Gas monitoring equipment for safety construction of shallow-buried gas tunnel

By adopting structures such as drainage cover, drainage pipe, suction fan and scraper in the gas monitoring equipment, the monitoring error caused by dust coverage is solved, and the high accuracy and automatic cleaning function of the gas monitoring equipment is achieved, ensuring construction Safety.

CN222087672UActive Publication Date: 2024-11-29CHINA RAILWAY SEVENTH GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420046216.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-09
Publication Date
2024-11-29
Estimated Expiration
2034-01-09

AI Technical Summary

Technical Problem

The existing gas monitoring equipment is covered with impurities such as dust during shallow buried tunnel construction, resulting in sensor incorrectness, affecting the accuracy of the alarm.

Method used

A gas monitoring device including a drainage cover, drainage tube, suction fan, filter and scraper is designed to suck air through the suction fan and keep the probe clean through the filter and turbine blades to prevent dust from covering, and achieve automatic cleaning and cleaning and Improve detection accuracy.

Benefits of technology

It effectively prevents dust coverage, improves the accuracy and service life of gas monitoring equipment, and ensures the safety of staff.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222087672U_ABST
    Figure CN222087672U_ABST
Patent Text Reader

Abstract

The utility model provides gas monitoring equipment for safety construction of a shallow-buried gas tunnel, which belongs to the technical field of tunnel safety monitoring and comprises a monitor body and a gas probe positioned on the monitor body and further comprises a drainage housing, one end, facing the monitor body, of the drainage housing is provided with an opening and fixedly covers the monitor body, and the other end of the drainage housing is provided with a gas inlet and a gas outlet. Meanwhile, the gas probe cover is arranged inside, and a plurality of air outlets are formed in the outer wall of the gas probe cover; the multiple drainage pipes are communicated in the circumferential direction of the drainage housing and are divergently arranged, and meanwhile the ends, away from the drainage housing, of the drainage pipes are obliquely arranged towards the side of the ground and are in a flaring shape; the suction fans are arranged in the drainage pipes; the filter screen is fixedly arranged at the flaring end of each drainage tube; the scraping plate abuts against the outer end face, away from the drainage pipe, of the filter screen. And the driving piece is used for driving the scraping plate to rotate so as to clean the filter screen. According to the utility model, the problems of misalignment of gas monitoring equipment and influence on alarm caused by impurities such as dust in the tunnel can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel safety monitoring, in particular to a gas monitoring device for safe construction of a shallow buried gas tunnel. Background Art

[0002] During the excavation of shallow tunnels, gas (a mixed gas, mainly including methane) is often encountered in the tunnel. Since gas is flammable, toxic and lighter than air, workers generally install multiple gas monitors on the top wall of the tunnel in advance to monitor the gas in the tunnel in real time, so as to promptly detect and alarm when the gas concentration exceeds the safety standard to ensure the safety of the workers.

[0003] The existing gas monitoring equipment on the market usually includes a monitoring instrument body and a display screen, a control unit, a sensor probe, an alarm and other structures located on the monitoring instrument body. After the sensor probe in the tunnel monitors the gas, it will trigger the alarm response to quickly alert the staff. However, in actual use, due to the large amount of impurities such as suspended dust generated during the tunnel construction process, the dust can easily cover the sensor probe, causing the gas monitoring equipment to be inaccurate, thereby affecting the alarm of the gas monitoring equipment. Utility Model Content

[0004] The utility model aims to provide a gas monitoring device for safe construction of a shallow buried gas tunnel, which can reduce the problem that impurities such as dust in the tunnel cause the gas monitoring device to become inaccurate and affect the alarm.

[0005] The embodiment of the utility model is realized by the following technical scheme: A gas monitoring device for safe construction of a shallow buried gas tunnel comprises a monitoring instrument body and a gas probe located on the monitoring instrument body, and further comprises:

[0006] The drainage cover is opened at one end facing the monitor body and the fixed cover is arranged on the monitor body, the gas probe cover is arranged inside, and a plurality of air outlets are opened along the outer wall;

[0007] A plurality of drainage pipes are connected and divergently arranged along the circumference of the drainage cover, and one end away from the drainage cover is arranged to be inclined toward the ground and is flared;

[0008] A suction fan is arranged in each of the drainage pipes;

[0009] A filter screen is fixedly arranged at the expanded end of each drainage tube;

[0010] A scraper is disposed abutting against the outer end surface of the filter screen away from the drainage pipe;

[0011] The driving member is used to drive the scraper to rotate so as to clean the filter screen.

