Pipe gallery foundation pit groove cleaning device
By combining bulldozers and traction mechanisms, the problem of low efficiency in manual excavation during the construction of underground utility tunnels was solved, achieving efficient and low-disturbance foundation pit clearing.
Patent Information
- Application Number
- CN202420229714.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-30
AI Technical Summary
In the construction of underground utility tunnels, manual excavation of foundation pits is inefficient, resulting in low construction efficiency.
By using a bulldozer and a traction mechanism, the bulldozer moves along the length of the pipe gallery pit through a traction rope and guide pulley system. The blades cut the soil, and the path is adjusted by the adjustable blade depth and pulley system to achieve full coverage of the trench cleaning.
It improves the efficiency of manual excavation, reduces disturbance to the original soil of the foundation, and ensures construction quality and efficiency.
Smart Images

Figure CN222083634U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of foundation pit excavation devices, and in particular to a tunnel foundation pit cleaning device. Background Art
[0002] During the construction of underground pipe corridors, foundation pit excavation is required. In order to prevent mechanical over-excavation or mechanical disturbance of the original soil at the base, according to construction specifications, it is usually necessary to reserve a 150mm to 300mm soil layer when mechanical excavation is used, and then manual excavation and leveling are used.
[0003] Since the pipeline corridor is generally several kilometers long and a dozen meters wide, a large amount of manual excavation is required and the construction efficiency is low. Utility Model Content
[0004] In order to improve the problem of low efficiency of manual trench cleaning, the present application provides a tunnel foundation pit trench cleaning device.
[0005] The present application provides a tunnel foundation pit cleaning device that adopts the following technical solution:
[0006] A pipe gallery foundation pit cleaning device, comprising:
[0007] A shovel truck is slidably arranged on the soil surface of the tunnel foundation pit, and a blade for shoveling soil is arranged at the front end of the shovel truck;
[0008] Two traction ropes are respectively connected to the front and rear ends of the earthmoving vehicle;
[0009] Two fixing seats are respectively fixed at both ends of the length direction of the tunnel foundation pit;
[0010] A traction mechanism, arranged on the fixed seat, for reeling in or unreeling the corresponding traction rope and driving the earthmoving vehicle to move along the length direction of the tunnel foundation pit;
[0011] The guide pulley block is used to guide the traction rope.
[0012] The corresponding traction rope is reeled in or unreeled through the traction mechanism, and the traction rope is guided by the guide pulley group, thereby driving the excavator to move along the length direction of the tunnel corridor foundation pit. During the movement of the excavator, the blade cuts the soil in the foundation pit, improving the problem of low efficiency of manual excavation.
[0013] Furthermore, the traction mechanism includes a winch fixedly arranged on the fixed seat, and the traction rope is wound around the output end of the corresponding winch.
[0014] The bulldozer can be driven forward or backward by winding or unwinding the corresponding traction rope with a winch.
[0015] Furthermore, the guide pulley group includes a first pulley group arranged on the fixed seat and a second pulley group arranged on the travel track of the earthmoving vehicle.
[0016] The first pulley group guides the traction rope at the output end of the winch, and the second pulley group guides the traction rope on the travel track of the bulldozer, so that the travel track of the bulldozer remains parallel to the length direction of the tunnel foundation pit.
[0017] Furthermore, the first pulley block includes two first pulleys rotatably disposed on the fixed seat, the axes of the two first pulleys are both vertically disposed, and a gap is disposed between the two first pulleys for the traction rope to pass through.
[0018] The traction rope passes through the gap between the two first pulleys, and the two first pulleys guide the traction rope.
[0019] Furthermore, the corridor foundation pit is fixedly provided with two mounting seats on the travel track of the excavator, and the two mounting seats are respectively located in front and rear of the excavator, and the second pulley group includes a second pulley rotatably arranged on each of the mounting seats, and the two traction ropes are respectively wound around the corresponding second pulleys.
[0020] The traction rope is guided by two second pulleys to keep the moving trajectory of the bulldozer parallel to the length direction of the tunnel foundation pit; by changing the position of the two mounting seats, the traction direction of the traction rope can be changed, thereby adjusting the bulldozer's earth-moving path to achieve full coverage of the trench cleaning area.
[0021] Furthermore, the earthmoving truck comprises a vehicle body and a bucket fixedly connected to the vehicle body, and the blade is fixedly arranged at the front end of the vehicle body.
[0022] Furthermore, the blade is arranged obliquely downward along the forward direction of the vehicle body, and the blade is provided with a cutting edge portion inserted into the soil.
[0023] Furthermore, a push plate is fixedly connected to the front end of the vehicle body, and the push plate is arranged obliquely upward along the forward direction of the vehicle body. The vehicle body is provided with an earth-exiting opening between the blade and the push plate.
