover of the electric energy meter is installed, the plug-in electric energy meter wiring module 1 is hidden in the outer shell of the electric energy meter to prevent someone from short-circuiting the terminals privately to steal electricity, and also to prevent foreign objects from entering and causing short circuits.

[0044] In the above scheme, the upper end surface of the plug-in acquisition terminal wiring module 3 is provided with a second positioning buckle 11; when the plug-in acquisition terminal wiring module 3 is connected to the acquisition terminal, the second positioning buckle 11 is clamped on the frame of the acquisition terminal wiring box.

[0045] The second terminal 4 is correspondingly inserted into the acquisition terminal and pushed to the fixed position, and the second positioning buckle 11 is clamped on the frame of the acquisition terminal junction box to complete the fixed connection of the plug-in acquisition terminal wiring module 3. The plug-in acquisition terminal wiring module 3 is closely matched with the size of the acquisition terminal. After the upper cover of the acquisition terminal is installed, the plug-in acquisition terminal wiring module 3 is hidden in the shell of the acquisition terminal to prevent someone from short-circuiting the terminals privately to steal electricity, and also to prevent foreign objects from entering and causing short circuits.

[0046] In the above scheme, the plug-in electric energy meter wiring module 1 is provided with a voltage acquisition port 12. The voltage acquisition port 12 is designed to be sunken, without the risk of electric shock, and can be seamlessly connected by inserting a universal pin into the port, which is a safer and more reliable voltage signal acquisition method, and also ensures the personal safety of the operator.

[0047] In the above solution, the first connecting wire harness cable 7 is a plastic-sealed 7-core integrated cable.

[0048] In the above solution, the second connecting wire harness cable 8 is a plastic-sealed three-core integrated cable.

[0049] According to the power industry's requirements for secondary circuit wiring of electric energy metering devices, the secondary circuit wiring identification marks are yellow phase A\green phase B\red ​​phase C, the voltage line uses 2.5mm2 multi-core copper wire, the current line uses 4mm2 multi-core copper wire, the quick-connect cable between the plug-in electric energy meter wiring module 1 and the plug-in combined junction box wiring module 5 is a plastic-sealed 7-core integrated flat cable, the quick-connect cable between the plug-in acquisition terminal wiring module 3 and the plug-in combined junction box wiring module 5 is a plastic-sealed 3-core integrated flat cable, the flat cable can ensure the flexibility of the wiring harness when moving to adapt to the requirements of different installation sizes, the connection between the wiring harness and the corresponding wiring module adopts an integrated soft rubber crimping joint, which plays a fixing role when used on site to protect the wiring harness from shifting or falling off.

[0050] Multi-core copper wire cable connectors use cold-pressed end embossing and tin-plating treatment, which is convenient for wiring and also solves the shortcomings of multi-strand wires that are easy to spread out, difficult to wire and easy to oxidize.

[0051] In the actual application process, by repeatedly testing and measuring the auxiliary wiring device of the three-phase three-wire electricity meter, and comparing and analyzing the measured data based on the wiring work time before and after implementation, very good results were achieved, which greatly saved working time and improved work efficiency.

[0052] Comparative analysis of data before and after implementation

[0053]

[0054]

[0055] The use of the three-phase three-wire electric energy meter auxiliary wiring device does not require any wiring throughout the process, saving the most tedious steps. The operation can be completed by simply pushing the electric energy meter auxiliary wiring tool connector into the wiring seat.

[0056] Combined with the above data analysis, it was concluded that after using the three-phase three-wire electricity meter auxiliary wiring device to improve the on-site operation method, the original wiring time was reduced from 52.7 minutes to 9.27 minutes, saving 43.4 minutes of time, and the work efficiency was increased by 82.4%. A skilled worker only needs about 8 minutes to complete the work, achieving very good results.

[0057] After using the three-phase three-wire energy meter auxiliary wiring device, the on-site meter replacement time is faster and more convenient, and the closed junction box cannot prevent criminals from stealing electricity, which will greatly improve the anti-theft work. It will achieve great results in the following two anti-theft work.

[0058] Anti-electricity theft behavior test analysis

[0059]

[0060] Combined with the above test analysis, it can be concluded that there are various types of electricity theft, roughly 7-8 types. We can play a certain protective role in the above two methods. The anti-electricity theft effect is calculated based on the total proportion of the 8 types. After using auxiliary wiring tools, the anti-electricity theft efficiency can be increased by about 8%.

[0061] The use of the three-phase three-wire electric energy meter auxiliary wiring device described in the utility model brings certain economic benefits:

[0062] (1) Save time:

[0063] The original wiring time was reduced from 52.7 minutes to 9.27 minutes, saving 43.4 minutes and increasing work efficiency by 82.4%. A skilled worker only needs about 8 minutes to complete the wiring of the electricity meter, collection terminal and joint junction box, achieving very good results.

[0064] (2) Save labor costs

[0065] Lanzhou Power Supply Bureau has a total of 9,185 three-phase three-wire data collection terminals in operation (excluding projects under construction).

