Bridge high pier concrete curing device

By designing a concrete curing device for high-piers of bridges, using a support frame system with a combination of long-stroke jacks and pallets, combined with heating and thermal conduction plates, efficient spray maintenance is achieved, and the problems of low efficiency and inconvenience in the existing technology are solved. Improve the water absorption effect and curing quality of concrete.

CN222083338UActive Publication Date: 2024-11-29姚庆
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323664011.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-31
Publication Date
2024-11-29
Estimated Expiration
2033-12-31

AI Technical Summary

Technical Problem

The spraying maintenance method of existing bridge high piers is inefficient, dangerous to operate and inconvenient to insulation, especially in cold environments, which leads to poor water absorption effect of concrete.

Method used

A concrete curing device for high-piers of bridges is designed, including base plate, support frame and positioning components. Using a combination of long-stroke jack and pallets, the support frame is lifted step by step through the bending part and threaded barrel system, equipped with heating rods and thermal conductor plates. Insulation and maintenance, the water pipe is fully sprayed through the nozzle.

Benefits of technology

It improves the curing quality and adapts to bridge high piers of different sizes and specifications, ensures efficient humidification and insulation, improves the water absorption effect of concrete, and reduces the risk of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083338U_ABST
    Figure CN222083338U_ABST
Patent Text Reader

Abstract

The utility model discloses a bridge high pier concrete curing device which comprises a bottom plate, a supporting frame and a positioning assembly. The right end of the upper surface of the bottom plate is rotationally connected with a supporting column, the left end of the upper surface of the bottom plate is rotationally connected with a long-stroke jack, and supporting plates are arranged at the top end of the supporting column and the top end of a push rod of the long-stroke jack correspondingly; the right side face of the first n-shaped plate and the left side face of the second n-shaped plate are detachably connected through symmetrically-arranged bolts, bending parts extending outwards are arranged at the upper ends of the first n-shaped plate and the second n-shaped plate correspondingly, water pipes are arranged at the upper ends of the inner wall faces of the first n-shaped plate and the second n-shaped plate correspondingly, and the rear ends of the two water pipes are communicated through a quick connector. According to the bridge high pier concrete curing device, the curing quality is improved, and the bridge high pier concrete curing device is suitable for being used for bridge high piers of different sizes and specifications and is wide in application range.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge engineering, in particular to a concrete curing device for high bridge piers. Background Technique

[0002] High bridge piers are essential building facilities for erecting bridges. Currently, there are two construction methods for high bridge piers: prefabricated components (directly transported to the construction site for construction and erection after production in the factory), or cast-in-place high piers. Regardless of which method, spraying curing is required for concrete construction. There are special spraying facilities in the factory prefabrication to ensure the subsequent concrete curing. However, for cast-in-place bridge high piers, continuous spraying curing is required for a period of time. Currently, the curing protection for cast-in-place is usually manual spraying with a water pipe, but the height of the bridge high pier is relatively high, it is not easy for personnel to spray, and the operation is dangerous and inefficient. Moreover, manual spraying is prone to incomplete spraying and easy to miss a certain place. In addition, in cold winter, it is not convenient to carry out heat preservation curing for the bridge high pier, resulting in poor water absorption effect of the bridge high pier concrete. Therefore, we propose a concrete curing device for bridge high piers. Content of the Utility Model

[0003] The technical problem to be solved by the utility model is to overcome the existing defects, provide a concrete curing device for bridge high piers, improve the curing quality, adapt to the use of bridge high piers with different size specifications, and has a wide application range, and can effectively solve the problems in the background technique.

[0004] To achieve the above purpose, the utility model provides the following technical scheme: A concrete curing device for bridge high piers, including a bottom plate, a support frame and a positioning component;

[0005] Bottom plate: A support column is rotatably connected to the right end of the upper surface thereof, a long-stroke jack is rotatably connected to the left end of the upper surface of the bottom plate, a support plate is provided at the top end of the support column and the top end of the push rod of the long-stroke jack. The support frame includes a U-shaped plate one and a U-shaped plate two. The right side surface of the U-shaped plate one and the left side surface of the U-shaped plate two are detachably connected by symmetrically arranged bolts. The upper ends of the U-shaped plate one and the U-shaped plate two are provided with bent parts extending outwards. Water pipes are provided at the upper ends of the inner wall surfaces of the U-shaped plate one and the U-shaped plate two. The rear ends of the two water pipes are communicated through quick connectors. A pagoda joint is provided at the front end of the water pipe on the right side. Nozzles are arranged in an array at the lower ends of the side walls of the water pipes. Connecting plates are symmetrically provided at the lower end of the front side surface of the U-shaped plate one. The connecting plates are respectively arranged in cooperation with the vertically corresponding support plates;

