Fan installation ship
By setting up multiple cranes on the wind turbine installation vessel to work together, the wind turbine towers are assembled as a whole on the hull and hoisted to the outside of the hull to dock with the foundation. This solves the problem of the risk of tower docking and collision during offshore wind power installation and improves installation efficiency.
Patent Information
- Application Number
- CN202420423325.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-03-05
AI Technical Summary
In existing technologies, the frequent docking of moving towers with stationary pile foundations during offshore wind power installation poses a significant risk of collision and affects installation efficiency.
The wind turbine installation vessel is equipped with a first crane, a second crane, and a third crane. Through the coordinated work of these cranes, the multiple towers of the wind turbine are assembled into a whole on the hull. The whole wind turbine is then rotated to the outside of the hull and connected to the wind turbine foundation by hoisting equipment, reducing the number of tower connections.
This reduces the number of tower connection and installation operations, lowers the risk of collisions between moving and stationary assembly states, and improves the installation efficiency of the wind turbine.
Smart Images

Figure CN222080874U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of offshore wind power, in particular to a wind turbine installation ship. Background Art
[0002] Wind power generation is the fastest growing green energy technology. While the construction of onshore wind farms is developing rapidly, people have noticed some limitations on the use of onshore wind energy, such as large land area, noise pollution, etc. Due to the abundant offshore wind energy resources and the feasibility of current technology, the ocean has become a rapidly developing wind power market.
[0003] Offshore wind turbines are usually transported to the target location by an installation vessel, and then fixedly connected to the pile foundation on the seabed.
[0004] In the prior art, most wind turbine installation vessels are anchored self-elevating vessels. As offshore wind power develops towards deep sea, deepwater dynamically positioned crane vessels are needed to carry out offshore wind power installation operations. However, the installation height requirement for wind turbines is relatively high. During the installation of wind turbines, the segmented wind turbine tower needs to be docked with the pile foundation many times. Affected by the waves at sea, frequent docking of the moving tower with the static pile foundation poses a greater risk of collision. Utility Model Content
[0005] In view of this, the utility model provides a wind turbine installation vessel to solve the problem in the prior art of frequently docking a moving tower with a stationary pile foundation, which results in a large risk of collision.
[0006] The utility model provides a wind turbine installation ship, comprising a hull, a first crane, a second crane and a third crane. The hull is suitable for transporting the wind turbine. The first crane is rotatably installed on the hull and is suitable for running the wind turbine. The second crane is fixedly installed on the top of the first crane and is suitable for fixing the wind turbine. The third crane is rotatably installed on the top of the first crane and is suitable for hoisting the wind turbine.
[0007] Beneficial effect: The utility model arranges the first crane, the second crane and the third crane on the hull. When installing the wind turbine, the third crane can be used to first assemble the multiple wind turbine towers of the wind turbine on the hull into a wind turbine as a whole. The first crane and the second crane are then used to cooperate to rotate and hoist the wind turbine as a whole to the outside of the hull and to connect it to the wind turbine foundation for installation. Connecting the wind turbine as a whole with the wind turbine foundation reduces the number of docking and installation times of the towers, reduces the risk of collision between the moving state and the stationary state when the wind turbine is installed at sea, and improves the installation efficiency of the wind turbine.
[0008] In an optional embodiment, the wind turbine installation vessel further comprises a support, the support is arranged on the hull, and the first crane is rotatably mounted on the support.
[0009] In an optional embodiment, the wind turbine installation vessel further includes a first rotating member, which is rotatably installed between the support and the first crane.
[0010] Beneficial effects: The utility model can realize the rotation of the first crane relative to the hull by setting a first rotating part between the support and the first crane. After the wind turbine is assembled on the hull, by rotating the first rotating part, the first crane cooperates with the second crane to hoist the wind turbine as a whole to the outside of the hull, so that the wind turbine as a whole can be docked and installed with the wind turbine pile foundation.
[0011] In an optional embodiment, the first crane includes a first body and a cantilever, one end of the first body is rotatably connected to the first rotating member, the other end of the first body is fixedly connected to the second crane, the cantilever is fixedly installed on the side of the first body, and the cantilever is suitable for operating the fan.
[0012] Beneficial effect: When the utility model hoists the wind turbine as a whole to the outside of the hull and docks it with the wind turbine pile foundation, the cantilever of the first crane hoists and operates the lower part of the wind turbine as a whole, and the second crane clamps and fixes the middle part of the wind turbine. Through the coordinated cooperation of the first crane and the second crane, the wind turbine as a whole can be docked and installed with the wind turbine base, reducing the number of docking and installation times of the tower, thereby reducing the risk of collision between the moving state and the static state when the wind turbine is installed at sea, and at the same time improving the installation efficiency of the wind turbine.
