Super high-rise door opening protective net capable of being manufactured along with floors
By designing a door opening protection net that is made on the floor in super high-rise buildings, using a combined structure of a rectangular frame and a dense safety net, the conflict between construction technology and safety protection is solved, and effective against high-altitude falls and object strikes are achieved. Protection improves construction safety and speed.
Patent Information
- Application Number
- CN202420145669.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-22
AI Technical Summary
In the construction of super high-rise buildings, the construction technology and safety protection of the vertical structure of the steel platform and the horizontal structure conflict, resulting in an increase in the risk of high-altitude falls and object strike accidents, especially in the process of three-dimensional cross-operation, which makes it difficult to effectively protect.
A super-high-rise door opening protection net is designed, including a rectangular frame and a dense safety net, which is installed in the building door opening or structural vacancy through ear plates and bolts, and is equipped with independent fixed frames, standard frames and isolation. The frame structure, the protective net is a continuous piece, and the perforated aluminum plate and angle steel material are used to ensure the structure is stable and safe.
The protective net has a simple structure, light transportation, and easy assembly and disassembly. It can effectively prevent high-altitude falls and object strike accidents, improve construction speed, resolve the conflict between construction technology and safety protection, and enhance construction safety.
Smart Images

Figure CN222084086U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction equipment, in particular to a super-high-rise door opening protection net that is made layer by layer. Background Art
[0002] In order to shorten the construction period of the entire super high-rise tower, construction projects are increasingly choosing to use the scheme of constructing the vertical structure first and then the horizontal structure. It is common that when a super high-rise tower uses a steel platform to construct the vertical structure of the core tube first, a construction elevator needs to be set up to directly reach the steel platform, and at the same time, a silo horizontal structure in the core tube is selected, including stairs close to the bottom of the steel platform, to be connected as a fire evacuation passage for super high-rise construction workers.
[0003] The horizontal structure of the silo where the construction elevator is located lags behind the patching progress of other silo horizontal structures, while the horizontal structure of the silo close to the bottom of the steel platform is ahead of other silos. This is similar to the working condition of the horizontal structure being patched in stages. For the relatively higher horizontal structure construction layers, protective measures must be taken at the gaps in the doorway structures to prevent personnel, materials, and machinery from falling from high altitudes during the structural construction process, which would seriously affect the construction safety of the adjacent horizontal structures below. Utility Model Content
[0004] The utility model aims to solve the conflicts between the existing construction technology of super high-rise building steel platforms and safety protection, and the problems of high-altitude falling casualties and object hitting accidents that are prone to occur in three-dimensional cross operations. The technical scheme adopted by the utility model is: a super high-rise door opening protection net that is made layer by layer, comprising: a rectangular frame and a protection net, the protection net is arranged on the rectangular frame, the rectangular frame is provided with ear plates, and the rectangular frame is arranged in the door opening or structural vacancy of the building through the ear plates.
[0005] A further improvement is that the rectangular frame includes a fixed frame, a standard frame and an isolation frame which are arranged in sequence, and the fixed frame, the standard frame and the isolation frame are all independent frames.
[0006] A further improvement is that the protective net on the fixed frame and the standard frame is a continuous protective net.
[0007] A further improvement is that the protective net is a dense mesh safety net.
[0008] A further improvement is that the protective net on the isolation frame is a perforated aluminum plate.
[0009] A further improvement is that the fixed frame and the standard frame, and the standard frame and the isolation frame are fixedly connected by bolts.
[0010] The beneficial effects of the utility model are:
[0011] The super-high-rise door opening protection net provided by the utility model is simple in structure, easy to transport, easy to assemble and disassemble, and highly maneuverable. It can be installed in advance when necessary, and can be installed in place after the vertical structure of the steel platform is constructed layer by layer. It solves the conflict between the construction technology of the steel platform of super-high-rise buildings and safety protection, and can effectively prevent and reduce the occurrence of high-altitude falling casualties and object impact accidents caused by three-dimensional cross-operation, while effectively improving the construction speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] The utility model is further described below in conjunction with the accompanying drawings and embodiments.
[0013] Figure 1 The utility model is a structural schematic diagram of a super-high-rise door opening protection net that is made layer by layer. DETAILED DESCRIPTION
[0014] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.
[0015] In the description of the utility model, it is necessary to understand that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0016] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0017] In the utility model, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood according to the specific circumstances.