[0006] Positioning components: They are respectively arranged on the front side wall, left side wall and rear side wall of the first U-shaped plate and the middle part of the right side wall of the second U-shaped plate, humidifying and heat-preserving the concrete of the high pier of the bridge, improving the maintenance quality, facilitating the step-by-step upward lifting of multiple groups of support frames until the high pier of the bridge is completely covered, adapting to the use of high piers of bridges with different size specifications, and having a wide application range.

[0007] Furthermore, the positioning components include threaded cylinders, threaded rods and universal wheels. The threaded cylinders are respectively arranged on the front side wall, left side wall and rear side wall of the first U-shaped plate and the middle part of the right side wall of the second U-shaped plate. The middle parts of the threaded cylinders are all threadedly connected with threaded rods, and universal wheels are arranged at the inner ends of the threaded rods to position the support frame and make the high pier of the bridge located at the center of the support frame.

[0008] Furthermore, heat-insulating boards are arranged on the outer wall surfaces of the first U-shaped plate and the second U-shaped plate, and the threaded cylinders respectively pass through the interiors of the adjacent heat-insulating boards, reducing the heat loss inside the concrete and performing heat-preserving maintenance on the concrete.

[0009] Furthermore, heating rods are symmetrically arranged inside the side walls of the first U-shaped plate and the second U-shaped plate to heat the concrete of the high pier of the bridge and avoid too low temperature.

[0010] Furthermore, heat-conducting plates are arranged on the inner wall surfaces of the first U-shaped plate and the second U-shaped plate, and the heating rods are arranged in cooperation with the heat-conducting plates to improve the heat dissipation effect.

[0011] Furthermore, convex columns are arranged on the upper surfaces of the support plates, and the convex columns are respectively arranged in cooperation with the jack holes arranged inside the connecting plates to limit the connecting plates and avoid the unbalanced force of the support frame caused by the insecure connection between the support plates and the connecting plates.

[0012] Furthermore, it also includes handles, and the handles are respectively fixedly connected to the outer arc surfaces of the support columns and the long-stroke jacks, which is convenient for manual rotation.

[0013] Compared with the prior art, the beneficial effects of the present utility model are: The concrete maintenance device for the high pier of the bridge has the following advantages:

[0014] 1. Sleeved the U-shaped plate one and the U-shaped plate two on the outer surface of the high pier of the bridge. The right side of the U-shaped plate one and the left side of the U-shaped plate two are connected and fixed by bolts. The rear ends of the two water pipes are connected through quick connectors. Rotate the long-stroke jack through the handle on the left side, so that the support plate at the top of the long-stroke jack avoids the connecting plate on the left side, lift the assembled support frame upward, and then reverse the long-stroke jack so that the lower surface of the connecting plate on the left side contacts the upper surface of the support plate at the upper end of the push rod of the long-stroke jack. The convex column is inserted into the jack set inside the connecting plate. Rotate the support plate on the right side by 90 degrees through the handle, so that the support plate on the right side avoids the connecting plate on the right side in a staggered manner. Press the long-stroke jack by using the lever of the long-stroke jack, so that the push rod of the long-stroke jack jacks up the connecting plate on the left side above the support column. Then rotate the support column in the reverse direction so that the left side of the support plate at the top of the support column corresponds to the vertical position of the connecting plate on the right side. Release the pressure of the long-stroke jack. At this time, the support plate on the right side lifts the connecting plate on the right side to prevent the U-shaped plate one and the U-shaped plate two from sliding down under the action of gravity. Assemble another support frame again, which is convenient to lift multiple groups of support frames upward step by step on the ground until the high pier of the bridge is completely covered.

[0015] 2. The upper support frame is inserted into the bending part of the lower support frame, and so on, to comprehensively wrap the high pier of the bridge. Use an external water pump to supply water into the water pipe at the lower right side. The water pipe sprays and wets the outer surface of the high pier of the bridge through the nozzle. When the external environmental temperature is relatively low, turn on the heating rod. The heating rod generates heat when powered on to heat the U-shaped plate one and the U-shaped plate two. The U-shaped plate one and the U-shaped plate two diffuse the heat to the outer surface of the high pier of the bridge through the heat conduction plate. The heat preservation board can effectively reduce the loss of heat, humidify and heat-preserve the concrete of the high pier of the bridge, and improve the maintenance quality.

