Steel rail profiling dehumidification device
Through the contoured air knife device combined with compressed air and high-speed heater, dehumidification of the rail's special-shaped cross-section and dead corner areas is achieved, which solves the problem of poor dehumidification effect in the existing technology, and improves the production efficiency of the welding rail base and the rail surface. Drying effect.
Patent Information
- Application Number
- CN202420834782.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-22
AI Technical Summary
The existing dehumidification device has poor dehumidification effect on the surface of the rail, especially the dehumidification effect on the special-shaped cross-section and dead-angle areas of the rail, which affects the welding quality and production efficiency.
Adopt the contoured air knife device, combined with compressed air and high-speed heater, the contoured air knife can open and close, equipped with rail detection sensor, automatic control device to start and stop, and use compressed air and high-speed heater to achieve full end surface dehumidification of the rail surface .
It significantly improves the dehumidification effect of the rail surface, ensures the drying effect of the rail surface, improves the production efficiency of the welding rail base, and saves energy consumption.
Smart Images

Figure CN222104288U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of railway engineering machinery and equipment manufacturing, and is a device used for dehumidifying the surface of rails in a welded rail foundation. Background Art
[0002] With the rapid development of high-speed rail, its popularity has gradually become widespread, and the demand for rails is increasing. At present, most seamless rail railways are welded into 500-meter long rails at the rail welding base, and then transported to the rail laying site for laying. The production efficiency of the rail welding base will directly affect the laying progress of the rails. In case of rainy days or water attached to the surface of the rails, it will directly affect the welding quality of the rails. The base will stop operating, greatly reducing the production efficiency of the rail base. For the above situation, a rail dehumidification device is needed to remove the water attached to the surface of the rails and improve the production efficiency of the rail welding base.
[0003] The existing dehumidification device patent CN 207710514 U dehumidifies the surface of a wide range of profiles, but the dehumidification effect on rails is not ideal. The rails have irregular cross-sections, and the device has dead corners for dehumidifying the rails. The drying effect of the rail surface after dehumidification cannot achieve the ideal effect. Summary of the invention
[0004] In order to solve the above problems existing in the prior art, a rail profile dehumidification device is now proposed that can achieve full end surface dehumidification of rails. The present application adopts a profile air knife to dehumidify the surface of the rail, and can dehumidify the dead corner area of the rail. At the same time, the profile air knife can open and close to reduce the probability of the rail colliding with the profile air knife.
[0005] In order to achieve the above technical effects, the technical solution of this application is as follows:
[0006] A rail profiling dehumidification device comprises a profiling air knife component and a high-speed hot air knife component arranged adjacent to each other, the profiling air knife component comprises at least one group of profiling air knife opening and closing components that can be opened and closed, the rail to be dehumidified passes through the middle of a group of profiling air knife opening and closing components, the inner side shape of the profiling air knife opening and closing components is adapted to the shape of the rail to be dehumidified, and the profiling air knife opening and closing components are connected to compressed air; the high-speed hot air knife component comprises a high-speed hot air knife and a high-speed hot air blower connected thereto.
[0007] Furthermore, the contoured wind knife component also includes a first rail guide assembly, a contoured wind knife component base and a second rail guide assembly, the first rail guide assembly and the second rail guide assembly are respectively installed at both ends of the contoured wind knife component base, and at least one group of contoured wind knife opening and closing assemblies are installed in the middle of the contoured wind knife component base and are located between the first rail guide assembly and the second rail guide assembly.
[0008] Furthermore, the first rail guide assembly and the second rail guide assembly have the same structure, both comprising a guide wheel seat, upper and lower guide rollers and side guide rollers, and the upper and lower guide rollers and side guide rollers are fixed on the guide wheel seat.
