Equipment room foundation structure

By dividing the stressed and non-forced areas of the concrete layer in the inter-equipment infrastructure, and using threaded rods and blocks to fix the equipment base, the problems of low concrete usage and installation efficiency in the inter-equipment foundation construction are solved, and stability is achieved Installation and cost reduction.

CN222100937UInactive Publication Date: 2024-12-03CHINA CONSTR EIGHTH ENG BUREAU HUAZHONG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420693089.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During construction, the construction of the equipment base is unable to directly pump concrete during construction, resulting in a long construction period, low efficiency and high cost. The pre-embedded method of the fixtures of the equipment base can easily lead to inaccurate positioning, affecting installation efficiency.

Method used

The multi-layer brick and steel mesh structure is adopted to divide the stress-bearing and non-forced areas of the concrete layer, and the equipment base is fixed with threaded rods and blocks, reducing the amount of concrete and improving installation accuracy.

Benefits of technology

It realizes the stable installation of the infrastructure between equipment, saves concrete materials, shortens construction periods, reduces costs, and improves the fixing accuracy of the equipment base through area division and positioning installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100937U_ABST
    Figure CN222100937U_ABST
Patent Text Reader

Abstract

The utility model discloses an equipment room foundation structure, which relates to the field of building foundation structures and comprises a plurality of brick layers laid on a base surface at intervals. The concrete layer is poured outside the brick layers so that the brick layers can be buried in the concrete layer, and a steel bar layer is arranged at the position, located above the brick layers, in the concrete layer; the threaded rods are arranged on the base surface and penetrate through the concrete layer; the equipment base is used for fixing equipment, and a plurality of through holes with the diameter larger than that of the threaded rod are formed in the equipment base. The area on the base surface of the equipment room is divided into the stress area and the non-stress area, the stress area mainly bears pressure of the equipment, the non-stress area is filled with the waste solid bricks, so that the equipment can be fixed, concrete materials can be saved, the round hole larger than the threaded rod is formed in the equipment base, and the service life of the equipment base is prolonged. Therefore, the equipment base can be conveniently positioned and mounted, and the conical pressing blocks can be conveniently matched with the round holes to fix the equipment base on the concrete layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building foundation structures, in particular to a basic structure for equipment rooms. Background Art

[0002] In order to meet the functional requirements of various types of buildings, equipment rooms for arranging electromechanical equipment will be set up in the buildings. During the operation of electromechanical equipment, due to its high power, it will experience large vibrations, which will have an adverse effect on the ground of the equipment room in the building. Therefore, before the equipment is installed, it is necessary to make the equipment foundation in advance to place the equipment.

[0003] In building construction, the foundation construction of the equipment room is usually carried out after the main structure is completed. A large amount of concrete is required for the foundation construction of the equipment room. However, after the main structure is completed, a large amount of concrete cannot be directly pumped into the equipment room, resulting in a long construction period, low efficiency and high cost for the foundation construction of the equipment room. At the same time, the equipment base fixings are generally fixed in the casting layer by pre-embedded means, which may easily lead to inaccurate positioning of the fixings during installation of the equipment base and thus failure to install. Utility Model Content

[0004] The purpose of the utility model is to solve the problems in the prior art and to propose an equipment room foundation structure which can shorten the construction period, improve the efficiency and save a large amount of concrete.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] An inter-device infrastructure, comprising:

[0007] Multiple layers of bricks, laid at intervals on the base surface;

[0008] A concrete layer is poured outside each brick layer so that each brick layer is buried inside the concrete layer, and a steel bar layer is arranged above each brick layer in the concrete layer;

[0009] A plurality of threaded rods are disposed on the base surface and pass through the concrete layer;

[0010] And an equipment base, which is used to fix the equipment. The equipment base is provided with multiple through holes with diameters larger than the threaded rods. Each threaded rod passes through a through hole. Each threaded rod is provided with a pressing block. The bottom of the pressing block is pressed into the through hole to fix the equipment base on the top of the concrete layer. The brick layer is located outside the vertical projection area of ​​the equipment base.

[0011] Furthermore, the brick layer adopts discarded solid bricks.

[0012] Furthermore, the steel bar layer is a steel bar grid.

[0013] Furthermore, the contact surface of the concrete layer with the bottom of the equipment base and the area spreading outward by 10 cm are stress-bearing areas, and the other areas are non-stress-bearing areas. The equipment base is located in the stress-bearing area of ​​the concrete layer, and the brick layer is located in the non-stress-bearing area of ​​the concrete layer.

[0014] Furthermore, the threaded rod penetrates the stress-bearing area of ​​the concrete layer, and a nut is threadedly connected to the threaded rod, and the nut is located above the pressing block.

[0015] Furthermore, the pressing block is conical in shape, and a circular hole is provided in the middle thereof, and the threaded rod passes through the circular hole.

