Supporting device for reserved iron box of underground false tunnel
By designing adjustable underground fake tunnel reserved iron box support devices, using technologies such as steel and spiral connectors, the problems of unstable and easy corrosion of existing wooden pillars are solved, and the safety and reliability of the iron box is achieved and the safety and reliability of the iron box is achieved. Long-life use reduces production costs and fire risks.
Patent Information
- Application Number
- CN202420852982.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-04-23
AI Technical Summary
The existing method of retaining iron box support for underground fake tunnels uses wooden pillars, which have defects such as unadjustable size, difficulty in recycling and easy corrosion, resulting in unstable support and short service life.
An adjustable support device including bottom, interior, side and top support assemblies is designed, made of steel, with adjustable support lengths through spiral connectors and support, and provided by basket screws and hoisting anchors. Multi-point and multi-direction support to ensure the stable and fixed iron box.
It realizes the adjustable size of the support device, convenient disassembly and assembly, light weight and recyclable use, extends the service life, reduces production costs, and reduces the risk of fire accidents, and meets environmental protection requirements.
Smart Images

Figure CN222084530U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of tunnel construction equipment, in particular to a supporting device for a reserved iron box in an underground false tunnel. Background Art
[0002] The quality of the support of the mine, as the main structure on which the working face of the mine is based, is directly related to the safety and stability of the mine. If the support is improper, it is easy to break directly above the non-mining wall during the mining process, causing the pressure concentration in the withdrawal tunnel below, resulting in greater safety hazards for the support, equipment and workers in the lower tunnel. Therefore, it is necessary to provide effective mine support technology to ensure the safety of mine production, prevent the collapse of the roof and side walls of the mine, and ensure the safety of miners and the smooth progress of mining safety operations.
[0003] In the process of infrastructure construction of metal and non-metal underground mines, the false tunnel is a key project reserved in the secondary middle section of the mine. As the mining depth gradually increases, the tunnel will be severely deformed and the temperature of the mining area will increase. Therefore, as an underground filling, return air and safe escape passage, it is particularly important to ensure the stability and reliability of the false tunnel. The reserved iron box in the filling return air false tunnel is one of the indispensable projects. The reserved iron box refers to a metal structure reserved in advance in the construction of the mine for installing equipment or as a safety facility. The overall iron box is spliced by sections of hollow cylinders. The reserved iron box in the false tunnel can improve the ventilation environment of the working area, ensure air circulation, avoid the retention of dirty air on the working surface, reduce the accumulation of harmful gases in the mine by controlling the wind flow, reduce the risk of poisoning, reduce ventilation resistance, improve ventilation efficiency, indirectly improve work efficiency, and create a good environment for filling operations.
[0004] The reserved iron box needs proper support inside its structure to ensure its stability and safety. The existing support method is to install wooden pillars inside the iron box to prevent its structural deformation. However, wooden pillars have the defects of non-adjustable size, great difficulty in recycling and easy corrosion, and short service life. Utility Model Content
[0005] The utility model provides a supporting device for a reserved iron box in an underground false tunnel, aiming to provide a supporting device with adjustable size and recyclable utilization.
[0006] To achieve its purpose, the utility model adopts the following technical solutions:
[0007] A support device for a reserved iron box in an underground false tunnel, comprising a bottom support assembly, a plurality of groups of internal support assemblies, a side support assembly and a top support assembly;
[0008] The bottom support assembly includes a plurality of brackets radially arranged below the iron box, and cross beams arranged symmetrically along the axial direction of the iron box are arranged on the top of the brackets, and the cross beams are tangent to the bottom of the iron box;
[0009] The internal support assembly includes an intermediate structure member arranged in the inner cavity of the iron box, the two ends of the intermediate structure member are respectively connected to the spiral connector, and the free end of the spiral connector is connected to the support member;
[0010] The side support assembly includes turnbuckles symmetrically arranged on both sides of the outer wall of the iron box, one end of the turnbuckle is connected to the outer wall of the iron box through a steel wire, and the other end is connected to a lifting anchor rod arranged on the side of the false tunnel through a steel wire;
[0011] The top support assembly includes a first connecting plate arranged on the top of the iron box, a hollow first connecting rod is vertically connected to the center of the top of the first connecting plate, a second connecting rod is sleeved inside the first connecting rod, and a free end of the second connecting rod is connected to the first support plate.
[0012] Preferably, the intermediate structural member includes a connecting tube, with screws symmetrically connected to both ends of the connecting tube; the spiral connecting member includes a second connecting plate, with nuts symmetrically fixed at the centers of both sides of the second connecting plate and a center opening, and the nut on one side is screwed to the screw; the supporting member includes a support rod, one end of the support rod is connected to the nut on the other side of the second connecting plate, and the other end is vertically provided with a second support plate.
