L-shaped concrete filled steel tube special-shaped column
By adopting multiple reinforcement design in the structure of L-shaped steel pipe concrete columns, the problem of insufficient bearing capacity of traditional structures is solved, significantly improving the bearing capacity and instability resistance, and ensuring the flowability and detection accuracy of concrete.
Patent Information
- Application Number
- CN202323371589.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-11
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2033-12-11
AI Technical Summary
Traditional L-shaped concrete special-shaped columns are difficult to meet the load capacity requirements of the lower loads of high-rise and super-high-rise buildings, and it is necessary to improve the effective bearing capacity of L-shaped steel pipe concrete special-shaped columns.
Using multiple reinforcement designs of the first reinforcement steel group, the second reinforcement steel group and the third reinforcement steel group, the reinforcement steel group and reinforcement steel mesh are ensured in the vertical cavity, horizontal cavity and transition cavity of the L-shaped steel pipe frame. The fluidity and connection firmness are enhanced to improve the bearing capacity of the structure.
It effectively improves the bearing capacity and instability resistance of L-shaped steel pipe concrete columns, ensures the flowability of concrete during the pouring process and the overall strength of the structure, and avoids concrete leakage and detection accuracy issues.
Smart Images

Figure CN222083878U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of construction, and in particular relates to an L-shaped steel tube concrete special-shaped column. Background Art
[0002] With the development of society and the gradual improvement of residents' living standards, there are more and more architectural structure design ideas for various types of buildings. For example, some L-shaped concrete special-shaped columns are increasingly appearing in design ideas. With the gradual increase in high-rise and super-high-rise buildings and the increase in upper loads, the bearing capacity of traditional L-shaped concrete special-shaped columns can no longer meet the requirements of engineering bearing capacity. How to improve the effective bearing capacity of L-shaped steel tube concrete special-shaped columns is a technical problem that needs to be solved in this field. Summary of the invention
[0003] The purpose of the utility model is to provide a technical solution for L-shaped steel tube concrete special-shaped columns to address the deficiencies in the prior art. The structural design is simple and reasonable and has strong practicability. Through the multiple reinforcement and strengthening design of the first reinforcement steel group, the second reinforcement steel group and the third reinforcement steel group, the effective bearing capacity of the L-shaped steel tube concrete special-shaped columns can be effectively improved.
[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0005] The L-shaped steel tube concrete special-shaped column comprises an L-shaped steel tube frame, a first reinforcing steel group, a second reinforcing steel group and a third reinforcing steel group. The interior of the L-shaped steel tube frame is used for pouring concrete. The interior of the L-shaped steel tube frame is divided into a vertical cavity, a transition cavity and a horizontal cavity. The transition cavity connects the vertical cavity and the horizontal cavity. The first reinforcing steel group is arranged in the vertical cavity. The first reinforcing steel group is evenly distributed along the height direction of the vertical cavity. The second reinforcing steel group is arranged in the horizontal cavity. The second reinforcing steel group is evenly distributed along the length direction of the horizontal cavity. The third reinforcing steel group is arranged in the transition cavity. The third reinforcing steel group is obliquely arranged between the inner corner of the L-shaped steel tube frame and the outer corner of the L-shaped steel tube frame. Through the multiple reinforcement and strengthening design of the first reinforcing steel group, the second reinforcing steel group and the third reinforcing steel group, the effective bearing capacity of the L-shaped steel tube concrete special-shaped column can be effectively improved.
[0006] Furthermore, the first reinforcing steel group includes a first T-shaped steel, a second T-shaped steel and a first reinforcing steel mesh. The first T-shaped steel and the second T-shaped steel are relatively arranged on the inner wall of the vertical cavity. The wing plates of the first T-shaped steel and the wing plates of the second T-shaped steel are welded and fixed to the inner wall of the vertical cavity. The two ends of the first reinforcing steel mesh are respectively welded and fixed to the web of the first T-shaped steel and the web of the second T-shaped steel. The first reinforcing steel group performs tension reinforcement on the L-shaped steel pipe frame from the vertical cavity. The design of the first T-shaped steel and the second T-shaped steel can strengthen the connection between the L-shaped steel pipe frame and the concrete and improve the structural performance. At the same time, the first T-shaped steel and the second T-shaped steel provide installation support points for the first reinforcing steel mesh. The first reinforcing steel mesh is connected between the corresponding first T-shaped steel and the second T-shaped steel to further improve the connection firmness. At the same time, the mesh design of the first reinforcing steel mesh can also ensure the fluidity of the concrete in the vertical section, so that the pouring work is not affected.
