Fabricated steel-concrete composite beam
By using reinforcement and assembly mechanisms in prefabricated steel-mixed composite beams, the compression and seismic performance of the beam slabs is improved, the splicing process is simplified, and the problems of beam slab strength damage and low construction efficiency in the existing technology are solved, so as to achieve More efficient construction and connection stability.
Patent Information
- Application Number
- CN202420763741.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-15
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-15
AI Technical Summary
During the splicing process, the prefabricated steel-concrete combination beam damages the beam slabs' own strength, consumes the construction's time and energy, and reduces the assembly convenience.
The reinforcement mechanism and assembly mechanism are adopted, including a plurality of uniformly distributed first steel plates, second steel plates, connecting rods, plug rods, plug blocks, positioning rods, support rods and stabilizing plates, and the beam plates are improved by pouring and fixing connections. Compression resistance, earthquake resistance and assembly convenience.
It improves the use strength and seismic resistance of beams and slabs, simplifies the splicing process, reduces construction time and energy, and enhances connection stability and convenience.
Smart Images

Figure CN222101284U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of steel-concrete composite beam assembly, in particular to an assembled steel-concrete composite beam. Background Art
[0002] Prefabricated steel-concrete composite beams are beams made of reinforced concrete and steel. They are characterized by prefabricated components that are assembled on site to form an overall structure. This type of composite beam can give full play to the advantages of steel and concrete, and has high bearing capacity and seismic resistance. In construction projects, prefabricated steel-concrete composite beams are widely used in large-span buildings and bridges.
[0003] Assembled steel-concrete composite beams combine the advantages of steel and concrete, they have a higher bearing capacity and are suitable for large-span buildings and bridges. Steel has good elasticity and toughness, while concrete has good compressive resistance. The combined assembled steel-concrete composite beams can have good seismic resistance. Assembled beams use prefabricated components, which can be prefabricated in the factory to reduce on-site construction time and improve construction efficiency. Prefabricated components are produced in the factory and their quality is strictly controlled to ensure the stability of the quality of the beams. Assembled beams can reduce on-site construction noise and dust, reduce the impact on the environment, and at the same time It can also save energy and materials. The assembled steel-concrete composite beam has the advantages of high bearing capacity, good earthquake resistance and high construction efficiency. It is a structural form widely used in construction projects. The problems with the above technology are: in the process of splicing assembled steel-concrete composite beams, multiple beams and slabs need to be connected by lifting equipment, and multiple reinforced steel plates and strengthening structures are used to cooperate with each other to fix the connection ends of the top and bottom of the beams and slabs on both sides. Therefore, this assembly method not only damages the strength of the beams and slabs themselves, but also excessively consumes the construction time and energy of the constructors, thereby reducing the assembly convenience of the steel-concrete composite beams. Utility Model Content
[0004] In view of the problems existing in the prior art, the utility model provides an assembled steel-concrete composite beam which can overcome the above problems or at least partially solve the above problems.
[0005] The utility model is implemented as follows: an assembled steel-concrete composite beam comprises two first beam plates, two second beam plates, a reinforcement mechanism and an assembly mechanism, wherein the two second beam plates are respectively located at the bottom of the two first beam plates, the number of the reinforcement mechanisms is multiple and evenly distributed in the inner cavities of the first beam plates and the second beam plates, the number of the assembly mechanisms is multiple and evenly distributed at the opposite ends of the two first beam plates and the two second beam plates; the reinforcement mechanism is used to strengthen the service strength of the first beam plates and the second beam plates; the assembly mechanism is used to assemble multiple first beam plates and multiple second beam plates.
[0006] In order to improve the service strength of the first beam and the second beam, preferably, the reinforcement mechanism includes a first steel plate, a second steel plate and a connecting rod, the number of the first steel plates is multiple and evenly distributed on the front side of the inner cavity of the first beam and the second beam, the number of the second steel plates is multiple and evenly distributed in the inner cavity of the first beam and the second beam, the number of the connecting rods is multiple and evenly distributed at the opposite ends of the first steel plate and the second steel plate and fixedly connected to the surfaces of the first steel plate and the second steel plate. By setting up the reinforcement mechanism, the first steel plate and the second steel plate can achieve the effect of improving the compressive and seismic resistance of the first beam and the second beam through mutual cooperation with the multiple connecting rods.
