Double-spliced type combined bridge structure

By introducing hydraulic cylinders, load-bearing blocks, support springs and cooling systems into the double-combined bridge structure, the thermal expansion and contraction of the bridge deck caused by high temperature is solved, and the stability and maintenance efficiency of the bridge are improved, and the stability of the bridge is improved, and the Waste of water resources.

CN222119903UActive Publication Date: 2024-12-06ZHEJIANG INFINITE ELEMENT COMPOSITE STRUCTURE BRIDGE DESIGN CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420468573.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-12-06
Estimated Expiration
2034-03-12

AI Technical Summary

Technical Problem

The existing double-combined bridge structure is prone to thermal expansion and contraction in high temperature environments, resulting in reduced load-bearing capacity of the bridge deck and even cracking, and low maintenance efficiency.

Method used

The cooling structure and load-bearing structure including hydraulic cylinders, load-bearing blocks, support springs, water collection chambers, water storage tanks, water pumps, diversion pipelines and nozzles are used to allocate weight through hydraulic cylinders and support springs, the nozzle cools down and dust, and collects rainwater through drainage tanks. Reduce water waste.

Benefits of technology

Effectively prevent the bridge deck from expanding and cracking, improve the stability and service life of the bridge, reduce water resources, and improve the maintenance efficiency of the bridge.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222119903U_ABST
    Figure CN222119903U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge construction, in particular to a double-spliced type combined bridge structure which comprises a first bridge, a fixing block, a fixing clamping block and a fixing clamping groove, the fixing block is arranged on the side face of the first bridge, the fixing clamping block is arranged on the other side of the first bridge, and the fixing clamping groove is formed in the side face of the fixing block. A cooling structure is arranged on the side face of the first bridge, and a bearing structure is arranged at the upper end of the fixing block. When the temperature is too high in summer, a water pump is turned on to pump water in a water storage tank into a flow dividing pipeline, then the flow dividing pipeline conveys the water into water collecting bins on the two sides, water flow is sprayed to the surface of a bridge through a spray head, cooling and dust falling are conducted on the surface of the bridge, and therefore the phenomenon that the surface of the bridge expands and cracks due to the too high temperature is prevented; in addition, rainwater can be collected through a drainage groove, the rainwater is collected into the water storage tank, and therefore waste of water resources can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a double-jointed combined bridge structure. Background Art

[0002] With the rapid development of transportation infrastructure construction, bridges, as key structures connecting different lands, have increasingly higher requirements for structural design and performance. Therefore, a double-jointed composite bridge structure is needed to meet the requirements of convenient construction and low cost. However, the existing devices still have certain defects when used, such as:

[0003] Patent No. "CN201721160013.0" discloses a double-jointed composite bridge structure. When the device is in use, the two spliced ​​bridge decks are spliced ​​together through the connecting groove on one side of the No. 1 bridge deck and the connecting protrusion on one side of the No. 2 bridge deck. The gap in the middle is filled with cement or other materials to form a flat traffic surface, which effectively simplifies the bridge construction process. However, when the device is in use, the high temperature in summer may cause the bridge deck to expand and contract due to heat. Long-term expansion will cause the bearing capacity of the bridge deck to decrease, and even cracks will occur. Utility Model Content

[0004] The utility model aims to solve the above-mentioned problem and proposes a double-jointed composite bridge structure, thereby improving the problem of low maintenance efficiency of the existing double-jointed composite bridge structure.

[0005] A double-jointed composite bridge structure, comprising a first bridge, a fixed block, a fixed card block and a fixed card slot: a fixed block is arranged on the side of the first bridge, a fixed card block is arranged on the other side of the first bridge, a fixed card slot is arranged on the side of the fixed block, a cooling structure is arranged on the side of the first bridge, and a load-bearing structure is arranged on the upper end of the fixed block;

[0006] The load-bearing structure includes a hydraulic cylinder, a load-bearing block and a supporting spring. The upper end of the fixed block is provided with a hydraulic cylinder, the hydraulic cylinder passes through the fixed slot, the upper end of the hydraulic cylinder is provided with a load-bearing block, and the surface of the load-bearing block is provided with a supporting spring.

[0007] Preferably, a bridge column is provided at the lower end of the first bridge, and a drainage groove is opened on the surface of the first bridge, and the drainage groove is arranged in a rectangular structure.

[0008] Preferably, a bridge guard bar is provided at the upper end of the first bridge, and the bridge guard bar is arranged in a semicircular structure, and the fixed block is arranged in a trapezoidal structure.

[0009] Preferably, the cooling structure includes a water collecting bin, a water storage tank, a water pump, a diversion pipe and a nozzle. A water collecting bin is arranged on the side of the first bridge, a nozzle is arranged on the upper end of the water collecting bin, a water storage tank is arranged on the lower end of the first bridge, a water pump is arranged on the side of the water storage tank, and a diversion pipe is arranged on the side of the water pump.

[0010] Preferably, the diversion pipe is arranged in a T-shape, and both ends are respectively connected to the water collecting bins on both sides.