[0007] Furthermore, the second reinforcing steel group includes a third T-shaped steel, a fourth T-shaped steel and a second reinforcing steel mesh. The third T-shaped steel and the fourth T-shaped steel are relatively arranged on the inner wall of the horizontal cavity. The wing plates of the third T-shaped steel and the wing plates of the fourth T-shaped steel are welded and fixed to the inner wall of the horizontal cavity. The two ends of the second reinforcing steel mesh are respectively welded and fixed to the web of the third T-shaped steel and the web of the fourth T-shaped steel. The first reinforcing steel group performs tension reinforcement on the L-shaped steel pipe frame from the horizontal cavity. The design of the third T-shaped steel and the fourth T-shaped steel can strengthen the connection between the L-shaped steel pipe frame and the concrete and improve the structural performance. At the same time, the third T-shaped steel and the fourth T-shaped steel provide installation support points for the second reinforcing steel mesh. The second reinforcing steel mesh is connected between the corresponding third T-shaped steel and the fourth T-shaped steel to further improve the connection firmness. At the same time, the mesh design of the second reinforcing steel mesh can also ensure the fluidity of the concrete in the horizontal cavity, so that the pouring work is not affected.
[0008] Furthermore, the third reinforcing steel group includes L-shaped steel and a third reinforcing steel mesh. The L-shaped steel is welded and fixed at the outer corner of the L-shaped steel tube frame. One end of the third reinforcing steel mesh is welded and fixed to the L-shaped steel, and the other end of the third reinforcing steel mesh is welded and fixed to the inner corner of the L-shaped steel tube frame. The third reinforcing steel group performs tensioning and reinforcement on the inside of the L-shaped steel tube frame from the transition cavity to improve the overall structural strength. The L-shaped steel is welded at the outer corner of the L-shaped steel tube frame to reinforce the corner. At the same time, the L-shaped steel also increases the installation support point for the third reinforcing steel mesh. The third reinforcing steel mesh is tilted in the transition cavity to reinforce the interior. At the same time, the first reinforcing steel mesh, the second reinforcing steel mesh and the third reinforcing steel mesh all adopt a mesh structure to ensure that the concrete has fluidity inside the entire L-shaped steel tube frame, so that the pouring work will not be affected.
[0009] Furthermore, the first reinforcement steel mesh, the second reinforcement steel mesh and the third reinforcement steel mesh are all formed by cross-welding of several steel bars, the acute angle α between the crossed steel bars is 30° to 80°, and the acute angle α between the crossed steel bars is preferably designed to be 60° to ensure the structural strength of the reinforcement steel mesh.
[0010] Furthermore, an observation port is provided on the outer wall of the L-shaped steel pipe frame, and the design of the observation port can be used to observe the pouring height during the concrete pouring process.
[0011] Furthermore, the observation port is circular, and the diameter of the observation port is no more than 5 cm. The design is ingenious and reasonable, and the diameter of the observation port is reasonably controlled to avoid a large amount of concrete leaking out of the observation port when pouring concrete in the L-shaped steel pipe frame due to the diameter being too large. Therefore, in this application, the diameter of the observation port is reasonably controlled to be no more than 5 cm to avoid a large amount of concrete leakage.
[0012] Furthermore, at least two observation ports are provided, and the plurality of observation ports are evenly distributed along the height direction of the L-shaped steel tube frame, so as to timely observe the current pouring height of the concrete in the L-shaped steel tube frame.
[0013] Furthermore, a test port is provided on the outer wall of the L-shaped steel tube frame. The test port transversely penetrates the L-shaped steel tube frame. The design is ingenious and reasonable. The test port is used to set and install the test instrument. The test port is transversely penetrated to ensure that the test port directly penetrates the thickness direction of the L-shaped steel tube frame so that the test instrument is in direct contact with the concrete, thereby improving the test accuracy of the test instrument.
[0014] Furthermore, at least two test ports are provided, and the test ports are evenly distributed along the height direction of the L-shaped steel tube frame. The position design is reasonable and ingenious. Testing is performed from multiple test ports, so that the detection of L-shaped steel tube concrete special-shaped columns is more comprehensive. For example, when the test instrument is a vibration detector, the vibration detector detects through the test port to obtain the vibration parameters of the L-shaped steel tube concrete special-shaped column after pouring concrete, thereby knowing whether there is a hollow situation in the L-shaped steel tube concrete special-shaped column.
