Perpendicularity detector for construction project supervision

By designing a building wall verticality detector combining fixed box, rotating shaft, protractor and gravity moving mechanism, the problems of low detection efficiency and heavy objects shaking in the prior art are solved, and efficient and accurate verticality of building walls are achieved. degree detection.

CN222104718UActive Publication Date: 2024-12-03SHANDONG MENGDE CONSTR DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420721742.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-12-03
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

The prior art has low detection efficiency in the verticality detection of building walls and heavy objects at the bottom are prone to shake, which affects the detection accuracy.

Method used

A construction project supervision verticality detector is designed, using the cooperation of fixed box, rotating shaft, protractor, draw rope and gravity moving mechanism, pulling rope through natural gravity sag and elastic force of tension spring, combined with the support mechanism to close the wall surface and the adjustment of threaded knobs to achieve efficient detection of wall perpendicularity.

Benefits of technology

The detection accuracy and portability are improved, the detection steps are reduced, and the detection steps are cumbersome, and the sliding during measurement is prevented through the spring elastic fixing device, ensuring the accuracy of the detection results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222104718U_ABST
    Figure CN222104718U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction project supervision verticality detector, and relates to the technical field of construction projects, the construction project supervision verticality detector comprises a detection box, the rear side of the detection box is fixedly connected with a handle, the front side of the detection box is fixedly connected with a supporting mechanism, the detection box comprises a fixed box, the top of the inner wall of the fixed box is fixedly connected with a rotating shaft, and the rotating shaft is fixedly connected with the rotating shaft. The bottom of the rotating shaft is fixedly connected with a pull rope, and a protractor is arranged on the right side of the top of the pull rope. Through the cooperation of the fixed box, the rotating shaft, the protractor, the pull rope, the moving mechanism, the arc groove and the sliding groove, the gravity cone slides on the sliding column through the pull rod, the pull rope is pulled through the elastic force of the tension spring and naturally droops through the gravity of the gravity moving mechanism, and the pull rope is pulled to be perpendicular to the horizontal plane; when the fixing box is tightly attached to the wall surface through the supporting mechanism, the vertical state of the wall surface is detected by observing the included angle between the pull rope and the protractor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a verticality detector for construction engineering supervision. Background Art

[0002] The supervision work of construction project includes: quality control, progress control, cost control, safety control, contract and information management, safety and civilized construction management, etc. during the construction phase; quality control during the construction phase is one of the important project tasks in construction project supervision. Among the quality control during the construction phase, the overall verticality of the building wall is an important part of construction quality control.

[0003] The existing technology has the following problems:

[0004] During the detection process, the existing technology adopts conventional measurement convenience: tie a heavy object on a rope, then pull the other end of the rope with one hand to lift the gravity, and use the verticality of gravity to know the verticality of the building wall; the verticality detection steps of this method are cumbersome, resulting in low detection efficiency. At the same time, the heavy object at the bottom is prone to shaking during the detection process, affecting the verticality detection. Utility Model Content

[0005] The utility model provides a construction engineering supervision verticality detector to solve the problems existing in the above-mentioned background technology.

[0006] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0007] A verticality detector for construction engineering supervision comprises a detection box, a handle is fixedly connected to the rear side of the detection box, a support mechanism is fixedly connected to the front side of the detection box, the detection box comprises a fixed box, a rotating shaft is fixedly connected to the top of the inner wall of the fixed box, a pull rope is fixedly connected to the bottom of the rotating shaft, a protractor is arranged on the right side of the top of the pull rope, and the right side of the protractor is fixedly connected to the right side of the inner wall of the fixed box.

[0008] A further improvement of the technical solution of the utility model is that: the bottom of the pull rope is fixedly connected to a gravity moving mechanism, a slide groove is provided at the bottom of the inner wall of the fixed box, the gravity moving mechanism is arranged inside the slide groove, and arc grooves are provided on both sides of the left and right sides of the bottom of the inner wall of the fixed box.

[0009] A further improvement of the technical solution of the utility model is that the gravity moving mechanism includes a sliding column, and the left and right sides of the sliding column are movably connected to three round wheels, and the three round wheels are arranged in a triangle.