[0016] 3. Rotate the four threaded rods respectively. The threaded rods drive the universal wheels to move inward relative to the threaded cylinders, so that the outer surfaces of the wheels of the universal wheels evenly contact the outer surface of the high pier of the bridge, position the U-shaped plate one and the U-shaped plate two, and are suitable for use with high piers of different sizes and specifications, with a wide range of applications. Description of the Drawings

[0017] Figure 1 It is a schematic structural diagram of the present utility model;

[0018] Figure 2 It is an exploded structural diagram of the present utility model;

[0019] Figure 3 It is a schematic structural diagram of the water pipe of the present utility model;

[0020] Figure 4 It is an assembled structural diagram of the present utility model.

[0021] In the figure: 1 base plate, 2 support column, 3 long stroke jack, 4 support plate, 41 boss, 5 support frame, 51 profile plate 1, 52 profile plate 2, 6 connecting plate, 7 water pipe, 8 heating rod, 9 positioning assembly, 91 threaded cylinder, 92 threaded rod, 93 universal wheel, 10 insulation plate, 11 heat conduction plate, 12 handle, 13 pagoda connector, 14 quick connector. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-4 , This embodiment provides a technical solution: a bridge high pier concrete maintenance device, including a bottom plate 1, a support frame 5 and a positioning assembly 9;

[0024] Bottom plate 1: A support column 2 is rotatably connected to the right end of its upper surface, and a long-stroke jack 3 is rotatably connected to the left end of the upper surface of the bottom plate 1. Support plates 4 are provided at the top ends of the support column 2 and the push rod of the long-stroke jack 3. The support frame 5 includes a U-shaped plate one 51 and a U-shaped plate two 52. The right side surface of the U-shaped plate one 51 and the left side surface of the U-shaped plate two 52 are detachably connected by symmetrically arranged bolts. The U-shaped plate one 51 and the U-shaped plate two 52 are sleeved on the outer surface of the bridge high pier. The right side surface of the U-shaped plate one 51 and the left side surface of the U-shaped plate two 52 are connected and fixed by bolts, which is convenient for later disassembly. The upper ends of the U-shaped plate one 51 and the U-shaped plate two 52 are both provided with bent portions extending outwards, which is convenient for the two adjacent support frames 5 in the vertical direction to be sleeved with each other. Water pipes 7 are provided at the upper ends of the inner wall surfaces of the U-shaped plate one 51 and the U-shaped plate two 52. The rear ends of the two water pipes 7 are connected by a quick connector 14. A pagoda joint 13 is provided at the front end of the right water pipe 7. The pagoda joint 13 is used for the quick connection and disassembly between the two vertically corresponding water pipes 7. Nozzles are arranged in an array at the lower ends of the side walls of the two water pipes 7. The surface of the bridge high pier is humidified and maintained through the nozzles. Connecting plates 6 are symmetrically provided at the lower end of the front side surface of the U-shaped plate one 51. The connecting plates 6 are respectively arranged in cooperation with the vertically corresponding support plates 4. Convex columns 41 are provided on the upper surfaces of the support plates 4. The convex columns 41 are respectively arranged in cooperation with the jack holes provided inside the connecting plates 6 to limit the connecting plates 6 and prevent the support plates 4 from being not firmly connected to the connecting plates 6, resulting in unbalanced force on the support frame 5. The U-shaped plate one 51 and the U-shaped plate two 52 are sleeved on the outer surface of the bridge high pier. The right side surface of the U-shaped plate one 51 and the left side surface of the U-shaped plate two 52 are connected and fixed by bolts. Rotate the long-stroke jack 3 through the left handle 12, so that the support plate 4 at the top end of the long-stroke jack 3 avoids the left connecting plate 6, lift the assembled support frame 5 upwards, and then reverse the long-stroke jack 3 so that the lower surface of the left connecting plate 6 contacts the upper surface of the support plate 4 at the upper end of the push rod of the long-stroke jack 3. The convex column 41 is inserted into the jack hole provided inside the connecting plate 6. Rotate the right support plate 4 by 90 degrees so that the right support plate 4 avoids the right connecting plate 6 in a staggered manner. Press the long-stroke jack 3 by using the lever of the long-stroke jack 3, so that the push rod of the long-stroke jack 3 jacks up the left connecting plate 6 above the support column 2. Reverse-rotate the support column 2 so that the left side of the support plate 4 at the top end of the support column 2 corresponds to the vertical position of the right connecting plate 6. Release the pressure of the long-stroke jack 3. At this time, the right support plate 4 supports the right connecting plate 6 to prevent the U-shaped plate one 51 and the U-shaped plate two 52 from sliding down under the action of gravity, which is convenient for lifting multiple groups of support frames 5 step by step until the bridge high pier is completely covered. Heat preservation plates 10 are provided on the outer wall surfaces of the U-shaped plate one 51 and the U-shaped plate two 52. The threaded cylinders 91 respectively pass through the interiors of the adjacent heat preservation plates 10 to reduce the loss of internal heat of the concrete and perform heat preservation maintenance on the concrete. Heating rods 8 are symmetrically provided inside the side walls of the U-shaped plate one 51 and the U-shaped plate two 52 to heat the concrete of the bridge high pier and prevent the temperature from being too low.Heat conduction plates 11 are provided on the inner wall surfaces of the U-shaped plate one 51 and the U-shaped plate two 52. The heating rod 8 is arranged in cooperation with the heat conduction plate 11 to improve the heat dissipation effect.