[0018] like Figure 1 As shown, the utility model provides a super high-rise door opening protection net that is made layer by layer, including: a rectangular frame 1 and a protection net 2. The rectangular frame 1 is a metal frame, and its manufacturing material is preferably angle steel that is easy to obtain. The protection net 2 is arranged on the rectangular frame 1. Ear plates 3 are welded and fixed on both sides of the top of the rectangular frame 1. The rectangular frame 1 is installed in the door opening or structural vacancy of the building by the expansion bolts passing through the ear plates 3. The connection of two adjacent angle steels is first fastened by bolts, and the angle steel joints are fixed by welding to ensure the overall stability of the structure.
[0019] The super-high-rise door opening protection net provided by the utility model is simple in structure, easy to transport, easy to assemble and disassemble, and highly maneuverable. It can be installed in advance when necessary, and can be installed in place after the vertical structure of the steel platform is constructed layer by layer. It solves the conflict between the construction technology of the steel platform of super-high-rise buildings and safety protection, and can effectively prevent and reduce the occurrence of high-altitude falling casualties and object impact accidents caused by three-dimensional cross-operation, while effectively improving the construction speed.
[0020] In order to facilitate transportation, the rectangular frame 1 is disassembled in the present technical solution. A further improvement of the present technical solution is that the rectangular frame 1 includes a fixed frame 11, a standard frame 12 and an isolation frame 13 arranged in sequence, arranged in a row and connected to each other, and the fixed frame 11, the standard frame 12 and the isolation frame 13 are all independent frames.
[0021] In order to achieve integrity, reduce construction procedures, and improve installation and assembly efficiency, a further improvement of the present technical solution is that the protective net 2 on the fixed frame 11 and the standard frame 12 is a continuous whole protective net, rather than installing a separate protective net in each frame.
[0022] A further improvement is that the protective net 2 is a dense mesh safety net.
[0023] A further improvement is that the protective net 2 on the isolation frame 13 is a perforated aluminum plate, which is fixed to the frame by welding as a bottom hard isolation.
[0024] As a further improvement, the fixed frame 11 and the standard frame 12, as well as the standard frame 12 and the isolation frame 13, are fixedly connected by bolts to form a whole and a close structure, thereby achieving safe closure and isolation of the adjacent door openings and effectively preventing being hit by falling objects from heights.
[0025] In view of the safety protection issues of the horizontal structure door openings or other structural gaps in the construction area, the technical solution proposes a prefabricated steel frame and a safety protection hanging net that can be made on a layer-by-layer basis, which can modify the size of the standardized isolation net according to the door openings of different sizes. The utility model is made of a standardized bracket with angle steel and bolts and an additional dense mesh. The standardized bracket can be quickly disassembled and assembled, and has the advantages of fast installation, convenient operation, comprehensive isolation and closure, and high safety protection performance. The angle steel, bolts and other materials of its components can be made in the processing plant, and only simple assembly and bolt fixing and installation are required at the construction site after transportation to the site. Isolation nets of different heights can be assembled at the construction site according to different door openings. When in use, they can be transported to the construction floor by tower cranes, unloading platforms, construction elevators or personnel transportation, and then assembled. If necessary, they can be installed and removed on the steel platform in advance. After the construction of this floor is completed, the isolation net is removed and a standardized railing is set. The isolation net is flipped over and reused on subsequent floors, which is green, energy-saving and environmentally friendly.
[0026] Based on the above ideal embodiments of the utility model, the relevant staff can make various changes and modifications without deviating from the technical concept of the utility model through the above description. The technical scope of the utility model is not limited to the content of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A super high-rise door opening protection net that is made layer by layer, characterized in that: include: A rectangular frame and a protective net, wherein the protective net is arranged on the rectangular frame, and ear plates are arranged on the rectangular frame, and the rectangular frame is arranged in a doorway or a structural gap of a building through the ear plates.
2. The super high-rise door opening protection net made layer by layer according to claim 1 is characterized in that: The rectangular frame includes a fixed frame, a standard frame and an isolation frame which are arranged in sequence, and the fixed frame, the standard frame and the isolation frame are all independent frames.
3. The super high-rise door opening protection net made layer by layer according to claim 2 is characterized in that: The protective net on the fixed frame and the standard frame is a continuous protective net.
4. The super high-rise door opening protection net made layer by layer according to claim 3 is characterized in that: The protective net is a dense mesh safety net.
5. The super high-rise door opening protection net made layer by layer according to claim 3 is characterized in that: The protective net on the isolation frame is a perforated aluminum plate.
6. The super high-rise door opening protection net made layer by layer according to claim 2 is characterized in that: The fixed frame and the standard frame, and the standard frame and the isolation frame are fixedly connected by bolts.