[0009] Furthermore, the contoured wind knife opening and closing assembly includes a rail head wind knife, two contoured wind knives and two rail bottom wind knives. The rail head wind knife is fixed on a rail head wind knife mounting seat, and the rail head wind knife mounting seat is fixed on a wind knife opening and closing support plate; the two contoured wind knives are respectively distributed on both sides of the steel rail to be dehumidified, each contoured wind knife is respectively fixed on a contoured wind knife mounting seat, and the two contoured wind knife mounting seats are respectively fixed on a wind knife opening and closing support plate; the rail bottom wind knife is fixed on the wind knife opening and closing support plate.
[0010] Furthermore, the wind knife opening and closing support plate is fixed on the optical axis through a linear bearing, and the wind knife opening and closing support plate is also connected to the opening and closing cylinder, and the opening and closing action is realized through the cylinder.
[0011] Furthermore, a rail detection sensor is provided at the front end of the contoured air knife component, and the rail detection sensor is connected to the opening and closing cylinder signal.
[0012] Furthermore, a rail bottom wind knife is fixed on each wind knife opening and closing support plate.
[0013] Furthermore, the middle part of each contoured air knife bulges outwards, and the two ends are concave inwards. After the two contoured air knives are symmetrically arranged, the space in the middle is adapted to the shape of the rail to be dehumidified.
[0014] Furthermore, the high-speed hot air knife component also includes a high-speed hot air knife component base, a third rail guide assembly and a fourth rail guide assembly are installed at both ends of the high-speed hot air knife component base, two groups of high-speed hot air knives are installed between the third rail guide assembly and the fourth rail guide assembly, the high-speed hot air knife is installed on the high-speed hot air knife component base, and a high-speed hot air blower is placed inside the high-speed hot air knife component base.
[0015] Furthermore, the structures of the third rail guide assembly and the fourth rail guide assembly are the same as the first rail guide assembly of the contoured air knife component.
[0016] Furthermore, the exterior of the high-speed hot air knife is covered with a heat-insulating cover.
[0017] The advantages of this application are:
[0018] 1. The contoured air knife of the utility model is mainly used to dehumidify the special-shaped cross-section of the rail, which greatly improves the dehumidification effect on the surface of the rail.
[0019] 2. The utility model combines two types of air to dehumidify the rail surface. First, compressed air is used to supply air to the contoured air knife. Due to the high pressure of the compressed air, the running water on the rail surface can be blown away directly, leaving only a thin layer of water on the rail surface. Then, the high-speed and high-temperature air generated by the high-speed hot air blower is used to spray hot air on the rail surface to increase the volatilization of the water layer on the rail surface, thereby achieving the effect of dehumidifying the rail surface.
[0020] 3. The utility model is equipped with a rail detection sensor, which can automatically control the start and stop of the device. It starts when there are rails passing and shuts down when there are no rails, which can save energy consumption of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the overall structure of this application.
[0022] Figure 2 It is a schematic diagram of the structure of the contoured air knife component.
[0023] Figure 3 This is a schematic diagram of the high-speed air knife component structure.
[0024] Figure 4 This is the front view of the first rail guide assembly.
[0025] Figure 5 It is a side view of the first rail guide assembly.
[0026] Figure 6 This is the main view of the contoured air knife opening and closing assembly in the closed state.
[0027] Figure 7 This is a top view of the contoured air knife opening and closing assembly in the closed state.
[0028] Figure 8 This is the main view of the contoured air knife opening and closing assembly when it is in the open state.
[0029] Fig. 9 This is a top view of the contoured air knife opening and closing assembly when it is in the open state.
[0030] Fig.10 Schematic diagram of a contoured wind knife structure.
[0031] Fig.11 Schematic diagram of the air outlet of the contoured air knife.
[0032] Fig.12 Schematic diagram of the air outlet of the high-speed hot air knife.