[0013] In an optional embodiment, the first crane further comprises a first sling, the first sling is movably mounted on the cantilever, and the first sling is suitable for operating the wind turbine.
[0014] Beneficial effects: The utility model can hoist the bottom of the entire wind turbine through the first sling, and can work in conjunction with the second crane to hoist the entire wind turbine structure of larger size and weight, thereby increasing the applicability of the wind turbine installation ship.
[0015] In an optional embodiment, the wind turbine installation vessel further includes a second rotating member installed between the second crane and the third crane.
[0016] Beneficial effect: The utility model can realize the rotation of the third crane by arranging the second rotating member between the second crane and the third crane, so as to hoist and assemble the segmented wind turbine tower on the hull into a whole wind turbine, thereby reducing the number of splicing times of the wind turbine tower and the wind turbine foundation.
[0017] In an optional embodiment, the second crane includes a second body and a clamp, one end of the second body is fixedly connected to the first crane, the other end of the second body is rotatably connected to the second rotating member, and a plurality of clamps are movably mounted on the side of the second body, and the clamps are suitable for clamping and fixing the fan.
[0018] Beneficial effect: The utility model arranges a plurality of clamps on the side of the second body. When the fan is moved as a whole to the outside of the hull, the clamps can clamp and fix the fan as a whole, thereby avoiding the shaking of the fan as a whole during operation and improving the stability during operation and installation.
[0019] In an optional embodiment, the third crane includes a third body and a lifting arm, the third body is rotatably connected to the second rotating member, a plurality of lifting arms are movably mounted on the third body, and the lifting arms are suitable for lifting the wind turbine.
[0020] Beneficial effect: The utility model can assemble multiple sections of wind turbine towers on the hull into a whole wind turbine through multiple movable lifting arms, thereby reducing the number of times the wind turbine tower and the wind turbine foundation are spliced.
[0021] In an optional embodiment, the third crane further comprises a second sling, the second sling is movably mounted on the boom, and the second sling is suitable for hoisting the wind turbine.
[0022] In an optional embodiment, the third crane further includes a hoisting device, the hoisting device is fixedly mounted on the second body, and the boom and the second sling are movably connected to the hoisting device. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 This is a front view of a wind turbine installation vessel according to an embodiment of the utility model;
[0025] Figure 2 for Figure 1 A local enlarged schematic diagram of the middle A;
[0026] Figure 3 for Figure 1 A local enlarged schematic diagram of point B in the middle.
[0027] Description of reference numerals:
[0028] 1. Hull;
[0029] 2. first crane; 201. first main body; 202. cantilever; 203. first sling;
[0030] 3. Second crane; 301. Second body; 302. Hoop;
[0031] 4. The third crane; 401. The third body; 402. The crane arm; 403. The second sling; 404. The hoisting device;
[0032] 5. Support;
[0033] 6. A first rotating member;
[0034] 7. A second rotating member;
[0035] 8. Fan; 801. Fan tower; 802. Fan main engine; 803. Fan blades; 804. Fan foundation. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0037] Combine the following Figures 1 to 3 , describing an embodiment of the utility model.
[0038] According to the embodiments of the present utility model, Figures 1 to 3 As shown, a wind turbine installation vessel is provided, including a hull 1, a first crane 2, a second crane 3 and a third crane 4, the hull 1 is suitable for transporting a wind turbine 8, the first crane 2 is rotatably installed on the hull 1, and the first crane 2 is suitable for operating the wind turbine 8, the second crane 3 is fixedly installed on the top of the first crane 2, and the second crane 3 is suitable for fixing the wind turbine 8, and the third crane 4 is rotatably installed on the top of the first crane 2, and the third crane 4 is suitable for hoisting the wind turbine 8.
[0039] Specifically, in this embodiment, there is no specific limitation on the hull 1. In order to conform to the actual situation, in this embodiment, the hull 1 adopts a semi-submersible dynamic positioning ship. The semi-submersible dynamic positioning ship adjusts the ballast water of the hull to submerge the loading deck into the water, so as to float the wind turbine 8 to be transported from the designated position to the loading deck of the semi-submersible ship and transport the cargo to the designated position.
[0040] like Figure 1 As shown, in this embodiment, the wind turbine 8 includes a wind turbine tower 801, a wind turbine main engine 802 and wind turbine blades 803, which are assembled into a wind turbine 8 as a whole on a semi-submersible dynamic positioning vessel.
