Novel submerged arc furnace waste heat recycling device

By using primary and secondary heat exchangers in the mineral furnace exhaust gas recovery and utilization device for heat exchange and using shot blasting chamber to clean up dust, the problems of high-temperature flue gas recovery and dust accumulation are solved, and energy utilization efficiency and equipment are improved efficiency.

CN222086707UActive Publication Date: 2024-11-29NINGXIA SEN SOURCE HEAVY EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420489666.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-11-29
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

During the recycling and utilization of existing mineral furnace exhaust gas, high-temperature flue gas cannot be effectively recycled, and dust accumulation inside the device will be caused during the recycling of waste heat, reducing structural efficiency.

Method used

The primary and secondary heat exchanger are used for heat exchange, and the dust is cleaned through the shot blasting chamber to avoid dust accumulation and achieve effective recycling and utilization of high-temperature flue gas.

Benefits of technology

It improves energy utilization efficiency, reduces dependence on traditional energy, reduces production costs, and effectively avoids dust accumulation inside the device, extending the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222086707U_ABST
    Figure CN222086707U_ABST
Patent Text Reader

Abstract

The utility model discloses a novel submerged arc furnace waste heat recycling device, and relates to the technical field of submerged arc furnace tail gas waste heat recovery. The device comprises a recovery tower, the bottom of the recovery tower is fixedly communicated with an ash storage bin, a feeding bin is arranged right above the recovery tower, a shot blasting bin fixedly communicated with the recovery tower is fixed at the bottom of the feeding bin, a primary heat exchanger is fixed in the recovery tower, and a secondary heat exchanger is fixed in the recovery tower right below the primary heat exchanger; an ash discharging round box is arranged under the ash storage bin, a screening round box is arranged under the ash discharging round box, and a progressive screw rod is rotationally arranged in the screening round box. High-temperature flue gas is subjected to heat exchange through the first-stage heat exchanger and the second-stage heat exchanger, so that cooling water is heated by waste heat, and meanwhile, steel shots are subjected to shot blasting treatment through the shot blasting bin, so that dust is not easy to accumulate on the structure; the problems that high-temperature flue gas cannot be effectively recycled and thick dust is accumulated on the surface of a structure in the device are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of waste heat recovery from tail gas of submerged arc furnaces, and particularly relates to a novel waste heat recovery and utilization device for submerged arc furnaces. Background Art

[0002] The tail gas produced by the closed low-carbon silicon-manganese ore hot furnace smelting is mainly composed of CO, and a small amount of H2, CO2, etc. The dust concentration is 100-150g / Nm 3 , the exhaust gas temperature is about 500-700℃. At present, most of the exhaust gas treatment is to reduce the high-temperature dusty flue gas through forced cooling measures. The high-temperature flue gas passes through the cooler to reduce the flue gas temperature to the filtering treatment temperature, and then the dust is filtered to achieve low-temperature clean coal gas for use by the gas unit. In traditional smelting production, a large amount of heat energy is directly discharged, and forced cooling requires high-power heat exchange and cooling equipment to provide operating power, which not only wastes energy but also increases the energy consumption of cooling measures;

[0003] Existing public documents disclose CN109341359A-a device for recovering waste heat from flue gas of an ore-fired furnace, comprising a cold water tank, a hot water tank and a flue gas pipe connected to the gas outlet of the ore-fired furnace, the flue gas pipe being provided with a heat conducting pipe for conducting heat, the flue gas pipe being provided with a groove matching the heat conducting pipe, the heat conducting pipe being provided with a water pipe clamp for fixing itself, the water pipe clamp being fixedly connected to the heat conducting pipe, the heat conducting pipe being bolted to the flue gas pipe through the water pipe clamp, the cold water tank being provided with a cold water pipe, the cold water pipe being bolted to the cold water tank, the hot water tank being provided with a hot water pipe, the hot water pipe being bolted to the hot water tank, the cold water pipe and the hot water pipe being flanged, the cold water pipe and the hot water pipe being flanged, the right side of the cold water tank being provided with a control device, the control device being fixedly connected to the cold water tank; the device for recovering waste heat from flue gas of an ore-fired furnace can effectively recover waste heat

