Berthing system of offshore wind turbine

By designing a traction system for floating body groups and mooring components in offshore wind farms, the installation problem of floating fan in the deep sea is solved, and efficient and safe fan installation is achieved, reducing costs and risks.

CN222097863UActive Publication Date: 2024-12-03BOHAI OIL NAVIGATION ENG&CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420581901.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-12-03
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

In deep-sea offshore wind farms, the increase in draft of floating fans has caused the berthing terminals to be unable to meet their installation needs, limiting the development of wind farms.

Method used

A berthing system for offshore fans is designed, including a floating body group, a first mooring assembly and a second mooring assembly. It is directly installed on the sea through the traction system of the floating body group and the mooring assembly, avoiding draft of the berthing terminal. Restrict and improve installation efficiency and safety through limit piles and operating terminals.

Benefits of technology

It realizes that there is no need to consider the problem of docks and floating drafts in deep-sea environments, improves work efficiency, reduces construction and maintenance costs, is suitable for deep-sea use, and reduces the risk of position shift during fan installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222097863U_ABST
    Figure CN222097863U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of offshore wind power, and discloses a berthing system of an offshore wind turbine, which comprises a floating body group comprising a plurality of floating bodies, the floating bodies are provided with first connecting points at the positions close to a first mooring assembly, and the floating bodies are provided with second connecting points at the positions close to a second mooring assembly; each pair of first mooring assemblies is correspondingly arranged on the two sides of the buffer area; the traction end of the first mooring assembly is connected with the first connecting point through a first mooring rope; each pair of second mooring assemblies is arranged at the head end and the tail end of the floating body group respectively; the traction end of the second mooring assembly is connected with the second connecting point through a second mooring rope. According to the embodiment of the invention, the floating body group can be dragged to a preset sea area near a wind field, the fan is directly mounted on the floating body, the draught problem of a wharf and the floating body does not need to be considered, the environment limitation of berthing the wharf is avoided, and the mounting requirement of the floating fan is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of offshore wind power, in particular to a berthing system for an offshore wind turbine. Background Art

[0002] Offshore wind farms usually set up fixed foundations in the sea and build wind turbines on the fixed foundations. As the scale of offshore wind farms gradually expands, offshore wind farms are developing towards the deep sea. Due to the deep sea water, the cost of fixed foundations will increase sharply, so offshore wind farms need to use floating foundations in the deep sea.

[0003] At present, floating wind turbines are composed of offshore wind turbines and floating foundations. As the capacity of offshore wind turbines increases, the depth and draft of floating foundations also increase sharply. Since floating wind turbines need to be pre-assembled in an area with less wind and waves, such as a berthing dock, after assembly, the floating wind turbines are towed as a whole to the designated offshore wind farm.

[0004] However, the draft of berthing terminals is generally shallow, which does not meet the predetermined waterline of floating wind turbines. As a result, the development of floating wind turbines is restricted by berthing terminals and cannot meet the installation requirements of floating wind turbines. Utility Model Content

[0005] In view of this, the utility model provides a berthing system for an offshore wind turbine to solve the problem that the berthing dock cannot meet the installation requirements of the floating wind turbine.

[0006] In a first aspect, the utility model provides a berthing system for an offshore wind turbine, the berthing system comprising:

[0007] A floating body group, comprising a plurality of floating bodies, each of which is arranged at intervals, and the interval area between two adjacent floating bodies forms a buffer zone; the floating body is provided with a first connection point at a position close to the first mooring component, and the floating body is provided with a second connection point at a position close to the second mooring component;

[0008] A plurality of pairs of first mooring components are installed in the seawater; and along the arrangement direction of the plurality of floating bodies, each pair of first mooring components is correspondingly arranged on both sides of the buffer zone; the traction end of the first mooring component is connected to the first connection point through a first cable;

[0009] Two pairs of second mooring components are installed in seawater; and along the arrangement direction of the multiple floating bodies, each pair of second mooring components are respectively arranged at the head end and the tail end of the floating body group; and along the arrangement direction of the multiple floating bodies, the two second mooring components in each pair of second mooring components are respectively arranged on both sides of the floating body; the traction end of the second mooring component is connected to the second connection point through a second cable.

[0010] Beneficial effects: The embodiment of the utility model can directly tow the floating body group to the predetermined sea area of ​​the wind farm by setting the first mooring assembly and the second mooring assembly, and then directly install the wind turbine on the floating body, so there is no need to consider the draft of the dock and the floating body, and thus it will not be subject to the environmental restrictions of the berthing dock, and the installation requirements of the floating wind turbine can be met. In addition, the number of floating bodies that can be berthed at the same time can be increased, greatly improving the work efficiency.

