Temporary positioning structure for side span closure section of cable-stayed bridge
By using a combined structure of L-shaped positioning piers, support piers, positioning platforms and transverse limiting plates in the construction of steel box beams, the displacement unstable problem of the A-beam section when lifting the crane hook is solved, and the A-beam section and B are realized The stable welding of the beam section improves the welding accuracy and structural strength.
Patent Information
- Application Number
- CN202420720573.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-09
AI Technical Summary
During the construction of steel box beams, beam A section is easily shaken when lifted to the end of beam B section through a crane hook, resulting in unstable displacement, which in turn affects the welding accuracy of beam A section and beam B section.
Adopt a combined structure of L-shaped positioning piers, support piers, positioning platforms and transverse limiting plates. The A beam section is lifted to the top surface of the support pier through a crane, and the transverse limiting plate is used to fix it on the positioning platform to realize the A beam section Temporary positioning ensures its stability and facilitates welding with B beam section.
The stability and welding accuracy of the butt of beam A and beam B are improved, the structural strength and support span of the support pier are enhanced, and the accuracy of the welding process is ensured.
Smart Images

Figure CN222100639U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of positioning structures, and in particular to a temporary positioning structure for a closure section of a side span of a cable-stayed bridge. Background Art
[0002] Steel box girder, also known as steel plate box girder, is a common structural form for long-span bridges. It is generally used on bridges with larger spans. It is called steel box girder because it looks like a box. During the construction process, the steel box girder will be divided into multiple sections, including A beam section and B beam section. The B beam section is positioned by inclined cables, and the A beam section is lifted to the end of the B beam section by the hook of the crane. Then the joint of the A beam section and the B beam section is welded with a code plate.
[0003] With respect to the above-mentioned related technologies, the inventors believe that when the code plate welding is performed at the joint of the A beam section and the B beam section, the A beam section is lifted at the end of the B beam section by the hook of the crane, and the A beam section is prone to shaking and displacement, which makes it inconvenient to weld the A beam section and the B beam section, resulting in welding deviation. Utility Model Content
[0004] In order to improve the stability of the joint between the A beam section and the B beam section, facilitate the welding of the A beam section and the B beam section, and improve the welding accuracy, the present application provides a temporary positioning structure for the joint section of the side span of a cable-stayed bridge.
[0005] The temporary positioning structure of the closure section of the side span of a cable-stayed bridge provided in this application adopts the following technical solution:
[0006] A temporary positioning structure for a side span closure section of a cable-stayed bridge, comprising an L-shaped positioning pier, a supporting pier, a positioning platform and a transverse limiting plate, wherein the L-shaped positioning pier comprises a bottom pier and a top pier fixedly arranged on one side of the top surface of the bottom pier, the supporting pier is fixedly arranged on the top surface of the bottom pier and arranged in parallel with the top pier, and the top surface of the supporting pier is lower than the top surface of the top pier;
[0007] The positioning platform is fixedly installed on the top of the top pier, and the transverse limit plate is detachably installed on one end of the top surface of the positioning platform close to the B beam section. The crane lifts the A beam section to place it on the top surface of the supporting pier, and then fixes the transverse limit plate on the positioning platform. The bottom surface of the transverse limit plate abuts against the top surface of the A beam section, and the crane releases the hook and moves away.
[0008] By adopting the above technical solution, when the A beam section and the B beam section are butt-jointed, the A beam section is first lifted by a crane and placed on the top surface of the supporting pier, and then the transverse limit plate is fixedly installed on the positioning platform, and the bottom surface of the transverse limit plate is abutted against the top surface of the A beam section, and then the crane is unhooked and removed. The A beam section is clamped between the supporting pier and the transverse limit plate to achieve temporary positioning of the A beam section, and then the A beam section and the B beam section are welded, which helps to improve the stability of the butt joint of the A beam section and the B beam section, facilitates the welding of the A beam section and the B beam section, and further helps to improve the welding accuracy.
[0009] Optionally, the supporting pier includes two rows of supporting rods, and the bottom ends of the supporting rods are fixedly connected to the top surface of the bottom pier by bolts.
[0010] Optionally, the two rows of support rods are respectively a first rod body and a second rod body, the first rod body is farther away from the top pier than the second rod body, and the top end of the second rod body is inclined in a direction away from the top pier.
