Prefabricated composition board, cantilever construction structure and building
Through the design of prefabricated combined plates and fixed beam structures, the problems of difficult construction and safety hazards of cantilever plates are solved, and structural stability and construction safety are improved, simplified the construction process and reduced costs.
Patent Information
- Application Number
- CN202420186302.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-25
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-25
AI Technical Summary
The construction of cantilever boards is difficult, costly and has safety risks, and the risk of cantilever boards cracking or falling off.
Design a prefabricated combined plate, including cantilever plate, laminated plate and steel bar structure, and a mounting gap is formed between the cantilever plate and the laminated plate. The steel bar structure passes through the gap and is buried in the two plates to increase structural stability and adopt fixed The relative positions of the beam structure and cast-in-place concrete fix the cantilever plate and the overlapping plate.
The construction process is simplified, the number of lifting times is reduced, the structural stability and construction safety are improved, the cantilever plates are bent or fallen off, and the construction cost is reduced.
Smart Images

Figure CN222083851U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a prefabricated composite panel, a cantilever construction structure and a building. Background Art
[0002] Both cantilever slabs and composite slabs are prefabricated slabs commonly used in building construction. On the one hand, cantilever slabs are supported on only one side, and an external cantilever frame or support needs to be added to fix the cantilever slab during construction. The design and construction are difficult and there are certain safety hazards. On the other hand, the construction and installation of cantilever slabs and composite slabs require secondary lifting, which has high construction costs and a long construction period. On the other hand, the stress-bearing steel bars of the cantilever slabs are post-anchored. If the construction process is not in place, the anchoring length is insufficient, or there are defects in the concrete construction quality, the cantilever slab may crack or fall off, posing certain safety hazards. Utility Model Content
[0003] Based on this, it is necessary to provide a prefabricated composite panel, a cantilever construction structure and a building to solve the technical problems existing in the prior art that the cantilever panel construction is difficult, the construction cost is high and there may be safety hazards.
[0004] To this end, according to one aspect of the present application, a prefabricated composite panel is provided, the prefabricated composite panel comprising:
[0005] Overhanging slab;
[0006] The composite plate is spaced apart from the cantilever plate, the thickness of the composite plate is smaller than the thickness of the cantilever plate, the bottom surface of the cantilever plate is coplanar with the bottom surface of the composite plate, and an installation gap for installation with the building main body is formed between the cantilever plate and the composite plate; and
[0007] One end of the steel bar structure is buried in the cantilever plate, the steel bar structure passes through the installation gap, and the bottom of the other end of the steel bar structure is buried in the composite plate.
[0008] Optionally, the steel bar structure includes a truss upper chord steel bar layer, a truss steel bar layer and a truss lower chord steel bar layer arranged in sequence from top to bottom, one end of the truss upper chord steel bar layer, one end of the truss steel bar layer and one end of the truss lower chord steel bar layer are embedded in the cantilever plate, and the other end of the truss lower chord steel bar layer and the bottom of the other end of the truss steel bar layer are embedded in the composite plate.
[0009] Optionally, the truss reinforcement layer is wavy.
[0010] Optionally, the steel bar structure further includes a tension steel bar layer, which is L-shaped, with one end of the tension steel bar layer buried in the cantilever plate and the other end of the tension steel bar layer pointing to and buried in the top surface of the composite plate.
[0011] Optionally, the truss upper chord steel bar layer includes a plurality of truss upper chord steel bars, the truss steel bar layer includes a plurality of truss steel bars, and one truss upper chord steel bar corresponds to two truss steel bars.
[0012] The beneficial effect of the prefabricated composite panel provided by the present application is that compared with the prior art, the prefabricated composite panel of the present application includes a cantilever panel, a composite panel and a steel bar structure, an installation gap for installation with the building main body is formed between the cantilever panel and the composite panel, one end of the steel bar structure is buried in the cantilever panel, the steel bar structure passes through the installation gap, and the bottom of the other end of the steel bar structure is buried in the composite panel, so that the cantilever panel and the composite panel are combined into an integral prefabricated composite panel through the steel bar structure, the structural stability of the cantilever panel is increased, the cantilever panel is not easy to fall off, and the cantilever panel and the composite panel can be hoisted into place at the same time in one hoisting, which simplifies the construction process.