[0010] A further improvement of the technical solution of the utility model is that a sliding groove penetrating from top to bottom is opened in the middle of the sliding column, and a pull rod is movably connected to the inner wall of the sliding groove, a gravity cone is fixedly connected to the bottom of the pull rod, and a tension spring is arranged on the top of the outer wall of the pull rod.

[0011] A further improvement of the technical solution of the utility model is that the top of the pull rod is fixedly connected to the bottom of the pull rope.

[0012] A further improvement of the technical solution of the utility model is that the three pull rods are movably connected to the inner wall of the circular arc groove respectively.

[0013] A further improvement of the technical solution of the utility model is that: the supporting mechanism includes a fixed column, the upper and lower ends of the fixed column are respectively provided with T-slots, the two T-slots are staggered left and right, the inner walls of the T-slots are slidably connected with the T-column, the right top and left bottom of the fixed column are both provided with threaded knobs, the outer walls of the two threaded knobs penetrate to the inner side of the fixed column, and the outer walls of the threaded knobs are threadedly connected to the fixed column.

[0014] A further improvement of the technical solution of the utility model is that a plurality of vertically parallel cylindrical slide grooves are provided in the middle of the fixed column, an extrusion block is slidably connected to the front side of the inner wall of the cylindrical slide groove, and a spring is fixedly connected to the rear end of the extrusion block.

[0015] Due to the adoption of the above technical solution, the utility model has achieved the following technical progress compared with the prior art:

[0016] 1. The utility model provides a verticality detector for construction engineering supervision, which adopts the coordination among a fixed box, a rotating shaft, a protractor, a pull rope, a moving mechanism, an arc groove and a slide groove. , The gravity cone slides on the sliding column through the pull rod, and at the same time, the pull rope is pulled by the elastic force of the tension spring. The gravity moves the mechanism to naturally droop, and the pull rope is pulled to be perpendicular to the horizontal plane. When the fixed box is close to the wall through the supporting mechanism, the vertical state of the wall is detected by observing the angle between the pull rope and the protractor.

[0017] 2. The utility model provides a verticality detector for construction engineering supervision, which adopts the cooperation between a fixed column, a T-slot, a T-column, a threaded knob, a cylindrical slide groove, and a spring. The threaded knob is twisted to fix and loosen, so as to adjust the contact area between the fixed column and the wall. At the same time, after contacting the wall, the elastic force of the spring squeezes the extrusion block to slide outward inside the cylindrical slide groove, and the extrusion block is fixed to the wall for support to prevent sliding during measurement, and the device is pressed against the wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1It is a schematic diagram of the structure of the utility model;

[0019] Figure 2 It is a cross-sectional schematic diagram of the structural fixing box of the utility model;

[0020] Figure 3 It is a three-dimensional schematic diagram of the structural moving mechanism of the utility model;

[0021] Figure 4 It is a three-dimensional schematic diagram of the structural support mechanism of the utility model;

[0022] Figure 5 It is a three-dimensional cross-sectional schematic diagram of the structural support mechanism of the utility model.

[0023] In the figure: 1. detection box; 2. handle; 3. support mechanism; 11. fixed box; 12. rotating shaft; 13. protractor; 14. pull rope; 15. gravity moving mechanism; 16. arc groove; 17. slide groove; 151. sliding column; 152. gravity cone; 153. pull rod; 154. round wheel; 155. tension spring; 31. fixed column; 32. T-slot; 33. T-column; 34. threaded knob; 35. extrusion block; 351. cylindrical slide groove; 352. spring. DETAILED DESCRIPTION

[0024] In order to make the technical means, creative features, objectives and effects of the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods:

[0025] like Figure 1 As shown, the utility model provides a verticality detector for construction engineering supervision, a detection box 1, a handle 2 is fixedly connected to the rear side of the detection box 1, a support mechanism 3 is fixedly connected to the front side of the detection box 1, the detection box 1 includes a fixed box 11, a rotating shaft 12 is fixedly connected to the top of the inner wall of the fixed box 11, a pull rope 14 is fixedly connected to the bottom of the rotating shaft 12, a protractor 13 is arranged on the right side of the top of the pull rope 14, and the right side of the protractor 13 is fixedly connected to the right side of the inner wall of the fixed box 11.

