Anti-floating structure for concrete pouring of electric power pipe bank

By using a combined structure of steel rods, steel rings and limit wires in power pipeline construction, the floating problem caused by the density of power pipes is solved, ensuring the stability of the power pipes and avoiding joint breakage.

CN222107552UActive Publication Date: 2024-12-03CHINA RAILWAY NO 8 ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420059671.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-10
Publication Date
2024-12-03
Estimated Expiration
2034-01-10

AI Technical Summary

Technical Problem

During the construction of urban power pipelines, when the power pipe is buried in the channel and poured concrete, the power pipe is floating and may cause the joint to break due to the density being less than the concrete.

Method used

A concrete anti-floating structure for pouring power pipes is designed, including the placement grooves, foundations, connecting pipes, steel rods, steel rings, connecting wires and limit wires on the ground, and the steel rings and steel rod rings are connected through welding. Limit the position of the steel wire and steel rod, and fix it on the side plate with the limit rod to ensure that the power pipe does not float before the concrete solidifies.

Benefits of technology

It effectively prevents the power pipe from floating up, ensures the stability of the power pipe, avoids breakage at the joints, and ensures the position consistency of the power pipe during construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222107552U_ABST
    Figure CN222107552U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of electric power pipeline construction, in particular to an electric power tube bank concrete pouring anti-floating structure which comprises the ground, a containing groove is formed in the ground, a foundation is fixedly connected to the containing groove, a connecting tube is fixedly connected to the containing groove, an electric power tube is fixedly connected to the surface of the connecting tube, and the electric power tube is fixedly connected to the surface of the connecting tube. A steel rod is fixedly connected to the surface of the foundation, a steel ring body is connected to the surface of the steel rod in a sleeving mode, a connecting steel wire is fixedly connected to the surface of the steel ring body, a limiting steel wire is fixedly connected to the surface of the connecting steel wire, and side plates are fixedly connected to the two sides of the containing groove. Limiting rods are fixedly mounted on the surfaces of the side plates, and concrete is poured on the placement grooves. The limiting steel wire and the limiting rod are used for limiting the electric power pipe, so that the electric power pipe cannot float upwards, the stability of the electric power pipe is guaranteed, the electric power pipe is prevented from floating upwards, and the problem that the connecting end of the electric power pipe is broken is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of power pipeline construction, in particular to an anti-floating structure for pouring concrete on a power pipe. Background Art

[0002] During the construction of urban power pipelines, when the power pipes are buried in the trench and concrete is poured, the density of the power pipes is less than that of concrete, which will cause the power pipes to float up. The floating of the power pipes will cause dislocation and cause the power pipes to break at the joints. Therefore, it is necessary to design an anti-floating structure for pouring concrete for power pipes. Utility Model Content

[0003] The purpose of the utility model is to provide a structure for preventing electric power pipes from floating up when poured with concrete, so as to solve the problem raised in the above-mentioned background technology that during the construction of urban power pipelines, when the electric power pipes are buried in trenches and concrete is poured, the density of the electric power pipes is less than that of concrete, which may cause the electric power pipes to float up, and the floating of the electric power pipes may cause dislocation and lead to breakage of the electric power pipes at the joints.

[0004] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions, a structure for preventing the floating of electric power pipes by pouring concrete:

[0005] It includes a ground, wherein a placement groove is opened on the ground, a foundation is fixedly connected to the placement groove, a connecting pipe is fixedly connected to the placement groove, an electric power pipe is fixedly connected to the surface of the connecting pipe, a steel rod is fixedly connected to the surface of the foundation, a steel ring body is connected to the surface ring of the steel rod, a connecting steel wire is fixedly connected to the surface of the steel ring body, a limiting steel wire is fixedly connected to the surface of the connecting steel wire, side panels are fixedly connected to both sides of the placement groove, limiting rods are fixedly installed on the surface of the side panels, and concrete is poured on the placement groove.

[0006] Preferably, the steel rods are "U"-shaped and are linearly and evenly arranged on the surface of the foundation.

[0007] Preferably, the steel ring body comprises a first steel ring component and a second tempered component, the first steel ring component and the second tempered component are welded together to form the steel ring body, and the steel ring body is annular in shape.

[0008] Preferably, the limiting steel wire is wound and connected to the surface of the power pipe, and the limiting steel wire connects multiple groups of power pipes into a whole.