[0004] At present, in the process of tail gas recycling, the high-temperature flue gas in the furnace gas cannot be effectively recycled and reused, and the tail gas must be recycled and reused after forced cooling, which greatly wastes the heat energy of the high-temperature flue gas and increases the energy consumption in the forced cooling process; at the same time, when the waste heat is recovered, there will be soot residue in the device. Under long-term working conditions, it will cause thick dust to accumulate on the surface of the internal structure of the device, thereby reducing the efficiency of the internal structure of the device. To this end, we provide a new type of waste heat recovery device for submerged arc furnaces to solve the above problems. Utility Model Content

[0005] The purpose of the utility model is to provide a novel waste heat recovery and utilization device for an electric arc furnace, which performs heat exchange on high-temperature flue gas through a primary heat exchanger and a secondary heat exchanger, so that the waste heat heats cooling water, and at the same time, the steel shots are shot blasted through a shot blasting bin, so that dust will not easily accumulate on the structure, thereby solving the problem that high-temperature flue gas cannot be effectively recovered and the thick dust accumulates on the surface of the structure inside the device.

[0006] In order to solve the above technical problems, the utility model is realized by the following technical solutions:

[0007] The utility model is a novel submerged arc furnace waste heat recovery and utilization device, comprising a recovery tower; the bottom of the recovery tower is fixedly connected to an ash storage bin, a feed bin is arranged directly above the recovery tower, a shot blasting bin fixedly connected to the recovery tower is fixed at the bottom of the feed bin, and a pressurized circulation pump is arranged outside the recovery tower;

[0008] Among them, a primary heat exchanger is fixed inside the recovery tower, and a secondary heat exchanger is fixed inside the recovery tower located directly below the primary heat exchanger;

[0009] An ash unloading circular box is arranged directly below the ash storage bin, and an ash unloading blade is arranged to rotate inside the ash unloading circular box. A screening circular box is arranged directly below the ash unloading circular box, and a progressive spiral rod is arranged to rotate inside the screening circular box. A recovery box is fixedly connected to the bottom position of the peripheral side of the screening circular box, and a screening plate is fixed at the position where the recovery box and the screening circular box are connected.

[0010] The outer side wall of the ash discharging round box is fixed with a second motor fixed to the end of the ash discharging blade shaft;

[0011] The outer side wall of the screening round box is fixed with a motor three which is fixedly connected with the end face of the progressive screw rod shaft.

[0012] The utility model is further configured such that a high-temperature air inlet pipe is fixedly connected to the peripheral side of the ash storage bin, and a low-temperature air outlet pipe is fixedly connected to the upper part of the recovery tower.

[0013] The utility model is further configured such that a low-temperature fluid pipe connected to the primary heat exchanger is fixed to the outer wall of the recovery tower at the same height as the low-temperature outlet pipe, and a high-temperature fluid pipe connected to the secondary heat exchanger is fixed to the outer wall of the recovery tower.

[0014] The utility model is further configured such that a connecting pipe is fixed to the outer wall of the recovery tower between the low-temperature fluid pipe and the high-temperature fluid pipe, and two port positions of the connecting pipe are respectively connected to the port positions of the primary heat exchanger and the secondary heat exchanger.

[0015] The utility model is further configured such that a circulation pipe connected to the inside of the recovery tower is fixed at the inlet and outlet pipe positions of the pressurized circulation pump.

[0016] The utility model is further configured that a nitrogen pipe is fixed on the side wall of the feed bin, two rollers arranged to rotate through gear meshing are rotatably connected inside the shot blasting bin, and a feed pipe is fixed on the upper end surface of the feed bin.

[0017] The utility model is further configured that a motor fixedly connected to the end of any roller is arranged on the outer side of the shot blasting bin, and the motor is fixed on the upper surface of the recovery tower.