[0011] By adopting the above technical solution, the support span of the supporting piers at both ends of A can be increased, and the stability of the support of the supporting piers to the A beam section can be improved.
[0012] Optionally, a support plate is fixedly connected to the top surface of the support rod, and the support plate is horizontally arranged and has a cross-sectional area greater than a cross-sectional area of the support rod.
[0013] By adopting the above technical solution, the supporting area of the support rod for the A-beam section can be increased, and the stability of the temporary positioning of the A-beam section can be further improved.
[0014] Optionally, the tops of the sides of the two rows of support rods that are close to each other are fixedly connected by a connecting plate.
[0015] By adopting the above technical solution, it is helpful to improve the connection strength between the two rows of support rods, thereby improving the overall structural strength of the support pier.
[0016] Optionally, the transverse limit plate is detachably connected to the positioning platform by bolts, a positioning plate is fixedly installed on the top surface of the positioning platform by bolts, the positioning plates are located on both sides of the transverse limit plate, and both sides of the transverse limit plate are respectively abutted against the positioning plates on both sides.
[0017] By adopting the above technical solution, the positioning plate can limit the two sides of the transverse limiting plate, thereby improving the stability of the installation of the transverse limiting plate, and further improving the stability of the transverse limiting plate limiting the top of the A-beam section.
[0018] Optionally, a reinforcement plate is provided on the top surface of the transverse limit plate, the bottom surface of the reinforcement plate abuts against the top surface of the horizontal limit plate, convex blocks are fixedly connected to the bottom surfaces at both ends of the reinforcement plate, and a convex groove for the convex block to pass through is opened on the side of the positioning plate away from the A-beam section.
[0019] By adopting the above technical solution, the reinforcement plate can limit the top of the transverse limiting plate and be connected to the positioning plate as a whole. In addition, the reinforcement plate is easy to install through the provision of the convex block and the convex groove.
[0020] Optionally, the middle portion of the reinforcement plate is fixedly connected to the transverse limiting plate by bolts.
[0021] By adopting the above technical solution, the stability of the connection between the reinforcement plate and the transverse limiting plate is further improved.
[0022] In summary, the present application includes at least one of the following beneficial technical effects:
[0023] 1. When the A beam section and the B beam section are butt-jointed, the A beam section is first lifted by a crane and placed on the top surface of the supporting pier, and then the transverse limit plate is fixedly installed on the positioning platform, and the bottom surface of the transverse limit plate is abutted against the top surface of the A beam section, and then the crane is unhooked and removed; the A beam section is clamped between the supporting pier and the transverse limit plate to achieve temporary positioning of the A beam section, and then the A beam section and the B beam section are welded, which helps to improve the stability of the butt joint between the A beam section and the B beam section, facilitates the welding of the A beam section and the B beam section, and thus helps to improve the welding accuracy;
[0024] 2. The first rod body is farther away from the top pier than the second rod body, and the top end of the second rod body is tilted away from the top pier, which can increase the support span of the support pier on both ends of A and improve the stability of the support pier on the A beam section;
[0025] 3. The positioning plate can limit the two sides of the transverse limit plate, thereby improving the stability of the installation of the transverse limit plate; the reinforcement plate can limit the top of the transverse limit plate and is connected to the positioning plate as a whole. In addition, the reinforcement plate is easy to install through the setting of the convex block and the convex groove. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural schematic diagram of the embodiment of the present application for showing the positional relationship between the crane, the A beam section and the B beam section.
[0027] Figure 2 It is a structural schematic diagram used to illustrate the support pier in the embodiment of the present application.
[0028] Figure 3 It is a schematic diagram of the structure of the lateral limiting plate used to illustrate the embodiment of the present application.
[0029] Figure 4 It is a schematic diagram of the structure of the reinforcement plate used to illustrate the embodiment of the present application.
[0030] Explanation of the reference numerals in the accompanying drawings: 1. L-shaped positioning pier; 11. Bottom pier; 12. Top pier; 2. Support pier; 21. Support rod; 211. Connecting plate; 22. First rod body; 23. Second rod body; 24. Support plate; 3. Positioning platform; 4. Horizontal limit plate; 41. Positioning plate; 411. Embossed groove; 42. Reinforcement plate; 421. Embossed block; 6. Crane; 7. A-beam section; 8. B-beam section. DETAILED DESCRIPTION
[0031] The following is combined with Figure 1-4 This application is described in further detail.
