Gas storage plugging well monitoring device
By designing a device including a monitoring module, a pressure gauge and a pressure sensor, the problem in the prior art is not convenient to simultaneously monitor the pressure of the gas storage sealing well, and the accuracy of the pressure of the meter sleeve, oil sleeve and technical sleeve is achieved. monitor.
Patent Information
- Application Number
- CN202420159288.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-23
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-01-23
AI Technical Summary
The existing gas storage sealing well monitoring device is not convenient to monitor the meter sleeve pressure, oil sleeve pressure and technical sleeve pressure at the same time.
A device including a monitoring module, a pressure gauge, a pressure sensor and a gate valve is designed. The monitoring module is installed on the gate valve on the sealing well of the gas storage storage through fixing bolts, and is set as a channel valve group, including a pressure induction port and a pressure relief port. and pressure monitoring port, three types of pressure are monitored using pressure gauge and sensor.
The simultaneous monitoring of the pressure of the meter sleeve, oil sleeve and technical sleeve of the gas storage seal well is realized, and the functionality and accuracy of the monitoring device are improved.
Smart Images

Figure CN222084488U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of gas storage plugging well monitoring, in particular to a gas storage plugging well monitoring device. Background Art
[0002] During the construction process around the plugging well of the gas storage reservoir, a monitoring device is needed to monitor the natural gas in the plugging well of the gas storage reservoir. However, the existing monitoring device for plugging wells of the gas storage reservoir is not convenient for simultaneously monitoring the surface pressure, oil casing pressure and technical casing pressure of the plugging well of the gas storage reservoir. Therefore, it is necessary to improve the existing monitoring device for plugging wells of the gas storage reservoir. Utility Model Content
[0003] The utility model aims to provide a gas storage plugging well monitoring device to solve the problem in the above background technology that it is inconvenient to simultaneously monitor the surface casing pressure, oil casing pressure and technical casing pressure of the gas storage plugging well.
[0004] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is a gas storage well plugging monitoring device, including a monitoring module, the top of the monitoring module is fixedly connected with three first joints, the tops of the three first joints are fixedly connected with pressure gauges, the two sides of the monitoring module are fixedly connected with second joints, the ends of two second joints away from the monitoring module are fixedly connected with pressure pipes, the front of the monitoring module is fixedly connected with three fourth joints, the ends of the three fourth joints away from the monitoring module are fixedly installed with pressure sensors, the back of the monitoring module is fixedly connected with three third joints, the ends of the three third joints away from the monitoring module are fixedly connected with ferrules, the ends of the three ferrules away from the third joints are fixedly connected with bent pipes, the bottom end of the monitoring module is fixedly connected with a connecting seat, the bottom end of the connecting seat is fixedly provided with a first connecting flange, the bottom end of the first connecting flange is provided with a second connecting flange, and the bottom end of the second connecting flange is fixedly provided with a gate valve.
[0005] The first connecting flange is connected to the second connecting flange by a plurality of first fixing bolts, and then the monitoring module is fixedly installed on the gate valve on the plugging well of the gas storage reservoir, and the monitoring module is configured as a channel valve group, with four channels forming a group, one channel being a pressure inlet, one being a pressure relief port, and the other two being pressure monitoring ports, each of which is equipped with a pressure gauge and a pressure sensor. The three groups of monitoring components can be used to monitor the pressures of the gauge sleeve, oil sleeve, and technical sleeve of the plugging well of the gas storage reservoir.
[0006] Preferably, a first through groove is provided in the middle of the connecting seat, and the first through groove is connected to the gate valve, so as to facilitate connecting the gate valve with the monitoring module.
[0007] Preferably, a plurality of first fixing bolts are provided at the connection between the first connecting flange and the second connecting flange, and the first connecting flange and the second connecting flange are connected by the plurality of first fixing bolts, thereby fixing the monitoring module on the gate valve on the plugging well of the gas storage reservoir.
[0008] Preferably, a rotating wheel is rotatably arranged on the front side of the gate valve, and the opening and closing of the gate valve can be easily controlled by the arrangement of the rotating wheel.
[0009] Preferably, a third connecting flange is fixedly provided at the bottom end of the gate valve, a mounting seat is provided at the bottom end of the third connecting flange, and a plurality of second fixing bolts are provided at the connection between the third connecting flange and the mounting seat, so that the gate valve and the mounting seat can be conveniently connected by the provision of the plurality of second fixing bolts.