[0018] The utility model is further configured that the upper portion of the outer side wall of the ash unloading circular box is fixedly connected to a connecting pipe 1 fixed to the bottom of the ash storage bin, and the lower portion of the outer side wall of the ash unloading circular box is fixedly connected to a connecting pipe 2.

[0019] The utility model is further configured that a drop pipe connected to the connecting pipe 2 is fixed to the outer side wall of the screening round box, and a drop cylinder is fixed to the other end face of the screening round box opposite to the motor 3.

[0020] The utility model has the following beneficial effects:

[0021] 1. When the utility model is in use, the low-temperature fluid pipe is connected to the external cooling water source, so that the cooling water will flow from the position of the low-temperature fluid pipe through the primary heat exchanger and the secondary heat exchanger, and will flow out from the position of the high-temperature fluid pipe. After the high-temperature flue gas enters the recovery tower, the high-temperature flue gas will pass through the secondary heat exchanger and the primary heat exchanger, and then the high-temperature flue gas will exchange heat with the secondary heat exchanger and the primary heat exchanger, absorb the heat in the high-temperature flue gas, and heat the secondary heat exchanger and the primary heat exchanger. Through the top-down flow effect, the cooling water will be heated, thereby realizing the improvement of energy utilization efficiency, and the waste heat can be effectively recovered for heating water for life and production use, reducing dependence on traditional energy and reducing production costs.

[0022] 2. When the utility model is in use, steel shots are poured from the position of the feed bin, and thus the steel shots will enter the shot blasting bin, and then the motor drives the roller to transfer the steel shots into the recovery tower, so that the steel shots will knock off the dust on the primary heat exchanger and the secondary heat exchanger during the free fall, so that the dust and steel shots will fall into the ash storage bin together, thereby avoiding the long-term accumulation of dust in the internal structure of the device.

[0023] Of course, any product implementing the present invention does not necessarily need to achieve all of the above advantages at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0025] Figure 1 The schematic diagram of the structure of a new type of waste heat recovery device for a submerged arc furnace.

[0026] Figure 2 This is the external structural diagram of the overall structure.

[0027] Figure 3 This is the external structure diagram of the recovery tower and ash storage bin.

[0028] Figure 4 This is the internal structure diagram of the screening round box.

[0029] Figure 5 This is the internal structure diagram of the ash unloading circular box.

[0030] Figure 6 This is the structural diagram of the feed bin.

[0031] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0032] 1. Recovery tower; 101. Low-temperature fluid pipe; 102. Low-temperature air outlet pipe; 103. Connecting pipe; 104. High-temperature fluid pipe; 2. Feed bin; 201. Feed pipe; 202. Shot blasting bin; 203. Roller; 204. Motor 1; 205. Nitrogen pipe; 3. Ash storage bin; 301. High-temperature air inlet pipe; 4. Ash unloading round box; 401. Connecting pipe 1; 402. Connecting pipe 2; 403. Ash unloading blades; 404. Motor 2; 5. Screening round box; 501. Dropping pipe; 502. Progressive screw rod; 503. Recovery box; 504. Screening plate; 505. Motor 3; 506. Sliding cylinder; 6. Primary heat exchanger; 7. Secondary heat exchanger; 8. Pressurized circulation pump; 801. Circulation pipe. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Specific embodiment 1

[0035] See also Figure 1-6The utility model is a novel waste heat recovery and utilization device for a submerged arc furnace. The primary heat exchanger 6 and the secondary heat exchanger 7 are arranged to perform heat exchange on the high-temperature flue gas, so that the waste heat heats the cooling water. At the same time, the steel shots are shot blasted through the shot blasting bin 202, so that dust will not easily accumulate on the structure.