[0011] Preferably, the fixed card block is embedded in the fixed card slot, and the load-bearing block is slidably connected to the fixed card slot.

[0012] Preferably, the empty slot formed by the fixed card slot has the same shape as the fixed card block.

[0013] The beneficial effects of the utility model are:

[0014] 1. Through the installation of drainage troughs, water storage tanks, water pumps, diversion pipes, water collection tanks and nozzles, when the temperature is too high in summer, turn on the water pump to pump the water inside the water storage tank into the diversion pipe, and then the diversion pipe will transport the water into the water collection tanks on both sides. The nozzles will spray the water onto the surface of the bridge to cool down and reduce dust on the bridge surface, so as to prevent the bridge surface from expanding and cracking due to excessive temperature. In addition, rainwater can be collected through the drainage trough and collected into the water storage tank, so as to reduce the waste of water resources.

[0015] 2. Through the setting of hydraulic cylinders, load-bearing blocks and supporting springs, when the bridge is open to traffic, the vehicle travels on one side of the bridge deck. When the weight of the vehicle is too heavy, the fixed block on one side will be pressed downward, causing the bridge deck to tilt. The fixed block on one side will press the load-bearing block downward, causing the load-bearing block to move toward the hydraulic cylinder. Because the liquid pressure inside the hydraulic cylinder is constant, the load-bearing block on the other side will be pushed upward to support the fixed block, thereby spreading the pressure on the heavier side, preventing the bridge from tilting and making the bridge more stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall front-view stereoscopic structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the three-dimensional structure of the first bridge and bridge column installation of the utility model;

[0018] Figure 3 It is a schematic diagram of the three-dimensional structure of the water pump and the diversion pipeline installation of the utility model;

[0019] Figure 4 This is a schematic diagram of the three-dimensional structure of the fixed block and the hydraulic cylinder of the utility model;

[0020] Figure 5 For the utility model Figure 4 Schematic diagram of the structure at point A in the middle.

[0021] In the figure: 1. First bridge; 2. Drainage trough; 3. Bridge column; 4. Bridge guardrail; 5. Fixed block; 6. Fixed block; 7. Fixed slot; 8. Water collecting bin; 9. Nozzle; 10. Water storage tank; 11. Water pump; 12. Diversion pipe; 13. Hydraulic cylinder; 14. Load-bearing block; 15. Support spring; 16. Cooling structure; 17. Load-bearing structure. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] When implementing: Figure 1-5 As shown, a double-jointed composite bridge structure comprises a first bridge 1, a fixed block 6, a fixed card block 5 and a fixed card slot 7: a fixed block 6 is arranged on the side of the first bridge 1, a fixed card block 5 is arranged on the other side of the first bridge 1, a fixed card slot 7 is arranged on the side of the fixed block 6, a cooling structure 16 is arranged on the side of the first bridge 1, and a load-bearing structure 17 is arranged on the upper end of the fixed block 6;

[0024] The load-bearing structure 17 includes a hydraulic cylinder 13, a load-bearing block 14 and a support spring 15. The upper end of the fixed block 6 is provided with the hydraulic cylinder 13, the hydraulic cylinder 13 passes through the fixed slot 7, the upper end of the hydraulic cylinder 13 is provided with the load-bearing block 14, and the surface of the load-bearing block 14 is provided with a support spring 15;

[0025] When the device is in use, after the first bridge 1 is opened to traffic, vehicles travel on one side of the bridge deck. When the weight of the vehicle is too heavy, the fixed block 5 on one side will be pressed downward, which may cause the bridge deck to tilt for a long time. At this time, the fixed block 5 on one side will press the load-bearing block 14 downward, so that the load-bearing block 14 is pressed into the hydraulic cylinder 13. Because the liquid pressure inside the hydraulic cylinder 13 is constant, the other load-bearing block 14 that is not under pressure will be pushed upward, and the fixed block 5 will be supported to support the connection between the first bridge 1, so as to share the pressure on the heavier side, prevent the first bridge 1 from tilting, and make the first bridge 1 more stable.

[0026] A bridge column 3 is provided at the lower end of the first bridge 1 , and a drainage ditch 2 is provided on the surface of the first bridge 1 . The drainage ditch 2 is arranged in a rectangular structure.

[0027] A bridge guard bar 4 is arranged at the upper end of the first bridge 1, and the bridge guard bar 4 is arranged in a semicircular structure, and the fixed clamp block 5 is arranged in a trapezoidal structure.

[0028] The cooling structure 16 includes a water collecting bin 8, a water storage tank 10, a water pump 11, a diversion pipe 12 and a nozzle 9. The water collecting bin 8 is arranged on the side of the first bridge 1, and the nozzle 9 is arranged on the upper end of the water collecting bin 8. The water storage tank 10 is arranged on the lower end of the first bridge 1, and the water pump 11 is arranged on the side of the water storage tank 10. The diversion pipe 12 is arranged on the side of the water pump 11;

[0029] When the device is in use, when the temperature is too high in summer, the bridge deck needs to be cooled and maintained to prevent the bridge deck temperature from being too high and causing expansion and cracking. First, rainwater is collected through the drainage trough 2 and flows into the water tank 10. At this time, the amount of water in the water tank 10 is observed and filled up. Then, the water pump 11 is turned on to pump the water in the water tank 10 into the diversion pipe 12, and the water is transported to the inside of the water collection bin 8 on both sides through the diversion pipe 12. The nozzle 9 sprays the water onto the surface of the first bridge 1 to cool down and reduce dust on the surface of the first bridge 1, so as to prevent the surface of the first bridge 1 from expanding and cracking due to excessive temperature, and to reduce dust to prevent dust from polluting the environment and reduce the waste of water resources.