[0033] In the attached figure: 100-profiling air knife component, 200-high-speed hot air knife component, 300-rail to be dehumidified, 110-first rail guide assembly, 120-profiling air knife opening and closing assembly, 130-profiling air knife component base, 140-second rail guide assembly, 111-guide wheel seat, 112-upper and lower guide rollers, 113-side guide rollers, 122-profiling air knife, 123-rail head air knife, 124-rail head air knife installation Seat, 125-rail bottom wind knife, 126-optical axis, 127-opening and closing cylinder, 128-wind knife opening and closing support plate, 129-contact wind knife mounting seat, 210-high-speed hot air knife, 220-insulation cover, 230-third rail guide assembly, 240-fourth rail guide assembly, 250-high-speed hot air blower, 260-high-speed hot air knife component base, 211-rail top hot air knife, 212-rail waist hot air knife, 213-rail bottom hot air knife. DETAILED DESCRIPTION
[0034] Example 1
[0035] like Figure 1 and Figure 2 As shown, a rail profiling dehumidification device includes a profiling air knife component 100 and a high-speed hot air knife component 200 arranged adjacent to each other, the profiling air knife component 100 includes at least one group of profiling air knife opening and closing components 120 that can be opened and closed, the rail 300 to be dehumidified passes through the middle of a group of profiling air knife opening and closing components 120, the inner side shape of the profiling air knife opening and closing components 120 is adapted to the outer shape of the rail 300 to be dehumidified, and the profiling air knife opening and closing components 120 are connected to compressed air; the high-speed hot air knife component 200 includes a high-speed hot air knife 210 and a high-speed hot air blower 250 connected thereto.
[0036] like Figure 2 As shown, the contoured wind knife component 100 also includes a first rail guide assembly 110, a contoured wind knife component base 130 and a second rail guide assembly 140, wherein the first rail guide assembly 110 and the second rail guide assembly 140 are respectively mounted at two ends of the contoured wind knife component base 130, and at least one group of contoured wind knife opening and closing assemblies 120 are mounted in the middle of the contoured wind knife component base 130 and are located between the first rail guide assembly 110 and the second rail guide assembly 140.
[0037] like Figure 4 and Figure 5 As shown, the first rail guide assembly 110 and the second rail guide assembly 140 have the same structure, both including a guide wheel seat 111, upper and lower guide rollers 112 and side guide rollers 113, the upper and lower guide rollers 112 and side guide rollers 113 are fixed on the guide wheel seat 111, and the upper and lower guide rollers 112 and side guide rollers 113 are both used to limit the rails to prevent the rails from colliding with equipment during transportation.
[0038] like Figure 6 and Figure 7 As shown, the contour wind knife opening and closing assembly 120 includes a rail head wind knife 123, two contour wind knives 122 and two rail bottom wind knives 125. Figure 5 The component includes five wind knives, the rail head wind knife 123 is fixed on the rail head wind knife mounting seat 124, and the rail head wind knife mounting seat 124 is fixed on the wind knife opening and closing support plate 128; two profiling wind knives 122 are respectively distributed on both sides of the steel rail 300 to be dehumidified, each profiling wind knife 122 is respectively fixed on a profiling wind knife mounting seat 129, and the two profiling wind knife mounting seats 129 are respectively fixed on a wind knife opening and closing support plate 128; the rail bottom wind knife 125 is fixed on the wind knife opening and closing support plate 128.
[0039] The wind knife opening and closing support plate 128 is fixed on the optical axis 126 through a linear bearing, so that the wind knife opening and closing support plate 128 can slide. The wind knife opening and closing support plate 128 is also connected to the opening and closing cylinder 127, and the opening and closing action is realized through the cylinder.
[0040] A rail detection sensor is provided at the front end of the contoured air knife component 100, and the rail detection sensor is connected to the opening and closing cylinder 127. After the rail detection sensor detects the rail, the opening and closing cylinder 127 can be started to act at the same time by signal transmission or the like.
[0041] A rail bottom wind knife 125 is fixed on each wind knife opening and closing support plate 128 .
[0042] like Figure 8 and Fig.10 As shown, the middle part of each contoured air knife 122 is convex outward, and the two ends are concave inward. After the two contoured air knives 122 are symmetrically arranged, the space in the middle thereof is adapted to the shape of the steel rail 300 to be dehumidified.