[0024] As the vehicle body moves forward, the blade cuts the soil, and the loose soil is collected in the truck bucket through the discharge port; the push plate helps the vehicle body to move forward smoothly, thereby keeping the cutting depth stable.
[0025] Furthermore, the vehicle body is in the shape of a flat plate, and the bottom surface of the vehicle body is in contact with the soil surface of the tunnel foundation pit.
[0026] During the shoveling process, the flat-plate-shaped vehicle body flattens the soil surface, and the contact area between the vehicle body and the soil surface is large, the pressure generated is small, and the disturbance to the original soil at the base is small.
[0027] Furthermore, a handrail is fixedly provided on the vehicle body, and a dump hook is fixedly connected to the handrail.
[0028] During the movement of the bulldozer, construction workers can use the handrails to assist the bulldozer to move forward smoothly; when the bulldozer has finished shoveling and needs to unload the soil, the traction rope at the front end of the bulldozer is hung on the dump hook, and then the traction rope at the front end of the bulldozer is reeled in to make the bulldozer tip forward to unload the soil.
[0029] In summary, the present application includes at least one of the following beneficial technical effects:
[0030] 1. The traction rope and the traction mechanism are used to pull the excavator to move along the tunnel foundation pit. The blade on the excavator cuts the soil in the foundation pit, which improves the problem of low efficiency of manual excavation.
[0031] 2. By adjusting the position of the second pulley block, the traction direction of the traction rope is changed, thereby adjusting the shoveling path of the shovel truck to achieve full coverage of the trough cleaning area;
[0032] 3. The contact area between the vehicle body and the soil surface is larger, the pressure generated is smaller, and the disturbance to the original soil at the base is smaller. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;
[0034] Figure 2 It is a schematic diagram mainly used to show the earthmoving vehicle and the traction mechanism in the embodiment of the present application;
[0035] Figure 3 is a schematic diagram of a bulldozer in an embodiment of the present application;
[0036] Figure 4 It is a partial schematic diagram mainly used to show the front end blade of the earthmoving vehicle in the embodiment of the present application;
[0037] Figure 5 It is a partial schematic diagram mainly used to show the traction mechanism and the first pulley block in the embodiment of the present application;
[0038] Figure 6 It is a partial schematic diagram mainly used to show the second pulley block in the embodiment of the present application.
[0039] Figure numerals: 1. handrail; 2. tipping hook; 3. truck bucket; 4. truck body; 5. blade; 6. traction rope; 7. anchor claw; 8. winch; 9. fixed seat; 10. mounting seat; 11. first pulley; 12. anchor steel pile; 13. second pulley; 14. movable plate; 15. bolt; 16. push plate; 17. front traction hole; 18. excavation port; 19. rear traction hole. DETAILED DESCRIPTION
[0040] The following is combined with Figure 1-6 This application is described in further detail.
[0041] The present application embodiment discloses a tunnel cleaning device for a tunnel foundation pit. Figure 1 and Figure 2 The tunnel pit cleaning device includes a bulldozer slidably arranged on the soil surface of the tunnel pit, the bulldozer includes a body 4 and a blade 5 arranged at the front end of the body 4 and used for bulldozing soil; the front and rear ends of the body 4 are respectively connected with a traction rope 6, which can be a steel wire rope.
[0042] Reference Figure 1 The tunnel foundation pit is respectively fixed with a fixed seat 9 at both ends of its length direction, and a traction mechanism is arranged on the fixed seat 9 for winding or unwinding the corresponding traction rope 6 and driving the earthmoving vehicle to move along the length direction of the tunnel foundation pit. The tunnel foundation pit cleaning device also includes a guide pulley block for guiding the traction rope 6.
[0043] When excavating the foundation pit, first use an earth excavation machine to excavate the upper soil layer of the tunnel foundation pit in sections, and excavate the upper soil layer to 150mm to 300mm above the design elevation of the foundation pit bottom to expose the reserved soil layer; anchor the fixed seats 9 at both ends of the length direction of the foundation pit on the reserved soil layer, and install a traction mechanism on the fixed seats 9. Two traction ropes 6 are respectively connected to the front and rear ends of the earthmoving vehicle, and the corresponding traction ropes 6 are wound or unwound by the traction mechanism, and the traction ropes 6 are guided by the guide pulley group, so as to drive the earthmoving vehicle to move along the length direction of the tunnel foundation pit. In the process of the earthmoving vehicle moving forward, the blade 5 cuts the soil in the foundation pit, which improves the problem of low efficiency of manual excavation.