[0013] According to another aspect of the present application, a cantilever construction structure is provided, the cantilever construction structure comprising:
[0014] Building body;
[0015] As in the above-mentioned prefabricated composite panels, the main body of the building is located in the installation gap of the prefabricated composite panels;
[0016] A fixed beam structure is located above the prefabricated composite slab, the fixed beam structure is horizontally arranged, and two ends of the fixed beam structure are respectively fixed to the cantilever slab and the composite slab to fix the relative position between the cantilever slab and the composite slab; and
[0017] Cast-in-place concrete, the steel structure in the installation gap and the steel structure above the composite slab are all in cast-in-place concrete.
[0018] Optionally, the fixed beam structure comprises:
[0019] A steel beam, one end of which is attached to the top surface of the cantilever slab and the other end of which is above the composite slab; and
[0020] A plurality of U-shaped structures are sequentially distributed on the cantilever plate and the composite plate along the steel beam, and the U-shaped structures fix the steel beam on the prefabricated composite plate from top to bottom.
[0021] Optionally, the U-shaped structure comprises:
[0022] Two screws are arranged on both sides of the steel beam, and one end of the screw is buried in the cantilever plate or the composite plate;
[0023] A limit plate is arranged above the steel beam, and both ends of the limit plate are respectively provided with mounting holes for mounting screws; and
[0024] Two limiting nuts are located on the side of the limiting plate away from the steel beam, and the limiting nuts are screwed to the screw rod protruding from the limiting plate.
[0025] Optionally, at least part of the U-shaped structure of the laminated plate further comprises:
[0026] An adjustment plate is arranged below the steel beam, and both ends of the adjustment plate are respectively provided with mounting holes for avoiding the screw rod; and
[0027] Two adjusting nuts are located on the side of the adjusting plate facing away from the steel beam, and the horizontal height of the adjusting plate is adjusted by adjusting the nuts.
[0028] The beneficial effects of the cantilever construction structure provided by the present application are as follows: compared with the prior art, the cantilever construction structure of the present application includes a building body, a prefabricated composite panel as mentioned above, a fixed beam structure and cast-in-place concrete, the fixed beam structure fixes the relative position between the cantilever panel and the composite panel to provide a certain support to the cantilever panel, balance the bending moment brought by the cantilever panel to the steel bars, avoid bending or falling of the cantilever panel, and ensure safer construction; the steel bar structure in the installation gap and the steel bar structure above the composite panel are both in the cast-in-place concrete, realizing the connection between the cantilever panel and the composite panel and the connection between the prefabricated composite panel and the building body.
[0029] According to another aspect of the present application, a building is provided, comprising the cantilever construction structure as described above.
[0030] The beneficial effect of the building provided by the present application is that, compared with the prior art, the building of the present application includes the cantilever construction structure as described above, which has a stable structure, a safe construction process, a small number of hoisting times, and a simple construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0032] Figure 1 A schematic diagram of the three-dimensional structure of the cantilever construction structure provided in an embodiment of the present application;
[0033] Figure 2 for Figure 1 The enlarged view of point A in the middle;
[0034] Figure 3 This is a schematic cross-sectional structural diagram of the cantilever construction structure provided in an embodiment of the present application.
[0035] Description of reference numerals:
[0036] 100, prefabricated composite slab; 110, cantilever slab; 120, composite slab; 130, steel bar structure; 131, truss upper chord steel bar layer; 132, truss steel bar layer; 133, truss lower chord steel bar layer; 134, tension steel bar layer; 140, installation gap;
[0037] 200. Building main body;
[0038] 300, fixed beam structure; 310, steel beam; 320, U-shaped structure; 321, screw; 322, limit plate; 323, limit nut; 324, adjustment plate; 325, adjustment nut;
[0039] 400. Cast-in-place concrete. DETAILED DESCRIPTION
[0040] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.
[0041] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0043] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0044] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0045] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.