[0043] like Figure 3 As shown, the high-speed hot air knife component 200 also includes a high-speed hot air knife component base 260, and a third rail guide assembly 230 and a fourth rail guide assembly 240 are installed at both ends of the high-speed hot air knife component base 260, and two groups of high-speed hot air knives 210 are installed between the third rail guide assembly 230 and the fourth rail guide assembly 240. The high-speed hot air knife 210 is installed on the high-speed hot air knife component base 260, and a high-speed hot air blower 250 is placed inside the high-speed hot air knife component base 260.
[0044] The structures of the third rail guide assembly 230 and the fourth rail guide assembly 240 are the same as the first rail guide assembly 110 of the contoured air knife component 100 .
[0045] The high-speed hot air knife 210 is covered with a heat-insulating cover 220 to reduce the diffusion speed of heat.
[0046] The high-speed hot air knife 210 includes four separate hot air knives, specifically one rail top hot air knife 211, two rail waist hot air knives 212 and one rail bottom hot air knife 213. The air outlets of the four hot air knives are installed opposite to each other, and the hot air is sprayed inwards to act on the four sides of the rail. Fig.12 shown.
[0047] The rail head wind knife 123, two contour wind knives 122 and rail bottom wind knife 125 are installed with their air outlets facing the rails. Fig.11 As shown, the air outlets are all facing the rail surface, and the wind curtain formed by the five wind knives is similar to the cross-section of the rail, achieving the effect of dehumidification without dead angles by the contoured wind knife 122.
[0048] Example 2
[0049] See Figure 1 A rail profile dehumidification device is composed of a profile air knife component 100 and a high-speed hot air knife component 200. The profile air knife component 100 is shown in FIG. Figure 2 , including: a first rail guide assembly 110, a contoured air knife opening and closing assembly 120, a contoured air knife component base 130, and a second rail guide assembly 140. The high-speed hot air knife component 200 is shown in FIG. Figure 3 The high-speed hot air knife comprises: a high-speed hot air knife 210 , a heat-insulating cover 220 , a third rail guide assembly 230 , a fourth rail guide assembly 240 , a high-speed hot air blower 250 , and a high-speed hot air knife component base 260 .
[0050] Further, the contoured wind knife component 100 is Figure 2 The first rail guide assembly 110, the second rail guide assembly 140, and the contoured wind knife opening and closing assembly 120 are all installed on the contoured wind knife component base 130. The first rail guide assembly 110 and the second rail guide assembly 140 are installed at both ends of the contoured wind knife component base 130, and the contoured wind knife opening and closing assembly 120 is installed in the middle of the contoured wind knife component base 130.
[0051] Furthermore, the first rail guide assembly 110 and the second rail guide assembly 140 have the same structure. Figure 4 Its structure includes a guide wheel seat 111, upper and lower guide rollers 112, and side guide rollers 113. The upper and lower guide rollers 112 and the side guide rollers 113 are fixed on the guide wheel seat 111. The upper and lower guide rollers 112 and the side guide rollers 113 are both used to limit the rails to prevent the rails from colliding with the equipment during transportation.
[0052] Further, the contoured air knife opening and closing assembly 120 is Figure 5The assembly consists of five wind knives. The rail head wind knife 123 is fixed on the rail head wind knife mounting seat 124, and the rail head wind knife mounting seat 124 is fixed on the wind knife opening and closing support plate 128. The profiling wind knife 122 is distributed on both sides of the steel rail 300 to be dehumidified. The profiling wind knife 122 is fixed on the profiling wind knife mounting seat 129, and the profiling wind knife mounting seat 129 is fixed on the wind knife opening and closing support plate 128. The rail bottom wind knife 125 is directly fixed on the wind knife opening and closing support plate 128. The wind knife opening and closing support plate 128 is fixed on the optical axis 126 through a linear bearing, so that the wind knife opening and closing support plate 128 can slide. The wind knife opening and closing support plate 128 is also connected to the opening and closing cylinder 127, and the opening and closing action is realized through the cylinder.
