Splicing type prefabricated reinforced concrete cement pipe
By adopting radial plugging and sealing structure in cement pipelines, the problems of easy dislocation of existing cement pipeline splicing and cumbersome processes are solved, and fast, stable and sealed pipeline connections are achieved, reducing labor intensity and water leakage risks.
Patent Information
- Application Number
- CN202420825220.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-20
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing cement pipeline splicing method can easily lead to pipeline misalignment, affecting drainage effect, and the process is cumbersome and labor intensity is high, making it difficult to directly plug up and down under the hoisting equipment.
Design a spliced prefabricated reinforced concrete cement pipe, which adopts radial plugging method, is connected through insertion plates and sockets, and combines the press rod, extrusion surface, bearing seat and sealing gasket to ensure the stability and sealing between the pipes. Reduce the need for manual drag.
The rapid splicing and stable connection of the pipeline is achieved, which reduces labor intensity, ensures the axial and radial stability of the pipeline, and improves the sealing ability, avoids misalignment and water leakage problems.
Smart Images

Figure CN222085428U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated cement pipes, in particular to a spliced prefabricated reinforced concrete cement pipe. Background Art
[0002] Cement pipes are also called cement pressure pipes and reinforced concrete pipes. They can be used as water pipes in urban construction foundations, can discharge sewage, flood control drainage, and are used as water pipes and farmland wells in some special factories and mines.
[0003] When cement pipes are used, adjacent cement pipes need to be spliced together. At present, the main splicing method between cement pipes is plug-in, that is, two cement pipes are plugged together along the axial direction. Although the two cement pipes are plugged together, there is little interference between the adjacent cement pipes in the axial and radial directions. It is easy to cause the pipes to be dislocated after being squeezed due to unstable water well foundation, dislocation caused by vibration of nearby construction pile drivers, and other reasons. Dislocation of the pipes will affect the drainage effect, leading to problems such as poor water flow, sewage backflow and even leakage. In severe cases, it will also destroy the integrity of the pipeline system; at the same time, when the cement pipes are axially plugged together, it is necessary to first put the cement pipes into the groove through the lifting equipment, and then the staff drags the cement pipes through the hand winch to make the adjacent two cement pipes axially plugged together. The bearing plug-in method leads to cumbersome procedures and large labor. The adjacent cement pipes cannot be directly plugged together from top to bottom when the lifting equipment is placing the cement pipes downward. Therefore, a spliced prefabricated reinforced concrete cement pipe is proposed to address the above problems. Utility Model Content
[0004] The technical problem to be solved by the utility model overcomes the existing defects and can effectively solve the problems in the background technology.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] A spliced prefabricated reinforced concrete cement pipe comprises a pipe body and a steel cage, wherein two ends of the pipe body are respectively fixedly connected with a plug plate and a socket, and the plug plate and the socket are both connected with the end of the pipe body, and the inner sides of the pipe body, the plug plate and the socket are all provided with a steel cage matching the pipe body, the plug plate and the socket.
[0007] Preferably, an opening is provided at the top of the socket for the plug board to move downward.
[0008] Preferably, the top of the socket is fixedly connected to a bearing seat, one end of the bearing seat is provided with a bearing surface, and the bearing surface is arranged obliquely upward, and the top of the plug board is fixedly connected to a pressure rod, one end of the pressure rod is provided with an extrusion surface, and the extrusion surface is arranged obliquely downward.
[0009] Preferably, the bearing surface and the extrusion surface are parallel to each other.
[0010] Preferably, a first sealing gasket is fixedly connected to the inner side of the socket, a second sealing gasket is fixedly connected to the top end of the first sealing gasket, and the second sealing gasket is fixedly connected to the bearing seat.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] 1. A spliced prefabricated reinforced concrete cement pipe, which is provided with a pipe body, a plug plate, and a socket. Under the action of the socket and the plug plate, adjacent pipe bodies can be connected together in a radial plug-in manner, so that when the lifting equipment places the pipe body downward, the adjacent pipe bodies can be directly plugged together from top to bottom through the plug plate and the socket, and the staff does not need to drag the pipe body through a hand winch, which reduces the process, reduces the labor intensity, and facilitates the rapid splicing of the pipe bodies. At the same time, under the interaction between the plug plate and the socket, the interference between the adjacent pipe bodies in the axial and radial directions is increased, so that the adjacent pipe bodies will not be misaligned in the front-to-back direction and the left-to-right direction, and will not be misaligned downward, thereby ensuring the stability of the adjacent pipe bodies after splicing.