[0046] According to one aspect of the present application, an embodiment of the present application provides a prefabricated composite panel, please refer to Figures 1 to 3 The prefabricated composite panel 100 includes a cantilever panel 110, a composite panel 120 and a steel bar structure 130. The composite panel 120 is spaced apart from the cantilever panel 110. The thickness of the composite panel 120 is less than that of the cantilever panel 110. The bottom surface of the cantilever panel 110 is coplanar with the bottom surface of the composite panel 120. An installation gap 140 for installation with a building main body 200 is formed between the cantilever panel 110 and the composite panel 120. One end of the steel bar structure 130 is buried in the cantilever panel 110, the steel bar structure 130 passes through the installation gap 140, and the bottom of the other end of the steel bar structure 130 is buried in the composite panel 120.
[0047] In the embodiment of the present application, the prefabricated composite panel 100 includes a cantilever panel 110, a composite panel 120 and a steel bar structure 130. An installation gap 140 for installation with a building main body 200 is formed between the cantilever panel 110 and the composite panel 120. One end of the steel bar structure 130 is buried in the cantilever panel 110. The steel bar structure 130 passes through the installation gap 140, and the bottom of the other end of the steel bar structure 130 is buried in the composite panel 120. In this way, the cantilever panel 110 and the composite panel 120 are combined into an integral prefabricated composite panel 100 through the steel bar structure 130, thereby increasing the structural stability of the cantilever panel 110. The cantilever panel 110 is not easy to fall off. The cantilever panel 110 and the composite panel 120 can be hoisted into place at the same time in one hoisting operation, thereby simplifying the construction process.
[0048] In one embodiment, please refer to Figure 1 and Figure 3 The steel structure 130 includes a truss upper chord steel bar layer 131, a truss steel bar layer 132 and a truss lower chord steel bar layer 133 which are arranged in sequence from top to bottom. One end of the truss upper chord steel bar layer 131, one end of the truss steel bar layer 132 and one end of the truss lower chord steel bar layer 133 are buried in the cantilever plate 110, and the other end of the truss lower chord steel bar layer 133 and the bottom of the other end of the truss steel bar layer 132 are buried in the composite plate 120.
[0049] In this way, the steel structure 130 is divided into three layers, so that the connection between the cantilever plate 110 and the composite plate 120 is more stable; only the bottom of the other end of the truss steel layer 132 is buried in the composite plate 120, that is, there are part of the truss steel layer 132 and part of the truss upper chord steel layer 131 above the composite plate 120, providing space for cast-in-place concrete 400.
[0050] In one embodiment, please refer to Figure 1 and Figure 3 The truss steel bar layer 132 is wavy, has a larger contact area with the composite plate 120 and the cantilever plate 110, has better mechanical properties, and the structure of the prefabricated composite plate 100 is more stable.
[0051] In one embodiment, see Figure 1 The steel structure 130 also includes a tensile steel layer 134 , which is L-shaped. One end of the tensile steel layer 134 is buried in the cantilever plate 110 , and the other end of the tensile steel layer 134 points to and is buried in the top surface of the composite plate 120 .
[0052] Through the above arrangement, the tension steel bars can further prevent the cantilever plate 110 from bending, and the structure of the prefabricated composite plate 100 is more stable.
[0053] In one embodiment, see Figure 1The truss upper chord steel bar layer 131 includes a plurality of truss upper chord steel bars, the truss steel bar layer 132 includes a plurality of truss steel bars, and one truss upper chord steel bar corresponds to two truss steel bars.
[0054] Specifically, the crests of the truss upper chord steel bars and the truss steel bars are tied together by wire, making the structure more stable.
[0055] According to another aspect of the present application, the embodiment of the present application also provides a cantilever construction structure, please refer to Figures 1 to 3 The cantilever construction structure includes a building body 200, the prefabricated composite panel 100 as mentioned above, a fixed beam structure 300 and cast-in-place concrete 400; the building body 200 is located at the installation gap 140 of the prefabricated composite panel 100; the fixed beam structure 300 is located above the prefabricated composite panel 100, the fixed beam structure 300 is horizontally arranged, and the two ends of the fixed beam structure 300 are respectively fixed to the cantilever panel 110 and the composite panel 120 to fix the relative position between the cantilever panel 110 and the composite panel 120; the steel bar structure 130 in the installation gap 140 of the cast-in-place concrete 400 and the steel bar structure 130 above the composite panel 120 are both in the cast-in-place concrete 400.