[0011] In an optional embodiment, the first mooring component comprises:

[0012] a first mooring pile, partly set in the sea water;

[0013] The first traction device is arranged on the end of the first mooring pile exposed to the sea water; the traction end of the first traction device is connected to the first connection point through a first cable.

[0014] Beneficial effects: The embodiment of the present invention sets a first traction device. When the floating body is towed, the first traction device can be started, so that the specific position of the floating body can be adjusted by adjusting the length of the first cable. There is no need for technicians to move the floating body personally, which improves the work efficiency of technicians and saves time and effort.

[0015] In an optional embodiment, the first mooring component further includes:

[0016] The first mooring platform is arranged on the end of the first mooring pile exposed from the sea water; the first traction equipment is arranged on the first mooring platform.

[0017] Beneficial effects: By setting up a mooring platform, the embodiment of the utility model has lower construction and maintenance costs than fixed dock facilities, which are expensive and require huge engineering work. The mooring platform is particularly suitable for use in deep-sea environments. At the same time, they do not occupy valuable shoreline resources. Moreover, the mooring platform can be moved or its specific use function can be adjusted according to the actual needs of technicians, thereby improving the versatility of the mooring platform.

[0018] In an optional embodiment, the second mooring component comprises:

[0019] a second mooring pile, partially set in seawater;

[0020] The second traction device is arranged on the end of the second mooring pile exposed to the sea water; the traction end of the second traction device is connected to the second connection point through a second cable.

[0021] In an optional embodiment, the second mooring component further includes:

[0022] The second mooring platform is arranged on the end of the second mooring pile exposed from the sea water; the second traction equipment is arranged on the second mooring platform.

[0023] In an optional embodiment, the first traction device and the second traction device are winches.

[0024] Beneficial effects: The embodiment of the utility model is provided with a winch, and because the winch is highly versatile and applicable to various environments and work occasions, technicians can flexibly apply the winch. In addition, because the winch has a relatively compact structure and occupies a small space, it is more suitable for use in the effective space of the mooring platform and can meet the use requirements of the mooring platform.

[0025] In an optional embodiment, the docking system further comprises:

[0026] The limit piles are arranged in the sea water; and the limit piles are arranged at predetermined berthing positions of the floating body.

[0027] Beneficial effect: By setting limit piles, the embodiment of the utility model can directly tow the floating body to the berthing position where the limit piles are located during the actual traction process, without causing the position of the floating body to shift, thereby ensuring the accuracy of the position of the floating body and reducing the risk of collision between the floating body in motion and the floating body in a stationary state when the wind turbine is installed at sea.

[0028] In an optional embodiment, a plurality of limit piles are provided at the berthing position.

[0029] In an optional embodiment, the distance between the first mooring assembly and the buffer zone is not less than the maximum width of the floating body.

[0030] Beneficial effect: The utility model makes the distance between the first mooring component and the buffer zone not less than the maximum width of the floating body, so that if the floating body at other positions needs to pass through the first mooring component and the buffer zone during the towing process, movement space can be reserved for the floating body at other positions.

[0031] In an optional embodiment, the docking system further comprises:

[0032] An operating terminal is communicatively connected with the first mooring component and the second mooring component.

[0033] Beneficial effect: By setting up an operation terminal, the utility model does not need the technician to personally operate the first mooring component and the second mooring component, but can directly perform remote control through the operation terminal, thereby facilitating the technician's operation, saving time and effort, and improving work efficiency to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the related technologies, the drawings required for use in the specific implementation methods or the related technical descriptions will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0035] Figure 1 A top view of a berthing system for an offshore wind turbine according to an embodiment of the utility model;

[0036] Figure 2 A side view of a berthing system for an offshore wind turbine according to an embodiment of the utility model;

[0037] Figure 3 It is a schematic diagram of berthing when multiple floating bodies are provided in an embodiment of the utility model.

[0038] Description of reference numerals:

[0039] 1. Floating body; 2. Buffer zone; 3. First mooring assembly; 31. First mooring pile; 32. First traction equipment; 33. First mooring platform; 4. Second mooring assembly; 41. Second mooring pile; 42. Second traction equipment; 43. Second mooring platform; 5. Limit pile; 6. First cable; 7. Second cable; 8. Sea water. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.

