Precise butt joint device for heat supply pipelines

By designing the first and second fixing mechanisms and clamping mechanisms of the precise docking device of the heating pipe, the problem of the docking of the heating pipe is not tightly matched, precise docking and correction are achieved, construction efficiency and welding quality are improved, and the construction efficiency and welding quality are reduced. cost.

CN222079138UActive Publication Date: 2024-11-29NORTHWEST CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420076521.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-12
Publication Date
2024-11-29
Estimated Expiration
2034-01-12

AI Technical Summary

Technical Problem

The existing rapid and accurate docking device for heating pipeline construction cannot handle the problem that the corresponding cross-section of the two heating pipelines is not in a close state after alignment, resulting in low construction efficiency and high cost.

Method used

A precise docking device for heating pipes is designed, adopting the first and second fixing mechanisms and clamping mechanisms. Through the structures such as hinge plates, limit blocks, threaded rods and hydraulic telescopic rods, the precise docking of the heating pipes and the Correct to ensure that the pipe section is tightly attached.

Benefits of technology

It realizes accurate docking of heating pipelines, saves manpower repair time, is easy to use, and is simple to operate, improves construction efficiency and welding quality, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222079138U_ABST
    Figure CN222079138U_ABST
Patent Text Reader

Abstract

The utility model discloses a heat supply pipeline precise butt joint device, and belongs to the technical field of heat supply pipeline construction, the heat supply pipeline precise butt joint device comprises a first fixing mechanism, the first fixing mechanism comprises a first hinge plate, the lower end of the first hinge plate is fixedly connected with a left ring, and the outer side of the left ring is uniformly distributed and fixedly connected with two limiting blocks; a first connecting plate is fixedly connected to the lower end of the left ring, a threaded rod is fixedly connected to one side of the first connecting plate, a retention nut is in threaded connection with the side face of the threaded rod, a second hinge plate is hinged to the first hinge plate, a right ring is fixedly connected to the lower end of the second hinge plate, and a limiting block is fixedly connected to the outer side of the middle of the right ring. The side face of the limiting block makes contact with a clamping mechanism, a second fixing mechanism is installed in the clamping mechanism, it is guaranteed that the corresponding sections of the two heat supply pipes are in a tightly attached state while precise butt joint of the heat supply pipes is achieved through the improved precise butt joint device for the heat supply pipes, and the time of manual repairing is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of heating pipeline construction, and in particular to a heating pipeline precision docking device. Background Art

[0002] Heating pipeline construction refers to the process of installing and building a heating system in a building or urban infrastructure. It mainly includes the material selection, layout, welding, pressure test, insulation and other links of the heating pipeline. The quality of heating pipeline construction is directly related to the operation effect and safety of the heating system. The heating pipeline precision docking device is a commonly used device in the heating pipeline system, which is mainly used to achieve precise docking and connection of pipelines.

[0003] In the patent document with the announcement number CN210232101U, a fast and accurate docking device for heating pipeline construction is provided, including a left round wheel and a right round wheel, the upper end of the left round wheel is fixedly connected with a left connecting block, the upper end of the right round wheel is fixedly connected with a right connecting block, the right connecting block is installed inside the left connecting block, the right connecting block and the left connecting block are connected to each other through a hinge pin, the inner ring of the left round wheel is fixedly connected with a left anti-slip strip, the inner ring of the right round wheel is fixedly connected with a right anti-slip strip, the lower end of the left round wheel is fixedly connected with a mounting seat, the inner end of the mounting seat is movably connected with one end of a rotating rod, the other end of the rotating rod is fixedly connected with a hydraulic jack, the movable end of the hydraulic jack is fixedly connected with a top block, and the lower end of the right round wheel is fixedly connected with a clamping block. The fast and accurate docking device for heating pipeline construction greatly improves the construction efficiency, the welding quality and sealing of the joint, and greatly shortens the construction period, thereby reducing the construction cost.

[0004] The device uses a hydraulic jack to fix the docking device. Before installing the device, the heating pipe needs to be manually adjusted to ensure that the corresponding cross-sections of the heating pipes at both ends are in contact, and then the device can be installed. That is, the device cannot handle the situation where the corresponding cross-sections of the two heating pipes are not in a close contact state after alignment. Utility Model Content

[0005] The present application proposes a heating pipe precision docking device to solve the problems raised in the above-mentioned background technology.