[0036] Specifically, it includes a recovery tower 1; the bottom of the recovery tower 1 is fixedly connected to an ash storage bin 3, a feed bin 2 is arranged directly above the recovery tower 1, a shot blasting bin 202 fixedly connected to the recovery tower 1 is fixed at the bottom of the feed bin 2, a pressurized circulation pump 8 is arranged outside the recovery tower 1, and the inlet and outlet pipe positions of the pressurized circulation pump 8 are fixed with a circulation pipe 801 connected to the inside of the recovery tower 1;

[0037] Among them, a primary heat exchanger 6 is fixed inside the recovery tower 1, and a secondary heat exchanger 7 is fixed inside the recovery tower 1 directly below the primary heat exchanger 6;

[0038] An ash unloading circular box 4 is arranged directly below the ash storage bin 3, and an ash unloading blade 403 is rotatably arranged inside the ash unloading circular box 4. A screening circular box 5 is arranged directly below the ash unloading circular box 4, and a progressive spiral rod 502 is rotatably arranged inside the screening circular box 5. A recovery box 503 is fixedly connected to the bottom position of the peripheral side of the screening circular box 5, and a screening plate 504 is fixed at the position where the recovery box 503 and the screening circular box 5 are connected.

[0039] The outer side wall of the ash discharging round box 4 is fixed with a second motor 404 fixed to the shaft end of the ash discharging blade 403;

[0040] The outer side wall of the screening round box 5 is fixed with a motor 505 which is fixedly connected to the axial end face of the progressive screw rod 502.

[0041] The operation process of this embodiment is as follows: through the use of the above-mentioned structure, when the waste heat of the flue gas in the submerged arc furnace is recovered, the high-temperature air inlet pipe 301 is connected to the position of the air outlet pipe of the submerged arc furnace, and the pressurized circulation pump 8 is controlled to work, thereby the pressurized circulation pump 8 will increase the pressure inside the recovery tower 1, and it is necessary to connect the low-temperature fluid pipe 101 to the external cooling water source, thereby the cooling water will flow from the position of the low-temperature fluid pipe 101 through the primary heat exchanger 6 and the secondary heat exchanger 7, and will flow out from the position of the high-temperature fluid pipe 104, and at the high-temperature flue gas outlet 104, the high-temperature fluid pipe 104 will be connected to the high-temperature fluid pipe 104, and the high-temperature flue gas outlet 104 will be connected to the high-temperature fluid pipe 104. After entering the recovery tower 1, the high-temperature flue gas will pass through the secondary heat exchanger 7 and the primary heat exchanger 6, and then the high-temperature flue gas will exchange heat with the secondary heat exchanger 7 and the primary heat exchanger 6, absorb the heat in the high-temperature flue gas, and heat the secondary heat exchanger 7 and the primary heat exchanger 6. Through the flow effect from top to bottom, the cooling water will be heated and flow out from the position of the high-temperature fluid pipe 104 for production and life use. At the same time, the cooled flue gas will flow through the position of the low-temperature outlet pipe 102, so that the cooled flue gas can be filtered;

[0042] At the same time, the small particles of dust carried in the high-temperature flue gas will be enriched on the primary heat exchanger 6 and the secondary heat exchanger 7. Therefore, in order to facilitate the cleaning of the dust, steel shots can be poured from the position of the feed bin 2, so that the steel shots will enter the shot blasting bin 202, and then the motor 1 204 drives the roller 203 to transfer the steel shots to the recovery tower 1, so that the steel shots will knock off the dust on the primary heat exchanger 6 and the secondary heat exchanger 7 during the free fall process, so that the dust and steel shots will fall into the ash storage bin 3 together and enter the ash unloading circular box 4. Therefore, after the motor 2 404 controls the rotation of the ash unloading blade 403 and the motor 3 505 controls the progressive screw rod 502 to work, the progressive screw rod 502 will push the steel shots out, and at the same time, the dust will fall from the position of the screening plate 504 to the recovery box 503. Specific embodiment 2

[0044] See also Figure 1-3 On the basis of the specific embodiment 1, the primary heat exchanger 6 and the secondary heat exchanger 7 are assembled and connected through the connecting pipe 103, so that the low-temperature fluid pipe 101 and the high-temperature fluid pipe 104 are connected, ensuring that the heat in the flue gas can stably heat the cooling water.