[0010] Preferably, a second through groove is opened in the middle of the mounting seat, the second through groove is connected to the gate valve, and a plurality of third fixing bolts are arranged on the outer side of the top end of the mounting seat, and the arrangement of the plurality of third fixing bolts facilitates the fixed installation of the gate valve.
[0011] Preferably, the second connector, the third connector and the fourth connector are all configured as M20×1.5 conversion connectors, and the monitoring module is configured as a 12-channel valve group.
[0012] Compared with the prior art, the beneficial effects of the utility model are as follows: the first connecting flange is connected to the second connecting flange by a plurality of first fixing bolts, and then the monitoring module is fixedly installed on the gate valve on the plugging well of the gas storage reservoir, and the monitoring module is arranged as a channel valve group, four channels are a group, one channel is a pressure inlet, one is a pressure relief port, and the other two are pressure monitoring ports, which are respectively equipped with pressure gauges and pressure sensors, and the pressures of the gauge sleeve, oil sleeve and technical sleeve of the plugging well of the gas storage reservoir can be respectively monitored through three groups of monitoring components. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the utility model;
[0014] Figure 2 It is a front view of the utility model;
[0015] Figure 3 It is a three-dimensional diagram of a part of the utility model;
[0016] Figure 4 It is a partial cross-sectional view of the utility model;
[0017] Figure 5 It is a top view of the monitoring module of the utility model.
[0018] In the figure: 1. monitoring module; 2. first joint; 3. pressure gauge; 4. second joint; 5. pressure pipe; 6. connecting seat; 7. first connecting flange; 8. second connecting flange; 9. first fixing bolt; 10. gate valve; 11. runner; 12. third connecting flange; 13. mounting seat; 14. third fixing bolt; 15. second fixing bolt; 16. third joint; 17. ferrule; 18. elbow; 19. fourth joint; 20. pressure sensor; 21. first through groove; 22. second through groove. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0020] Example 1
[0021] like Figure 1-5 As shown, a gas storage well plugging monitoring device includes a monitoring module 1, the top of the monitoring module 1 is fixedly connected with three first joints 2, the tops of the three first joints 2 are fixedly connected with pressure gauges 3, both sides of the monitoring module 1 are fixedly connected with second joints 4, the ends of the two second joints 4 away from the monitoring module 1 are fixedly connected with pressure-leading pipes 5, the front of the monitoring module 1 is fixedly connected with three fourth joints 19, the ends of the three fourth joints 19 away from the monitoring module 1 are fixedly installed with pressure sensors 20, the back of the monitoring module 1 is fixedly connected with three third joints 16, the ends of the three third joints 16 away from the monitoring module 1 are fixedly connected with ferrules 17, and the ends of the three ferrules 17 away from the third joints 16 are fixedly connected with elbows 18. The bottom end of the monitoring module 1 is fixedly connected to a connecting seat 6, the bottom end of the connecting seat 6 is fixedly provided with a first connecting flange 7, the bottom end of the first connecting flange 7 is provided with a second connecting flange 8, the bottom end of the second connecting flange 8 is fixedly provided with a gate valve 10, the first connecting flange 7 is connected to the second connecting flange 8 by a plurality of first fixing bolts 9, and then the monitoring module 1 is fixedly installed on the gate valve 10 on the plugging well of the gas storage reservoir, and the monitoring module 1 is configured as a 12-channel valve group, four channels as a group, one channel is a pressure inlet, one is a pressure relief port, and the other two are pressure monitoring ports, which are respectively installed with a pressure gauge 3 and a pressure sensor 20, and can respectively monitor the gauge sleeve, oil sleeve, and technical sleeve pressures of the plugging well of the gas storage reservoir through three groups of monitoring components.