[0012] Furthermore, one end of the drainage tube close to the drainage cover shell is configured to be constricted.

[0013] Furthermore, the driving member includes a rotating rod and turbine blades. The rotating rod is rotatably installed on the filter screen, and a plurality of turbine blades are evenly and fixedly installed along the circumference of the rotating rod.

[0014] Furthermore, a rotating seat is rotatably arranged inside the drainage cover, and the rotation axis of the rotating seat is consistent with the axial center line of the gas probe. A plurality of turbine scrapers are fixedly arranged on the rotating seat, and the plurality of turbine scrapers respectively correspond to the connecting openings facing the drainage pipe and the drainage cover, and the turbine scrapers are arranged around the circumference of the gas probe and abut against the gas probe.

[0015] Furthermore, the lengths of adjacent drainage tubes are different.

[0016] Furthermore, it also includes a fixing plate, the drainage cover shell is rotatably set on the fixing plate, the fixing plate is fixedly connected to the top wall of the tunnel by expansion bolts, and at the same time, the monitoring instrument body is evenly fixed with multiple turbine wind plates along the circumferential direction.

[0017] Furthermore, flange plates are fixedly provided on the outer wall of the monitor body and the open end of the drainage cover, and the flange plate of the monitor body and the flange plate of the drainage cover are threadedly connected together through a screw.

[0018] Furthermore, a filter plate is also provided at the air outlet of the drainage cover.

[0019] The technical solution of the embodiment of the utility model has at least the following advantages and beneficial effects:

[0020] 1. The utility model uses a suction fan and a drainage pipe to suck the air in the tunnel into the drainage cover. During this period, the filter will filter the air in the tunnel to prevent the gas probe from being exposed to the air and covered by impurities such as dust, thereby affecting the accuracy of the gas monitoring equipment. Then the gas probe detects the air without dust and other impurities after filtration, so as to achieve the purpose of detecting the air in the tunnel. The scraper can scrape off the impurities on the filter to ensure that the filter can continue to absorb air normally, and the multiple sets of divergent drainage pipes can increase the coverage area of ​​the absorbed air and improve the air collection effect in the detection area, so as to achieve the purpose of reducing the dust and other impurities in the tunnel that cause the gas monitoring equipment to be inaccurate and affect the alarm.

[0021] 2. The utility model sets a rotating rod and a turbine blade. After the suction fan is started, the air flowing in the drainage pipe will drive the turbine blade and the rotating rod to rotate, thereby driving the scraper to continuously rotate to clean the filter. This process achieves the purpose of automatic cleaning, and has a compact structure and a long service life. The turbine scraper will rotate together with the rotating seat under the blowing of the air flowing in the drainage pipe, thereby continuously scraping the gas probe to ensure the cleanliness of the gas probe and enable the gas probe to maintain the best detection state. The contracted shape of the drainage pipe close to the drainage cover can increase the flow rate of the air and ensure the blowing force on the turbine scraper, so that the turbine scraper can rotate stably. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 The overall structural diagram of the gas monitoring equipment for safe construction of shallow buried gas tunnels provided by the utility model;

[0024] Figure 2 This is a schematic diagram of the structure of the utility model for showing the interior of the drainage cover, the interior of the drainage tube and the monitor body;

[0025] Figure 3 This is a schematic diagram of the structure of the utility model for displaying the driving component and the monitoring instrument body;

[0026] Figure 4 This is a schematic diagram of the structure of the utility model for separately displaying the rotating seat and the turbine scraper;

[0027] Figure 5 This is a schematic diagram of the structure of the utility model for showing that the gas monitoring equipment is installed in a tunnel.

