Overturning retaining wall repairing and reinforcing structure
By setting up reinforced wall and force transmission rod structures in front of the retaining wall, combined with stone embedded and gravel cushioning, the defects of the retaining wall overturning treatment method in the existing technology are solved, and the overall strength of the retaining wall is improved and anti-slip and anti-capsulation of the retaining wall is achieved. Enhanced capacity and is suitable for restoration in water conservancy projects.
Patent Information
- Application Number
- CN202420114145.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-17
AI Technical Summary
In the prior art, the method of handling retaining wall overturning is mainly to remove and rebuild or not remove and reinforce. The demolition and reconstruction period is long and the safety risks are high. Without removing and reinforcing, it can only repair the surface and cannot completely improve the overall strength of the retaining wall.
A remediation and reinforcement structure of overturning retaining wall was designed, including setting up a reinforcement wall in front of the old retaining wall, combining the force transmission rod between the concrete foundation and the foundation, fixed with stone embedded and epoxy mortar to form a 1:1 inclined structure, and A drainage ditches are set up on the reinforced wall, the foundation and the concrete foundation form a vertical connection, and a gravel cushion layer and a soil covering layer are laid on the bottom of the concrete foundation to form a Z-shaped contact structure.
Through this structure, the overall strength repair of the retaining wall is achieved, the anti-slip and anti-pollution capabilities are enhanced, the construction risks and costs are reduced, and it is suitable for repair in water conservancy projects, which strengthens the reliability and safety of the structure.
Smart Images

Figure CN222100727U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a repair and reinforcement structure for an overturned retaining wall. Background Art
[0002] Retaining walls are widely used in embankment and bank wall structures of water conservancy projects. They are wall structures built to prevent the collapse of roadbed fill and resist the lateral pressure of soil. Over time, retaining walls will inevitably overturn due to water scouring and slope instability. If not handled in time, the disease will easily develop rapidly, affecting the safety of the overall structure.
[0003] In the prior art, the treatment methods for the collapse of the retaining wall are generally divided into two methods: demolition and reconstruction or reinforcement without demolition. The method of demolishing the retaining wall and rebuilding it not only has a long construction period and high cost, but also has high safety risks. Reconstruction is not suitable for water conservancy projects. The existing method of not demolishing the retaining wall usually adopts the method of mortar grouting repair. However, this method can only repair the surface, but cannot completely repair the overall strength of the retaining wall. Utility Model Content
[0004] In order to solve the above problems, the present application provides a structurally rational overturned retaining wall repair and reinforcement structure, thereby effectively enhancing the anti-slip and anti-overturning capabilities of the retaining wall, and improving and ensuring the overall structural strength of the retaining wall.
[0005] The technical solution adopted by the utility model is as follows:
[0006] A structure for repairing and reinforcing an overturned retaining wall comprises an old retaining wall, wherein a foundation is arranged on the bottom surface of the old retaining wall, a concrete foundation is connected to the front end of the foundation, and a force transmission rod is provided at the connection between the foundation and the concrete foundation; a crushed stone cushion layer is paved on the bottom surface of the concrete foundation, and a covering soil layer extends to the front end of the concrete foundation; a reinforcing wall is arranged on the wall side in front of the old retaining wall, and the reinforcing wall is located above the connection between the concrete foundation and the foundation.
[0007] As a further improvement of the above technical solution:
[0008] The reinforcement wall is lower than the old retaining wall, and the reinforcement wall is higher than the normal water level. A drainage ditch is provided through the old retaining wall above the reinforcement wall.
[0009] The top surface of the foundation is flush with the top surface of the concrete base, and the front end of the concrete base extends forward relative to the reinforced wall.
[0010] The joints between the reinforcement wall and the concrete foundation are jointly embedded with inlaid stones.
[0011] The wall surface side of the reinforcement wall is arranged as a 1:1 slope structure, and the slope structure extends downward until it is connected with the top surface of the concrete foundation.
[0012] The front end surface of the foundation is drilled with holes at intervals along the length direction, force transfer rods are inserted into the corresponding holes, and the force transfer rods are fixed in the holes using epoxy mortar; a concrete foundation is cast in situ at the front end of the foundation.