[0015] The utility model has the following beneficial effects due to the adoption of the above technical solution:
[0016] The utility model has a simple and reasonable structural design and strong practicality. The three cavities of the L-shaped steel tube frame are all reinforced by the first reinforcing steel group, the second reinforcing steel group and the third reinforcing steel group. The design of multiple reinforcements can effectively improve the anti-instability ability of the outer steel tube frame, and improve the sleeve effect of the L-shaped steel tube concrete special-shaped column, so that the bearing capacity of the L-shaped steel tube concrete special-shaped column is significantly improved. The reinforcing steel mesh in the three reinforcing steel groups adopts a mesh shape ingeniously and reasonably, which can ensure that the concrete has fluidity inside the entire L-shaped steel tube frame, so that the pouring work will not be affected. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The utility model is further described below in conjunction with the accompanying drawings:
[0018] Figure 1 This is a schematic diagram of the structure of the L-shaped steel tube concrete special-shaped column of the utility model;
[0019] Figure 2 It is a structural schematic diagram of the first reinforcement steel mesh in the utility model;
[0020] Figure 3 It is a schematic diagram of the position distribution structure of the observation port and the test port on the L-shaped steel pipe frame in the utility model.
[0021] In the figure: 1-L-shaped steel pipe frame; 2-vertical cavity; 3-transition cavity; 4-horizontal cavity; 5-first reinforcement steel group; 6-second reinforcement steel group; 7-third reinforcement steel group; 8-first T-shaped steel; 9-second T-shaped steel; 10-first reinforcement steel mesh; 11-third T-shaped steel; 12-fourth T-shaped steel; 13-second reinforcement steel mesh; 14-L-shaped steel; 15-third reinforcement steel mesh; 16-observation port; 17-test port. DETAILED DESCRIPTION
[0022] like Figures 1 to 3 As shown, the utility model L-shaped steel tube concrete special-shaped column includes an L-shaped steel tube frame 1, a first reinforcing steel group 5, a second reinforcing steel group 6 and a third reinforcing steel group 7, the interior of the L-shaped steel tube frame 1 is used for pouring concrete; the L-shaped steel tube frame 1 is divided into a vertical cavity 2, a transition cavity 3 and a horizontal cavity 4, and the transition cavity 3 connects the vertical cavity 2 and the horizontal cavity 4; the first reinforcing steel group 5 is arranged in the vertical cavity 2; the first reinforcing steel group 5 is evenly distributed along the height direction of the vertical cavity 2; the second reinforcing steel group 6 is arranged in the horizontal cavity 4; the second reinforcing steel group 6 is evenly distributed along the length direction of the horizontal cavity 4; the third reinforcing steel group 7 is arranged in the transition cavity 3; the third reinforcing steel group 7 is obliquely arranged between the inner corner of the L-shaped steel tube frame 1 and the outer corner of the L-shaped steel tube frame 1; the structural design is simple and reasonable, and the practicality is strong. Through the multiple reinforcement and strengthening design of the first reinforcing steel group 5, the second reinforcing steel group 6 and the third reinforcing steel group 7, the effective bearing capacity of the L-shaped steel tube concrete special-shaped column can be effectively improved.
[0023] The first reinforcing steel group 5 includes a first T-shaped steel 8, a second T-shaped steel 9 and a first reinforcing steel mesh 10. The first T-shaped steel 8 and the second T-shaped steel 9 are relatively arranged on the inner wall of the vertical cavity 2. The first T-shaped steel 8 and the second T-shaped steel 9 are arranged one by one. The wing plates of the first T-shaped steel 8 and the wing plates of the second T-shaped steel 9 are welded and fixed to the inner wall of the vertical cavity 2. The two ends of the first reinforcing steel mesh 10 are respectively welded and fixed to the web of the first T-shaped steel 8 and the web of the second T-shaped steel 9. Welding is used to ensure the connection firmness and reliability between the components. The first reinforcing steel group The L-shaped steel pipe frame 1 is reinforced from the vertical cavity 2. The design of the first T-shaped steel 8 and the second T-shaped steel 9 can strengthen the connection between the L-shaped steel pipe frame 1 and the concrete, and improve the structural performance. At the same time, the first T-shaped steel 8 and the second T-shaped steel 9 provide installation support points for the first reinforcement steel mesh 10. The first reinforcement steel mesh 10 is connected between the corresponding first T-shaped steel 8 and the second T-shaped steel 9, and further improves the connection firmness. At the same time, the mesh design of the first reinforcement steel mesh 10 can also ensure the fluidity of the concrete in the vertical section, so that the pouring work is not affected.