[0030] The diversion pipe 12 is arranged in a T-shape, and both ends are connected to the water collecting bins 8 on both sides respectively.

[0031] The fixed card block 5 is embedded in the fixed card slot 7 , and the load-bearing block 14 is slidably connected to the fixed card slot 7 .

[0032] The empty slot formed by the fixed card slot 7 has the same shape as the fixed card block 5;

[0033] When the device is in use, first lift the bridge on one side, then align the fixed block 5 on the side of the bridge deck on one side with the fixed slot 7 on the side of the first bridge 1, and then lower it so that the fixed block 5 is engaged in the fixed slot 7, so that the fixed block 5 and the load-bearing block 14 are fitted together. Because the fixed block 5 and the fixed slot 7 are both trapezoidal in shape, the stability of the fixation between the bridges is improved, and then cement, asphalt, etc. are poured on the top of the fixed block 5 to flatten and fix it.

[0034] When the utility model is in use, the bridge on one side is first lifted, and then the fixed block 5 on the side of the bridge deck on one side is aligned with the fixed slot 7 on the side of the first bridge 1 and lowered, so that the fixed block 5 is embedded in the fixed slot 7, and then cement, asphalt, etc. are poured on the fixed block 5 to be flattened and fixed to improve the fixation between the bridges. After the first bridge 1 is opened to traffic, the vehicle travels on one side of the bridge deck. At this time, the fixed block 5 on one side will be pressed downward, which may cause the bridge deck to tilt for a long time. At this time, the fixed block 5 on one side presses the load-bearing block 14 into the hydraulic cylinder 13. Because the liquid pressure inside the hydraulic cylinder 13 is constant, the other load-bearing block 14 that is not under pressure will be pushed upward to support the fixed block 5, so as to achieve the purpose of distributing the pressure on the heavier side, so as to make the first bridge 1 more stable, thereby improving the stability of the bridge.

[0035] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A double-jointed composite bridge structure, It is characterized in that The invention comprises a first bridge (1), a fixing block (6), a fixing block (5) and a fixing slot (7): a fixing block (6) is arranged on the side of the first bridge (1), a fixing block (5) is arranged on the other side of the first bridge (1), a fixing slot (7) is arranged on the side of the fixing block (6), a cooling structure (16) is arranged on the side of the first bridge (1), and a load-bearing structure (17) is arranged on the upper end of the fixing block (6); The load-bearing structure (17) comprises a hydraulic cylinder (13), a load-bearing block (14) and a support spring (15); the upper end of the fixed block (6) is provided with a hydraulic cylinder (13); the hydraulic cylinder (13) passes through the fixed slot (7); the upper end of the hydraulic cylinder (13) is provided with a load-bearing block (14); and the surface of the load-bearing block (14) is provided with a support spring (15).

2. A double-jointed composite bridge structure according to claim 1, Features: A bridge column (3) is arranged at the lower end of the first bridge (1), and a drainage groove (2) is provided on the surface of the first bridge (1), wherein the drainage groove (2) is arranged in a rectangular structure.

3. A double-jointed composite bridge structure according to claim 1, Features: A bridge guard bar (4) is arranged at the upper end of the first bridge (1), and the bridge guard bar (4) is arranged in a semicircular structure, and the fixed clamping block (5) is arranged in a trapezoidal structure.

4. A double-jointed composite bridge structure according to claim 1, Features: The cooling structure comprises (16) a water collecting bin (8), a water storage tank (10), a water pump (11), a diversion pipe (12) and a nozzle (9); the side of the first bridge (1) is provided with a water collecting bin (8); the upper end of the water collecting bin (8) is provided with a nozzle (9); the lower end of the first bridge (1) is provided with a water storage tank (10); the side of the water storage tank (10) is provided with a water pump (11); and the side of the water pump (11) is provided with a diversion pipe (12).

5. A double-jointed composite bridge structure according to claim 4, Features: The diversion pipe (12) is arranged in a T-shape, and its two ends are respectively connected to the water collection bins (8) on both sides.

6. A double-jointed composite bridge structure according to claim 1, Features: The fixed card block (5) is embedded in the fixed card slot (7), and the load-bearing block (14) is slidably connected to the fixed card slot (7).

7. A double-jointed composite bridge structure according to claim 1, Features: The empty slot formed by the fixed card slot (7) has the same shape as that of the fixed card block (5).

Citation Information

Patent Citations

  • Double -spliced type combining bridge structure

    CN207419217U