[0013] Preferably, handles are symmetrically provided on the sides of the second connecting plate.
[0014] Preferably, a through hole is provided on the connecting pipe, and the two sets of internal support components are connected by bolts inserted into the through hole.
[0015] Preferably, the distance between every two groups of internal support components is 0.8-1.2m.
[0016] Preferably, reinforcing ribs are provided on the inner side of the connection between the cross beam and the bracket.
[0017] Preferably, the first connecting plate is arc-shaped, and its curvature is consistent with the curvature of the iron box.
[0018] Preferably, a plurality of positioning holes are equidistantly provided on the first connecting rod and the second connecting rod, and the first connecting rod and the second connecting rod are connected and positioned by means of bent round steels inserted into the positioning holes.
[0019] Preferably, the distance between two adjacent groups of brackets is 0.8-1.2 m.
[0020] Preferably, the distance between two adjacent groups of side support assemblies and the distance between two adjacent groups of top support assemblies are both 0.8-1.2m.
[0021] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0022] 1. The support device provided by the utility model includes a bottom support assembly, an internal support assembly, a side support assembly and a top support assembly. After the assembly is combined for support, the reserved iron box can be stably fixed in the false tunnel, which is safe and reliable. Moreover, the support size is adjustable, the assembly and disassembly are convenient, the weight is light, it is easy to store and carry, it can be recycled, and it has a long service life.
[0023] 2. The internal support assembly provided by the utility model includes an intermediate structural member, a spiral connector and a support member. When supporting the underground false tunnel reserved iron box, the spiral connector is rotated to adjust the length of the pillar. After the adjustment is completed, the support plate at the end of the support member fits with the inner wall of the iron box to form an effective internal support. The design is ingenious, practical and convenient. Moreover, the internal support assembly can be used alone or in combination. The angle and length of the support can be adjusted according to actual use requirements. It is flexible and can provide multi-point and multi-directional internal support for the underground false tunnel reserved iron box, effectively preventing the iron box from deforming during the filling process.
[0024] 3. The support device provided by this application is made of steel, which replaces the traditional method of using wood for support, reduces wood loss, effectively reduces the number of underground hot work, and can effectively prevent the occurrence of fire accidents. All structural parts can be standardized and produced in an assembly line, which can be reused, with a high recycling rate and reduced production costs. In addition, the steel used is all scrap steel, which achieves the purpose of repairing and reusing waste, and meets the national requirements for energy conservation and environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is a diagram of the use state of the support device of the utility model;
[0026] Figure 2 This is a front view of the support device of the utility model;
[0027] Figure 3 It is a top view of the support device of the utility model;
[0028] Figure 4 It is a left view of the supporting device of the utility model;
[0029] Figure 5 This is a schematic diagram of the bottom support assembly structure of the utility model;
[0030] Figure 6 This is a schematic diagram of the structure of the connector of the utility model;
[0031] Figure 7 This is a schematic diagram of the structure of the internal support assembly of the utility model;
[0032] Figure 8 This is a schematic diagram of the structure of the intermediate structural member of the utility model;
[0033] Fig. 9 This is a schematic diagram of the structure of the spiral connector of the utility model;
[0034] Fig.10 It is a schematic diagram of the support structure of the utility model;
[0035] Fig.11 It is a schematic diagram of the combined use of two sets of internal support components of the utility model;
[0036] Fig.12 for Fig.11 The combined use state diagram of the two sets of internal support components;
[0037] Fig.13 This is a schematic diagram of the top support assembly structure of the utility model;
[0038] Fig.14 It is a schematic diagram of the connection structure between the first connecting plate and the first connecting rod of the utility model;
[0039] Fig.15 This is a schematic diagram of the connection structure between the first support plate and the second connecting rod of the utility model;
[0040] In the figure: 1- bracket; 2- crossbeam; 3- iron box; 4- intermediate structural member; 5- support member; 6- spiral connector; 7- connector; 8- turnbuckle; 9- first connecting plate; 10- first supporting plate; 11- first connecting rod; 12- connecting pipe; 13- lead screw; 14- second connecting plate; 15- nut; 16- supporting rod; 17- second supporting plate; 18- handle; 19- through hole; 20- reinforcing rib; 21- second connecting rod; 22- positioning hole. DETAILED DESCRIPTION
[0041] The utility model is further described below in conjunction with the accompanying drawings:
[0042] like Figure 1-15 As shown, the utility model is a support device for a reserved iron box in an underground false tunnel, comprising a bottom support assembly, multiple groups of internal support assemblies, side support assemblies and a top support assembly; the distance between adjacent brackets 1, two groups of internal support assemblies, two adjacent groups of side support assemblies and two adjacent groups of top support assemblies is 1m.