[0024] The second reinforcing steel group 6 includes a third T-shaped steel 11, a fourth T-shaped steel 12 and a second reinforcing steel mesh 13. The third T-shaped steel 11 and the fourth T-shaped steel 12 are relatively arranged on the inner wall of the horizontal cavity 4. The third T-shaped steel 11 and the fourth T-shaped steel 12 are arranged one by one. The wing plates of the third T-shaped steel 11 and the wing plates of the fourth T-shaped steel 12 are welded and fixed to the inner wall of the horizontal cavity 4. The two ends of the second reinforcing steel mesh 13 are respectively welded and fixed to the webs of the third T-shaped steel 11 and the webs of the fourth T-shaped steel 12. Welding is used to ensure the firmness and reliability of the connection between the components. The first reinforcing steel group 6 includes a third T-shaped steel 11, a fourth T-shaped steel 12 and a second reinforcing steel mesh 13. The steel group 5 performs tension reinforcement on the L-shaped steel tube frame 1 from the horizontal cavity 4. The design of the third T-shaped steel 11 and the fourth T-shaped steel 12 can strengthen the connection between the L-shaped steel tube frame 1 and the concrete and improve the structural performance. At the same time, the third T-shaped steel 11 and the fourth T-shaped steel 12 provide installation support points for the second reinforcement steel mesh 13. The second reinforcement steel mesh 13 is connected between the corresponding third T-shaped steel 11 and the fourth T-shaped steel 12 to further improve the connection firmness. At the same time, the mesh design of the second reinforcement steel mesh 13 can also ensure the fluidity of the concrete in the horizontal cavity 4, so that the pouring work is not affected.
[0025] The third reinforcement steel group 7 includes an L-shaped steel 14 and a third reinforcement steel mesh 15. The L-shaped steel 14 is welded and fixed at the outer corner of the L-shaped steel tube frame 1. One end of the third reinforcement steel mesh 15 is welded and fixed to the L-shaped steel 14. The other end of the third reinforcement steel mesh 15 is welded and fixed to the inner corner of the L-shaped steel tube frame 1. Welding is used to ensure the connection firmness and reliability between the components. The third reinforcement steel group 7 is used to tie and reinforce the L-shaped steel tube frame 1 from the transition cavity 3 to improve the overall structural strength. The L-shaped steel 14 is welded to the L-shaped steel tube frame 1. At the outer corner of the frame 1, the corner is reinforced and strengthened. At the same time, the L-shaped steel 14 also improves the installation support point for the third reinforcing steel mesh 15. The third reinforcing steel mesh 15 is tilted in the transition cavity 3 to reinforce the interior. The mesh design of the third reinforcing steel mesh 15 can ensure the fluidity of the concrete in the transition cavity 3. The first reinforcing steel mesh 10, the second reinforcing steel mesh 13 and the third reinforcing steel mesh 15 all adopt a mesh structure to ensure that the concrete has fluidity inside the entire L-shaped steel pipe frame 1, so that the pouring work will not be affected.
[0026] The first reinforcing steel mesh 10, the second reinforcing steel mesh 13 and the third reinforcing steel mesh 15 are all formed by cross-welding of a number of steel bars, the acute angle α between the crossed steel bars is 30° to 80°, and the acute angle α between the crossed steel bars is preferably designed to be 60° to ensure the structural strength of the reinforcing steel mesh.
[0027] An observation port 16 is provided on the outer wall of the L-shaped steel tube frame 1. The design of the observation port 16 can be used to observe the pouring height during the concrete pouring process. The observation port 16 is circular, and the diameter of the observation port 16 is not more than 5 cm. The design is ingenious and reasonable, and the diameter of the observation port 16 is reasonably controlled to avoid a large amount of concrete leaking from the observation port 16 when the concrete is poured into the L-shaped steel tube frame 1 due to the large diameter. Therefore, in this application, the diameter of the observation port 16 is reasonably controlled to be not more than 5 cm to avoid a large amount of concrete leakage. There are at least two observation ports 16, and several observation ports 16 are evenly distributed along the height direction of the L-shaped steel tube frame 1. Multiple observation ports 16 are evenly distributed along the height direction of the L-shaped steel tube frame 1, so as to timely observe the current pouring height of the concrete in the L-shaped steel tube frame 1.
[0028] A test port 17 is provided on the outer wall of the L-shaped steel tube frame 1. The test port 17 runs horizontally through the L-shaped steel tube frame 1. The design is ingenious and reasonable. The test port 17 is used to set and install the test instrument. The test port 17 is set horizontally to ensure that the test port 17 directly runs through the thickness direction of the L-shaped steel tube frame 1, so that the test instrument is in direct contact with the concrete, thereby improving the accuracy of the test of the test instrument. There are at least two test ports 17, and several test ports 17 are evenly distributed along the height direction of the L-shaped steel tube frame 1. The position design is reasonable and ingenious. Testing is performed from multiple test ports 17, so that the detection of L-shaped steel tube concrete special-shaped columns is more comprehensive. For example, when the test instrument is a vibration detector, the vibration detector detects through the test port 17 to obtain the vibration parameters of the L-shaped steel tube concrete special-shaped column after pouring concrete, so as to know whether there is a hollow situation in the L-shaped steel tube concrete special-shaped column.
