Anti-cracking structure for expressway

By staggering the traction modules on the top of the concrete road body of the expressway, the traction rods and limit blocks embedded in the asphalt pavement are pulled and tightened, solving the problem of easy cracking on the asphalt pavement and extending the service life of the expressway.

CN222100528UActive Publication Date: 2024-12-03内蒙古交通集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420751648.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2024-12-03
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

The existing asphalt pavement of highways lacks reinforcement, which leads to prone to cracking and damage during use, affecting the service life.

Method used

The traction module is installed interlaced on the top of the concrete road body, including mounting plates, fastening nails and traction mechanisms, traction rods and limit blocks, the traction rods and limit blocks are embedded in the asphalt pavement, and the asphalt pavement is passed through the traction rods and limit blocks to the asphalt pavement Carry out traction and tighten to prevent cracking.

Benefits of technology

It effectively reduces the possibility of cracking and damage on the surface of asphalt pavement and extends the service life of the expressway.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100528U_ABST
    Figure CN222100528U_ABST
Patent Text Reader

Abstract

The utility model discloses an expressway anti-cracking structure which comprises an expressway body, the expressway body comprises an asphalt pavement, a concrete road body and a roadbed, the concrete road body is poured on the top of the roadbed, the asphalt pavement is poured on the top of the concrete road body, and the expressway anti-cracking structure further comprises a plurality of traction modules. The traction modules are mounted at the concrete road body and the roadbed in a staggered manner; the traction module comprises a mounting plate, fastening nails and a plurality of traction mechanisms, the fastening nails are fixedly mounted at the bottom of the mounting plate, and the traction mechanisms are mounted at the top edge of the mounting plate; according to the anti-cracking structure for the expressway, the multiple traction modules are installed on the top of the concrete road body in a staggered mode, so that when the asphalt pavement is poured, the traction modules can be embedded in the asphalt pavement, and traction rods and limiting blocks of the traction modules are used for conducting traction fastening on the interior of the asphalt pavement; the possibility of cracking and damage of the surface of the asphalt pavement can be effectively reduced, so that the service life of an expressway is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of highway construction, in particular to a highway crack prevention structure. Background Art

[0002] Expressways, or highways for short, are roads designed for high-speed driving of cars. Expressways have different regulations in different countries, regions, eras, and scientific research fields. According to China's Highway Engineering Technical Standards (JTG B01-2014), expressways are multi-lane roads designed for cars to drive in different directions and lanes, with full access control. The average annual daily design traffic volume of expressways should be more than 15,000 passenger cars, with a design speed of 80 to 120 kilometers per hour.

[0003] Existing highway pavements are generally poured with asphalt, which makes the driving performance of the highway better; however, there is no reinforcement in the existing highway asphalt pavement. If reinforcement is added, the construction cost of the highway will be greatly increased. In the later use process, the asphalt pavement is prone to cracking and damage, affecting normal use and reducing the service life of the highway. Utility Model Content

[0004] In order to solve the above technical problems, a highway crack prevention structure is provided.

[0005] To achieve the above purpose, the following scheme is provided: a highway crack prevention structure, comprising a highway body, the highway body comprising an asphalt pavement, a concrete road body and a roadbed, the concrete road body is cast on the top of the roadbed, the asphalt pavement is cast on the top of the concrete road body, and also comprising a plurality of traction modules, each of the traction modules is staggeredly installed at the concrete road body and the roadbed;

[0006] The traction module includes a mounting plate, a fastening nail and a plurality of traction mechanisms, wherein the fastening nail is fixedly mounted on the bottom of the mounting plate, and each of the traction mechanisms is evenly mounted at the top edge of the mounting plate. The traction mechanism includes a traction rod and a limit block, wherein one end of the traction rod is fixedly mounted on the mounting plate, and the limit block is mounted at the other end of the traction rod. The fastening nail is driven into the concrete road body and the mounting plate abuts against the top surface of the concrete road body, and the mounting plate, the traction rod and the limit block are all embedded in the asphalt pavement.

[0007] Furthermore, the traction rod has an arc-shaped structure.

[0008] Furthermore, the limiting block is a spherical structure.

[0009] Furthermore, the mounting plate is a circular plate-shaped structure.

[0010] Furthermore, the fastening nail is located in the middle of the mounting plate.

[0011] The working principle and advantages of the utility model are as follows: the highway crack prevention structure installs a plurality of traction modules alternately on the top of the concrete road body, so that when pouring the asphalt pavement, the traction modules can be embedded in the asphalt pavement, and the interior of the asphalt pavement is pulled and tightened by the traction rods and limit blocks of the traction modules, which can effectively reduce the possibility of cracking and damage on the surface of the asphalt pavement, thereby extending the service life of the highway. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural diagram of the utility model;

[0013] Figure 2 This is a schematic diagram of the installation of the traction module of the utility model;

[0014] Figure 3 This is a front view of the traction module of the utility model;

[0015] Figure 4 It is a top view of the traction door module of the utility model.