[0007] In order to improve the convenience of assembling the first beam and the second beam, preferably, the assembly mechanism includes a plug rod, a plug block and a positioning rod, the number of the plug rods is multiple and evenly distributed on the right side of the first beam and the second beam, and is fixedly connected to the surface of the first beam and the second beam, the number of the plug blocks is multiple and evenly distributed on the left side of the first beam and the second beam, and is fixedly connected to the surface of the first beam and the second beam, the plug block is close to the plug rod The side of the plug rod contacts the surface of the plug rod, the number of the positioning rods is multiple and evenly distributed on the bottom of the plug block, the surface of the positioning rod is connected to the connection between the plug block and the plug rod by a threaded connection, and by setting the assembly mechanism, the plug rod and the plug block can be docked to achieve the effect of quickly docking and adapting the multiple first beams and the second beam plates. After the docking and adaptation are completed, the positioning rod, the plug rod and the plug block can cooperate with each other to achieve the effect of quickly assembling the multiple first beams and the second beam plates.
[0008] In order to improve the connection convenience of the first beam and the second beam, preferably, the left and right sides of the opposite ends of the first beam and the second beam are fixedly connected with support rods, the number of the support rods is multiple and evenly distributed at the opposite ends of the first beam and the second beam and fixedly connected to the surfaces of the first beam and the second beam, and the opposite ends of the multiple support rods are fixedly connected with reinforcement plates. By arranging support rods and reinforcement plates, the multiple support rods are evenly distributed at the opposite ends of the first beam and the second beam, so as to achieve the effect of connecting and assembling the first beam and the second beam through multiple support rods during the casting of the first beam and the second beam, thereby avoiding the situation that after the casting of the first beam and the second beam is completed, the external structure and the support rods need to be connected to each other to achieve the combination of the first beam and the second beam.
[0009] In order to improve the compression resistance of the first beam and the second beam, preferably, the central parts of the opposite ends of the first beam and the second beam are fixedly connected with stabilizing plates, and the connection between the multiple stabilizing plates can form a triangular area with the connection between the first beam and the second beam. By setting the stabilizing plates, multiple stabilizing plates are distributed at the opposite ends of the first beam and the second beam to form a triangular area, which can further improve the connection stability of the first beam and the second beam and enhance the seismic resistance of the combination of the two.
[0010] In order to improve the convenience of combining the reinforcement mechanism with the first beam and the second beam, preferably, the connecting rod is made of high-strength threaded steel, and multiple connecting rods are fixed to the inner cavity of the first beam and the second beam by casting, and the first steel plate and the second steel plate are fixed to the inner cavity of the first beam and the second beam by casting. By setting up the reinforcement mechanism, the opposite ends of the first steel plate and the second steel plate are fixedly connected to the front and rear sides of multiple connecting rods, and are fixed to the inner cavity of the first beam and the second beam by casting the prefabricated placement, the reinforcement mechanism can be more conveniently combined and installed with the first beam and the second beam, thereby improving the service strength of the first beam and the second beam.
[0011] In order to improve the connection stability between the support rod and the first beam plate and the second beam plate, preferably, the material of the reinforcing plate is high-strength steel, and triangular areas are formed at the connection ends of the front and rear sides of the reinforcing plate and the support rod. By setting the reinforcing plate, multiple reinforcing plates are evenly distributed at the opposite ends of multiple support rods, which can prevent one of the support rods from affecting the connection stability of the first beam plate and the second beam plate after breaking. The reinforcing plate is made of steel, which can further improve the connection strength between the support rod and the first beam plate and the second beam plate.