[0044] Reference Figure 2 , Figure 3 and Figure 4 The blade 5 is arranged obliquely downward along the forward direction of the vehicle body 4, and a blade portion for inserting into the soil is arranged on one side of the blade 5. A push plate 16 is fixedly connected to the front end of the vehicle body 4, and the push plate 16 is arranged obliquely upward along the forward direction of the vehicle body 4. The vehicle body 4 has a soil discharge opening 18 between the blade 5 and the push plate 16. The vehicle body 4 is fixedly provided with a bucket 3.
[0045] As the vehicle body 4 moves forward, the blade 5 cuts the soil, and the loose soil is collected by entering the vehicle bucket 3 through the soil outlet 18; the push plate 16 helps the vehicle body 4 to move forward smoothly, thereby maintaining a stable cutting depth.
[0046] Reference Figure 2 The vehicle body 4 is in a flat plate shape, and the bottom surface of the vehicle body 4 is in contact with the soil surface of the tunnel foundation pit.
[0047] During the soil shoveling process, the flat-plate vehicle body 4 flattens the soil surface, and the contact area between the vehicle body 4 and the soil surface is large, the pressure generated is small, and the disturbance to the original soil of the base is small.
[0048] In order to facilitate the towing of the vehicle body 4, refer to Figure 3 The two ends of the push plate 16 are respectively provided with front traction holes 17, and the side of the vehicle body 4 away from the push plate 16 is provided with two rear traction holes 19, and the front traction holes 17 and the rear traction holes 19 are respectively connected to the corresponding traction ropes 6. Further, the vehicle body 4 is fixedly provided with a handrail 1, and the handrail 1 is fixedly connected with a dump hook 2.
[0049] During the movement of the earthmoving vehicle, the construction personnel can use the handrail 1 to assist the vehicle body 4 to move forward steadily; when the earthmoving vehicle has finished shoveling and needs to unload the soil, refer to Figure 2 , hang the traction rope 6 at the front end of the vehicle body 4 on the dump hook 2, then reel in the traction rope 6 at the front end of the vehicle body 4, so that the vehicle body 4 is turned forward with the blade 5 as the fulcrum to unload the soil.
[0050] Reference Figure 4 The blade 5 is connected to the vehicle body 4 by bolts 15. A plurality of bolt holes of different heights can be provided on the vehicle body 4, so that the installation height of the blade 5 can be adjusted, thereby changing the depth of the blade 5 inserted into the soil layer, and then controlling the depth of soil cutting. After the position of the blade 5 is fixed, the depth of soil cutting is determined, which helps to avoid over-excavation and prevent disturbance of the original soil below the design elevation of the foundation pit.
[0051] Reference Figure 1 , Figure 2 and Figure 5 The traction mechanism includes a winch 8 fixedly mounted on a fixed seat 9, and one end of the traction rope 6 away from the earthmoving vehicle is wound around the output end of the corresponding winch 8. A plurality of anchor claws 7 inserted into the soil layer are fixedly connected to the bottom of the fixed seat 9 for anchoring the fixed seat 9 to the soil surface.
[0052] By winding or unwinding the corresponding traction rope 6 by the winch 8, the excavator can be driven forward or backward.
[0053] Reference Figure 1 The guide pulley group includes a first pulley group arranged on the fixed seat 9 and a second pulley group arranged on the moving track of the earthmoving vehicle. Figure 1 and Figure 5The first pulley block includes two first pulleys 11 rotatably disposed on a fixed seat 9 , the axes of the two first pulleys 11 are both vertically disposed, and a gap is disposed between the two first pulleys 11 for the traction rope 6 to pass through.
[0054] During the traction process, the traction rope 6 passes through the gap between the two first pulleys 11 , and the two first pulleys 11 guide the traction rope 6 .
[0055] Further, refer to Figure 1 and Figure 6 Two mounting seats 10 are fixedly arranged on the travel track of the bulldozer, and the two mounting seats 10 are respectively located in front and behind the bulldozer; anchorage steel piles 12 inserted into the soil layer are fixedly connected to the mounting seats 10. The second pulley block includes a second pulley 13 rotatably arranged on each mounting seat 10, and two traction ropes 6 are respectively wound around the corresponding second pulleys 13.
[0056] The traction rope 6 is guided by the two second pulleys 13 so that the moving track of the earthmoving vehicle is kept parallel to the length direction of the tunnel foundation pit. By changing the positions of the two mounting seats 10, the traction direction of the traction rope 6 can be changed, thereby adjusting the earthmoving path of the earthmoving vehicle to achieve full coverage of the trench cleaning area.
[0057] In order to improve the stability of the guide pulley group in guiding the traction rope 6, the first pulley 11 and the second pulley 13 are both provided with grooves for accommodating the traction rope 6 along their own circumference, thereby helping to avoid the traction rope 6 from being offset along the axial direction of the first pulley 11 or the second pulley 13 during the traction process.