[0029] The utility model has a simple and reasonable structural design and strong practicality. The three cavities of the L-shaped steel tube frame 1 are reinforced by the first reinforcing steel group 5, the second reinforcing steel group 6 and the third reinforcing steel group 7. The design of multiple reinforcements can effectively improve the anti-instability ability of the outer steel tube frame, and improve the sleeve effect of the L-shaped steel tube concrete special-shaped column, so that the bearing capacity of the L-shaped steel tube concrete special-shaped column is significantly improved. The reinforcing steel mesh in the three reinforcing steel groups adopts a mesh shape ingeniously and reasonably, which can ensure that the concrete has fluidity inside the entire L-shaped steel tube frame 1, so that the pouring work will not be affected.
[0030] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.
Claims
1. L-shaped steel tube concrete column, characterized by include: An L-shaped steel tube frame, the interior of which is used for pouring concrete; the L-shaped steel tube frame is divided into a vertical cavity, a transition cavity and a horizontal cavity, and the transition cavity connects the vertical cavity and the horizontal cavity; A first reinforcement steel group is arranged in the vertical cavity; the first reinforcement steel group is evenly distributed along the height direction of the vertical cavity; A second reinforcement steel group is arranged in the horizontal cavity; the second reinforcement steel group is evenly distributed along the length direction of the horizontal cavity; The third reinforcing steel group is arranged in the transition cavity; the third reinforcing steel group is obliquely arranged between the inner corner of the L-shaped steel tube frame and the outer corner of the L-shaped steel tube frame.
2. The L-shaped steel tube concrete-filled special-shaped column according to claim 1, characterized in that: The first reinforcing steel group includes a first T-shaped steel, a second T-shaped steel and a first reinforcing steel mesh. The first T-shaped steel and the second T-shaped steel are relatively arranged on the inner wall of the vertical cavity. The wing plates of the first T-shaped steel and the wing plates of the second T-shaped steel are both welded and fixed to the inner wall of the vertical cavity. The two ends of the first reinforcing steel mesh are respectively welded and fixed to the web of the first T-shaped steel and the web of the second T-shaped steel.
3. The L-shaped steel tube concrete-filled special-shaped column according to claim 2, characterized in that: The second reinforcing steel group includes a third T-shaped steel, a fourth T-shaped steel and a second reinforcing steel mesh. The third T-shaped steel and the fourth T-shaped steel are relatively arranged on the inner wall of the horizontal cavity. The wing plates of the third T-shaped steel and the wing plates of the fourth T-shaped steel are both welded and fixed to the inner wall of the horizontal cavity. The two ends of the second reinforcing steel mesh are respectively welded and fixed to the web of the third T-shaped steel and the web of the fourth T-shaped steel.
4. The L-shaped steel tube concrete-filled special-shaped column according to claim 3, characterized in that: The third reinforcing steel group includes L-shaped steel and a third reinforcing steel mesh. The L-shaped steel is welded and fixed at the outer corner of the L-shaped steel tube frame. One end of the third reinforcing steel mesh is welded and fixed to the L-shaped steel, and the other end of the third reinforcing steel mesh is welded and fixed to the inner corner of the L-shaped steel tube frame.
5. The L-shaped steel tube concrete-filled special-shaped column according to claim 4, characterized in that: The first reinforcement steel mesh, the second reinforcement steel mesh and the third reinforcement steel mesh are all formed by cross-welding of a plurality of steel bars, and the acute angle α between the cross-welded steel bars is 30° to 80°.
6. The L-shaped steel tube concrete-filled special-shaped column according to claim 1, characterized in that: An observation port is arranged on the outer wall of the L-shaped steel pipe frame.
7. The L-shaped steel tube concrete-filled special-shaped column according to claim 6, characterized in that: The observation port is circular, and the diameter of the observation port is no greater than 5 cm.
8. The L-shaped steel tube concrete-filled special-shaped column according to claim 6, characterized in that: At least two observation ports are provided, and the plurality of observation ports are evenly distributed along the height direction of the L-shaped steel pipe frame.
9. The L-shaped steel tube concrete-filled special-shaped column according to claim 1, characterized in that: A test port is provided on the outer side wall of the L-shaped steel pipe frame, and the test port passes through the L-shaped steel pipe frame transversely.