[0032] The present application embodiment discloses a temporary positioning structure for the closure section of a side span of a cable-stayed bridge. Figure 1-4 A temporary positioning structure for a side span closure section of a cable-stayed bridge includes a temporary positioning structure for a side span closure section of a cable-stayed bridge, including an L-shaped positioning pier 1, a supporting pier 2, a positioning platform 3 and a transverse limiting plate 4. The L-shaped positioning pier 1 includes a bottom pier 11 and a top pier 12 fixedly arranged on one side of the top surface of the bottom pier 11, the supporting pier 2 is fixedly arranged on the top surface of the bottom pier 11 and is arranged in parallel with the top pier 12, and the top surface of the supporting pier 2 is lower than the top surface of the top pier 12.
[0033] The positioning platform 3 is fixedly installed on the top of the top pier 12, and the transverse limit plate 4 is detachably installed on one end of the top surface of the positioning platform 3 close to the B beam section 8. The crane 6 lifts the A beam section 7 to be placed on the top surface of the supporting pier 2, and then fixes the transverse limit plate 4 on the positioning platform 3. The bottom surface of the transverse limit plate 4 abuts against the top surface of the A beam section 7, and the crane 6 releases the hook and moves away.
[0034] When the A beam section 7 and the B beam section 8 are butt-jointed, the A beam section 7 is first lifted by the crane 6 and placed on the top surface of the supporting pier 2, and then the transverse limit plate 4 is fixedly installed on the positioning platform 3, and the bottom surface of the transverse limit plate 4 is abutted against the top surface of the A beam section 7, and then the crane 6 is unhooked and removed. The A beam section 7 is clamped between the supporting pier 2 and the transverse limit plate 4 to achieve temporary positioning of the A beam section 7, and then the A beam section 7 and the B beam section 8 are welded, which helps to improve the stability of the butt joint of the A beam section 7 and the B beam section 8, facilitates the welding of the A beam section 7 and the B beam section 8, and further helps to improve the welding accuracy.
[0035] The support pier 2 includes two rows of support rods 21, the bottom ends of which are fixedly connected to the top surface of the bottom pier 11 by bolts. The tops of the sides of the two rows of support rods 21 that are close to each other are fixedly connected by a connecting plate 211, which helps to improve the connection strength between the two rows of support rods 21, thereby improving the overall structural strength of the support pier 2. The two rows of support rods 21 are respectively a first rod body 22 and a second rod body 23. The first rod body 22 is farther away from the top pier 12 than the second rod body 23, and the top end of the second rod body 23 is inclined in a direction away from the top pier 12, which can increase the support span of the support pier 2 on both ends of A and improve the stability of the support pier 2 on the A beam section 7. The top surface of the support rod 21 is fixedly connected with a support plate 24, which is horizontally arranged and has a cross-sectional area greater than the cross-sectional area of the support rod 21, which can increase the support area of the support rod 21 on the A beam section 7 and further improve the stability of the temporary positioning of the A beam section 7.
[0036] The transverse limit plate 4 is detachably connected to the positioning platform 3 by bolts, and a positioning plate 41 is fixedly installed on the top surface of the positioning platform 3 by bolts. The positioning plates 41 are located on both sides of the transverse limit plate 4, and the two sides of the transverse limit plate 4 are respectively abutted against the positioning plates 41 on both sides. The positioning plates 41 can limit the two sides of the transverse limit plate 4, thereby improving the stability of the installation of the transverse limit plate 4, and further improving the stability of the transverse limit plate 4 limiting the top of the A beam section 7. A reinforcing plate 42 is arranged on the top surface of the transverse limit plate 4, and the bottom surface of the reinforcing plate 42 abuts against the top surface of the transverse limit plate. Convex blocks 421 are fixedly connected to the bottom surfaces of both ends of the reinforcing plate 42, and a convex groove 411 for the convex block 421 to pass through is provided on the side of the positioning plate 41 away from the A beam section 7. The reinforcing plate 42 can limit the top of the transverse limiting plate 4 and is connected to the positioning plate 41 as a whole. In addition, the reinforcing plate 42 is easy to install through the arrangement of the convex block 421 and the convex groove 411. The middle part of the reinforcing plate 42 is fixedly connected to the transverse limiting plate 4 by bolts, which further improves the stability of the connection between the reinforcing plate 42 and the transverse limiting plate 4.