[0026] like Figure 2As shown, the utility model provides a technical solution: preferably, the bottom of the pull rope 14 is fixedly connected with a gravity moving mechanism 15, and a slide groove 17 is provided at the bottom of the inner wall of the fixed box 11, and the gravity moving mechanism 15 is arranged inside the slide groove 17. Arc grooves 16 are provided on both sides of the left and right sides of the bottom of the inner wall of the fixed box 11. Due to gravity, the gravity cone 152 slides on the sliding column 151 through the pull rod 153, and at the same time, the pull rope 14 is pulled by the elastic force of the tension spring 155. The pull rope 14 naturally droops due to gravity through the gravity moving mechanism 15, and the pull rope 14 is pulled to be vertical to the horizontal plane. When the fixed box 11 is close to the wall through the supporting mechanism 3, the vertical state of the wall is detected by observing the angle between the pull rope 14 and the protractor 13, thereby improving the detection accuracy and portability of the device.

[0027] like Figure 3 As shown, the utility model provides a technical solution: preferably, the gravity moving mechanism 15 includes a sliding column 151, and three round wheels 154 are movably connected on the left and right sides of the sliding column 151, and the three round wheels 154 are arranged in a triangle. A sliding groove that runs through the upper and lower parts is opened in the middle of the sliding column 151, and a pull rod 153 is movably connected to the inner wall of the sliding groove, and the bottom of the pull rod 153 is fixedly connected to a gravity cone 152, and a tension spring 155 is arranged on the top of the outer wall of the pull rod 153, and the top of the pull rod 153 is fixedly connected to the bottom of the pull rope 14, and the three pull rods 153 are movably connected to the inner wall of the arc groove 16 respectively, and the gravity moving mechanism 15 at the bottom of the fixed box 11 slides along the arc groove 16 through the round wheels 154 on both sides of the sliding column 151 due to gravity.

[0028] like Figure 4 As shown, the utility model provides a technical solution: preferably, the support mechanism 3 includes a fixed column 31, and T-slots 32 are respectively provided at the upper and lower ends of the fixed column 31, and the two T-slots 32 are staggered left and right, and the inner walls of the T-slots 32 are slidably connected with T-columns 33. The right top and left bottom of the fixed column 31 are provided with threaded knobs 34, and the outer walls of the two threaded knobs 34 penetrate to the inner side of the fixed column 31, and the outer walls of the threaded knobs 34 are threadedly connected to the fixed column 31. First, the support mechanism 3 is held close to the wall by the handle 2 hand-held device, so that the T-column 33 is pulled up and down inside the T-slot 32, and is fixed and loosened by twisting the threaded knob 34, so as to adjust the contact area between the fixed column 31 and the wall.

[0029] like Figure 5As shown, the utility model provides a technical solution: preferably, a plurality of cylindrical slide grooves 351 parallel to each other are opened in the middle of the fixed column 31, and a squeeze block 35 is slidably connected to the front side of the inner wall of the cylindrical slide groove 351, and a spring 352 is fixedly connected to the rear end of the squeeze block 35. At the same time, after contacting the wall, the squeeze block 35 is squeezed by the elastic force of the spring 352 to slide outward inside the cylindrical slide groove 351, and the squeeze block 35 is fixed on the wall for support to prevent sliding during measurement. After the device is pressed against the wall

[0030] The following is a detailed description of the working principle of the construction project supervision verticality detector.