[0016] Furthermore, the bottom diameter of the pressing block is smaller than the through hole, and the upper diameter is larger than the through hole.

[0017] Further, the diameter of the circular hole is consistent with that of the threaded rod.

[0018] Furthermore, the equipment base is welded by channel steel, and ribs are welded on the channel steel at the positions on both sides of each through hole.

[0019] Furthermore, the device base is frame-shaped.

[0020] The beneficial effects of the utility model are:

[0021] The equipment room foundation structure in the utility model divides the area on the base surface of the equipment room into a stress-bearing area and a non-stress-bearing area, lays discarded solid bricks on the base surface of the non-stress-bearing area, then lays a steel mesh on the solid bricks, and finally casts the whole structure to form the foundation structure. The equipment base is installed in the stress-bearing area of ​​the concrete layer, so the stress-bearing area of ​​the concrete casting mainly bears the pressure of the equipment and the vibration force generated by the work, while the non-stress-bearing area does not bear pressure and is filled with discarded solid bricks. Therefore, the equipment room foundation structure can not only stabilize and fix the equipment, but also save concrete materials, improve efficiency and reduce costs;

[0022] A circular hole larger than the threaded rod is provided on the equipment base, so that when the equipment base is fixed, the threaded rod passes through the equipment base for positioning and installation. A conical pressing block is provided on the threaded rod, so that the equipment base can be firmly fixed on the concrete layer by cooperating with the circular hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A three-dimensional structural diagram of a basic structure of a device room proposed by the utility model;

[0024] Figure 2 This is a cross-sectional structural diagram of a basic structure of a device room proposed by the utility model;

[0025] Figure 3 This is a schematic diagram of the three-dimensional structure of an equipment room infrastructure proposed by the utility model after the equipment base is installed;

[0026] Figure 4 This is a three-dimensional structural cross-sectional view of an equipment room infrastructure structure proposed by the utility model after installation of an equipment base;

[0027] Figure 5 This is a top view of the structure of a basic structure of an equipment room proposed by the utility model;

[0028] Figure 6 This is a three-dimensional enlarged structural schematic diagram of an equipment room infrastructure proposed by the utility model after installation of an equipment base.

[0029] In the figure: 1 base surface, 2 brick layer, 3 casting layer, 4 steel bar layer, 5 equipment base, 501 rib plate, 502 through hole, 6 equipment, 7 threaded rod, 8 pressure block, 9 nut. DETAILED DESCRIPTION

[0030] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.

[0031] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0032] In the description of this patent, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing this patent and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this patent.

[0033] In the description of this patent, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense, for example, it can be fixedly connected or set, or it can be detachably connected or set, or connected or set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in this patent can be understood according to specific circumstances.

[0034] Reference Figure 1-6 , a foundation structure for an equipment room, is used as a foundation structure for equipment installation in a building equipment room in order to reduce the amount of concrete used in the foundation structure, improve construction efficiency and reduce costs.

[0035] The basic structure of the equipment room includes a brick layer 2, a concrete layer 3, a threaded rod 7 and an equipment base 5;

[0036] In order to control the cost of concrete usage, after the construction of the main structure of the building is completed, the area to be poured is divided into stress-bearing area and non-stress-bearing area. The contact surface on the concrete layer 3 with the bottom of the equipment base 5 and the vertical projection area spreading 10 cm outward are stress-bearing areas, and other areas are non-stress-bearing areas. The brick layer 2 uses the discarded solid bricks generated during the secondary structure construction, which are laid in the non-stress-bearing area on the base surface 1. The steel bar layer 4 is a steel bar grid, which is laid above each brick layer 2. Concrete is poured between and on the top of each brick layer 2 to form a concrete layer 3. The concrete layer 3 covers each brick layer 2 and the steel bar layer 4, so that each brick layer 2 and the steel bar layer 4 are buried in the concrete layer 3.

[0037] In addition, in order to facilitate the positioning and installation of the equipment base 5;

[0038] After the main structure is completed, a threaded rod 7 is implanted on the base surface 1 at the bottom of the installation position of the equipment base 5. The threaded rod 7 penetrates the concrete layer 3 and is located in the stress-bearing area of ​​the concrete layer 3. The equipment base 5 is provided with a plurality of through holes 502 with a diameter larger than the threaded rod 7. Each threaded rod 7 passes through a through hole 502. A pressing block 8 is provided on each threaded rod 7. A circular hole with the same diameter as the threaded rod 7 is provided in the middle of the pressing block 8 to facilitate the pressing block 8 to pass through the outside of the threaded rod 7. The pressing block 8 is conical in shape, and the bottom diameter of the pressing block 8 is smaller than the through hole 502 and the upper diameter is larger than the through hole 502. The bottom of the pressing block 8 can be pressed into the through hole 502, and a nut 9 is threadedly connected to the threaded rod 7. The nut 9 is located above the pressing block 8 to fix the equipment base 5 to the top of the concrete layer 3.