[0006] In order to achieve the above purpose, this application adopts the following technical solutions:

[0007] A precise docking device for a heating pipe comprises a first fixing mechanism, which comprises a first hinged plate, a left ring is fixedly connected to the lower end of the first hinged plate, two limit blocks are evenly distributed and fixedly connected to the outer side of the left ring, a first connecting plate is fixedly connected to the lower end of the left ring, a threaded rod is fixedly connected to one side of the first connecting plate, a retaining nut is threadedly connected to the side surface of the threaded rod, the first hinged plate is hinged to the second hinged plate, a right ring is fixedly connected to the lower end of the second hinged plate, a limit block is fixedly connected to the middle outer side of the right ring, the side of the limit block contacts with a clamping mechanism, and a second fixing mechanism is installed inside the clamping mechanism.

[0008] As a preferred embodiment, the lower end of the right ring is fixedly connected to a second connecting plate, and a limiting groove is opened in the middle of the second connecting plate and passes through both sides of the second connecting plate. One side of the second connecting plate is in contact with the first connecting plate, and the side of the second connecting plate away from the first connecting plate is in contact with a retaining nut.

[0009] By adopting the above technical solution, the installation of the first fixing mechanism is responsible for providing a correct fixing point for the docking device.

[0010] As a preferred embodiment, anti-slip pads are fixedly connected inside the left ring and the right ring.

[0011] By adopting the above technical solution, the anti-slip pad ensures that the first fixing mechanism is not easily displaced during the correction process, thereby avoiding affecting the correction effect.

[0012] As a preferred embodiment, the structure of the second fixing mechanism is the same as that of the first fixing mechanism, and the limiting blocks on the side surfaces of the second fixing mechanism are all fixedly connected to the inside of the clamping mechanism.

[0013] By adopting the above technical solution, the second fixing mechanism is responsible for providing a second correction fixing point for the docking device, and together with the first fixing mechanism, realizes the correction work of the heating pipeline.

[0014] As a preferred embodiment, the clamping mechanism includes a shell, which is fixedly connected to the second fixing mechanism, a sliding groove is provided on the side of the shell close to the second fixing mechanism, and a hydraulic telescopic rod is fixedly connected to the end away from the second fixing mechanism, the hydraulic telescopic rod is fixed inside the sliding groove, and a push plate is fixedly connected to the extending end of the hydraulic telescopic rod, and the push plate is slidably connected to the wall of the sliding groove.

[0015] By adopting the above technical solution, the clamping mechanism is responsible for controlling the first fixing mechanism and the second fixing mechanism to squeeze and approach each other.

[0016] As a preferred embodiment, the left ring and the right ring are symmetrically arranged.

[0017] By adopting the above technical solution, the first fixing mechanism and the second fixing mechanism fix the heating pipe through the left ring and the right ring.

[0018] Beneficial effects of this application:

[0019] The heating pipe precise docking device achieves the fixation of two heating pipes by setting a first fixing mechanism and a second fixing mechanism, and simultaneously locates and corrects the positions of the first fixing mechanism and the second fixing mechanism through three clamping mechanisms, thereby achieving precise docking of the heating pipes while ensuring that the corresponding cross-sections of the two heating pipes are in a close contact state, saving manpower repair time, being easy to use, and simple to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the main structure of this application;

[0021] Figure 2 This is a front view structural diagram of the first fixing mechanism of the present application;

[0022] Figure 3 This is a schematic diagram of the clamping mechanism structure of the present application.

[0023] Numbers in the figure: 1. first fixing mechanism; 101. first hinge plate; 102. left ring; 103. right ring; 104. limit block; 105. first connecting plate; 106. threaded rod; 107. second connecting plate; 108. retaining nut; 109. second hinge plate; 110. limit groove; 111. anti-slip pad; 2. second fixing mechanism; 3. clamping mechanism; 301. housing; 302. hydraulic telescopic rod; 303. push plate; 304. slide groove. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments.