[0043] The bottom support assembly includes a bracket 1 radially arranged below the iron box 3. The bracket 1 is made of 10# channel steel with a length of 2500mm and a height of 800mm. An oblong hole with a length of 48mm and a diameter of 12mm is opened on both sides of the center of the bracket 1 at a position of 520mm. A crossbeam 2 is symmetrically arranged along the axial direction of the iron box 3 on the top of the bracket, and the crossbeam 2 is tangent to the bottom of the iron box 3. The crossbeam 2 is made of 10# channel steel with a length of 6000mm. An oblong hole with a length of 48mm and a diameter of 12mm is opened at an interval of 1000mm at the center of the crossbeam 2, and an oblong hole with a length of 48mm and a diameter of 12mm is opened at an interval of 500mm at both ends. Bolts are inserted into the oblong holes for connecting the bracket 1. A φ18 round steel with a length of 250mm is welded on the inner side of the connection between the crossbeam 2 and the bracket 1 as a reinforcing rib 20 to strengthen the connection. When encountering an iron box with larger specifications, it is necessary to use a connecting piece 7 to connect multiple brackets 1. The connecting piece 7 is made of 10# channel steel with a specification of 200×60×10mm.
[0044] The internal support assembly includes an intermediate structure 4 arranged in the inner cavity of the iron box 3, the two ends of the intermediate structure 4 are respectively connected to the spiral connector 6, and the free end of the spiral connector 6 is connected to the support member 5; the intermediate structure 4 includes a steel connecting pipe 12 with a length of 200mm and φ60mm, and a lead screw 13 with a length of 400mm and a model of M30 is symmetrically welded at both ends of the connecting pipe 12, and a 20mm length portion at one end of the lead screw 13 is inserted into the connecting pipe 12 and continuously fully welded; the spiral connector 6 includes a specification of 100mm×100mm×1 The second connecting plate 14 is made of steel with a diameter of 0 mm, and a handle 18 is symmetrically welded on the side of the second connecting plate 14. A hole of φ30 is opened in the center of the second connecting plate 14, and a nut 15 of model M30 is symmetrically welded at the center of the front and back sides, and the nut 15 on one side is threadedly connected to the lead screw 13; the support member 5 includes a steel support rod 16 with a length of 1000 mm and φ=45 mm, one end of the support rod 16 is threadedly connected to the nut 15 on the other side of the second connecting plate 14, and the other end is vertically welded with a second supporting plate 17 with a specification of 100 mm×100 mm×10 mm. A through hole 19 is provided at the center of the connecting pipe 12, and the two sets of internal support components are connected by bolts inserted into the through hole 19.
[0045] The side support assembly includes M6 OO-type turnbuckle screws 8 symmetrically arranged on both sides of the outer wall of the iron box 3, one end of the turnbuckle screw 8 is connected to the outer wall of the iron box 3 through a φ6.2mm steel wire, and the other end is connected to the lifting anchor rod arranged on the side of the false tunnel through a φ6.2mm steel wire;
[0046] The top support assembly includes a first connecting plate 9 arranged at the top of the iron box 3. The first connecting plate 9 is made of a steel pipe with a length of 450mm and φ50×3.5mm and bent at 20°. After bending, the first connecting plate 9 is in an arc shape, and its curvature is consistent with the curvature of the iron box 3. When supporting, the first connecting plate 9 and the iron box 3 have a high degree of fit. A hollow steel first connecting rod 11 with a length of 600mm and φ50×3.5mm is vertically welded at the center of the top of the first connecting plate 9. A steel second connecting rod 21 with a length of 450mm and φ50×3.5mm is sleeved in the first connecting rod 11. A steel first supporting plate 10 with a specification of 100mm×100mm×10mm is welded at the free end of the second connecting rod 21. Multiple positioning holes 22 with a diameter of φ12mm are opened on the first connecting rod 11 and the second connecting rod 21 at intervals of 20mm. The first connecting rod 11 and the second connecting rod 21 are fixed by inserting the bent round steel into the positioning holes 22 to fix the height of the top support assembly.