[0041] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0042] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components, it can be a wireless connection, or it can be a wired connection. For ordinary workers in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0043] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0044] Offshore wind farms usually set up fixed foundations in the sea and build wind turbines on the fixed foundations. As the scale of offshore wind farms gradually expands, offshore wind farms are developing towards the deep sea. Due to the deep sea water, the cost of fixed foundations will increase sharply, so offshore wind farms need to use floating foundations in the deep sea.

[0045] At present, floating wind turbines are composed of offshore wind turbines and floating foundations. As the capacity of offshore wind turbines increases, the depth and draft of floating foundations also increase dramatically. Since floating wind turbines need to be pre-assembled in an area with less wind and waves, such as a berthing dock, after assembly, the floating wind turbine is towed as a whole to the designated offshore wind farm. However, the draft of the berthing dock is generally shallow and does not meet the predetermined draft of the floating wind turbine, so the development of floating wind turbines is restricted by the berthing dock and cannot meet the installation requirements of floating wind turbines.

[0046] In view of this, the utility model provides a berthing system for an offshore wind turbine to solve the problem that the berthing dock cannot meet the installation requirements of the floating wind turbine.

[0047] Combine the following Figure 1 to Figure 2 , describing an embodiment of the utility model.

[0048] According to an embodiment of the present invention, on one hand, a berthing system for an offshore wind turbine is provided. The berthing system includes a floating body group, a first mooring component 3 and a second mooring component 4.

[0049] Specifically, in the embodiment of the utility model, the floating body group may include a plurality of floating bodies 1, each of which is arranged at intervals, and the interval area between two adjacent floating bodies 1 forms a buffer zone 2, that is, a certain distance is set between two adjacent floating bodies 1. The floating body 1 is provided with a first connection point at a position close to the first mooring component 3, and the floating body 1 is provided with a second connection point at a position close to the second mooring component 4. The number of the first connection point and the second connection point is not limited in this embodiment, and those skilled in the art can adjust it according to the actual situation, as long as it can achieve a certain technical effect.

[0050] Further, in the embodiment of the utility model, multiple pairs of first mooring components 3 are installed in the seawater 8, and along the arrangement direction of the multiple floating bodies 1, each pair of first mooring components 3 is correspondingly arranged on both sides of the buffer zone 2. In other words, each pair of first mooring components 3 needs to be arranged outside the buffer zone 2. The traction end of the first mooring component 3 is connected to the first connection point through the first cable 6, so that the two first mooring components 3 can pull the floating body 1 in two different directions, so that the specific position of the floating body 1 can be adjusted.

[0051] Further, in the embodiment of the utility model, two pairs of second mooring components 4 are installed in the seawater 8, and along the arrangement direction of the plurality of floating bodies 1, each pair of second mooring components 4 is respectively arranged at the head end and the tail end of the floating body group. In other words, each pair of second mooring components 4 needs to be arranged on the outside of the floating body group. Moreover, along the arrangement direction of the plurality of floating bodies 1, two second mooring components 4 in each pair of second mooring components 4 are respectively arranged on both sides of the floating body 1, and the traction end of the second mooring component 4 is connected to the second connection point through the second cable 7, so that the two second mooring components 4 are pulled in two different directions respectively, so that the specific position of the floating body 1 can be adjusted.

[0052] In this way, the embodiment of the utility model can directly tow the floating body group to the predetermined sea area near the wind farm by setting the first mooring component 3 and the second mooring component 4, and then directly install the wind turbine on the floating body 1, so there is no need to consider the draft of the dock and the floating body 1, and thus it will not be subject to the environmental restrictions of the berthing dock, and the installation requirements of the floating wind turbine can be met. In addition, the number of floating bodies 1 berthed at the same time can be increased, which greatly improves the work efficiency.

[0053] Furthermore, in actual operation, the outermost floating body 1 can use two first mooring components 3 and two second mooring components 4 to adjust its position at the same time. The inner floating body 1 is different from the outermost floating body 1 in that the inner floating body 1 adjusts its position through four first mooring components 3.

[0054] For the specific work process, Figure 3Let's give an example. Figure 3 As shown, four buoys 1 are arranged from left to right, the first buoy 1 and the fourth buoy 1 are arranged on the outside, and the second and third buoys 1 are arranged on the inside. The first buoy 1 and the fourth buoy 1 can use two first mooring components 3 and two second mooring components 4 to adjust the position at the same time, and the second buoy 1 and the third buoy 1 can adjust the position through four first mooring components 3.