[0041] In this embodiment, no specific limitation is made to the first crane 2 . To meet the actual situation, in this embodiment, the first crane 2 adopts a fixed forklift double-lift crane, and the lower part of the fixed forklift double-lift crane can rotate as a whole on the hull 1 .
[0042] The present embodiment does not make any specific limitation on the second crane 3. To conform to the actual situation, the present embodiment adopts a high tower crane as the second crane 3. A fixing device is provided on the high tower crane. When the fan 8 is operated as a whole and is outboard of the hull 1, the fixing device can clamp and fix the fan 8 as a whole, thereby improving the stability of the fan 8 during the operation as a whole and avoiding the shaking of the fan 8 as a whole.
[0043] In this embodiment, the third crane 4 is not specifically limited. In order to conform to the actual situation, the third crane 4 in this embodiment adopts a full-slewing crane, which can rotate as a whole in the horizontal plane. The full-slewing crane is used to assemble the wind turbine tower 801, the wind turbine main engine 802 and the wind turbine blades 803 into a wind turbine 8 as a whole on the semi-submersible dynamic positioning ship. After the assembly is completed, the high tower crane cooperates with the fixed forklift double-lift crane to lift the wind turbine 8 as a whole. The high tower crane and the fixed forklift double-lift crane rotate synchronously to rotate the wind turbine 8 as a whole to the outside of the ship, and perform the docking operation of the wind turbine 8 as a whole with the wind turbine foundation 804 pre-installed in the sea, thereby completing the installation of the wind turbine 8 as a whole.
[0044] The utility model arranges a first crane 2, a second crane 3 and a third crane 4 on the hull 1. When installing the wind turbine 8, the third crane 4 can be used to first assemble multiple wind turbine towers 801 of the wind turbine 8 on the hull 1 into a wind turbine 8 as a whole. Then, the first crane 2 and the third crane 4 cooperate to rotate and hoist the wind turbine 8 as a whole to the outboard of the hull 1 and to connect it with the wind turbine foundation 804. Connecting the wind turbine 8 as a whole with the wind turbine foundation 804 reduces the number of docking and installation times of the towers, reduces the risk of collision between the moving state and the stationary state when the wind turbine 8 is installed at sea, and improves the installation efficiency of the wind turbine 8.
[0045] In one embodiment, Figure 1 and Figure 2 As shown, the wind turbine installation vessel further comprises a support 5 , which is arranged on the hull 1 , and the first crane 2 is rotatably mounted on the support 5 .
[0046] Specifically, in this embodiment, the support 5 is fixedly mounted on the hull 1 , and the first crane 2 is rotatably mounted on the support 5 .
[0047] In one embodiment, Figure 1 and Figure 2 As shown, the wind turbine installation vessel further includes a first rotating member 6 , which is rotatably installed between the support 5 and the first crane 2 .
[0048] Specifically, in this embodiment, the first rotating member 6 adopts a slewing supporting device, which includes a slewing seat ring, a fixed seat ring and a slewing driver. The slewing seat ring is fixedly connected to the bottom of the first crane 2, the fixed seat ring is sleeved in the slewing seat ring, and the inner side wall of the fixed seat ring is provided with a first tooth portion. The slewing driver is fixedly installed on the first crane 2, and the slewing driver is provided with a second tooth portion meshing with the first tooth portion. The fixed seat ring is fixedly installed on the top of the support 5. The slewing driver controls the slewing seat ring to rotate relative to the fixed seat ring, thereby realizing the rotation of the first crane 2.
[0049] The utility model arranges a first rotating member 6 between the support 5 and the first crane 2, so that the first crane 2 can rotate relative to the hull 1. After the wind turbine 8 is assembled on the hull 1 as a whole, the first crane 2 cooperates with the second crane 3 to hoist the wind turbine 8 as a whole to the outside of the hull 1 by rotating the first rotating member 6, so that the wind turbine 8 as a whole can be docked and installed with the wind turbine foundation 804.
[0050] In one embodiment, Figure 2 As shown, the first crane 2 includes a first body 201 and a cantilever 202. One end of the first body 201 is rotatably connected to the first rotating member 6, and the other end of the first body 201 is fixedly connected to the second crane 3. The cantilever 202 is fixedly installed on the side of the first body 201, and the cantilever 202 is suitable for operating the fan 8.
[0051] Specifically, in this embodiment, the first body 201 adopts a tower structure, the bottom is connected to the first rotating member 6, the top is connected to the second crane 3, and the cantilever 202 is perpendicular to the first body 201 and protrudes out of the first body 201. When the fan 8 is operated as a whole, the cantilever 202 is used to hoist the bottom of the fan 8 as a whole.