[0066] The traditional labor cost estimate is as follows: (1 person's daily wage is 200 yuan / day, each job requires a team of 2 people, each team can complete 6 units of work per day, there are 250 working days in a year, each team can complete 1,500 units of work per year, and 6.12 teams, or 13 people, are needed to complete the total workload throughout the year).

[0067] 200 (daily wages) × 13 (people) × 250 (annual working days) = 650,000 yuan

[0068] The labor cost of using the three-phase three-wire electricity meter auxiliary wiring device is estimated as follows: (person-day wage is 200 yuan / day, each group is expected to complete the workload of 13 units per day, and only 2.8 groups, or 6 units, are needed to complete the total workload throughout the year).

[0069] 200 (daily wages) × 6 (people) × 250 (effective working days) = RMB 300,000

[0070] By using the three-phase three-wire electric energy meter auxiliary wiring device described in the utility model, it is estimated that labor costs can be saved by 350,000 yuan.

[0071] (3) Economic benefit estimation:

[0072] After using the three-phase three-wire energy meter auxiliary wiring device, the error rate is 0. The convenient and fast access method greatly shortens the time for replacing meters or overhauling due to power outages, and the efficiency is improved by more than 80%. The operation and maintenance time of the metering device is short, and the power loss during the maintenance or replacement of the meter can be reduced by 80%. It can also greatly reduce the economic losses caused by shutdowns of power users. The loss of large power users for each hour of shutdown is estimated to be tens of thousands of yuan. Large enterprises have their own generators or power plants, but small and medium-sized enterprises can only suspend operations for each maintenance. These losses are accumulated and cannot be estimated. The three-phase three-wire energy meter auxiliary wiring device will bring the most direct economic benefits to power supply companies and corporate users.

[0073] The use of three-phase three-wire energy meter auxiliary wiring devices can prevent electricity theft. Although it is impossible to completely detect and block electricity theft 100%, the losses caused by electricity theft across the country each year are incalculable, and the means of electricity theft are varied and endless. Modular products are easy to replace and can be replaced regularly, which can effectively avoid the theft of electricity by some lawless elements. An 8% improvement in the anti-theft effect will bring great results to economic assets. For example, according to the calculation that Lanzhou City loses 1 million kWh due to electricity theft and the average electricity price is 0.86 yuan / kWh, the annual loss is about 860,000 yuan. An 8% efficiency improvement will reduce the loss by 68,800 yuan.

[0074] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the utility model by ordinary technicians in this field should be included in the scope of the claims of the utility model as long as they do not depart from the spirit and scope of the technical solution of the utility model.

Claims

1. A three-phase three-wire electric energy meter auxiliary wiring device, characterized in that: include: A plug-in electric energy meter wiring module (1), comprising a first wiring post (2) connected to the electric energy meter, wherein the position of the first wiring post (2) is arranged corresponding to a connection point of the electric energy meter; A plug-in type acquisition terminal wiring module (3), comprising a second wiring post (4) connected to the acquisition terminal, wherein the position of the second wiring post (4) is arranged corresponding to a connection point of the acquisition terminal; A plug-in type combined junction box wiring module (5), comprising a third wiring post (6) connected to the combined junction box, wherein the position of the third wiring post (6) is arranged corresponding to a connection point of the combined junction box; A first connection harness cable (7) connecting the plug-in electric energy meter wiring module (1) and the plug-in combined junction box wiring module (5); A second connection harness cable (8) connecting the plug-in type acquisition terminal wiring module (3) and the plug-in type joint wiring box wiring module (5).

2. The three-phase three-wire electric energy meter auxiliary wiring device according to claim 1, characterized in that: The first terminal (2), the second terminal (4) and the third terminal (6) are lantern-shaped spring plugs.

3. The three-phase three-wire electric energy meter auxiliary wiring device according to claim 1, characterized in that: The plug-in type combined junction box wiring module (5) is provided with a lead sealing hole (9).

4. The three-phase three-wire electric energy meter auxiliary wiring device according to claim 1, characterized in that: The upper end surface of the plug-in electric energy meter wiring module (1) is provided with a first positioning buckle (10); When the plug-in electric energy meter wiring module (1) is connected to an electric energy meter, the first positioning buckle (10) is clamped on the frame of the electric energy meter wiring box.

5. The three-phase three-wire electric energy meter auxiliary wiring device according to claim 1, characterized in that: The upper end surface of the plug-in acquisition terminal wiring module (3) is provided with a second positioning buckle (11); When the plug-in acquisition terminal wiring module (3) is connected to the acquisition terminal, the second positioning buckle (11) is clamped on the frame of the acquisition terminal wiring box.

6. The three-phase three-wire electric energy meter auxiliary wiring device according to claim 1, characterized in that: The plug-in electric energy meter connection module (1) is provided with a voltage collection port (12).

7. The three-phase three-wire electric energy meter auxiliary wiring device according to claim 1, characterized in that: The first connecting wire harness cable (7) is a plastic-sealed 7-core integrated cable.

8. The three-phase three-wire electric energy meter auxiliary wiring device according to claim 1, characterized in that: The second connecting wire harness cable (8) is a plastic-sealed three-core integrated cable.

Citation Information

Cited By

  • Wiring device of electric energy meter

    CN120195437A