[0056] It can be understood that the above-mentioned building main body 200 is a beam or a wall, and the top surface of the beam or the wall can be flat; or, steel bars are pre-embedded on the top surface of the beam or the wall.
[0057] Preferably, steel bars are embedded in the top surface of the beam or wall, and these steel bars are inserted into the steel bar structure 130 in the installation gap 140 of the prefabricated composite panel 100, and then concrete is poured to achieve a stable connection between the prefabricated composite panel 100 and the building body 200.
[0058] In the embodiment of the present application, the cantilever construction structure includes a building body 200, a prefabricated composite panel 100 as described above, a fixed beam structure 300 and cast-in-place concrete 400. The fixed beam structure 300 fixes the relative position between the cantilever panel 110 and the composite panel 120 to provide a certain support to the cantilever panel 110, balance the bending moment brought by the cantilever panel 110 to the steel bars, avoid bending or falling of the cantilever panel 110, and ensure safe construction. The steel bar structure 130 in the installation gap 140 and the steel bar structure 130 above the composite panel 120 are both in the cast-in-place concrete 400, thereby realizing the connection between the cantilever panel 110 and the composite panel 120 and the connection between the prefabricated composite panel 100 and the building body 200.
[0059] Exemplarily, two fixed beam structures 300 are disposed on each prefabricated composite panel 100 , and the two fixed beam structures 300 are spaced apart along the extending direction of the installation gap 140 .
[0060] In one embodiment, please refer to Figure 1 and Figure 3 The fixed beam structure 300 includes a steel beam 310 and a plurality of U-shaped structures 320; one end of the steel beam 310 is attached to the top surface of the cantilever plate 110, and the other end of the steel beam 310 is above the composite plate 120; the plurality of U-shaped structures 320 are sequentially distributed on the cantilever plate 110 and the composite plate 120 along the steel beam 310, and the U-shaped structures 320 fix the steel beam 310 on the prefabricated composite plate 100 from top to bottom.
[0061] Specifically, one end of the steel beam 310 is attached to the top surface of the cantilever plate 110, and the steel beam 310 and the cantilever plate 110 can be approximately regarded as a whole. If the cantilever plate 110 is bent, one end of the steel beam 310 on the composite plate 120 will tilt upward, and the fixed beam structure 300 of the present application is provided with a U-shaped structure 320 on the composite plate 120. The U-shaped structure 320 on the composite plate 120 will limit the steel beam 310 from tilting upward, thereby avoiding the cantilever plate 110 from bending, and the entire cantilever construction structure is relatively stable.
[0062] In one embodiment, see Figure 2 The U-shaped structure 320 includes two screws 321, a limiting plate 322 and two limiting nuts 323. The two screws 321 are arranged on both sides of the steel beam 310, and one end of the screw 321 is buried in the cantilever plate 110 or the composite plate 120; the limiting plate 322 is arranged above the steel beam 310, and the two ends of the limiting plate 322 are respectively provided with mounting holes for installing the screws 321; the two limiting nuts 323 are located on the side of the limiting plate 322 away from the steel beam 310, and the limiting nuts 323 are screwed to the screws 321 protruding from the limiting plate 322.
[0063] In this way, the two screws 321 can be pre-buried in the composite plate 120 and the cantilever plate 110 in the production factory. During actual construction, the steel beam 310, the limit plate 322 and the limit nut 323 are installed in sequence, which reduces the construction difficulty. At the same time, after the cast-in-place concrete 400 solidifies, the limit nut 323 can be directly removed, and the limit plate 322 and the steel beam 310 can also be removed and reused in subsequent construction, which reduces the construction cost.
[0064] In one embodiment, see Figure 2 At least part of the U-shaped structure 320 in the composite plate 120 also includes an adjustment plate 324 and two adjustment nuts 325; the adjustment plate 324 is arranged below the steel beam 310, and both ends of the adjustment plate 324 are respectively provided with mounting holes for avoiding the screw rod 321; the two adjustment nuts 325 are located on the side of the adjustment plate 324 away from the steel beam 310, and the horizontal height of the adjustment plate 324 is adjusted by the adjustment nuts 325.