[0022] When in use, a first through groove 21 is provided in the middle of the connection seat 6, the first through groove 21 is connected to the gate valve 10, and a plurality of first fixing bolts 9 are provided at the connection between the first connection flange 7 and the second connection flange 8;
[0023] The first connecting flange 7 is connected to the second connecting flange 8 by a plurality of first fixing bolts 9, and the monitoring module 1 is then fixedly mounted on the gate valve 10 on the plugging well of the gas storage reservoir;
[0024] When in use, a rotating wheel 11 is rotatably provided on the front side of the gate valve 10, a third connecting flange 12 is fixedly provided on the bottom end of the gate valve 10, a mounting seat 13 is provided at the bottom end of the third connecting flange 12, a plurality of second fixing bolts 15 are provided at the connection between the third connecting flange 12 and the mounting seat 13, a second through groove 22 is opened in the middle of the mounting seat 13, the second through groove 22 is communicated with the gate valve 10, a plurality of third fixing bolts 14 are provided on the outer side of the top end of the mounting seat 13, the second joint 4, the third joint 16 and the fourth joint 19 are all set as M20×1.5 conversion joints, and the monitoring module 1 is set as a 12-channel valve group.
[0025] The gate valve 10 is conveniently connected to the mounting seat 13 by the provision of a plurality of second fixing bolts 15 , the gate valve 10 is conveniently fixedly installed by the provision of a plurality of third fixing bolts 14 , and the opening and closing of the gate valve 10 is conveniently controlled by the provision of the runner 11 .
[0026] When the embodiment of the present application is in use: the first connecting flange 7 is connected to the second connecting flange 8 by a plurality of first fixing bolts 9, and then the monitoring module 1 is fixedly installed on the gate valve 10 on the plugging well of the gas storage reservoir, and the monitoring module 1 is configured as a 12-channel valve group, with four channels as a group, one channel being a pressure inlet, one being a pressure relief port, and the other two being pressure monitoring ports, each of which is equipped with a pressure gauge 3 and a pressure sensor 20, respectively. The gauge sleeve, oil sleeve, and technical sleeve pressures of the plugging well of the gas storage reservoir can be monitored respectively through three groups of monitoring components, wherein the provision of a plurality of second fixing bolts 15 facilitates the connection of the gate valve 10 with the mounting seat 13, and the provision of a plurality of third fixing bolts 14 facilitates the fixed installation of the gate valve 10.
[0027] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A gas storage well plugging monitoring device, comprising a monitoring module, characterized in that: The top of the monitoring module is fixedly connected with three first joints, and the tops of the three first joints are fixedly connected with pressure gauges, the two sides of the monitoring module are fixedly connected with second joints, and the ends of the two second joints away from the monitoring module are fixedly connected with pressure pipes, the front of the monitoring module is fixedly connected with three fourth joints, and the ends of the three fourth joints away from the monitoring module are fixedly installed with pressure sensors, the back of the monitoring module is fixedly connected with three third joints, and the ends of the three third joints away from the monitoring module are fixedly connected with ferrules, and the ends of the three ferrules away from the third joints are fixedly connected with bent pipes, the bottom of the monitoring module is fixedly connected with a connecting seat, the bottom of the connecting seat is fixedly provided with a first connecting flange, the bottom of the first connecting flange is provided with a second connecting flange, and the bottom of the second connecting flange is fixedly provided with a gate valve.
2. The gas storage well plugging monitoring device according to claim 1 is characterized in that: A first through groove is provided in the middle of the connecting seat, and the first through groove is communicated with the gate valve.
3. The gas storage well plugging monitoring device according to claim 1 is characterized in that: A plurality of first fixing bolts are arranged at the connection between the first connecting flange and the second connecting flange.
4. The gas storage well plugging monitoring device according to claim 1 is characterized in that: The front side of the gate valve is rotatably provided with a rotating wheel.
5. The gas storage well plugging monitoring device according to claim 1 is characterized in that: A third connecting flange is fixedly arranged at the bottom end of the gate valve, a mounting seat is arranged at the bottom end of the third connecting flange, and a plurality of second fixing bolts are arranged at the connection between the third connecting flange and the mounting seat.
6. The gas storage well plugging monitoring device according to claim 5 is characterized in that: A second through slot is provided in the middle of the mounting seat, the second through slot is communicated with the gate valve, and a plurality of third fixing bolts are provided on the outer side of the top end of the mounting seat.
7. The gas storage well plugging monitoring device according to claim 1 is characterized in that: The second connector, the third connector and the fourth connector are all configured as M20×1.5 conversion connectors, and the monitoring module is configured as a 12-channel valve group.