[0025] Reference Figure 1-3A precise docking device for a heating pipe comprises a first fixing mechanism 1, which comprises a first hinged plate 101, a left ring 102 is fixedly connected to the lower end of the first hinged plate 101, two limit blocks 104 are evenly distributed and fixedly connected to the outer side of the left ring 102, a first connecting plate 105 is fixedly connected to the lower end of the left ring 102, a threaded rod 106 is fixedly connected to one side of the first connecting plate 105, a retaining nut 108 is threadedly connected to the side of the threaded rod 106, the first hinged plate 101 is hinged to the second hinged plate 109, a right ring 103 is fixedly connected to the lower end of the second hinged plate 109, a limit block 104 is fixedly connected to the middle outer side of the right ring 103, the side of the limit block 104 contacts with a clamping mechanism 3, and a second fixing mechanism 2 is installed inside the clamping mechanism 3.

[0026] Reference Figure 1-3 The lower end of the right ring 103 is fixedly connected with the second connecting plate 107. The middle of the second connecting plate 107 is provided with a limiting groove 110 that runs through both sides of the second connecting plate 107. One side of the second connecting plate 107 contacts the first connecting plate 105, and the side of the second connecting plate 107 away from the first connecting plate 105 contacts the retaining nut 108. The left ring 102 and the right ring 103 are opened along the hinged position of the first hinged plate 101 and the second hinged plate 109, and are fixed to the side of the heating pipe. The left ring 102 and the right ring 103 are closed along the hinged position of the first hinged plate 101 and the second hinged plate 109, so that the threaded rod 106 is inserted into the limiting groove 110, and the second connecting plate 107 is fixed to the side of the threaded rod 106 by the retaining nut 108, thereby realizing the installation of the first fixing mechanism 1.

[0027] Reference Figure 1-3 , the left ring 102 and the right ring 103 are fixedly connected with anti-skid pads 111. After the first fixing mechanism 1 is installed, the anti-skid pads 111 located inside the left ring 102 and the right ring 103 are close to the side of the heating pipe, ensuring that the first fixing mechanism 1 is not easily displaced during the correction process to avoid affecting the correction effect.

[0028] Reference Figure 1-3 The structure of the second fixing mechanism 2 is the same as that of the first fixing mechanism 1, and the stopper 104 on the side of the second fixing mechanism 2 is fixedly connected to the inside of the clamping mechanism 3. After the first fixing mechanism 1 is fixed to the heating pipe, the second fixing mechanism 2 is installed to the side of another heating pipe using the same method, and the stopper 104 on the side of the first fixing mechanism 1 is placed inside the clamping mechanism 3 on the side of the second fixing mechanism 2, and the installation of the second fixing mechanism 2 is completed. At this time, the heating pipes have tended to be aligned under the action of the three clamping mechanisms 3.

[0029] Reference Figure 1-3The clamping mechanism 3 includes a shell 301, which is fixedly connected to the second fixing mechanism 2. A slide groove 304 is provided on the side of the shell 301 close to the second fixing mechanism 2, and a hydraulic telescopic rod 302 is fixedly connected to the end away from the second fixing mechanism 2. The hydraulic telescopic rod 302 is fixed inside the slide groove 304, and a push plate 303 is fixedly connected to the extended end of the hydraulic telescopic rod 302. The push plate 303 is slidably connected to the groove wall of the slide groove 304. After the second fixing mechanism 2 is installed, the hydraulic telescopic rod 302 inside the clamping mechanism 3 is started, and the hydraulic telescopic rod 302 extends to push the push plate 303 to move. The push plate 303 begins to squeeze the limit block 104 along the slide groove 304, forcing the limit block 104 to be parallel to the surface of the push plate 303. The two heating pipes are clamped together by the three clamping mechanisms 3 to achieve the operation of approaching and correcting the direction.

[0030] Reference Figure 1-3 The left ring 102 and the right ring 103 are symmetrically arranged. The first fixing mechanism 1 and the second fixing mechanism 2 fix the heating pipe through the left ring 102 and the right ring 103, and the first fixing mechanism 1 and the second fixing mechanism 2 are arranged in parallel. The heating pipe is close to and aligned under the action of the clamping mechanism 3. At this time, the staff only needs to weld the heating pipe and remove the docking device after welding.