[0045] Specifically, a high-temperature air inlet pipe 301 is fixedly connected to the surrounding side of the ash storage bin 3, a low-temperature air outlet pipe 102 is fixedly connected to the upper part of the recovery tower 1, a low-temperature fluid pipe 101 connected to the primary heat exchanger 6 is fixedly connected to the outer wall of the recovery tower 1 at the same height as the low-temperature air outlet pipe 102, a high-temperature fluid pipe connected to the secondary heat exchanger 7 is fixedly connected to the outer wall of the recovery tower 1, a connecting pipe 103 is fixedly connected to the outer wall of the recovery tower 1 located between the low-temperature fluid pipe 101 and the high-temperature fluid pipe 104, and the two ends of the connecting pipe 103 are respectively connected to the port positions of the primary heat exchanger 6 and the secondary heat exchanger 7.

[0046] The operating process of this embodiment is as follows: after the high-temperature flue gas flows into the recovery tower 1 from the position of the high-temperature air inlet pipe 301, the high-temperature air inlet pipe 301 will heat the cooling water flowing into the low-temperature fluid pipe 101, so that the heated cooling water flows out from the high-temperature fluid pipe 104 and can be used in daily life, and the flue gas after heat exchange will rise and be discharged from the position of the low-temperature air outlet pipe 102. Specific embodiment three

[0048] See also Figure 6 On the basis of the specific embodiment 1, the two rollers 203 are rotated to allow the steel shots to fall freely from different positions, thereby comprehensively and effectively knocking off the dust on the tube walls of the primary heat exchanger 6 and the secondary heat exchanger 7.

[0049] Specifically, a nitrogen pipe 205 is fixed on the side wall of the feed bin 2, two rollers 203 are rotatably connected inside the shot blasting bin 202 and are arranged to rotate through gear meshing, a feed pipe 201 is fixed to the upper end surface of the feed bin 2, and a motor 204 fixedly connected to the end of any roller 203 is arranged on the outer side of the shot blasting bin 202, and the motor is fixed on the upper surface of the recovery tower 1.

[0050] The operation process of this embodiment is: by controlling the motor 204 to work, the motor 204 will drive the single roller 203 to rotate, and the two rollers 203 are meshed through gears. Therefore, when the single roller 203 rotates, the other roller 203 will also rotate accordingly, so that the two rollers 203 will throw the steel shots between them from the positions on both sides of the two rollers 203, and thereby knock off the dust on the tube walls of the first-stage heat exchanger 6 and the second-stage heat exchanger 7. Specific embodiment 4

[0052] See also Figure 2 , 4 5. On the basis of the specific embodiment 1, the steel shot and dust can be stably transmitted in the dust discharge circular box 4 and the screening circular box 5 through the coordinated connection of multiple structures.

[0053] Specifically, the upper part of the outer wall of the ash unloading circular box 4 is fixedly connected to the connecting pipe 1 401 fixed to the bottom of the ash storage bin 3, the lower part of the outer wall of the ash unloading circular box 4 is fixedly connected to the connecting pipe 2 402, the outer wall of the screening circular box 5 is fixed with a drop pipe 501 connected to the connecting pipe 2 402, and the other end face of the screening circular box 5 opposite to the motor 3 505 is fixed with a sliding cylinder 506.

[0054] The operation process of this embodiment is as follows: through the setting and use of the above-mentioned structure, the steel shots and dust in the ash storage bin 3 will enter the ash unloading circular box 4, and at the same time, the ash unloading blades 403 driven by the motor 2 404 will make the dust and steel shots enter the screening circular box 5, and then the progressive screw rod 502 will push the dust and steel shots to move in the screening circular box 5, and the dust will enter the recovery box 503 from the position of the screening plate 504, and the steel shots will be pushed by the progressive screw rod 502 and slide out from the position of the sliding cylinder 506.

[0055] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0056] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is limited only by the claims and their full scope and equivalents.