[0013] The connecting surface between the foundation and the concrete foundation is a vertical surface, a stopper is mounted on the force transmission rod at the connecting point between the foundation and the concrete foundation, and a plurality of barbs are arranged along the length direction on the force transmission rod in the concrete foundation.
[0014] The bottom surface of the concrete foundation is composed of horizontal plane 1, inclined plane 1, and horizontal plane 2 from front to back. Obtuse angles are formed between inclined plane 1 and horizontal plane 1, and between inclined plane 1 and horizontal plane 2 respectively. Horizontal plane 1 is higher than horizontal plane 2.
[0015] The bottom surface of the covering soil layer is composed of a second inclined plane and a horizontal plane from front to back, and the second inclined plane is connected with the horizontal plane at the dredging boundary; the top surface of the covering soil layer is a inclined plane extending forward and downward.
[0016] Dams are arranged at intervals in front of the covering soil layer, and the tops of the dams are higher than the height of the concrete foundation.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] The utility model has a compact and reasonable structure and is easy to operate. By fitting a newly built reinforced wall on the front wall side of the old retaining wall and combining the setting of a force transmission rod between the concrete foundation and the foundation, the structural strength of the old retaining wall can be completely repaired, the anti-slip and anti-overturning capabilities of the retaining wall as a whole can be effectively enhanced, and the structural strength of the retaining wall as a whole can be improved and guaranteed.
[0019] The utility model also has the following advantages:
[0020] Compared with the reconstruction of retaining walls, the setting of the reinforcement wall in the utility model is relatively easy to implement, and is particularly suitable for the repair and reinforcement of retaining walls in water conservancy projects;
[0021] The setting of embedded stones at the junction of the reinforcement wall and the concrete foundation effectively strengthens the reliable connection between the two;
[0022] A Z-shaped contact structure is formed between the concrete foundation, the bottom surface of the gravel cushion layer and the land through horizontal plane one, inclined plane one and horizontal plane two. This is not only convenient for manufacturing and economical, but also effectively ensures the force. The soil layer can provide a buffered reaction force, thereby ensuring reliability and safety during use and guaranteeing service life. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of the utility model.
[0024] Figure 2 for Figure 1 A partial enlarged view of point A in the middle.
[0025] Among them: 1. Slope protection belt; 2. Old retaining wall; 3. Reinforced wall; 4. Force transmission rod; 5. Stone embedding; 6. Concrete foundation; 7. Overburden layer; 8. Dam construction; 9. Gravel cushion layer; 10. Desilting limit; 20. Normal water level;
[0026] 21. Drainage ditch; 22. Foundation;
[0027] 41. barb; 42. stopper;
[0028] 61. Horizontal plane 1; 62. Inclined plane 1; 63. Horizontal plane 2;
[0029] 71. Incline 2. DETAILED DESCRIPTION
[0030] The specific implementation of the present utility model is described below in conjunction with the accompanying drawings.
[0031] like Figure 1 As shown, a repair and reinforcement structure for an overturned retaining wall in this embodiment includes an old retaining wall 2, a foundation 22 is provided on the bottom surface of the old retaining wall 2, a concrete foundation 6 is connected to the front end of the foundation 22, and a force transmission rod 4 is jointly provided at the connection between the foundation 22 and the concrete foundation 6; a crushed stone cushion layer 9 is paved on the bottom surface of the concrete foundation 6, and a covering soil layer 7 is extended to the front end of the concrete foundation 6; a reinforcement wall 3 is provided on the front wall side of the old retaining wall 2, and the reinforcement wall 3 is located above the connection between the concrete foundation 6 and the foundation 22.
[0032] In this embodiment, by attaching the newly built reinforced wall 3 to the front wall side of the old retaining wall 2 and combining the arrangement of the force transmission rod 4 between the concrete foundation 6 and the foundation 22, the structural strength of the old retaining wall 2 is completely repaired.
[0033] The back side of the old retaining wall 2 is connected with the slope protection belt 1, the green belt, the roadway, etc. in sequence.
[0034] The reinforcement wall 3 is lower than the old retaining wall 2 , and is higher than the normal water level 20 . A drainage ditch 21 is provided through the old retaining wall 2 above the reinforcement wall 3 .
[0035] In this embodiment, the reinforced wall 3 is higher than the normal water level 20. Under normal conditions, the reinforced wall 3 is in contact with water. While considering economy and practicality, it also meets the drainage needs of the drainage ditch 21 on the old retaining wall 2.