[0031] Working principle: open the left ring 102 and the right ring 103 along the hinged position of the first hinge plate 101 and the second hinge plate 109, and install and fix them on the side of the heating pipe, close the left ring 102 and the right ring 103 along the hinged position of the first hinge plate 101 and the second hinge plate 109, so that the threaded rod 106 is inserted into the limiting groove 110, and the second connecting plate 107 is fixed to the side of the threaded rod 106 by the retaining nut 108, thereby realizing the installation of the first fixing mechanism 1. After the first fixing mechanism 1 is installed, the anti-slip pad 111 located inside the left ring 102 and the right ring 103 is close to the side of the heating pipe, ensuring that the first fixing mechanism 1 is not easily displaced during the correction process to avoid affecting the correction effect.

[0032] After the first fixing mechanism 1 is fixed to the heating pipe, the second fixing mechanism 2 is installed to the side of another heating pipe using the same method, and the limit block 104 on the side of the first fixing mechanism 1 is placed inside the clamping mechanism 3 on the side of the second fixing mechanism 2, and the installation of the second fixing mechanism 2 is completed. At this time, the heating pipe has tended to be aligned under the action of the three clamping mechanisms 3. After the second fixing mechanism 2 is installed, the hydraulic telescopic rod 302 inside the clamping mechanism 3 is started, and the hydraulic telescopic rod 302 extends to push the push plate 303 to move. The push plate 303 begins to squeeze the limit block 104 along the slide groove 304, forcing the limit block 104 to be parallel to the surface of the push plate 303. The two heating pipes are clamped together by the three clamping mechanisms 3 to achieve the operation of approaching and correcting the direction.

[0033] The first fixing mechanism 1 and the second fixing mechanism 2 fix the heating pipe through the left ring 102 and the right ring 103, and the first fixing mechanism 1 and the second fixing mechanism 2 are arranged in parallel. The heating pipe is close to and aligned under the action of the clamping mechanism 3. At this time, the staff only needs to weld the heating pipe and remove the docking device after welding.

[0034] The above is only a preferred specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed in the present application according to the technical solution and utility model concept of the present application, which should be covered by the protection scope of the present application.

Claims

1. A heating pipe precision docking device, comprising a first fixing mechanism (1), characterized in that: The first fixing mechanism (1) comprises a first hinge plate (101), the lower end of the first hinge plate (101) is fixedly connected to a left ring (102), the outer side of the left ring (102) is evenly distributed and fixedly connected to two limit blocks (104), the lower end of the left ring (102) is fixedly connected to a first connecting plate (105), one side of the first connecting plate (105) is fixedly connected to a threaded rod (106), the side of the threaded rod (106) is threadedly connected to a retaining nut (108), the first hinge plate (101) is hinged to a second hinge plate (109), the lower end of the second hinge plate (109) is fixedly connected to a right ring (103), the middle outer side of the right ring (103) is fixedly connected to a limit block (104), the side of the limit block (104) contacts a clamping mechanism (3), and the second fixing mechanism (2) is installed inside the clamping mechanism (3).

2. A heating pipe precise docking device according to claim 1, characterized in that: The lower end of the right ring (103) is fixedly connected to a second connecting plate (107), and a limiting groove (110) is provided in the middle of the second connecting plate (107) and passes through both sides of the second connecting plate (107). One side of the second connecting plate (107) contacts the first connecting plate (105), and the side of the second connecting plate (107) away from the first connecting plate (105) contacts the retaining nut (108).

3. A heating pipe precise docking device according to claim 2, characterized in that: An anti-slip pad (111) is fixedly connected inside the left ring (102) and the right ring (103).

4. A heating pipe precise docking device according to claim 1, characterized in that: The structure of the second fixing mechanism (2) is the same as that of the first fixing mechanism (1), and the limiting blocks (104) on the side surfaces of the second fixing mechanism (2) are fixedly connected to the inside of the clamping mechanism (3).

5. The heating pipe precise docking device according to claim 1, characterized in that: The clamping mechanism (3) comprises a shell (301), the shell (301) is fixedly connected to the second fixing mechanism (2), a sliding groove (304) is provided on a side of the shell (301) close to the second fixing mechanism (2), and a hydraulic telescopic rod (302) is fixedly connected to an end away from the second fixing mechanism (2), the hydraulic telescopic rod (302) is fixed inside the sliding groove (304), and a push plate (303) is fixedly connected to an extended end of the hydraulic telescopic rod (302), and the push plate (303) is slidably connected to a groove wall of the sliding groove (304).

6. The heating pipe precise docking device according to claim 1, characterized in that: The left ring (102) and the right ring (103) are symmetrically arranged.