[0047] Before using the support device of the utility model for support, the bottom support assembly, the internal support assembly, the side support assembly and the top support assembly are assembled separately. To enhance the support effect, two sets of internal support assemblies are used in combination. If necessary, the side support assembly of the iron box can be replaced with the top support assembly. When supporting, the specific steps are as follows:
[0048] Step 1: Place the iron box 3 on the bottom support assembly to form a bottom support;
[0049] Step 2: Adjust the angles of the two sets of internal support components and the extension distance of the screw rod 13 so that the second support plate 17 is in contact with the inner wall of the iron box 3 and then tighten the bolts inserted into the through holes 19 to form an internal fixed support;
[0050] Step 3: Adjust the distance between the second connecting rod 21 and the first connecting rod 11, so that the first supporting plate 10 fits closely with the inner wall of the lane, and at the same time, the first connecting plate 9 fits closely with the outer wall of the iron box 3, and then insert the two ends of the bent round steel into two different round holes for fixing, so as to form a top fixed support;
[0051] Step 4: Use the turnbuckle screws 8 in combination with the steel wire to connect the iron box with the lifting anchor rods arranged on the side of the false tunnel to form flexible fixation on both sides.
[0052] After support is provided by the above bottom support components, internal support components, side support components and top support components, the reserved iron box can be stably fixed in the false tunnel, which is safe and reliable.
Claims
1. A support device for a reserved iron box in a false tunnel underground, characterized in that: It includes a bottom support assembly, several groups of internal support assemblies, a side support assembly and a top support assembly; The bottom support assembly comprises a plurality of groups of brackets (1) radially arranged below the iron box (3), and cross beams (2) symmetrically arranged along the axial direction of the iron box (3) are arranged on the top of the brackets (1), and the cross beams (2) are tangent to the bottom of the iron box (3); The internal support assembly comprises an intermediate structure (4) arranged in the inner cavity of the iron box (3), the two ends of the intermediate structure (4) are respectively connected to the spiral connection pieces (6), and the free end of the spiral connection piece (6) is connected to the support piece (5); The side support assembly comprises a turnbuckle (8) symmetrically arranged on both sides of the outer wall of the iron box (3), one end of the turnbuckle (8) is connected to the outer wall of the iron box (3) through a steel wire, and the other end is connected to a lifting anchor rod arranged on the side of the false tunnel through a steel wire; The top support assembly comprises a first connecting plate (9) arranged on the top of the iron box (3), a hollow first connecting rod (11) being vertically connected to the center of the top of the first connecting plate (9), a second connecting rod (21) being sleeved inside the first connecting rod (11), and a free end of the second connecting rod (21) being connected to the first support plate (10).
2. A support device for a reserved iron box in a false tunnel underground as claimed in claim 1, characterized in that: The intermediate structural member (4) comprises a connecting tube (12), with screws (13) symmetrically connected to both ends of the connecting tube (12); the spiral connecting member (6) comprises a second connecting plate (14), with nuts (15) symmetrically fixed at the centers of both sides of the second connecting plate (14) and a central opening, with the nut (15) on one side being screwed to the screw (13); the supporting member (5) comprises a supporting rod (16), with one end of the supporting rod (16) being screwed to the nut (15) on the other side of the second connecting plate (14), and the other end being vertically provided with a second supporting plate (17).
3. A support device for a reserved iron box in a false tunnel underground as claimed in claim 2, characterized in that: Handles (18) are symmetrically provided on the side of the second connecting plate (14).
4. A support device for a reserved iron box in a false tunnel underground as claimed in claim 3, characterized in that: The connecting pipe (12) is provided with a through hole (19), and the two sets of internal support components are connected by bolts inserted into the through hole (19).
5. A support device for a reserved iron box in a false underground tunnel as claimed in claim 4, characterized in that: The distance between every two sets of internal support components is 0.8-1.2m.
6. A support device for a reserved iron box in a false tunnel underground as claimed in claim 5, characterized in that: A reinforcing rib (20) is provided on the inner side of the connection between the crossbeam (2) and the bracket (1).
7. A support device for a reserved iron box in a false tunnel underground as claimed in claim 6, characterized in that: The first connecting plate (9) is arc-shaped, and its curvature is consistent with the curvature of the iron box (3).
8. A support device for a reserved iron box in a false underground tunnel as claimed in claim 7, characterized in that: A plurality of positioning holes (22) are equidistantly provided on the first connecting rod (11) and the second connecting rod (21), and the first connecting rod (11) and the second connecting rod (21) are connected and positioned by means of bent round steel bars inserted into the positioning holes (22).
9. A support device for a reserved iron box in an underground false tunnel as claimed in any one of claims 1 to 8, characterized in that: The distance between two adjacent groups of brackets (1) is 0.8-1.2 m.
10. A support device for a reserved iron box in an underground false tunnel as claimed in any one of claims 1 to 8, characterized in that: The distance between two adjacent sets of side support assemblies and two adjacent sets of top support assemblies is 0.8-1.2m.