[0013] 2. A spliced prefabricated reinforced concrete cement pipe, which can ensure the sealing between adjacent pipe bodies by arranging a pressure rod, an extrusion surface, a bearing seat, a bearing surface, a first sealing gasket, and a second sealing gasket. At the same time, the second sealing gasket can be squeezed under the action of the pressure rod and the bearing seat, thereby further improving the sealing between the plug board and the top of the socket. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0015] Figure 1 The utility model is a schematic diagram of the overall structure of a spliced prefabricated reinforced concrete cement pipe.
[0016] Figure 2 The utility model is a schematic diagram of the installation structure of a bearing seat of a spliced prefabricated reinforced concrete cement pipe.
[0017] Figure 3 The utility model is a structural schematic diagram of a steel cage of a spliced prefabricated reinforced concrete cement pipe.
[0018] Figure 4The utility model is a schematic diagram of the installation structure of a compression rod of a spliced prefabricated reinforced concrete cement pipe.
[0019] Figure 5 The utility model is a schematic diagram of the installation structure of the second sealing gasket of a spliced prefabricated reinforced concrete cement pipe.
[0020] Figure 6 The utility model is a schematic diagram of the installation structure when adjacent pipe bodies of a spliced prefabricated reinforced concrete cement pipe are spliced.
[0021] In the figure: 1, tube body; 2, plug plate; 3, pressure rod; 301, extrusion surface; 4, socket; 5, bearing seat; 501, bearing surface; 6, steel cage; 7, first sealing gasket; 8, second sealing gasket. DETAILED DESCRIPTION
[0022] The utility model is further described below in conjunction with specific implementation methods, wherein the accompanying drawings are only used for exemplary descriptions and represent only schematic diagrams rather than actual drawings, and cannot be understood as limitations on this patent. In order to better illustrate the specific implementation methods of the utility model, some parts of the accompanying drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the accompanying drawings may be omitted. Based on the specific implementation methods in the utility model, all other specific implementation methods obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0023] Example
[0024] like Figure 1-6 As shown, a spliced prefabricated reinforced concrete cement pipe comprises a pipe body 1 and a steel cage 2, wherein the two ends of the pipe body 1 are fixedly connected with a plug plate 2 and a socket 4 respectively, and the plug plate 2 and the socket 4 are communicated with the end of the pipe body 1, and the inner sides of the pipe body 1, the plug plate 2 and the socket 4 are provided with a steel cage 6 matching the pipe body 1, the plug plate 2 and the socket 4. Under the action of the socket 2 and the plug plate 4, adjacent pipe bodies 1 can be connected together in a radial plug-in manner, so that when the lifting equipment places the pipe body 1 downward, the adjacent pipe bodies 1 can be directly plugged together from top to bottom through the plug plate 2 and the socket 4, and the staff does not need to drag the pipe body 1 through the hand winch, which reduces the process and the labor intensity, and is convenient for the rapid splicing of the pipe bodies 1. At the same time, under the interaction between the plug plate 2 and the socket 4, the interference between the adjacent pipe bodies 1 in the axial and radial directions is increased, so that the adjacent pipe bodies 1 will not be misaligned in the front-to-back direction and the left-to-right direction, and will not be misaligned downward, thereby ensuring the stability of the adjacent pipe bodies 1 after splicing.
[0025] As a further improvement of the utility model, Figure 1 , Figure 2 and Figure 6 As shown, the top of the socket 4 is provided with an opening for the plug board 2 to move downward, so as to ensure that the plug board 2 can be smoothly inserted into the inner side of the socket 4.
[0026] As a further improvement of the utility model, Figure 1 , Figure 5 and Figure 6 As shown, a first sealing gasket 7 is fixedly connected to the inner side of the socket 4, a second sealing gasket 8 is fixedly connected to the top of the first sealing gasket 7, and the second sealing gasket 8 is fixedly connected to the supporting seat 5. The first sealing gasket 7 and the second sealing gasket 8 can ensure the sealing between adjacent tube bodies 1.