[0058] Reference Figure 6 A movable plate 14 is hinged on the anchor steel pile 12, and a through hole is opened on the movable plate 14 for accommodating the rotating shaft of the second pulley 13. The through hole can be a waist-shaped hole, and the length of the through hole is greater than the cross-sectional diameter of the rotating shaft of the second pulley 13, so that when the movable plate 14 is flipped, the rotating shaft of the second pulley 13 can pass through the through hole.
[0059] When the traction rope 6 needs to be wound around the second pulley 13, the movable plate 14 is flipped upward; after the traction rope 6 is wound, the movable plate 14 is flipped to be parallel to the mounting seat 10, so that the rotating shaft of the second pulley 13 passes through the through hole on the movable plate 14, which helps to improve the stability of the rotation of the second pulley 13 during traction.
[0060] The implementation principle of a tunnel pit cleaning device of the present application embodiment is as follows: when the tunnel is excavated, the upper soil layer of the tunnel pit is first excavated in sections using an earthwork excavation machine, and the upper soil layer is excavated to 150mm to 300mm above the design elevation of the bottom of the tunnel, exposing the reserved soil layer; a fixing seat 9 is anchored at both ends of the length direction of the tunnel on the reserved soil layer, and a winch 8 is installed on the fixing seat 9. Two traction ropes 6 are respectively connected to the front and rear ends of the earthmoving vehicle, and the corresponding traction rope 6 is wound or unwound by the winch 8, and the traction rope 6 is guided by the first pulley group and the second pulley group, so that the earthmoving vehicle is driven to move along the length direction of the tunnel pit. During the process of the earthmoving vehicle moving forward, the blade 5 cuts the soil in the tunnel, thereby improving the problem of low efficiency of manual excavation. By changing the position of the second pulley group, the traction direction of the traction rope 6 can be changed, thereby adjusting the earthmoving path of the earthmoving vehicle to achieve full coverage of the cleaning area.
[0061] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A pipe gallery foundation pit cleaning device, characterized in that: include: A shovel truck is slidably arranged on the soil surface of the tunnel foundation pit, and a blade for shoveling soil is arranged at the front end of the shovel truck; Two traction ropes are respectively connected to the front and rear ends of the earthmoving vehicle; Two fixing seats are respectively fixed at both ends of the length direction of the tunnel foundation pit; A traction mechanism, arranged on the fixed seat, for reeling in or unreeling the corresponding traction rope and driving the earthmoving vehicle to move along the length direction of the tunnel foundation pit; The guide pulley block is used to guide the traction rope.
2. A pipe gallery foundation pit cleaning device according to claim 1, characterized in that: The traction mechanism comprises a winch fixedly arranged on the fixing seat, and the traction rope is wound around the output end of the corresponding winch.
3. A pipe gallery foundation pit cleaning device according to claim 1, characterized in that: The guide pulley group includes a first pulley group arranged on the fixed seat and a second pulley group arranged on the travel track of the earthmoving vehicle.
4. A pipe gallery foundation pit cleaning device according to claim 3, characterized in that: The first pulley block includes two first pulleys rotatably disposed on the fixed seat, the axes of the two first pulleys are both vertically disposed, and a gap is disposed between the two first pulleys for the traction rope to pass through.
5. The pipe gallery foundation pit cleaning device according to claim 3 is characterized by: The corridor foundation pit is fixedly provided with two mounting seats on the travel track of the excavator, and the two mounting seats are respectively located in front and rear of the excavator. The second pulley group includes a second pulley rotatably arranged on each of the mounting seats, and the two traction ropes are respectively wound around the corresponding second pulleys.
6. A pipe gallery foundation pit cleaning device according to claim 1, characterized in that: The earthmoving truck comprises a vehicle body and a bucket fixedly connected to the vehicle body, and the blade is fixedly arranged at the front end of the vehicle body.
7. A pipe gallery foundation pit cleaning device according to claim 6, characterized in that: The vehicle body is in the shape of a flat plate, and the bottom surface of the vehicle body is in contact with the soil surface of the foundation pit of the pipeline gallery.
8. The pipe gallery foundation pit cleaning device according to claim 6, characterized in that: The blade is arranged obliquely downward along the advancing direction of the vehicle body, and the blade is provided with a cutting edge portion that is inserted into the soil.
9. A pipe gallery foundation pit cleaning device according to claim 6, characterized in that: A push plate is fixedly connected to the front end of the vehicle body. The push plate is arranged upwardly and obliquely along the forward direction of the vehicle body. The vehicle body is provided with an earth-discharging opening between the blade and the push plate.
10. A pipe gallery foundation pit cleaning device according to claim 6, characterized in that: A handrail is fixedly arranged on the vehicle body, and a dump hook is fixedly connected to the handrail.