[0025] Among them: It also includes a handle 12, and the handle 12 is respectively fixedly connected to the outer arc surfaces of the support column 2 and the long-stroke jack 3, which is convenient for manual rotation.

[0026] The positioning assembly 9: is respectively arranged on the front side wall, the left side wall and the rear side wall of the U-shaped plate one 51 and the middle part of the right side wall of the U-shaped plate two 52. The positioning assembly 9 includes a threaded barrel 91, a threaded rod 92 and a universal wheel 93. The threaded barrels 91 are respectively arranged on the front side wall, the left side wall and the rear side wall of the U-shaped plate one 51 and the middle part of the right side wall of the U-shaped plate two 52. The middle parts of the threaded barrels 91 are all threadedly connected with the threaded rods 92. The inner ends of the threaded rods 92 are all provided with universal wheels 93. Rotate the four threaded rods 92 respectively, and the threaded rods 92 drive the universal wheels 93 to move inwards relative to the threaded barrels 91, so that the outer surface of the wheel body of the universal wheels 93 is evenly in contact with the outer surface of the bridge high pier, position the U-shaped plate one 51 and the U-shaped plate two 52, and make the bridge high pier located at the center of the support frame 5.

[0027] The working principle of a bridge high pier concrete curing device provided by the present utility model is as follows:

[0028] Socket the U-shaped plate 1-51 and the U-shaped plate 2-52 on the outer surface of the high pier of the bridge. The right side surface of the U-shaped plate 1-51 and the left side surface of the U-shaped plate 2-52 are fixedly connected by bolts. The rear ends of the two water pipes 7 are communicated through quick connectors 14. Rotate the four threaded rods 92 respectively. The threaded rods 92 drive the universal wheels 93 to move inwards relative to the threaded barrels 91, so that the outer surfaces of the wheel bodies of the universal wheels 93 are in contact with the outer surface of the high pier of the bridge evenly, positioning the U-shaped plate 1-51 and the U-shaped plate 2-52. Rotate the long-stroke jack 3 through the handle 12 on the left side, so that the support plate 4 at the top of the long-stroke jack 3 avoids the connecting plate 6 on the left side, lift the assembled support frame 5 upwards, and then reverse the long-stroke jack 3 so that the lower surface of the connecting plate 6 on the left side contacts the upper surface of the support plate 4 at the upper end of the push rod of the long-stroke jack 3. The convex column 41 is inserted into the jack arranged inside the connecting plate 6. Rotate the support plate 4 on the right side by 90 degrees through the handle 12, so that the support plate 4 on the right side avoids the connecting plate 6 on the right side in a staggered manner. Press the long-stroke jack 3 by using the lever of the long-stroke jack 3, so that the push rod of the long-stroke jack 3 jacks up the connecting plate 6 on the left side above the support column 2. Then rotate the support column 2 in the reverse direction so that the left side of the support plate 4 at the top of the support column 2 corresponds to the vertical position of the connecting plate 6 on the right side. Release the pressure of the long-stroke jack 3. At this time, the support plate 4 on the right side lifts the connecting plate 6 on the right side to prevent the U-shaped plate 1-51 and the U-shaped plate 2-52 from sliding down under the action of gravity. Assemble another support frame 5 again, so that the top end of the water pipe 7 on the lower left is fixedly connected to the宝塔接头13 above. Lift the assembled support frame 5 upwards according to the above working principle. The upper support frame 5 is inserted into the bending part of the lower support frame 5. And so on, the high pier of the bridge is comprehensively wrapped. Use an external water pump to supply water into the water pipe 7 at the lower right side. The water pipe 7 sprays and wets the outer surface of the high pier of the bridge through the nozzle. When the external environmental temperature is relatively low, turn on the heating rod 8. The heating rod 8 generates heat when powered on to heat the U-shaped plate 1-51 and the U-shaped plate 2-52. The U-shaped plate 1-51 and the U-shaped plate 2-52 diffuse the heat to the outer surface of the high pier of the bridge through the heat conduction plate 11. The heat preservation plate 10 can effectively reduce the loss of heat, so as to heat and cure the concrete of the high pier of the bridge.