[0012] The utility model provides a first beam, a second beam, a reinforcement mechanism and an assembly mechanism. During the casting process of the first beam and the second beam, the first steel plate, the second baffle plate and a plurality of connecting rods need to be placed inside the casting groove cavity of the first beam and the second beam, and cast and installed by casting. After the first beam and the second beam are initially formed, the plurality of support rods and the reinforcement plate are distributed at the opposite ends of the first beam and the second beam, and need to be plugged and connected with the inner cavity of the first beam and the second beam. After the first beam and the second beam are cast and formed, the plurality of support rods and the reinforcement plate can be quickly fixed to complete the combination effect of the first beam and the second beam. After the first beam and the second beam are respectively connected with the reinforcement mechanism and the plurality of support rods, the plurality of stabilizing plates are then installed horizontally in sequence. , and a triangular area is formed between the multiple stabilizing plates and the first beam plate and the second beam plate, so as to improve the combined seismic resistance of the first beam plate and the second beam plate. Then, after the first beam plate and the second beam plate are transported to the construction area, the first beam plate and the second beam plate are lifted to the top of the column by the lifting equipment. In the process of docking the multiple first beam plates and the second beam plates with each other, it is necessary to insert the plug-in rod into the inner cavity of the plug-in block. After the plug-in rod is inserted into the inner cavity of the plug-in block, the positioning rod is inserted into the inner cavity of the plug-in block, and the positioning rod passes through the plug-in rod through the mutual cooperation with the threaded opening of the inner cavity of the plug-in block and extends to the threaded opening at the top of the inner cavity of the plug-in block, so as to achieve the effect of rapid assembly of the multiple first beam plates and the second beam plates, and the stability of the connection ends of the multiple first beam plates and the second beam plates is improved through the mutual cooperation of the multiple positioning rods, the plug-in rods and the plug-in blocks. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of a three-dimensional structure provided by an embodiment of the utility model;
[0014] Figure 2 The embodiment of the utility model provides a three-dimensional cross-sectional view;
[0015] Figure 3 It is a schematic diagram of the distribution of the reinforcing plate, the stabilizing plate and the supporting rods provided by the embodiment of the utility model;
[0016] Figure 4 It is a three-dimensional schematic diagram of a reinforcement mechanism provided by an embodiment of the utility model;
[0017] Figure 5 It is a connection schematic diagram of an assembly mechanism provided by an embodiment of the utility model.
[0018] In the figure: 1. first beam plate; 2. second beam plate; 3. reinforcement mechanism; 4. assembly mechanism; 301. first steel plate; 302. second steel plate; 303. connecting rod; 401. plug-in rod; 402. plug-in block; 403. positioning rod; 5. support rod; 6. reinforcement plate; 7. stabilizing plate. DETAILED DESCRIPTION
[0019] The structure of the utility model is described in detail below in conjunction with the accompanying drawings.
[0020] like Figures 1 to 5As shown, an assembled steel-concrete composite beam provided by an embodiment of the utility model comprises two first beam plates 1, two second beam plates 2, a reinforcement mechanism 3 and an assembly mechanism 4, the two second beam plates 2 are respectively located at the bottom of the two first beam plates 1, the number of the reinforcement mechanisms 3 is multiple and evenly distributed in the inner cavity of the first beam plates 1 and the second beam plates 2, the number of the assembly mechanisms 4 is multiple and evenly distributed at the opposite ends of the two first beam plates 1 and the two second beam plates 2; the reinforcement mechanism 3 is used to strengthen the service strength of the first beam plates 1 and the second beam plates 2; the assembly mechanism 4 is used to assemble multiple first beam plates 1 and multiple second beam plates 2, the reinforcement mechanism 3 comprises a first steel plate 301, a second steel plate 302 and a connecting rod 303, the number of the first steel plate 301 The plurality of second steel plates 302 are evenly distributed on the front side of the inner cavity of the first beam plate 1 and the second beam plate 2, the number of the second steel plates 302 is evenly distributed in the inner cavity of the first beam plate 1 and the second beam plate 2, the number of the connecting rods 303 is evenly distributed at the opposite ends of the first steel plate 301 and the second steel plate 302 and fixedly connected to the surfaces of the first steel plate 301 and the second steel plate 302, and by setting the reinforcement mechanism 3, the first steel plate 301 and the second steel plate 302 can achieve the effect of improving the compression resistance and seismic resistance of the first beam plate 1 and the second beam plate 2 through the mutual cooperation with the plurality of connecting rods 303, and the assembly mechanism 4 includes a plug rod 401, a plug block 402 and a positioning rod 403, and the number of the plug rod 401 is evenly distributed. The plug-in block 402 is located on the right side of the first beam 1 and the second beam 2 and is fixedly connected to the surface of the first beam 1 and the second beam 2. The number of the plug-in blocks 402 is multiple and evenly distributed on the left side of the first beam 1 and the second beam 2 and is fixedly connected to the surface of the first beam 1 and the second beam 2. The plug-in block 402 is close to the plug-in rod 401 and contacts the surface of the plug-in rod 401. The number of the positioning rods 403 is multiple and evenly distributed at the bottom of the plug-in block 402. The surface of the