[0052] When the utility model hoists the wind turbine 8 as a whole to the outside of the hull 1 and docks it with the wind turbine foundation 804, the cantilever 202 of the first crane 2 operates the lower part of the wind turbine 8 as a whole, and the second crane 3 clamps and fixes the middle part of the wind turbine 8. Through the coordinated cooperation of the first crane 2 and the second crane 3, the wind turbine 8 as a whole can be docked and installed with the base of the wind turbine 8, which reduces the number of docking and installation times of the tower, thereby reducing the risk of collision between the moving state and the static state when the wind turbine 8 is installed at sea, and at the same time improves the installation efficiency of the wind turbine 8.
[0053] In one embodiment, Figure 2 As shown, the first crane 2 further comprises a first sling 203 , which is movably mounted on the cantilever 202 , and the first sling 203 is suitable for operating the wind turbine 8 .
[0054] Specifically, in this embodiment, a winch device is provided on the cantilever 202, one end of the first sling 203 is connected to the winch device, and the other end is movably mounted on the cantilever 202. When the wind turbine 8 is moved as a whole to the outside of the hull 1, the bottom of the wind turbine 8 as a whole can be fixedly connected through the first sling 203, and the wind turbine 8 as a whole can be lifted off the deck of the hull 1, and then the upper end of the wind turbine 8 as a whole can be lifted in cooperation with the third crane 4, and the wind turbine 8 as a whole can be moved off the deck of the hull 1.
[0055] The utility model can hoist the bottom of the entire wind turbine 8 through the first hoisting rope 203, and can work in conjunction with the second crane 3 to hoist the entire structure of the wind turbine 8 of larger size and weight, thereby improving the application range of the wind turbine installation ship.
[0056] In one embodiment, Figure 1 and Figure 3 As shown, the wind turbine installation vessel further includes a second rotating member 7 , which is installed between the second crane 3 and the third crane 4 .
[0057] Specifically, in this embodiment, the second rotating member 7 adopts a slewing supporting device, which includes a slewing seat ring, a fixed seat ring and a slewing driver. The slewing seat ring is fixedly connected to the bottom of the third crane 4, the fixed seat ring is sleeved in the slewing seat ring, and the inner side wall of the fixed seat ring is provided with a first tooth portion. The slewing driver is fixedly installed on the third crane 4, and the slewing driver is provided with a second tooth portion meshing with the first tooth portion. The fixed seat ring is fixedly installed on the top of the second crane 3. The slewing seat ring is controlled to rotate relative to the fixed seat ring by the slewing driver, thereby realizing the rotation of the third crane 4.
[0058] The utility model arranges a second rotating member 7 between the second crane 3 and the third crane 4 to realize the rotation of the third crane 4, so as to hoist and assemble the segmented wind turbine tower 801 on the hull 1 into a whole wind turbine 8, thereby reducing the number of splicing times of the wind turbine tower 801 and the wind turbine foundation 804.
[0059] In one embodiment, Figure 1 As shown, the second crane 3 includes a second body 301 and a clamp 302. One end of the second body 301 is fixedly connected to the first crane 2, and the other end of the second body 301 is rotatably connected to the second rotating member 7. A plurality of clamps 302 are movably mounted on the side of the second body 301, and the clamps 302 are suitable for clamping and fixing the fan 8.
[0060] Specifically, in this embodiment, the second body 301 adopts a tower structure, the bottom of the second body 301 is fixedly connected to the top of the first body 201, and the top of the second body 301 is connected to the second rotating member 7. In this embodiment, a plurality of clamps 302 are provided on the side of the second body 301 in the vertical direction. The clamps 302 are driven by a driver to open and close to achieve clamping and fixing of the fan 8 as a whole. In this embodiment, two groups of clamps 302 are provided. In some other embodiments, other numbers of clamps 302 can be set according to actual needs.
[0061] The utility model arranges a plurality of clamps 302 on the side of the second body 301. When the fan 8 is moved as a whole to the outside of the hull 1, the clamps 302 can clamp and fix the fan 8 as a whole, thereby preventing the fan 8 from shaking as a whole during operation and improving the stability during operation and installation.
[0062] In one embodiment, Figure 1 and Figure 3 As shown, the third crane 4 includes a third body 401 and a boom 402 . The third body 401 is rotatably connected to the second rotating member 7 . A plurality of booms 402 are movably mounted on the third body 401 . The booms 402 are suitable for hoisting the wind turbine 8 .