[0036] The top surface of the foundation 22 is flush with the top surface of the concrete foundation 6, and the front end of the concrete foundation 6 extends forward relative to the reinforced wall 3, effectively ensuring the foundation requirements for the reinforced wall 3 and protecting the retaining wall structure.
[0037] The joints between the reinforcement wall 3 and the concrete foundation 6 are jointly embedded with inlay stones 5 , and the inlay stones 5 effectively strengthen the reliable connection between the reinforcement wall 3 and the concrete foundation 6 .
[0038] In this embodiment, the inlaid stone 5 can be selected from blocks with a particle size of 30-40 cm. The stone material should be uniform in texture, without cracks, not weathered, and have a compressive strength of ≥30Mpa.
[0039] In this embodiment, the embedded stones 5 occupy about 25% of the contact area between the concrete foundation 6 and the reinforced wall 3, and adjacent embedded stones 5 are arranged at equal distances.
[0040] The wall side of the reinforcement wall 3 is set to a 1:1 slope structure, and the slope structure extends downward until it connects with the top surface of the concrete foundation 6.
[0041] In this embodiment, the top surface of the reinforcement wall 3 is set to be a plane, and the plane is located below the outlet of the drainage ditch 21.
[0042] Holes are drilled at intervals along the length direction on the front end surface of the foundation 22 , and the force transfer rods 4 are inserted into the corresponding holes, and the force transfer rods 4 are fixed in the holes using epoxy mortar; a concrete foundation 6 is cast in situ at the front end of the foundation 22 .
[0043] In this embodiment, by setting the force transmission rod 4, the connection between the concrete foundation 6 and the foundation 22 is effectively improved and guaranteed to be stable and reliable, which helps to ensure the stability of the connection between the reinforced wall 3 and the old retaining wall 2.
[0044] In this embodiment, the force transmission rods 4 can be selected to have a length of 50 cm and are evenly arranged at intervals of 30 cm along the length direction of the foundation 22 .
[0045] like Figure 2 As shown, the interface between the foundation 22 and the concrete foundation 6 is a vertical surface, a block 42 is mounted on the force transmission rod 4 located at the interface between the foundation 22 and the concrete foundation 6, and a plurality of barbs 41 are arranged along the length direction on the force transmission rod 4 located in the concrete foundation 6.
[0046] In this embodiment, the force transmission rod 4 is combined with the block 42 and the barb 41 to form a strong connection component, which effectively ensures the connection stability between the newly poured concrete foundation 6 and the original foundation 22.
[0047] The bottom surface of the concrete foundation 6 is composed of a horizontal plane 1 61 , an inclined plane 1 62 , and a horizontal plane 2 63 from front to back. Obtuse angles are formed between the inclined plane 1 62 and the horizontal plane 1 61 , and between the inclined plane 1 62 and the horizontal plane 2 63 , respectively. The horizontal plane 1 61 is higher than the horizontal plane 2 63 .
[0048] In this embodiment, the crushed stone cushion layer 9 located at the bottom surface of the concrete foundation 6 is evenly laid along the horizontal plane 1 61, the inclined plane 1 62, and the horizontal plane 2 63 in sequence to form a cushion layer with a thickness of about 10 cm.
[0049] In this embodiment, the maximum particle size of the particles in the crushed stone cushion layer 9 should not exceed 37.5 mm, the aggregate crushing value is not greater than 35%, the liquid limit is less than 28%, and the plasticity index is less than 6.
[0050] In this embodiment, the specific composition of the particles in the crushed stone cushion layer 9 can be determined according to actual conditions. For example, in certain cases, the gradation range shown in the following table can be used as a reference.
[0051] Table 1: Gravel cushion particle composition range
[0052]
[0053] In this embodiment, a Z-shaped contact structure is formed between the bottom surface of the concrete foundation 6, the gravel cushion layer 9 and the land through the horizontal plane 1 61, the inclined plane 1 62 and the horizontal plane 2 63, which is not only convenient for manufacturing and economical, but also effectively ensures the force, and can provide a buffered reaction force by the soil layer, thereby ensuring reliability and safety during use and guaranteeing service life.
