Rebar mounting and adjusting tool

By designing a steel bar installation and adjustment tool that combines the lever principle, the adjustable jaws and anti-slip handles solve the problem of steel bars deviating or deformation at the construction site, convenient and efficient adjustments are achieved, and construction safety and efficiency are improved. .

CN222084064UActive Publication Date: 2024-11-29中国水电建设集团十五工程局有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420513336.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-11-29
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

At the civil engineering construction site, steel bars are prone to bias or deformation after installation, and the existing technology is difficult to adjust easily and effectively, affecting the quality of concrete pouring.

Method used

A steel bar installation and adjustment tool is designed, using adjustable vertical jaws and parallel jaws. Combined with the principle of lever, the steel bar is easily adjusted through an anti-slip handle and a retractable force transmission rod.

Benefits of technology

This tool realizes flexible and efficient adjustment of steel bars, simplifies operation, improves construction safety and work efficiency, saves manpower, and is suitable for different working conditions and steel bar diameters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222084064U_ABST
    Figure CN222084064U_ABST
Patent Text Reader

Abstract

A reinforcing steel bar mounting and adjusting tool is characterized in that the upper end of a dowel bar is provided with a first parallel clamp rod parallel to the dowel bar, a first vertical clamp rod perpendicular to the dowel bar, the dowel bar is provided with at least one group of second vertical clamp rods, and vertical jaws are formed between the first vertical clamp rod and the second vertical clamp rods and between the adjacent second vertical clamp rods; the dowel bar is provided with at least one group of second parallel forceps rods, and parallel jaws are formed between the first parallel forceps rods and the second parallel forceps rods and between the adjacent second parallel forceps rods; compared with a traditional construction method, the device has the advantages of being flexible, efficient, easy and convenient to operate and safe in construction, manpower can be saved, working efficiency can be improved, and the device can be popularized and applied to the field of steel bar installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of steel bar installation at a construction site, and specifically relates to a steel bar installation and adjustment tool. Background Art

[0002] During the steel bar installation process at the construction site of a civil engineering project, due to the lack of installation proficiency of the operators or the limitations of the construction environment, there are problems with the steel bars being displaced or deformed after installation, or the installed steel bars are displaced during the concrete pouring process. In order to meet the construction quality requirements, it is necessary to adjust the displaced and deformed steel bars, and it is labor-intensive and time-consuming to remove them. If the concrete blocks being poured are corrected by dismantling them, it will affect the quality of the concrete pouring. Using hammering or steel pipe repair to adjust the steel bars is a barbaric operation with unsatisfactory results.

[0003] Taking the outdoor reinforced concrete construction of water conservancy projects as an example, The following steel bars are prone to displacement or deformation. How to conveniently adjust the displaced or deformed steel bars needs to be solved urgently. Summary of the invention

[0004] The technical problem to be solved by the utility model is to overcome the deficiencies of the above-mentioned prior art and provide a steel bar installation and adjustment tool with reasonable design, simple structure, low cost and convenient operation.

[0005] The technical solution adopted to solve the above technical problems is: a steel bar installation and adjustment tool, a first parallel clamp rod is arranged at the upper end of the force transmission rod parallel to the force transmission rod, a first vertical clamp rod is arranged perpendicular to the force transmission rod, at least one group of second vertical clamp rods is arranged on the force transmission rod, vertical clamps are formed between the first vertical clamp rod and the second vertical clamp rod, and between adjacent second vertical clamp rods, at least one group of second parallel clamp rods is arranged on the force transmission rod, parallel clamps are formed between the first parallel clamp rod and the second parallel clamp rod, and between adjacent second parallel clamp rods.

[0006] The distances between the vertical jaws and the parallel jaws of the utility model are adjustable.

[0007] A vertical sleeve is arranged at the end of the second vertical clamp rod of the utility model. The vertical sleeve can slide up and down along the force transmission rod. The vertical sleeve is fixed on the force transmission rod through a vertical fastening nail.

[0008] The second horizontal clamp rod of the utility model is circumferentially provided with a parallel sleeve, the parallel sleeve can slide up and down along the force transmission rod, and the parallel sleeve is fixed on the force transmission rod through parallel fastening nails.

[0009] The utility model is provided with two groups of parallel fastening nails.

[0010] The lower end of the force transmission rod of the utility model is provided with an anti-slip handle.

[0011] The force transmission rod of the utility model is a telescopic rod.

[0012] Since the utility model adopts a non-slip handle at one end of the force transmission rod and an adjustable vertical jaw and parallel jaw at the other end, the lever principle is used for labor-saving operation; during operation, the vertical jaw of the tool is used to clamp a steel bar that needs to be adjusted, and the handle is held. Under the drive of the force transmission rod, the vertical jaw bites the steel bar and adjusts the bending under the action of the bending fulcrum, and finally the offset or deformed steel bar is adjusted to the required degree; the parallel jaw can also be used to adjust the offset or deformed steel bar according to the on-site conditions. The advantage of the parallel jaw is that it can adjust the steel bar with a large spacing, and the tool end is used as a support point to rotate the torque to achieve the purpose of adjusting the steel bar; the jaw distance can be adjusted according to the diameter of the steel bar, and the number of jaws can also be determined according to the actual working conditions. Compared with the traditional construction method, this device has the advantages of flexibility and efficiency, simple operation, and safe construction, which can save manpower and improve work efficiency, and can be promoted and applied to the field of steel bar installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of an embodiment of the utility model.