[0029] The above is only the embodiment of the present invention, and does not limit the patent scope of the present invention accordingly. All equivalent structural or equivalent process transformations made by using the content of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are equally included in the patent protection scope of the present invention.

Claims

1. A bridge high pier concrete curing device, characterized in that: It includes a bottom plate (1), a support frame (5) and a positioning component (9); Bottom plate (1): A support column (2) is rotatably connected to the right end of its upper surface. A long-stroke jack (3) is rotatably connected to the left end of the upper surface of the bottom plate (1). A support plate (4) is provided at the top of the support column (2) and the top of the push rod of the long-stroke jack (3). The support frame (5) includes a U-shaped plate one (51) and a U-shaped plate two (52). The right side surface of the U-shaped plate one (51) and the left side surface of the U-shaped plate two (52) are detachably connected by symmetrically arranged bolts. The upper ends of the U-shaped plate one (51) and the U-shaped plate two (52) are both provided with bent parts extending outwards. Water pipes (7) are provided at the upper ends of the inner wall surfaces of the U-shaped plate one (51) and the U-shaped plate two (52). The rear ends of the two water pipes (7) are connected by a quick connector (14). A pagoda joint (13) is provided at the front end of the right water pipe (7). Nozzles are arranged in an array at the lower ends of the side walls of the water pipes (7). Connecting plates (6) are symmetrically provided at the lower end of the front side surface of the U-shaped plate one (51). The connecting plates (6) are respectively arranged in cooperation with the vertically corresponding support plates (4); Positioning component (9): It is respectively arranged on the front side wall, left side wall and rear side wall of the U-shaped plate one (51) and the middle part of the right side wall of the U-shaped plate two (52).

2. A bridge high pier concrete curing device according to claim 1, characterized in that: The positioning component (9) includes a threaded cylinder (91), a threaded rod (92) and a universal wheel (93). The threaded cylinders (91) are respectively arranged on the front side wall, left side wall and rear side wall of the U-shaped plate one (51) and the middle part of the right side wall of the U-shaped plate two (52). The middle parts of the threaded cylinders (91) are all threadedly connected with threaded rods (92). Universal wheels (93) are provided at the inner ends of the threaded rods (92).

3. A bridge high pier concrete curing device according to claim 2, characterized in that: Heat preservation plates (10) are provided on the outer wall surfaces of the U-shaped plate one (51) and the U-shaped plate two (52). The threaded cylinders (91) respectively pass through the interiors of the adjacent heat preservation plates (10).

4. A bridge high pier concrete curing device according to claim 1, characterized in that: Heating rods (8) are symmetrically provided inside the side walls of the U-shaped plate one (51) and the U-shaped plate two (52).

5. A bridge high pier concrete curing device according to claim 4, characterized in that: Heat conducting plates (11) are provided on the inner wall surfaces of the U-shaped plate one (51) and the U-shaped plate two (52). The heating rods (8) are arranged in cooperation with the heat conducting plates (11).

6. A bridge high pier concrete curing device according to any one of claims 1-5, characterized in that: Convex columns (41) are provided on the upper surfaces of the support plates (4). The convex columns (41) are respectively arranged in cooperation with the jacks arranged inside the connecting plates (6).

7. A bridge high pier concrete curing device according to claim 1, characterized in that: It further includes a handle (12). The handle (12) is respectively fixedly connected to the outer arc surfaces of the support column (2) and the long-stroke jack (3).