[0053] Further, the high-speed hot air knife component 200 is Figure 3 The third rail guide assembly 230 and the fourth rail guide assembly 240 are installed at both ends of the high-speed hot air knife component 200, and two groups of high-speed hot air knives 210 are installed in the middle. The high-speed hot air knife 210 is fixed on the high-speed hot air knife component base 260. The high-speed hot air knife 210 is covered with a heat preservation cover 220 on the outside to reduce the diffusion speed of heat. A high-speed hot air blower 250 is placed inside the high-speed hot air knife component base 260, and the high-speed hot air blower 250 is connected to the high-speed hot air knife 210 through a pipeline.
[0054] The working principle of this application is:
[0055] Step 1: The welded rail base conveys the steel rail 300 to be dehumidified through a conveyor line. The device is installed on the conveyor line, and the steel rail conveying process passes through the inside of the device.
[0056] Step 2: The dehumidified rail 300 first passes through the rail guide assembly and enters the contoured air knife component 100. At the same time, after the sensor located at the front end of the contoured air knife component 100 detects the rail, the opening and closing cylinder 127 is activated to close the contoured air knife 122.
[0057] Step 3: After the contoured air knife 122 is closed, the compressed air control valve is opened at the same time, and the compressed air enters the air knife through the pipeline, is ejected by the air knife and drives the surrounding air to form an air curtain, and blows the running water on the rail surface away from the rail surface.
[0058] Step 4: After the sensor at the front section of the contoured air knife component 100 detects the rail, the high-speed hot air knife component 200 will also be turned on at the same time, and the high-speed hot air knife component 200 will start preheating. Then, after the end of the rail passes through the contoured air knife component 100, it immediately enters the interior of the high-speed hot air knife component 200.
[0059] Step 5: The high-speed hot air blower 250 provides a large flow of high-temperature air to the high-speed hot air knife 210, and sprays it out from the air outlet of the high-speed hot air knife 210. After the large flow of high-temperature air contacts the surface of the rail, it will accelerate the volatilization of the last moisture attached to the surface of the rail, thereby achieving a drying effect on the surface of the rail.
[0060] Step 6: When a rail completely passes through the device, the sensor no longer detects the rail, the equipment stops working, and starts working again when the next rail is detected.
[0061] The rail profiling dehumidification device needs to be installed according to the conveying direction of the rail conveying device of the rail welding base. The rail first passes through the profiling air knife component 100 and then passes through the high-speed hot air knife component 200. When the dehumidified rail 300 enters the profiling air knife component 100, the rail detection sensor at the front end of the profiling air knife component 100 will detect the rail, and at the same time, the opening and closing cylinder 127 will act to push the air knife opening and closing support plate 128 to close the profiling air knife 122. The closed state is shown in FIG. Figure 5 . After closing, the compressed air control valve is opened, and the compressed air enters the contoured air knife 122 through the pipeline and is ejected from the air knife mouth. The ejected high-velocity air will drive the surrounding air to form a wind curtain, blowing the flowing water on the surface of the rail 300 to be dehumidified away from the surface of the rail, leaving only a thin layer of water. While the rail is detected, the high-speed hot air blower 250 inside the high-speed hot air knife component 200 is turned on for preheating. The high-speed hot air blower 250 generates high-velocity and high-temperature air, which enters the high-speed hot air knife 210 through the pipeline and is ejected from the air port of the high-speed hot air knife 210. A large amount of hot air is blown onto the surface of the rail 300 to be dehumidified, increasing the volatilization of the water layer on the surface of the rail, thereby achieving the dehumidification effect on the surface of the rail. After a rail has completely passed through the rail contoured dehumidification device, when the rail detection sensor at the tail of the device does not detect the rail, the device stops operating, the opening and closing cylinder 127 is actuated, and the air knife opening and closing support plate 128 is pulled open, and the open state is seen. Figure 6 The high-speed hot air blower 250 stops working, and the compressed air control valve is closed and reopened when the next rail is detected.