[0009] Preferably, the steel rod limits the position of the limiting steel wire through the steel ring body and the connecting steel wire, and the limiting steel wire limits the position of the power pipe.

[0010] Preferably, the limiting rod is fixed inside the accommodating groove through a side plate, and the limiting rod is arranged just above the power pipe.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] 1. The anti-floating structure of the electric power pipe pouring concrete is as follows: the limiting steel wire on the connecting steel wire is bundled between multiple groups of electric power pipes, and then the first steel ring assembly on the connecting steel wire is sleeved on the steel rod, and the two ends of the first steel ring assembly are welded to the two ends of the second steel rod assembly by welding, so that the steel rod and the steel ring body are sleeved and connected. At this time, the steel rod limits the position of the connecting steel wire through the steel ring body, and the connecting steel wire limits the position of the electric power pipe inside the placement groove through the limiting steel wire, and then the limiting rod is fixed between the two groups of side plates, and the limiting rod limits the topmost electric power pipe, and then concrete is poured on the placement groove. Before the concrete solidifies, the buoyancy of the electric power pipe is upward, but it is limited by the limiting steel wire and the limiting rod, so that the electric power pipe will not float up, thereby ensuring the stability of the electric power pipe, avoiding the floating of the electric power pipe, and solving the problem of the breakage of the connecting end of the electric power pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a cross-sectional schematic diagram of the overall structure of the utility model;

[0014] Figure 2 It is a partial three-dimensional schematic diagram of a front view and section view of one end of the structure of the utility model;

[0015] Figure 3 It is a partial three-dimensional schematic diagram of a front view and section of the middle part of the structure of the utility model;

[0016] Figure 4 For this utility model Figure 3 A schematic diagram of the enlarged structure at A in the middle;

[0017] Figure 5 It is a frontal three-dimensional exploded schematic diagram of the steel ring body structure of the utility model.

[0018] In the figure: 1. ground; 2. placement groove; 3. foundation; 4. connecting pipe; 5. power pipe; 6. steel pole; 7. steel ring body; 71. first steel ring assembly; 72. second tempered assembly; 8. connecting steel wire; 9. limiting steel wire; 10. side panel; 11. limiting rod; 12. concrete. DETAILED DESCRIPTION

[0019] See also Figure 1-5 , an embodiment provided by the utility model:

[0020] A structure for preventing the floating of electric power pipes by pouring concrete:

[0021] The utility model comprises a ground 1, wherein a placement groove 2 is opened on the ground 1, a foundation 3 is fixedly connected to the placement groove 2, a connecting pipe 4 is fixedly connected to the placement groove 2, an electric power pipe 5 is fixedly connected to the surface of the connecting pipe 4, a steel rod 6 is fixedly connected to the surface of the foundation 3, a steel ring body 7 is connected to the surface of the steel rod 6 by a ring, a connecting steel wire 8 is fixedly connected to the surface of the steel ring body 7, a limiting steel wire 9 is fixedly connected to the surface of the connecting steel wire 8, side plates 10 are fixedly connected to both sides of the placement groove 2, and limiting rods 11 are fixedly installed on the surface of the side plates 10, concrete 12 is poured on the placement groove 2, and the concrete 12 is used to fix the position of the electric power pipe 5 inside the placement groove 2. When the concrete 12 is just poured, the electric power pipe 5 will float upward, thereby causing the connecting pipe 4 and the electric power pipe 5 to break. The anti-floating structure effectively prevents the electric power pipe 5 from floating after the concrete 12 is poured, thereby ensuring the relative position of the electric power pipe 5 on the placement groove 2, so that the position of the electric power pipe 5 remains unchanged before the concrete 12 solidifies.

[0022] Furthermore, the steel rods 6 are "U"-shaped and linearly and evenly arranged on the surface of the foundation 3, and both ends of the foundation 3 are pre-buried in the surface of the foundation 3, thereby completing the fixation of the steel rods 6 on the foundation 3. By pre-buried steel rods 6, a suitable force point is found for the fixation of the power pipe 5.

[0023] Furthermore, the steel ring body 7 includes a first steel ring component 71 and a second tempered component 72, and the first steel ring component 71 and the second tempered component 72 are welded to form the steel ring body 7. The first steel ring component 71 and the second tempered component 72 are both in an arc shape, and the two ends of the first steel ring component 71 and the two ends of the first steel ring component 71 are fixed by welding, which is convenient to operate and has higher stability. The steel ring body 7 is in an annular shape, and a closed loop is formed between the base 3 and the steel rod 6, and a ring connection is formed between the steel ring body 7 and the steel rod 6.