[0027] As a further improvement of the utility model, Figure 2 and Figure 6 As shown, the top of the socket 4 is fixedly connected to a bearing seat 5, one end of the bearing seat 5 is provided with a bearing surface 501, and the bearing surface 501 is set obliquely upward, the top of the plug board 2 is fixedly connected to a pressure rod 3, one end of the pressure rod 3 is provided with an extrusion surface 301, and the extrusion surface 301 is set obliquely downward, under the action of the pressure rod 3 and the bearing seat 5, the end of the second sealing gasket 8 can be squeezed, thereby further improving the sealing performance between the plug board 2 and the top of the socket 4.
[0028] As a further improvement of the utility model, Figure 1 , Figure 2 and Figure 6 As shown, the bearing surface 501 and the extrusion surface 301 are parallel to each other, so that the pressure rod 3 and the bearing seat 5 can achieve tight extrusion and fit to the second sealing gasket 8 through the extrusion surface 301 and the bearing surface 501 .
[0029] Working process: when it is necessary to splice adjacent pipe bodies 1 together, the adjacent pipe bodies 1 can be connected together in a radial plug-in manner under the action of the socket 2 and the plug plate 4, and then the adjacent pipe bodies 1 are directly plugged together from top to bottom when the hoisting equipment places the cement pipe downward, and the staff does not need to drag the pipe body 1 through a hand chain hoist, which reduces the process and the labor intensity, and facilitates the rapid splicing of the pipe bodies 1. At the same time, under the interaction between the plug plate 2 and the socket 4, the interference between the adjacent pipe bodies 1 in the axial and radial directions is increased, so that the adjacent pipe bodies 1 will not be misaligned in the front-to-back direction, the left-to-right direction, and will not be misaligned downward. , thereby ensuring the stability of adjacent tube bodies 1 after splicing, and after the plugboard 2 is inserted into the inner side of the socket 4, the plugboard 2 will squeeze the first sealing gasket 7 to ensure that there is no gap between the plugboard 2 and the first sealing gasket 7, thereby ensuring the sealing between adjacent tube bodies 1, and after the plugboard 2 is inserted into the inner side of the socket 4, the pressure rod 3 will also squeeze the second sealing gasket 8 on the side of the bearing surface 501 through the extrusion surface 301, so that the pressure rod 3, the second sealing gasket 8 and the bearing seat 5 are closely fitted together, so that the end of the second sealing gasket 8 is squeezed under the action of the pressure rod 3 and the bearing seat 5, thereby further improving the sealing between the plugboard 2 and the top of the socket 4.
[0030] The above is a preferred implementation mode of the utility model. The above shows and describes the basic principles and main features of the utility model and the advantages of the utility model. Technical personnel in this industry should understand that the utility model is not limited to the above embodiments. The above embodiments and descriptions are only for illustrating the principles of the utility model. Without departing from the protection scope of the utility model, the utility model will have various changes and improvements, and these changes and improvements all fall within the scope of the utility model to be protected. The protection scope of the utility model is defined by the attached claims and their equivalents.
Claims
1. A spliced prefabricated reinforced concrete cement pipe, comprising a pipe body (1) and a steel cage (2), characterized in that: The two ends of the pipe body (1) are respectively fixedly connected with a plug plate (2) and a socket (4), and the plug plate (2) and the socket (4) are both connected to the end of the pipe body (1), and the inner sides of the pipe body (1), the plug plate (2) and the socket (4) are provided with a steel cage (6) matching the pipe body (1), the plug plate (2) and the socket (4).
2. The spliced prefabricated reinforced concrete cement pipe according to claim 1, characterized in that: The top end of the socket (4) is provided with an opening for the plug board (2) to move downward.
3. The spliced prefabricated reinforced concrete cement pipe according to claim 1, characterized in that: The top end of the socket (4) is fixedly connected to a bearing seat (5), one end of the bearing seat (5) is provided with a bearing surface (501), and the bearing surface (501) is arranged obliquely upward; the top end of the plug board (2) is fixedly connected to a pressure rod (3), one end of the pressure rod (3) is provided with an extrusion surface (301), and the extrusion surface (301) is arranged obliquely downward.
4. The spliced prefabricated reinforced concrete cement pipe according to claim 3, characterized in that: The bearing surface (501) and the extrusion surface (301) are parallel to each other.
5. The spliced prefabricated reinforced concrete cement pipe according to claim 1, characterized in that: A first sealing gasket (7) is fixedly connected to the inner side of the socket (4), a second sealing gasket (8) is fixedly connected to the top of the first sealing gasket (7), and the second sealing gasket (8) is fixedly connected to the bearing seat (5).
Citation Information
Cited By
Combined reinforced concrete pipe
CN223868743U