[0031] like Figure 1-5 As shown, first, the device is held by the handle 2, and the support mechanism 3 is pressed against the wall, so that the T-shaped column 33 is pulled to slide up and down inside the T-shaped slot 32, and the threaded knob 34 is twisted to fix and loosen, so as to adjust the contact area between the fixed column 31 and the wall. At the same time, after contacting the wall, the elastic force of the spring 352 squeezes the squeezing block 35 to slide outward inside the cylindrical slide slot 351, and the squeezing block 35 is fixed to the wall for support to prevent sliding during measurement. After the device is pressed against the wall, the gravity moving mechanism 15 at the bottom of the fixed box 11 is fixed due to gravity. The gravity moving mechanism 15 slides along the arc groove 16 through the round wheels 154 on both sides of the sliding column 151. Due to gravity, the gravity cone 152 slides on the sliding column 151 through the pull rod 153. At the same time, the pull rope 14 is pulled by the elastic force of the tension spring 155. The gravity moving mechanism 15 naturally droops due to gravity, and the pull rope 14 is pulled to be vertical to the horizontal plane. When the fixed box 11 is close to the wall through the supporting mechanism 3, the vertical state of the wall is detected by observing the angle between the pull rope 14 and the protractor 13, thereby improving the detection accuracy and portability of the device.

[0032] The above generally describes the present invention in detail, but it is obvious to a person skilled in the art that some modifications or improvements can be made to the present invention. Therefore, modifications or improvements that do not deviate from the spirit of the present invention are within the scope of protection of the present invention.

Claims

1. A verticality detector for construction engineering supervision, comprising a detection box (1), a handle (2) being fixedly connected to the rear side of the detection box (1), characterized in that: The front side of the detection box (1) is fixedly connected to a support mechanism (3), and the detection box (1) comprises a fixed box (11), a rotating shaft (12) is fixedly connected to the top of the inner wall of the fixed box (11), a pull rope (14) is fixedly connected to the bottom of the rotating shaft (12), a protractor (13) is arranged on the right side of the top of the pull rope (14), and the right side of the protractor (13) is fixedly connected to the right side of the inner wall of the fixed box (11).

2. A construction project supervision verticality detector according to claim 1, characterized in that: The bottom of the pull rope (14) is fixedly connected to a gravity moving mechanism (15), the bottom of the inner wall of the fixed box (11) is provided with a slide groove (17), the gravity moving mechanism (15) is arranged inside the slide groove (17), and arc grooves (16) are provided on both sides of the bottom of the inner wall of the fixed box (11).

3. A construction project supervision verticality detector according to claim 2, characterized in that: The gravity moving mechanism (15) comprises a sliding column (151), and the left and right sides of the sliding column (151) are movably connected to three round wheels (154), and the three round wheels (154) are arranged in a triangle.

4. A construction project supervision verticality detector according to claim 3, characterized in that: A sliding groove running through from top to bottom is provided in the middle of the sliding column (151), and a pull rod (153) is movably connected to the inner wall of the sliding groove, a gravity cone (152) is fixedly connected to the bottom of the pull rod (153), and a tension spring (155) is provided at the top of the outer wall of the pull rod (153).

5. A construction engineering supervision verticality detector according to claim 4, characterized in that: The top of the pull rod (153) is fixedly connected to the bottom of the pull rope (14).

6. A construction engineering supervision verticality detector according to claim 5, characterized in that: The three pull rods (153) are movably connected to the inner wall of the circular arc groove (16) respectively.

7. A construction engineering supervision verticality detector according to claim 1, characterized in that: The support mechanism (3) comprises a fixed column (31), the upper and lower ends of the fixed column (31) are respectively provided with T-shaped slots (32), the two T-shaped slots (32) are staggered left and right, the inner walls of the T-shaped slots (32) are slidably connected with a T-shaped column (33), the right top and left bottom of the fixed column (31) are both provided with threaded knobs (34), the outer walls of the two threaded knobs (34) are both penetrated to the inner side of the fixed column (31), and the outer walls of the threaded knobs (34) are threadedly connected to the fixed column (31).

8. A construction engineering supervision verticality detector according to claim 7, characterized in that: A plurality of cylindrical slide grooves (351) parallel to each other are provided in the middle of the fixed column (31), a squeezing block (35) is slidably connected to the front side of the inner wall of the cylindrical slide groove (351), and a spring (352) is fixedly connected to the rear end of the squeezing block (35).