[0037] The implementation principle of a temporary positioning structure for the joint section of a side span of a cable-stayed bridge according to an embodiment of the present application is as follows: when the A beam section 7 and the B beam section 8 are butt-jointed, the A beam section 7 is first lifted by the crane 6 and placed on the top surface of the supporting pier 2, and then the transverse limiting plate 4 is fixedly installed on the positioning platform 3, and the bottom surface of the transverse limiting plate 4 is made to abut against the top surface of the A beam section 7, and then the crane 6 is unhooked and removed; the A beam section 7 is clamped between the supporting pier 2 and the transverse limiting plate 4 to achieve temporary positioning of the A beam section 7, and then the A beam section 7 and the B beam section 8 are welded, which helps to improve the stability of the butt joint of the A beam section 7 and the B beam section 8, facilitates the welding of the A beam section 7 and the B beam section 8, and further helps to improve the welding accuracy.
[0038] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A temporary positioning structure for the closure section of a side span of a cable-stayed bridge, characterized in that: The invention comprises an L-shaped positioning pier (1), a supporting pier (2), a positioning platform (3) and a transverse limiting plate (4), wherein the L-shaped positioning pier (1) comprises a bottom pier (11) and a top pier (12) fixedly arranged on one side of the top surface of the bottom pier (11), the supporting pier (2) is fixedly arranged on the top surface of the bottom pier (11) and arranged in parallel with the top pier (12), and the top surface of the supporting pier (2) is lower than the top surface of the top pier (12); The positioning platform (3) is fixedly installed on the top of the top pier (12), and the transverse limiting plate (4) is detachably installed on one end of the top surface of the positioning platform (3) close to the B beam section (8). The crane (6) lifts the A beam section (7) to be placed on the top surface of the supporting pier (2), and then the transverse limiting plate (4) is fixedly installed on the positioning platform (3). The bottom surface of the transverse limiting plate (4) is in contact with the top surface of the A beam section (7), and the crane (6) is unhooked and moved away.
2. A temporary positioning structure for the closure section of a side span of a cable-stayed bridge according to claim 1, characterized in that: The support pier (2) comprises two rows of support rods (21), and the bottom ends of the support rods (21) are fixedly connected to the top surface of the bottom pier (11) by bolts.
3. A temporary positioning structure for the closure section of a side span of a cable-stayed bridge according to claim 2, characterized in that: The two rows of support rods (21) are respectively a first rod body (22) and a second rod body (23); the first rod body (22) is farther away from the top pier (12) than the second rod body (23); and the top end of the second rod body (23) is inclined in a direction away from the top pier (12).
4. A temporary positioning structure for the closure section of a side span of a cable-stayed bridge according to claim 3, characterized in that: A support plate (24) is fixedly connected to the top surface of the support rod (21); the support plate (24) is arranged horizontally and the cross-sectional area of the support plate (24) is larger than the cross-sectional area of the support rod (21).
5. The temporary positioning structure for the closure section of the side span of a cable-stayed bridge according to claim 2, characterized in that: The tops of the mutually adjacent sides of the two rows of support rods (21) are fixedly connected via a connecting plate (211).
6. The temporary positioning structure for the closure section of the side span of a cable-stayed bridge according to claim 1, characterized in that: The transverse limiting plate (4) is detachably connected to the positioning platform (3) by means of bolts, a positioning plate (41) is fixedly mounted on the top surface of the positioning platform (3) by means of bolts, the positioning plate (41) is located on both sides of the transverse limiting plate (4), and both sides of the transverse limiting plate (4) are respectively in contact with the positioning plates (41) on both sides.
7. A temporary positioning structure for the closure section of a side span of a cable-stayed bridge according to claim 6, characterized in that: A reinforcing plate (42) is arranged on the top surface of the transverse limiting plate (4), the bottom surface of the reinforcing plate (42) is in contact with the top surface of the transverse limiting plate, convex blocks (421) are fixedly connected to the bottom surfaces of both ends of the reinforcing plate (42), and a convex groove (411) for the convex block (421) to pass through is provided on the side of the positioning plate (41) away from the A-beam section (7).
8. The temporary positioning structure for the closure section of the side span of a cable-stayed bridge according to claim 7, characterized in that: The middle portion of the reinforcing plate (42) is fixedly connected to the transverse limiting plate (4) by means of bolts.