[0065] Specifically, through the cooperation between the limit plate 322 and the adjustment plate 324, the horizontal height of one end of the steel beam 310 above the composite plate 120 can be adjusted, and the angle of the cantilever plate 110 relative to the horizontal plane can be adjusted, which brings more construction options to the cantilever construction structure.
[0066] According to another aspect of the present application, an embodiment of the present application further provides a building, which includes the cantilever construction structure as described above.
[0067] In the embodiment of the present application, the building includes the cantilever construction structure as described above, which has a stable structure, a safe construction process, a small number of hoisting times, and a simple construction process.
[0068] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0069] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.
Claims
1. A prefabricated composite panel, characterized in that: include: Overhanging slab; The composite plate is spaced apart from the cantilever plate, the thickness of the composite plate is less than the thickness of the cantilever plate, the bottom surface of the cantilever plate is coplanar with the bottom surface of the composite plate, and an installation gap for installation with the building main body is formed between the cantilever plate and the composite plate; as well as A steel bar structure has one end buried in the cantilever plate, the steel bar structure passes through the installation gap, and the bottom of the other end of the steel bar structure is buried in the composite plate.
2. The prefabricated composite panel according to claim 1, characterized in that: The steel bar structure includes a truss upper chord steel bar layer, a truss steel bar layer and a truss lower chord steel bar layer which are arranged in sequence from top to bottom; one end of the truss upper chord steel bar layer, one end of the truss steel bar layer and one end of the truss lower chord steel bar layer are embedded in the cantilever plate; the other end of the truss lower chord steel bar layer and the bottom of the other end of the truss steel bar layer are embedded in the composite plate.
3. The prefabricated composite panel according to claim 2, characterized in that: The truss steel bar layer is wavy.
4. The prefabricated composite panel according to claim 2, characterized in that: The steel bar structure also includes a tension steel bar layer, which is L-shaped, with one end of the tension steel bar layer buried in the cantilever plate, and the other end of the tension steel bar layer pointing to and buried in the top surface of the composite plate.
5. The prefabricated composite panel according to claim 2, characterized in that: The truss upper chord steel bar layer includes a plurality of truss upper chord steel bars, the truss steel bar layer includes a plurality of truss steel bars, and one truss upper chord steel bar corresponds to two truss steel bars.
6. A cantilever construction structure, characterized in that: include: Building body; The prefabricated composite panel according to any one of claims 1 to 5, wherein the building body is located at the installation gap of the prefabricated composite panel; A fixed beam structure is located above the prefabricated composite plate, the fixed beam structure is horizontally arranged, and two ends of the fixed beam structure are respectively fixed to the cantilever plate and the composite plate to fix the relative position between the cantilever plate and the composite plate; as well as Cast-in-place concrete, the steel structure in the installation gap and the steel structure above the composite plate are both in the cast-in-place concrete.
7. The cantilever construction structure according to claim 6, characterized in that: The fixed beam structure comprises: A steel beam, one end of which is attached to the top surface of the cantilever plate, and the other end of which is located above the composite plate; and A plurality of U-shaped structures are sequentially distributed on the cantilever plate and the composite plate along the steel beam, and the U-shaped structures fix the steel beam on the prefabricated composite plate from top to bottom.
8. The cantilever construction structure according to claim 7, characterized in that: The U-shaped structure comprises: Two screw rods are respectively arranged on both sides of the steel beam, and one end of the screw rod is buried in the cantilever plate or the composite plate; A limit plate is arranged above the steel beam, and both ends of the limit plate are respectively provided with mounting holes for mounting the screw rod; and Two limiting nuts are located on a side of the limiting plate away from the steel beam, and the limiting nuts are screwed to the screw rod protruding from the limiting plate.
9. The cantilever construction structure according to claim 8, characterized in that: At least part of the U-shaped structure in the laminated plate further comprises: An adjustment plate is arranged below the steel beam, and both ends of the adjustment plate are respectively provided with mounting holes for avoiding the screw rod; and Two adjusting nuts are located on a side of the adjusting plate away from the steel beam, and the horizontal height of the adjusting plate is adjusted by the adjusting nuts.
10. A building, characterized in that: It comprises the cantilever construction structure as described in claim 6.