Claims
1. A rail profile dehumidification device, characterized in that: The invention comprises a profiling air knife component (100) and a high-speed hot air knife component (200) arranged adjacent to each other, wherein the profiling air knife component (100) comprises at least one group of profiling air knife opening and closing components (120) capable of opening and closing, the steel rail (300) to be dehumidified passes through the middle of the group of profiling air knife opening and closing components (120), the inner shape of the profiling air knife opening and closing components (120) is adapted to the outer shape of the steel rail (300) to be dehumidified, and the profiling air knife opening and closing components (120) are connected to compressed air; and the high-speed hot air knife component (200) comprises a high-speed hot air knife (210) and a high-speed hot air blower (250) connected thereto.
2. A rail profile dehumidification device according to claim 1, characterized in that: The profiling wind knife component (100) further comprises a first rail guide assembly (110), a profiling wind knife component base (130) and a second rail guide assembly (140), wherein the first rail guide assembly (110) and the second rail guide assembly (140) are respectively mounted at two ends of the profiling wind knife component base (130), and at least one group of profiling wind knife opening and closing assemblies (120) are mounted in the middle of the profiling wind knife component base (130) and are located between the first rail guide assembly (110) and the second rail guide assembly (140).
3. A rail profile dehumidification device according to claim 2, characterized in that: The first rail guide assembly (110) and the second rail guide assembly (140) have the same structure, both comprising a guide wheel seat (111), upper and lower guide rollers (112) and side guide rollers (113), wherein the upper and lower guide rollers (112) and side guide rollers (113) are fixed on the guide wheel seat (111).
4. A rail profile dehumidification device according to claim 2, characterized in that: The profiling wind knife opening and closing assembly (120) comprises a rail head wind knife (123), two profiling wind knives (122) and two rail bottom wind knives (125); the rail head wind knife (123) is fixed on a rail head wind knife mounting seat (124), and the rail head wind knife mounting seat (124) is fixed on a wind knife opening and closing support plate (128); the two profiling wind knives (122) are respectively distributed on both sides of the steel rail (300) to be dehumidified, each profiling wind knife (122) is respectively fixed on a profiling wind knife mounting seat (129), and the two profiling wind knife mounting seats (129) are respectively fixed on a wind knife opening and closing support plate (128); and the rail bottom wind knife (125) is fixed on the wind knife opening and closing support plate (128).
5. A rail profile dehumidification device according to claim 4, characterized in that: The wind knife opening and closing support plate (128) is fixed on the optical axis (126) via a linear bearing, and the wind knife opening and closing support plate (128) is also connected to an opening and closing cylinder (127) to achieve an opening and closing action via the cylinder.
6. A rail profile dehumidification device according to claim 4, characterized in that: A rail detection sensor is provided at the front end of the contoured air knife component (100), and the rail detection sensor is connected to the opening and closing cylinder (127) by signal.
7. A rail profile dehumidification device according to claim 4, characterized in that: A rail bottom wind knife (125) is fixed on each wind knife opening and closing support plate (128).
8. The rail profile dehumidification device according to claim 1, characterized in that: The middle parts of the two contoured air knives (122) are convex outwards, and the two ends are concave inwards. After the two contoured air knives (122) are symmetrically arranged, the space in the middle thereof is adapted to the shape of the steel rail (300) to be dehumidified.
9. The rail profile dehumidification device according to claim 1, characterized in that: The high-speed hot air knife component (200) further comprises a high-speed hot air knife component base (260); a third steel rail guide assembly (230) and a fourth steel rail guide assembly (240) are mounted at both ends of the high-speed hot air knife component base (260); two groups of high-speed hot air knives (210) are mounted between the third steel rail guide assembly (230) and the fourth steel rail guide assembly (240); the high-speed hot air knives (210) are mounted on the high-speed hot air knife component base (260); and a high-speed hot air blower (250) is placed inside the high-speed hot air knife component base (260).
10. A rail profile dehumidification device according to claim 9, characterized in that: The high-speed hot air knife (210) is externally covered with a heat-insulating cover (220).