[0055] Therefore, each buoy 1 does not need to be used with a separate mooring assembly, that is, each first mooring assembly 3 can adjust the position of two buoys 1 at the same time, so that the first mooring assembly 3 can achieve the "sharing" function. Figure 3 The four floating bodies 1 in the embodiment can use a total of ten mooring components, four second mooring components 4, and six first mooring components 3. In contrast, compared with the traditional method, when each floating body 1 is used with a separate mooring component, each floating body 1 will use four separate mooring components. Figure 3 A total of sixteen separate mooring components are used for the four buoys 1. Therefore, the use of mooring components can be greatly reduced, which can significantly reduce economic costs to a certain extent.

[0056] Likewise, if Figure 1 As shown, when two floating bodies 1 are provided, two first mooring components 3 are connected to the two floating bodies 1 at the same time, so that the first mooring components 3 can realize the "sharing" function. Figure 1 The two floating bodies 1 in the embodiment can use a total of six mooring components, four second mooring components 4, and two first mooring components 3. In contrast, compared with the traditional method, when each floating body 1 is used with a separate mooring component, the two floating bodies 1 use a total of eight separate mooring components. Obviously, the use of mooring components can be reduced.

[0057] Therefore, the greater the number of floating bodies 1 is, the more obvious the advantages of this embodiment are.

[0058] Further, in an optional embodiment, the first mooring component 3 includes a first mooring pile 31 and a first traction device 32 .

[0059] Specifically, in the embodiment of the utility model, the first mooring pile 31 is partially arranged in the seawater 8, that is, the lower half of the first mooring pile 31 is inserted into the seawater 8, and the upper half of the first mooring pile 31 is exposed above the seawater 8. The first traction device 32 is arranged on the end of the first mooring pile 31 exposed from the seawater 8, and the traction end of the first traction device 32 is connected to the first connection point through the first cable 6.

[0060] In this way, the embodiment of the present invention sets a first traction device 32. When the floating body 1 is towed, the first traction device 32 can be started, so that the specific position of the floating body 1 can be adjusted by adjusting the length of the first cable 6. There is no need for technicians to move the floating body 1 personally, which improves the work efficiency of technicians and saves time and effort.

[0061] Further, in an optional embodiment, the first mooring component 3 further includes a first mooring platform 33 , which is disposed on the end of the first mooring pile 31 exposed from the sea water 8 , and the first traction device 32 is disposed on the first mooring platform 33 .

[0062] In this way, the embodiment of the utility model sets up a mooring platform, which has lower construction and maintenance costs than fixed dock facilities that are expensive and require huge engineering work, and is particularly suitable for use in deep-sea environments. At the same time, they do not occupy valuable shoreline resources. Moreover, the mooring platform can be moved or the specific use function of the mooring platform can be adjusted according to the actual needs of the technicians, thereby improving the versatility of the mooring platform.

[0063] Further, in an optional embodiment, the second mooring assembly 4 is the same as the first mooring assembly 3, and the second mooring assembly 4 includes a second mooring pile 41 and a second traction device 42. Specifically, the second mooring pile 41 is partially disposed in the seawater 8, and the second traction device 42 is disposed on the end of the second mooring pile 41 exposed to the seawater 8; the traction end of the second traction device 42 is connected to the second connection point through a second cable 7.

[0064] Furthermore, in an optional embodiment, the second mooring component 4 further includes a second mooring platform 43 , which is disposed on the end of the second mooring pile 41 exposed from the sea water 8 ; the second traction device 42 is disposed on the second mooring platform 43 .

[0065] Further, in an optional embodiment, the first traction device 32 and the second traction device 42 are winches.

[0066] In this way, the embodiment of the utility model is provided with a winch, and because the winch is highly versatile and applicable to various environments and work occasions, technicians can flexibly apply the winch. In addition, because the winch has a relatively compact structure and occupies a relatively small space, it is more suitable for use in the effective space of the mooring platform and can meet the use requirements of the mooring platform.

[0067] Furthermore, in an optional embodiment, the berthing system further includes a limit pile 5 , which is disposed in the seawater 8 and is disposed at a predetermined berthing position of the floating body 1 .

[0068] With such an arrangement, the embodiment of the utility model can directly tow the floating body 1 to the berthing position where the limiting piles 5 are located during the actual towing process by setting the limiting piles 5, without causing the position of the floating body 1 to shift, thereby ensuring the accuracy of the position of the floating body 1 and reducing the risk of collision between the floating body 1 in motion and the floating body 1 in a stationary state when the wind turbine is installed at sea.