[0024] Furthermore, the limiting steel wire 9 is wound and connected on the surface of the power tube 5, and the limiting steel wire 9 connects the multiple groups of power tubes 5 into a whole, so that the positions of the multiple groups of power tubes 5 can be changed synchronously, and the limiting steel wire 9 binds the wound power tubes 5 to the steel ring body 7 through the connecting steel wire 8.

[0025] Furthermore, the steel rod 6 limits the position of the limiting steel wire 9 through the steel ring body 7 and the connecting steel wire 8. The limiting steel wire 9 limits the position of the power pipe 5, preventing the concrete 12 from driving the power pipe 5 to float, thereby preventing the connection between the power pipe 5 and the connecting pipe 4 from breaking.

[0026] Furthermore, the limiting rod 11 is fixed inside the mounting groove 2 through the side plate 10. The side plate 10 places concrete 12 inside the mounting groove 2 to prevent it from leaking out. The limiting rod 11 is arranged directly above the power pipe 5, and can also limit the power pipe 5 at the top of the mounting groove 2, so that the concrete 12 cannot float the power pipe 5, thereby ensuring the position of the power pipe 5 inside the mounting groove 2.

[0027] Working principle: the limiting steel wire 9 on the connecting steel wire 8 is bundled between multiple groups of power tubes 5, and then the first steel ring assembly 71 on the connecting steel wire 8 is sleeved on the steel rod 6, and the two ends of the first steel ring assembly 71 are welded to the two ends of the second steel assembly 72 by welding, so that the steel rod 6 and the steel ring body 7 are sleeved and connected. At this time, the steel rod 6 limits the position of the connecting steel wire 8 through the steel ring body 7, and the connecting steel wire 8 limits the position of the power tube 5 inside the placement groove 2 through the limiting steel wire 9, and then the limiting rod 11 is fixed between the two groups of side plates 10. The limiting rod 11 limits the topmost power tube 5, and then the concrete 12 is poured on the placement groove 2. Before the concrete 12 solidifies, the buoyancy of the power tube 5 is upward, but it is limited by the limiting steel wire 9 and the limiting rod 11, so that the power tube 5 will not float up, thereby ensuring the stability of the power tube 5 and avoiding the breakage of the connection between the connecting tube 4 and the power tube 5.

Claims

1. A structure for preventing the floating of electric power pipes by pouring concrete, characterized in that: It includes a ground, wherein a placement groove is opened on the ground, a foundation is fixedly connected to the placement groove, a connecting pipe is fixedly connected to the placement groove, an electric power pipe is fixedly connected to the surface of the connecting pipe, a steel rod is fixedly connected to the surface of the foundation, a steel ring body is connected to the surface ring of the steel rod, a connecting steel wire is fixedly connected to the surface of the steel ring body, a limiting steel wire is fixedly connected to the surface of the connecting steel wire, side panels are fixedly connected to both sides of the placement groove, limiting rods are fixedly installed on the surface of the side panels, and concrete is poured on the placement groove.

2. The anti-floating structure of pouring concrete for electric power pipes according to claim 1 is characterized by: The steel rods are "U" shaped and are linearly and evenly arranged on the surface of the foundation.

3. The anti-floating structure of pouring concrete for electric power pipes according to claim 2 is characterized by: The steel ring body comprises a first steel ring component and a second tempered component. The first steel ring component and the second tempered component are welded together to form the steel ring body, and the steel ring body is in a ring shape.

4. The anti-floating structure of pouring concrete for electric power pipes according to claim 3 is characterized by: The limiting steel wire is wound and connected to the surface of the power pipe, and the limiting steel wire connects multiple groups of power pipes into a whole.

5. The anti-floating structure of pouring concrete for electric power pipes according to claim 4 is characterized by: The steel rod limits the position of the limiting steel wire through the steel ring body and the connecting steel wire, and the limiting steel wire limits the position of the power pipe.

6. The anti-floating structure of pouring concrete for electric power pipes according to claim 5 is characterized by: The limiting rod is fixed inside the placement groove through the side plate, and the limiting rod is arranged just above the power pipe.