[0014] In the figure: 1, anti-slip handle; 2, force transmission rod; 3, second parallel clamp rod; 4, parallel sleeve; 5, vertical sleeve; 6, first parallel clamp rod; 7, first vertical clamp rod; 8, second vertical clamp rod; 9, vertical fastening nail; 10, parallel fastening nail. DETAILED DESCRIPTION

[0015] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments, but the present invention is not limited to these embodiments.

[0016] Example 1

[0017] exist Figure 1 In the utility model, a steel bar installation and adjustment tool is provided, wherein the force transmission rod 2 is The upper end of the force transmission rod 2 is welded with a first parallel clamp rod 6 parallel to the force transmission rod 2, and a first vertical clamp rod 7 is welded perpendicular to the force transmission rod 2. At least one group of second vertical clamp rods 8 are arranged on the force transmission rod 2, and a vertical jaw is formed between the first vertical clamp rod 7 and the second vertical clamp rod 8, and between adjacent second vertical clamp rods 8. At least one group of second parallel clamp rods 3 are arranged on the force transmission rod 2, and parallel jaws are formed between the first parallel clamp rod 6 and the second parallel clamp rod 3, and between adjacent second parallel clamp rods 3. The number of the second vertical clamp rods 8 and the second parallel clamp rods 3 is determined according to the actual working conditions on site. In order to adapt to different working conditions, the above-mentioned vertical clamp rods 8 and the second parallel clamp rods 3 are preferably selected according to the actual working conditions on site. The distance between the straight jaws and the parallel jaws is adjustable. In practice, a reasonable distance is adjusted according to the diameter of the steel bar to be adjusted. Specifically, in this embodiment, a vertical sleeve 5 is welded at the end of the second vertical clamp rod 8, and the vertical sleeve 5 is sleeved on the force transmission rod 2. The vertical sleeve 5 can slide up and down along the force transmission rod 2. The vertical sleeve 5 is fixed to any position of the force transmission rod 2 by a vertical fastening nail 9. In practice, the fixed position is determined according to the diameter of the steel bar to be adjusted. The second horizontal clamp rod 3 is circumferentially welded with a parallel sleeve 4, and the parallel sleeve 4 is sleeved on the force transmission rod 2. The parallel sleeve 4 can slide up and down along the force transmission rod 2, and the parallel sleeve 4 is fixed to the force transmission rod 2 by a parallel fastening nail 10. For the stability of the connection, two groups of parallel fastening nails 10 are provided. In practice, in order to facilitate operation, the force transmission rod 2 is a telescopic rod, and an anti-slip handle 1 is provided at the lower end of the force transmission rod 2.

Claims

1. A steel bar installation and adjustment tool, characterized in that: A first parallel clamp rod (6) is arranged at the upper end of the force transmission rod (2) in parallel with the force transmission rod (2), and a first vertical clamp rod (7) is arranged perpendicular to the force transmission rod (2). At least one set of second vertical clamp rods (8) is arranged on the force transmission rod (2), and vertical jaws are formed between the first vertical clamp rod (7) and the second vertical clamp rods (8) and between adjacent second vertical clamp rods (8). At least one set of second parallel clamp rods (3) is arranged on the force transmission rod (2), and parallel jaws are formed between the first parallel clamp rod (6) and the second parallel clamp rods (3) and between adjacent second parallel clamp rods (3).

2. The steel bar installation and adjustment tool according to claim 1, characterized in that: The distances between the vertical jaws and the parallel jaws are adjustable.

3. The steel bar installation and adjustment tool according to claim 1, characterized in that: A vertical sleeve (5) is provided at the end of the second vertical clamp rod (8). The vertical sleeve (5) can slide up and down along the force transmission rod (2). The vertical sleeve (5) is fixed to the force transmission rod (2) by a vertical fastening nail (9).

4. The steel bar installation and adjustment tool according to claim 1, characterized in that: The second parallel clamp rod (3) is circumferentially provided with a parallel sleeve (4), the parallel sleeve (4) can slide up and down along the force transmission rod (2), and the parallel sleeve (4) is fixed to the force transmission rod (2) by means of a parallel fastening nail (10).

5. The steel bar installation and adjustment tool according to claim 4, characterized in that: The parallel fastening nails (10) are provided in two groups.

6. The steel bar installation and adjustment tool according to claim 1, characterized in that: The lower end of the force transmission rod (2) is provided with an anti-slip handle (1).

7. The steel bar installation and adjustment tool according to claim 1, characterized in that: The force transmission rod (2) is a telescopic rod.