[0063] Specifically, in this embodiment, the third body 401 adopts a tower structure, and the bottom end of the third body 401 is rotatably connected to the second rotating member 7. In this embodiment, a plurality of lifting arms 402 are provided on the third body 401, one end of the lifting arm 402 is rotatably connected to the third body 401, and the other end is used to hoist the fan 8.
[0064] The utility model can assemble multiple sections of wind turbine tower 801 on the hull 1 into a whole wind turbine 8 through multiple movable lifting arms 402, thereby reducing the number of splicing times of the wind turbine tower 801 and the wind turbine foundation 804.
[0065] In one embodiment, Figure 3 As shown, the third crane 4 also includes a second sling 403 and a hoisting device 404. The second sling 403 is movably installed on the lifting arm 402. The second sling 403 is suitable for lifting the wind turbine 8. The hoisting device 404 is fixedly installed on the second body 301. The lifting arm 402 and the second sling 403 are movably connected with the hoisting device 404.
[0066] Specifically, in this embodiment, the hoisting device 404 is fixedly installed on the second body 301, and the hoisting device 404 is connected to the end of the boom 402 away from the second body 301 through a connecting piece. The hoisting device 404 controls the retraction and extension of the connecting piece to realize the pitching of the boom 402. A second sling 403 is also provided at the end of the boom 402 away from the second body 301. The second sling 403 is connected to the hoisting device 404 and is used to control the retraction and extension of the second sling 403 to realize the lifting of the wind turbine tower 801.
[0067] Although the embodiments of the present invention are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A wind turbine installation vessel, characterized in that: include: A hull (1), wherein the hull (1) is suitable for transporting a wind turbine (8); a first crane (2), the first crane (2) being rotatably mounted on the hull (1), the first crane (2) being suitable for operating the wind turbine (8); a second crane (3), the second crane (3) being fixedly mounted on the top of the first crane (2), the second crane (3) being suitable for fixing the wind turbine (8); A third crane (4), the third crane (4) is rotatably mounted on the top of the second crane (3), and the third crane (4) is suitable for hoisting the wind turbine (8).
2. The wind turbine installation vessel according to claim 1, characterized in that: Also includes: A support (5), wherein the support (5) is arranged on the hull (1), and the first crane (2) is rotatably mounted on the support (5).
3. The wind turbine installation vessel according to claim 2, characterized in that: Also includes: A first rotating member (6), the first rotating member (6) is rotatably mounted between the support (5) and the first crane (2).
4. The wind turbine installation vessel according to claim 3, characterized in that: The first crane (2) comprises: A first body (201), one end of the first body (201) being rotatably connected to the first rotating member (6), and the other end of the first body (201) being fixedly connected to the second crane (3); A cantilever (202), the cantilever (202) is fixedly mounted on a side of the first body (201), and the cantilever (202) is suitable for operating the fan (8).
5. The wind turbine installation vessel according to claim 4, characterized in that: The first crane (2) further comprises: A first sling (203), wherein the first sling (203) is movably mounted on the cantilever (202), and the first sling (203) is suitable for operating the fan (8).
6. The wind turbine installation vessel according to any one of claims 1 to 5, characterized in that: Also includes: A second rotating member (7), wherein the second rotating member (7) is installed between the second crane (3) and the third crane (4).
7. The wind turbine installation vessel according to claim 6, characterized in that: The second crane (3) comprises: A second body (301), one end of the second body (301) being fixedly connected to the first crane (2), and the other end of the second body (301) being rotatably connected to the second rotating member (7); A plurality of clamps (302), wherein the clamps (302) are movably mounted on the side of the second body (301), and the clamps (302) are suitable for clamping and fixing the fan (8).
8. The wind turbine installation vessel according to claim 7, characterized in that: The third crane (4) comprises: A third body (401), the third body (401) being rotatably connected to the second rotating member (7); A plurality of lifting arms (402), wherein the lifting arms (402) are movably mounted on the third body (401), and the lifting arms (402) are suitable for hoisting the wind turbine (8).
9. The wind turbine installation vessel according to claim 8, characterized in that: The third crane (4) further comprises: A second sling (403), wherein the second sling (403) is movably mounted on the lifting arm (402), and the second sling (403) is suitable for slinging the wind turbine (8).
10. The wind turbine installation vessel according to claim 9, characterized in that: The third crane (4) further comprises: A hoisting device (404), wherein the hoisting device (404) is fixedly mounted on the third body (401), and the lifting arm (402) and the second sling (403) are movably connected to the hoisting device (404).