[0028] Icons: 1-monitor body, 11-display screen, 12-alarm, 13-turbine air plate, 2-gas probe, 3-drainage cover, 31-air outlet, 311-filter plate, 4-drainage pipe, 41-suction fan, 42-filter screen, 43-scraper, 5-driving part, 51-rotating rod, 52-turbine blade, 6-rotating seat, 61-turbine scraper, 7-fixing plate, 71-expansion bolt, 8-flange plate, 81-screw. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0030] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] Example

[0032] The following is further described in conjunction with specific embodiments. Figure 1-Figure 5 As shown, the utility model is a gas monitoring device for safe construction of shallow buried gas tunnels, including a monitor body 1 and a gas probe 2 located on the monitor body 1. A display screen 11 and an alarm 12 are installed at the bottom of the monitor body 1. When the gas probe 2 detects that the gas in the tunnel exceeds the standard content, the alarm 12 will trigger an alarm to remind the staff, and the display screen 11 will display the gas content in the air in real time. It also includes: a drainage cover 3, the cross section of which is circular, and one side of the drainage cover 3 facing the monitor body 1 is The end is open, and the outer wall of the monitor body 1 and the open end of the drainage cover 3 are fixedly welded with a flange plate 8. The flange plate 8 of the monitor body 1 and the flange plate 8 of the drainage cover 3 are threadedly connected together through a plurality of screws 81, so that the drainage cover 3 is fixed on the monitor body 1. At the same time, the drainage cover 3 covers the gas probe 2 inside. The drainage cover 3 is evenly provided with four air outlets 31 along the outer wall, and a filter plate 311 is installed at each air outlet 31 to prevent dust and other impurities from entering the drainage cover 3;

[0033] Four drainage pipes 4 are connected and divergently installed along the circumference of the drainage cover 3. The cross-section of the drainage pipes 4 is circular. In this embodiment, the four drainage pipes 4 are divided into two groups, and two opposite drainage pipes 4 form a group. The lengths of the two groups of drainage pipes 4 are different. This arrangement can improve the collection range of the air in the tunnel by the drainage pipes 4. In other arrangements, the lengths of the drainage pipes 4 can be different. At the same time, the end away from the drainage cover 3 is inclined toward the ground and is flared to increase the amount of inhaled air, while the end of the drainage pipe 4 close to the drainage cover 3 is contracted; a suction fan 41 is installed in each drainage pipe 4; a filter screen 42 is fixedly installed at the flared end of each drainage pipe 4; a scraper 43 is abutted against the outer end surface of the filter screen 42 away from the drainage pipe 4; a driving member 5 is used to drive the scraper 43 to rotate to clean the filter screen 42.

[0034] Reference Figure 2 , Figure 3 In order to drive the scraper 43 to rotate, the driving member 5 includes a rotating rod 51 and a turbine blade 52. The rotating rod 51 is rotatably installed on the filter 42. The turbine blade 52 has multiple pieces uniformly fixed and welded along the circumference of the rotating rod 51. The air sucked in by the suction fan 41 can drive the turbine blade 52 to rotate automatically, thereby achieving the purpose of cleaning the filter 42. In other implementations, the driving member 5 can directly use a motor.

[0035] Reference Figure 2 , Figure 4 A rotating seat 6 is rotatably clamped in the drainage cover 3, and the longitudinal section of the rotating seat 6 is "T"-shaped to prevent the rotating seat 6 from falling off. The rotation axis of the rotating seat 6 is consistent with the axial center line of the gas probe 2, and a plurality of turbine scrapers 61 are fixedly and evenly welded on the rotating seat 6. The plurality of turbine scrapers 61 respectively correspond to the connecting openings facing the drainage pipe 4 and the drainage cover 3. In this embodiment, the number of turbine scrapers 61 is greater than the number of drainage pipes 4, and the turbine scrapers 61 are arranged around the circumference of the gas probe 2 and abut against the gas probe 2.

[0036] Reference Figure 1 , Figure 2 The gas monitoring equipment also includes a fixing plate 7, the cross-section of the fixing plate 7 is circular, the drainage cover shell 3 is rotatably mounted on the fixing plate 7, and the fixing plate 7 is fixedly connected to the top wall of the tunnel by expansion bolts 71. At the same time, the monitoring instrument body 1 is uniformly fixed and welded with multiple turbine wind plates 13 along the circumferential direction. The multiple turbine wind plates 13 can rotate automatically under the action of the air flowing in the tunnel, thereby improving the air collection effect in the detection area.