positioning rod 403 is connected to the connection between the plug-in block 402 and the plug-in rod 401 through a threaded connection. By setting the assembly mechanism 4, the plug-in rod 401 and the plug-in block 402 can achieve the effect of quickly docking and adapting multiple first beams 1 and second beams 2 after docking. After the docking and adaptation are completed Afterwards, the positioning rod 403 can cooperate with the plug-in rod 401 and the plug-in block 402 to achieve the effect of quickly assembling multiple first beam plates 1 and second beam plates 2. The left and right sides of the opposite ends of the first beam plate 1 and the second beam plate 2 are fixedly connected with support rods 5. The number of the support rods 5 is multiple and evenly distributed at the opposite ends of the first beam plate 1 and the second beam plate 2 and fixedly connected to the surfaces of the first beam plate 1 and the second beam plate 2. The opposite ends of the multiple support rods 5 are fixedly connected with reinforcement plates 6. By arranging the support rods 5 and the reinforcement plates 6, the multiple support rods 5 are evenly distributed at the opposite ends of the first beam plate 1 and the second beam plate 2. The effect of connecting and assembling the first beam plate 1 and the second beam plate 2 through the multiple support rods 5 can be achieved during the pouring of the first beam plate 1 and the second beam plate 2.To avoid the situation where, after the first beam 1 and the second beam 2 are cast, the external structure and the support rod 5 need to be connected to each other in order to combine the first beam 1 and the second beam 2, the central parts of the opposite ends of the first beam 1 and the second beam 2 are fixedly connected with a stabilizing plate 7, and the connection between the plurality of stabilizing plates 7 can form a triangular area with the connection between the first beam 1 and the second beam 2. By providing the stabilizing plate 7, the plurality of stabilizing plates 7 are distributed at the opposite ends of the first beam 1 and the second beam 2 and form a triangular area, which can further improve the connection stability of the first beam 1 and the second beam 2 while enhancing the seismic effect of the combination thereof. The material of the connecting rod 303 is high-strength threaded steel, and the plurality of connecting rods 303 are fixed to the inner cavities of the first beam 1 and the second beam 2 by casting. The first steel plate 301 and the second steel plate 302 are fixed to the first beam 1 and the second by casting. The inner cavity of the beam 2 is fixedly installed. By setting up the reinforcement mechanism 3, the opposite ends of the first steel plate 301 and the second steel plate 302 are fixedly connected to the front and rear sides of the plurality of connecting rods 303, and the reinforcement mechanism 3 can be more conveniently combined and installed with the first beam 1 and the second beam 2 by pouring the prefabricated placement fixed to the inner cavity of the first beam 1 and the second beam 2, so as to improve the use strength of the first beam 1 and the second beam 2. The material of the reinforcement plate 6 is high-strength steel. The front and rear sides of the reinforcement plate 6 form a triangular area at the connection end with the support rod 5. By setting up the reinforcement plate 6, multiple reinforcement plates 6 are evenly distributed at the opposite ends of the plurality of support rods 5, which can prevent one of the support rods 5 from affecting the connection stability of the first beam 1 and the second beam 2 after breaking. The reinforcement plate 6 is made of steel, which can further improve the connection strength of the support rod 5 with the first beam 1 and the second beam 2.
[0021] When the utility model is in use, during the process of pouring the first beam 1 and the second beam 2, it is necessary to place the first steel plate 301, the second baffle plate and the plurality of connecting rods 303 inside the pouring groove cavity of the first beam 1 and the second beam 2, and cast and install them by casting. After the first beam 1 and the second beam 2 are initially formed, the plurality of support rods 5 and the reinforcing plate 6 are distributed at the opposite ends of the first beam 1 and the second beam 2, and need to be plugged and connected with the inner cavity of the first beam 1 and the second beam 2. After the first beam 1 and the second beam 2 are cast and formed, the plurality of support rods 5 and the reinforcing plate 6 can be quickly fixed to complete the combination effect of the first beam 1 and the second beam 2. After the first beam 1 and the second beam 2 are respectively combined and connected with the reinforcement mechanism 3 and the plurality of support rods 5, the plurality of stabilizing plates 7 are then installed horizontally in sequence, and the plurality of stabilizing plates 7 are connected to the first beam 1 and the second beam 2. A triangular area is formed between the two beams, so as to improve the combined seismic resistance of the first beam 1 and the second beam 2. Then, after the first beam 1 and the second beam 2 are transported to the construction area, the first beam 1 and the second beam 2 are lifted to the top of the column by the lifting equipment. In the process of docking the multiple first beams 1 and the second beam 2, it is necessary to insert the plug rod 401 into the inner cavity of the plug block 402. After the plug rod 401 is inserted into the inner cavity of the plug block 402, the positioning rod 403 is inserted into the inner cavity of the plug block 402, and the positioning rod 403 passes through the plug rod 401 through the mutual cooperation with the threaded opening of the inner cavity of the plug block 402 and extends to the threaded opening at the top of the inner cavity of the plug block 402, so as to achieve the effect of rapid assembly of the multiple first beams 1 and the second beam 2, and the stability of the connection ends of the multiple first beams 1 and the second beam 2 is improved through the mutual cooperation of the multiple positioning rods 403, the plug rod 401 and the plug block 402.