Claims

1. A novel device for recovering waste heat from a submerged arc furnace, comprising a recovery tower (1); characterized in that: The bottom of the recovery tower (1) is fixedly connected to an ash storage bin (3), a feed bin (2) is arranged directly above the recovery tower (1), a shot blasting bin (202) fixedly connected to the recovery tower (1) is fixedly arranged at the bottom of the feed bin (2), and a pressurized circulation pump (8) is arranged outside the recovery tower (1); Wherein, a primary heat exchanger (6) is fixed inside the recovery tower (1), and a secondary heat exchanger (7) is fixed inside the recovery tower (1) directly below the primary heat exchanger (6); An ash unloading circular box (4) is arranged directly below the ash storage bin (3), an ash unloading circular box (4) is provided with ash unloading blades (403) for rotation inside, a screening circular box (5) is arranged directly below the ash unloading circular box (4), a progressive spiral rod (502) is provided for rotation inside the screening circular box (5), a recovery box (503) is fixedly connected to the bottom position of the peripheral side of the screening circular box (5), and a screening plate (504) is fixed at the position where the recovery box (503) and the screening circular box (5) are connected; A second motor (404) fixed to the shaft end of the ash discharging blade (403) is fixed to the outer side wall of the ash discharging circular box (4); A motor 3 (505) fixedly connected to the axial end surface of the progressive screw rod (502) is fixed to the outer side wall of the screening circular box (5).

2. The novel submerged arc furnace waste heat recovery device according to claim 1 is characterized in that: A high-temperature air inlet pipe (301) is fixedly connected to the peripheral side of the ash storage bin (3), and a low-temperature air outlet pipe (102) is fixedly connected to the upper portion of the recovery tower (1).

3. The novel submerged arc furnace waste heat recovery device according to claim 2 is characterized in that: A low-temperature fluid pipe (101) connected to the primary heat exchanger (6) is fixed to the outer wall of the recovery tower (1) at the same height as the low-temperature outlet pipe (102), and a high-temperature fluid pipe connected to the secondary heat exchanger (7) is fixed to the outer wall of the recovery tower (1).

4. The novel submerged arc furnace waste heat recovery device according to claim 3 is characterized in that: A connecting pipe (103) is fixed to the outer wall of the recovery tower (1) between the low-temperature fluid pipe (101) and the high-temperature fluid pipe (104), and two ports of the connecting pipe (103) are respectively connected to the ports of the primary heat exchanger (6) and the secondary heat exchanger (7).

5. The novel submerged arc furnace waste heat recovery device according to claim 1 is characterized in that: A circulation pipe (801) connected to the interior of the recovery tower (1) is fixed at the inlet and outlet pipe positions of the pressurized circulation pump (8).

6. The novel submerged arc furnace waste heat recovery and utilization device according to claim 1 is characterized in that: A nitrogen pipe (205) is fixed on the side wall of the feed bin (2), two rollers (203) are rotatably connected inside the shot blasting bin (202) and are arranged to rotate via gear meshing, and a feed pipe (201) is fixed on the upper end surface of the feed bin (2).

7. The novel submerged arc furnace waste heat recovery device according to claim 6 is characterized in that: A motor 1 (204) fixedly connected to the end of any one of the rotating rollers (203) is arranged on the outside of the shot blasting bin (202), and the motor 1 (204) is fixed on the upper surface of the recovery tower (1).

8. The novel submerged arc furnace waste heat recovery and utilization device according to claim 1 is characterized in that: The upper portion of the outer wall of the ash unloading circular box (4) is fixedly connected to a connecting pipe 1 (401) fixed to the bottom of the ash storage bin (3), and the lower portion of the outer wall of the ash unloading circular box (4) is fixedly connected to a connecting pipe 2 (402).

9. The novel submerged arc furnace waste heat recovery and utilization device according to claim 8 is characterized in that: A drop pipe (501) connected to the second connecting pipe (402) is fixed to the outer wall of the screening circular box (5), and a sliding cylinder (506) is fixed to the other end surface of the screening circular box (5) opposite to the third motor (505).