[0039] The equipment base 5 is used to fix the equipment 6, and the shape of the force-bearing area is consistent with the shape of the bottom surface of the equipment base 5. The equipment base 5 is welded by channel steel, and ribs 501 are welded on the channel steel at both sides of each through hole 502. The ribs 501 can support the channel steel structure of the equipment base 5, thereby improving the structural strength at the through hole 502, so that the equipment base 5 is firmly fixed on the concrete layer 3 through the through hole 502 and the threaded rod 7.

[0040] The construction steps of the equipment room foundation structure are as follows: first, the area on the equipment room base surface 1 is divided into a stress-bearing area and a non-stress-bearing area, that is, the area 10 cm outwardly diffused from the bottom contact surface of the equipment base 5 is the stress-bearing area, and the other areas are non-stress-bearing areas. After the main structure is completed, a threaded rod 7 is implanted at the installation position of the equipment base 5 on the equipment room base surface 1, and then a brick layer 2 of discarded solid bricks is laid on the base surface 1 in the non-stress-bearing area, and then a steel bar layer 4 of a steel mesh is laid on the brick layer 2, and finally, the whole concrete is poured to form a concrete layer 3. , the concrete layer 3 covers the brick layer 2 and the steel layer 4, so that the brick layer 2 and the steel layer 4 are buried in the concrete layer 3 to form an integral foundation structure, and finally, through the through hole 502 having a diameter larger than the threaded rod 7, it is convenient to pass the threaded rod 7 through the through hole 502, so that the device base 5 is positioned on the concrete layer 3, and then the pressing block 8 is put on the outside of the threaded rod 7, and the bottom of the conical pressing block 8 is pressed into the inside of the through hole 502 through the nut 9, so that the device base 5 is fixed downward on the concrete layer 3, and finally the device 6 is installed on the device base 5;

[0041] The pressure generated by the operation of the equipment 6 is borne by the concrete layer 3 in the stress-bearing area, while other non-stress-bearing areas are not subjected to stress. Therefore, the non-stress-bearing areas are filled with the brick layer 2 of discarded solid bricks, which can ensure that the basic structure of the equipment room can stably fix the equipment 6 while saving concrete materials and reducing costs.

[0042] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A device-to-device infrastructure, characterized in that: include: A plurality of brick layers (2) are laid on the base surface (1) at intervals; A concrete layer (3) is poured outside each of the brick layers (2) so that each of the brick layers (2) is buried inside the concrete layer (3), and a steel bar layer (4) is arranged above each of the brick layers (2) in the concrete layer (3); A plurality of threaded rods (7) which are arranged on the base surface (1) and pass through the concrete layer (3); and an equipment base (5) for fixing the equipment (6); the equipment base (5) is provided with a plurality of through holes (502) having a diameter greater than that of the threaded rod (7); each of the threaded rods (7) passes through one of the through holes (502); each of the threaded rods (7) is provided with a pressing block (8); the bottom of the pressing block (8) is pressed into the through hole (502) so as to fix the equipment base (5) on the top of the concrete layer (3); the brick layer (2) is located outside the vertical projection area of ​​the equipment base (5).

2. The equipment room infrastructure according to claim 1, characterized in that: The brick layer (2) is made of discarded solid bricks.

3. The equipment room infrastructure according to claim 1, characterized in that: The steel bar layer (4) is a steel bar grid.

4. The equipment room infrastructure according to claim 1, characterized in that: The contact surface of the concrete layer (3) with the bottom of the equipment base (5) and the area spreading outward by 10 cm are stress-bearing areas, and the other areas are non-stress-bearing areas. The equipment base (5) is located in the stress-bearing area of ​​the concrete layer (3), and the brick layer (2) is located in the non-stress-bearing area of ​​the concrete layer (3).

5. The equipment room infrastructure according to claim 4, characterized in that: The threaded rod (7) passes through the stress-bearing area of ​​the concrete layer (3); a nut (9) is threadedly connected to the threaded rod (7); and the nut (9) is located above the pressing block (8).

6. The equipment room infrastructure according to claim 1, characterized in that: The pressing block (8) is conical in shape and has a circular hole in the middle, and the threaded rod (7) passes through the circular hole.

7. The equipment room infrastructure according to claim 6, characterized in that: The bottom diameter of the pressing block (8) is smaller than the through hole (502), and the top diameter is larger than the through hole (502).

8. The equipment room infrastructure according to claim 6, characterized in that: The diameter of the circular hole is consistent with that of the threaded rod (7).

9. The equipment room infrastructure according to claim 1, characterized in that: The equipment base (5) is welded from channel steel, and ribs (501) are welded to the channel steel at locations on both sides of each through hole (502).

10. The equipment room infrastructure according to claim 1, characterized in that: The equipment base (5) is in a frame shape.