[0016] The reference numerals in the drawings of the specification include:

[0017] 1. Asphalt pavement, 2. Concrete road body, 3. Roadbed, 4. Traction module, 41. Mounting plate, 42. Fastening nails, 43. Traction rod, 44. Limit block. DETAILED DESCRIPTION

[0018] The following is a further detailed description through specific implementation methods:

[0019] like Figures 1 to 4 As shown:

[0020] A highway crack prevention structure includes a highway body formed by an asphalt pavement 1, a concrete road body 2 and a roadbed 3 arranged in sequence from top to bottom, and also includes a plurality of traction modules 4, each of which is staggeredly installed at the concrete road body 2 and the roadbed 3, and the traction module 4 is fixedly installed on the top of the concrete road body 2 and embedded in the asphalt pavement 1, so as to traction the inside of the asphalt pavement 1;

[0021] The traction module 4 includes a mounting plate 41, a fastening nail 42 and a plurality of traction mechanisms. The fastening nail 42 is fixedly mounted at the bottom of the mounting plate 41 and is located in the middle of the mounting plate 41. The fastening nail 42 is nailed into the concrete road body 2, so that the mounting plate 41 is fixedly mounted on the surface of the concrete road body 2. The mounting plate 41 is a round pancake-shaped structure. Each traction mechanism is evenly mounted at the top edge of the mounting plate 41, that is, each traction mechanism is distributed in a circumferential array on the top of the mounting plate 41. The traction mechanism is embedded in the asphalt pavement 1, so that the asphalt pavement 1 is more solid.

[0022] The traction mechanism consists of a traction rod 43 and a limit block 44. One end of the traction rod 43 is fixedly mounted on the mounting plate 41, and the limit block 44 is mounted at the other end of the traction rod 43. The traction rod 43 has an arc-shaped structure, so that the traction rod 43 gradually expands outward from its end close to the mounting plate 41, so that the traction rod 43 can pull the asphalt pavement 1 over a larger range, and the limit block 44 enables the traction rod 43 to better pull the asphalt pavement 1.

[0023] The limiting block 44 is spherical in structure, which is convenient for production.

[0024] The specific implementation process is as follows:

[0025] When the anti-cracking structure of the expressway is applied, the concrete road body 2 is first cast on the roadbed 3, and after the concrete road body 2 solidifies, the traction modules 4 are staggeredly installed on the top of the concrete road body 2; when installing the traction modules 4, the mounting plate 41 is fastened to the top of the concrete road body 2 by the fastening nails 42, so that the bottom of the mounting plate 41 is close to the top of the concrete road body 2, and then the asphalt pavement 1 is cast on the top of the concrete road body 2, so that each traction mechanism is cast and embedded in the asphalt pavement 1, and the traction rod 43 and the limit block 44 of the traction mechanism can work together to traction the inside of the asphalt pavement 1. When the asphalt pavement 1 is driving, the vehicle presses the asphalt pavement 1, causing the asphalt pavement 1 to bear pressure, and then part of the pressure borne by the asphalt pavement 1 is transmitted to each traction rod 43, and the traction rod 43 shares the pressure for the asphalt pavement 1, while pulling the inside of the asphalt pavement 1, which can effectively prevent the asphalt pavement 1 from cracking and damage, thereby effectively extending the service life of the asphalt pavement 1.

[0026] The anti-cracking structure of the highway installs a plurality of traction modules 4 alternately on the top of the concrete road body 2, so that when the asphalt pavement 1 is poured, the traction modules 4 can be embedded in the asphalt pavement 1, and the interior of the asphalt pavement 1 is pulled and tightened by the traction rods 43 and the limit blocks 44 of the traction modules 4, which can effectively reduce the possibility of cracking and damage on the surface of the asphalt pavement 1, thereby extending the service life of the highway.

[0027] The above is only an embodiment of the utility model. The common sense such as the known specific structure and characteristics in the scheme is not described in detail here. The ordinary technicians in the relevant field know all the common technical knowledge in the technical field of the utility model before the application date or priority date, can obtain all the existing technologies in the field, and have the ability to apply the conventional experimental means before that date. The ordinary technicians in the relevant field can improve and implement this scheme in combination with their own abilities under the enlightenment given by this application. Some typical known structures or known methods should not become obstacles for ordinary technicians in the relevant field to implement this application. It should be pointed out that for the technicians in this field, without departing from the structure of the utility model, several deformations and improvements can be made, which should also be regarded as the protection scope of the utility model, which will not affect the effect of the implementation of the utility model and the applicability of the patent. The protection scope required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to explain the content of the claims.

Claims

1. A highway crack prevention structure, comprising a highway body, the highway body comprising an asphalt pavement, a concrete road body and a roadbed, the concrete road body is cast on the top of the roadbed, and the asphalt pavement is cast on the top of the concrete road body, characterized in that: It also includes a plurality of traction modules, each of which is staggeredly installed on the concrete road body and the roadbed; The traction module includes a mounting plate, a fastening nail and a plurality of traction mechanisms, wherein the fastening nail is fixedly mounted on the bottom of the mounting plate, and each of the traction mechanisms is evenly mounted at the top edge of the mounting plate. The traction mechanism includes a traction rod and a limit block, wherein one end of the traction rod is fixedly mounted on the mounting plate, and the limit block is mounted at the other end of the traction rod. The fastening nail is driven into the concrete road body and the mounting plate abuts against the top surface of the concrete road body, and the mounting plate, the traction rod and the limit block are all embedded in the asphalt pavement.

2. The highway crack prevention structure according to claim 1, characterized in that: The traction rod is in an arc-shaped structure.

3. The highway crack prevention structure according to claim 1, characterized in that: The limiting block is in a spherical structure.

4. The highway crack prevention structure according to claim 1, characterized in that: The mounting plate is in a circular plate structure.

5. The highway crack prevention structure according to claim 4 is characterized in that: The fastening nail is located in the middle of the mounting plate.