[0054] The bottom surface of the covering soil layer 7 is composed of a second inclined surface 71 and a horizontal surface from front to back, and the second inclined surface 71 is connected to the horizontal surface at the dredging boundary 10; the top surface of the covering soil layer 7 is a slope extending forward and downward.
[0055] Dams 8 are arranged at intervals in front of the covering soil layer 7 , and the tops of the dams 8 are higher than the height of the concrete foundation 6 .
[0056] In actual implementation, for large water areas, a dam 8 combined with water pumping is usually used to facilitate the repair of the retaining wall. For small rivers and ponds, a complete draining method can also be used, which can be specifically determined based on actual conditions.
[0057] Compared with the reconstruction of the retaining wall, the provision of the reinforcement wall 3 in this embodiment is relatively easy to implement, and is particularly suitable for the repair and reinforcement of the retaining wall in water conservancy projects.
[0058] In this embodiment, the reinforcement wall 3 can be formed by casting in situ using M7.5 mortar-laid rubble stones, and at the same time, a C20 concrete foundation can be used.
[0059] The utility model is easy to operate, realizes the thorough repair of the structural strength of the old retaining wall, effectively enhances the anti-slip and anti-overturning capabilities of the retaining wall as a whole, and improves and ensures the overall structural strength of the retaining wall.
[0060] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0061] The above description is an explanation of the utility model, not a limitation of the utility model. The scope of the utility model is defined by the claims. Any form of modification can be made within the protection scope of the utility model.
Claims
1. A structure for repairing and reinforcing an overturned retaining wall, comprising an old retaining wall (2), wherein the bottom surface of the old retaining wall (2) is provided with a foundation (22), and characterized in that: The front end of the foundation (22) is connected to a concrete foundation (6), and a force transmission rod (4) is installed at the connection between the foundation (22) and the concrete foundation (6); a crushed stone cushion layer (9) is laid on the bottom surface of the concrete foundation (6), and a covering soil layer (7) extends from the front end of the concrete foundation (6); a reinforcement wall (3) is arranged on the front wall side of the old retaining wall (2), and the reinforcement wall (3) is located above the connection between the concrete foundation (6) and the foundation (22).
2. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: The reinforcement wall (3) is shorter than the old retaining wall (2), the reinforcement wall (3) is higher than the normal water level (20), and a drainage ditch (21) is provided through the old retaining wall (2) located above the reinforcement wall (3).
3. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: The top surface of the foundation (22) is flush with the top surface of the concrete base (6), and the front end of the concrete base (6) extends forward relative to the reinforced wall (3).
4. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: The joint between the reinforcement wall (3) and the concrete foundation (6) is jointly embedded with inlaid stones (5).
5. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: The wall surface side of the reinforcement wall (3) is arranged as a 1:1 slope structure, and the slope structure extends downward until it is connected with the top surface of the concrete foundation (6).
6. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: The front end surface of the foundation (22) is drilled with holes at intervals along the length direction, and the force transmission rod (4) is inserted into the corresponding hole. The force transmission rod (4) is fixed in the hole using epoxy mortar; and a concrete foundation (6) is cast in situ at the front end of the foundation (22).
7. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: The interface between the foundation (22) and the concrete foundation (6) is a vertical surface, a stopper (42) is mounted on the force transmission rod (4) at the interface between the foundation (22) and the concrete foundation (6), and a plurality of barbs (41) are arranged along the length direction on the force transmission rod (4) located in the concrete foundation (6).
8. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: The bottom surface of the concrete foundation (6) is composed of a horizontal plane 1 (61), an inclined plane 1 (62), and a horizontal plane 2 (63) from front to back, and an obtuse angle is formed between the inclined plane 1 (62) and the horizontal plane 1 (61), and between the inclined plane 1 (62) and the horizontal plane 2 (63), respectively, and the horizontal plane 1 (61) is higher than the horizontal plane 2 (63).
9. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: The bottom surface of the covering soil layer (7) is composed of a second inclined surface (71) and a horizontal surface from front to back, and the second inclined surface (71) is connected to the horizontal surface at the dredging boundary (10); the top surface of the covering soil layer (7) is a inclined surface extending forward and downward.
10. The overturned retaining wall repair and reinforcement structure according to claim 1, characterized in that: Dams (8) are arranged at intervals in front of the covering soil layer (7), and the top of the dams (8) is higher than the height of the concrete foundation (6).