[0069] Further, in an optional embodiment, the berthing position is provided with a plurality of limit piles 5. The number of limit piles 5 may be two, three or four. The present embodiment does not limit the number of limit piles 5, and those skilled in the art may adjust the number according to actual conditions, as long as a certain technical effect can be achieved.

[0070] Further, in an optional embodiment, the distance between the first mooring component 3 and the buffer zone 2 is not less than the maximum width of the floating body 1 .

[0071] With such an arrangement, the utility model makes the distance between the first mooring component 3 and the buffer zone 2 not less than the maximum width of the floating body 1. Thus, during the towing process, if the floating body 1 at other positions needs to pass between the first mooring component 3 and the buffer zone 2, movement space can be reserved for the floating body 1 at other positions.

[0072] Furthermore, in an optional embodiment, the mooring system further comprises an operation terminal, which is in communication connection with the first mooring component 3 and the second mooring component 4. The operation terminal may be a notebook, a mobile phone or other device.

[0073] In this way, the utility model provides an operation terminal, so that the technician does not need to operate the first mooring component 3 and the second mooring component 4 personally, but can directly perform remote control through the operation terminal, thereby facilitating the operation of the technician, saving time and effort, and improving work efficiency to a certain extent.

[0074] Although the embodiments of the present invention are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A berthing system for an offshore wind turbine, characterized in that: include: A floating body group comprises a plurality of floating bodies (1), each of the floating bodies (1) is arranged at intervals, and the interval area between two adjacent floating bodies (1) forms a buffer zone (2); A plurality of pairs of first mooring components (3) are installed in seawater (8); and along the arrangement direction of the plurality of floating bodies (1), each pair of first mooring components (3) is correspondingly arranged on both sides of the buffer zone (2); the floating body (1) is provided with a first connection point at a position close to the first mooring component (3), and the traction end of the first mooring component (3) is connected to the first connection point via a first cable (6); Two pairs of second mooring components (4) are installed in seawater (8); and along the arrangement direction of the plurality of floating bodies (1), each pair of second mooring components (4) is respectively arranged at the head end and the tail end of the floating body group; and along the arrangement direction of the plurality of floating bodies (1), the two second mooring components (4) in each pair of second mooring components (4) are respectively arranged on both sides of the floating body (1); the floating body (1) is provided with a second connection point at a position close to the second mooring component (4), and the traction end of the second mooring component (4) is connected to the second connection point via a second cable (7).

2. The offshore wind turbine berthing system according to claim 1, characterized in that: The first mooring component (3) comprises: A first mooring pile (31), partially disposed in the seawater (8); A first traction device (32) is arranged on the end of the first mooring pile (31) exposed from the sea water (8); the traction end of the first traction device (32) is connected to the first connection point via a first cable (6).

3. The offshore wind turbine berthing system according to claim 2, characterized in that: The first mooring component (3) further comprises: The first mooring platform (33) is arranged on the end of the first mooring pile (31) exposed from the sea water (8); the first traction device (32) is arranged on the first mooring platform (33).

4. The offshore wind turbine berthing system according to claim 3, characterized in that: The second mooring component (4) comprises: A second mooring pile (41) partially disposed in the seawater (8); A second traction device (42) is arranged on the end of the second mooring pile (41) exposed from the sea water (8); the traction end of the second traction device (42) is connected to the second connection point via a second cable (7).

5. The offshore wind turbine berthing system according to claim 4, characterized in that: The second mooring component (4) further comprises: The second mooring platform (43) is arranged on the end of the second mooring pile (41) exposed from the sea water (8); the second traction equipment (42) is arranged on the second mooring platform (43).

6. The offshore wind turbine berthing system according to claim 4 or 5, characterized in that: The first traction device (32) and the second traction device (42) are winches.

7. The offshore wind turbine berthing system according to any one of claims 1 to 5, characterized in that: The berthing system also includes: The limit pile (5) is arranged in the sea water (8); and the limit pile (5) is arranged at a predetermined berthing position of the floating body (1).

8. The offshore wind turbine berthing system according to claim 7, characterized in that: The berthing position is provided with a plurality of limit piles (5).

9. The offshore wind turbine berthing system according to any one of claims 1 to 5, characterized in that: The distance between the first mooring assembly (3) and the buffer zone (2) is not less than the maximum width of the floating body (1).