[0037] The working process of this embodiment is as follows: first, the fixing plate 7 is fixed to the top wall of the tunnel by the expansion bolts 71, and then the suction fans 41 in all the drainage pipes 4 are turned on. The suction fans 41 will suck the air in the tunnel into the drainage cover 3, and the air flowing in the drainage pipe 4 will drive the turbine blades 52 and the rotating rod 51 to rotate, thereby driving the scraper 43 to continuously rotate to clean the filter 42 and keep the filter 42 clean. Furthermore, the turbine scraper 61 will rotate together with the rotating seat 6 under the blowing of the air flowing in the drainage pipe 4, thereby continuously scraping the gas probe 2 to ensure that the gas probe 2 is clean, so that the gas probe 2 can maintain the best detection state, thereby preventing gas The probe 2 is exposed to the air and covered by impurities such as dust, thereby affecting the accuracy of the gas monitoring equipment. The gas probe 2 then detects the air without impurities such as dust after filtration, so as to achieve the purpose of detecting the air in the tunnel, and multiple groups of divergent drainage pipes 4 of different lengths can increase the coverage area of ​​​​the absorbed air, and multiple turbine wind plates 13 can rotate automatically under the action of the air flowing in the tunnel, further improving the air collection effect in the detection area, and improving the monitoring effect of the detection equipment, as well as reducing the dust and other impurities in the tunnel that cause the gas monitoring equipment to be inaccurate and affect the alarm, so that the staff can safely construct in the tunnel.

[0038] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A gas monitoring device for safe construction of a shallow buried gas tunnel, comprising a monitoring instrument body (1) and a gas probe (2) located on the monitoring instrument body (1), characterized in that: Also includes: A drainage cover (3) is provided with an opening at one end facing the monitor body (1) and is fixedly mounted on the monitor body (1), and the gas probe (2) is covered inside, and a plurality of air outlets (31) are opened along the outer wall; A plurality of drainage pipes (4) are connected and divergently arranged along the circumference of the drainage cover (3), and one end away from the drainage cover (3) is arranged in an inclined manner toward the ground and is in a flared shape; A suction fan (41) is arranged in each drainage pipe (4); A filter screen (42) is fixedly arranged at the expanded end of each drainage tube (4); A scraper (43) is disposed in contact with the outer end surface of the filter screen (42) away from the drainage pipe (4); The driving member (5) is used to drive the scraper (43) to rotate so as to clean the filter screen (42).

2. The gas monitoring equipment for safe construction of shallow buried gas tunnel according to claim 1 is characterized by: One end of the drainage tube (4) close to the drainage housing (3) is configured to be constricted.

3. The gas monitoring equipment for safe construction of shallow buried gas tunnel according to claim 1 is characterized by: The driving member (5) comprises a rotating rod (51) and turbine blades (52); the rotating rod (51) is rotatably arranged on the filter screen (42); and a plurality of turbine blades (52) are evenly and fixedly arranged along the circumference of the rotating rod (51).

4. The gas monitoring equipment for safe construction of shallow buried gas tunnel according to claim 2 is characterized by: A rotating seat (6) is rotatably arranged inside the drainage housing (3), the rotation axis of the rotating seat (6) is consistent with the axis center line of the gas probe (2), and a plurality of turbine scrapers (61) are fixedly arranged on the rotating seat (6), and the plurality of turbine scrapers (61) respectively correspond to the connecting openings facing the drainage pipe (4) and the drainage housing (3), and the turbine scrapers (61) are arranged around the circumference of the gas probe (2) and abut against the gas probe (2).

5. The gas monitoring equipment for safe construction of shallow buried gas tunnel according to claim 4 is characterized by: The lengths of adjacent drainage tubes (4) are different.

6. The gas monitoring equipment for safe construction of shallow buried gas tunnel according to claim 5 is characterized by: It also includes a fixing plate (7), the drainage cover (3) is rotatably arranged on the fixing plate (7), the fixing plate (7) is fixedly connected to the top wall of the tunnel by expansion bolts (71), and the monitoring instrument body (1) is evenly and fixedly arranged with a plurality of turbine wind plates (13) along the circumferential direction.

7. The gas monitoring equipment for safe construction of shallow buried gas tunnel according to claim 1 is characterized by: The outer wall of the monitor body (1) and the open end of the drainage cover (3) are both fixedly provided with flange plates (8), and the flange plate (8) of the monitor body (1) and the flange plate (8) of the drainage cover (3) are threadedly connected together via a screw (81).

8. The gas monitoring equipment for safe construction of shallow buried gas tunnel according to claim 1 is characterized by: A filter plate (311) is also provided at the air outlet (31) of the drainage housing (3).