[0022] The specific models and specifications of the first beam 1, the second beam 2, the first steel plate 301, the second steel plate 302, the connecting rod 303, the plug rod 401, the plug block 402, the positioning rod 403, the support rod 5, the reinforcing plate 6 and the stabilizing plate 7 proposed in this application need to be selected and determined according to the actual specifications of the device. The specific selection and calculation method adopts the existing technology in the field, so it will not be described in detail.
Claims
1. An assembled steel-concrete composite beam, comprising two first beam plates (1), two second beam plates (2), a reinforcement mechanism (3) and an assembly mechanism (4), characterized in that: The two second beam plates (2) are respectively located at the bottom of the two first beam plates (1), the reinforcement mechanisms (3) are multiple in number and are evenly distributed in the inner cavities of the first beam plates (1) and the second beam plates (2), and the assembly mechanisms (4) are multiple in number and are evenly distributed at the opposite ends of the two first beam plates (1) and the two second beam plates (2); The reinforcement mechanism (3) is used to strengthen the service strength of the first beam plate (1) and the second beam plate (2); The assembly mechanism (4) is used to assemble a plurality of first beam plates (1) and a plurality of second beam plates (2).
2. The assembled steel-concrete composite beam according to claim 1, characterized in that: The reinforcement mechanism (3) comprises a first steel plate (301), a second steel plate (302) and a connecting rod (303); the first steel plates (301) are multiple and evenly distributed on the front side of the inner cavity of the first beam plate (1) and the second beam plate (2); the second steel plates (302) are multiple and evenly distributed in the inner cavity of the first beam plate (1) and the second beam plate (2); the connecting rods (303) are multiple and evenly distributed at the opposite ends of the first steel plate (301) and the second steel plate (302) and are fixedly connected to the surfaces of the first steel plate (301) and the second steel plate (302).
3. The assembled steel-concrete composite beam according to claim 1, characterized in that: The assembly mechanism (4) comprises a plug rod (401), a plug block (402) and a positioning rod (403); the plug rods (401) are multiple and evenly distributed on the right side of the first beam plate (1) and the second beam plate (2) and fixedly connected to the surface of the first beam plate (1) and the second beam plate (2); the plug blocks (402) are multiple and evenly distributed on the left side of the first beam plate (1) and the second beam plate (2) and fixedly connected to the surface of the first beam plate (1) and the second beam plate (2); a side of the plug block (402) close to the plug rod (401) contacts the surface of the plug rod (401); the positioning rods (403) are multiple and evenly distributed on the bottom of the plug block (402); and the surface of the positioning rod (403) is connected to the connection between the plug block (402) and the plug rod (401) by a thread.
4. The assembled steel-concrete composite beam according to claim 1, characterized in that: Support rods (5) are fixedly connected to the left and right sides of the opposite ends of the first beam plate (1) and the second beam plate (2); the number of the support rods (5) is multiple and evenly distributed at the opposite ends of the first beam plate (1) and the second beam plate (2) and fixedly connected to the surfaces of the first beam plate (1) and the second beam plate (2); and the opposite ends of the multiple support rods (5) are fixedly connected to reinforcement plates (6).
5. The assembled steel-concrete composite beam according to claim 1, characterized in that: A stabilizing plate (7) is fixedly connected to the central parts of the opposite ends of the first beam plate (1) and the second beam plate (2), and the connection points of a plurality of the stabilizing plates (7) can form a triangular area with the connection points of the first beam plate (1) and the second beam plate (2).
6. The assembled steel-concrete composite beam according to claim 2, characterized in that: The connecting rod (303) is made of high-strength threaded steel, and a plurality of the connecting rods (303) are fixed to the inner cavities of the first beam plate (1) and the second beam plate (2) by casting, and the first steel plate (301) and the second steel plate (302) are fixed to the inner cavities of the first beam plate (1) and the second beam plate (2) by casting.