Pressing construction system for anchor rod static pressure steel pipe pile
By designing the gantry frame structure and combining the reaction columns and beams with the main structure, the problem of insufficient stability of the pressure pile frame in the construction of anchor static steel pipe piles is solved, and the construction safety is improved.
Patent Information
- Application Number
- CN202420850476.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-23
AI Technical Summary
During the construction of anchor static steel pipe piles, the stability of the pile pressing frame is poor, and the problem of frame overturning and instability is prone to affect construction safety.
A construction system for pile pressing piles including pile pressing frames, lifting components and jacks was designed. By abutting the top of the pile pressing frame on the structural beams or structural floors of the main structure, and using reaction columns , reaction beams and connecting beams form a gantry frame to increase structural stability.
It effectively improves the structural stability of the pile pressing frame, avoids the overhang end, and ensures the safety of pile pressing construction.
Smart Images

Figure CN222120233U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of foundation reinforcement, in particular to an anchor static pressure steel pipe pile pressure construction system. Background Art
[0002] As a pile-type underpinning technology, anchor static steel pipe piles are widely used in foundation reinforcement, pile supplementation, foundation underpinning and deviation correction. The pile frame of anchor static steel pipe piles is fixed by pile anchors, and the steel pipe piles are pressed into the foundation section by section by using the reaction force provided by the building's own weight through the jack. The pile frame is a reaction frame for the construction of anchor static steel pipe piles. During the pile pressing construction process, if the pile pressing frame is not stable enough, the frame is prone to overturning and instability. Its stability determines whether the pile pressing construction is safe. Therefore, how to increase the structural stability of the pile pressing frame has become a technical problem that must be solved in pile pressing construction. Utility Model Content
[0003] The utility model aims to provide an anchor static pressure steel pipe pile pressure construction system to solve the technical problems described in the background technology.
[0004] In order to achieve the above technical purpose, the utility model adopts the following technical solutions:
[0005] A construction system for anchor static pressure steel pipe pile driving, comprising a pile driving frame, a lifting assembly and a jack, the pile driving frame comprising two vertically arranged reaction columns, the bottom ends of the reaction columns are fixed to a raft foundation by anchor rods and locking nuts, the top ends of the reaction columns are connected and fixed by a connecting crossbeam, the reaction columns and the connecting crossbeam form a portal frame, and the connecting crossbeam rests on a structural beam or a structural floor slab of a main structure, a reaction crossbeam is arranged between the two reaction columns, a jack is arranged at the bottom end of the reaction crossbeam, the top end of the jack rests on the reaction crossbeam, and the bottom end is fixedly connected to a steel pile cap sleeved on the top of a steel pipe pile inserted in a pile driving hole.
[0006] Preferably, the reaction column is made of double-jointed channel steels, the openings of the two channel steels are back to back, the outer flanges thereof are connected and fixed by steel plate strips welded at intervals, and a gap is formed between the webs of the two channel steels.
[0007] Preferably, a plurality of pairs of pin holes are correspondingly opened on the two channel steel webs of the reaction column, and the pin holes are spaced apart along the length direction of the channel steel webs, and the end of the reaction beam extends into the gap between the two channel steel webs of the reaction column, and the top ends of the two side ends of the reaction beam are both against the pins passed through the pin holes, and the top middle part of the reaction beam is connected to the lifting assembly installed on the connecting beam.
[0008] Preferably, a steel plate is inserted between the top end of the connecting beam and the main structure, and the cross-sectional dimension of the steel plate is larger than the cross-sectional dimension of the connecting beam.
[0009] Preferably, the lifting assembly adopts a hand hoist or an electric hoist.
[0010] Compared with the prior art, the beneficial effects of the utility model are as follows: the utility model has a simple structure and ingenious design. By placing the top of the pile driving frame against the structural beam or structural floor slab of the main structure, the structural beam or structural floor slab and the anchor rods at the raft foundation are jointly subjected to force. Compared with the conventional pile driving frame structure, the cantilever end at the top of the pile driving frame is avoided, the structural stability of the pile driving frame is effectively improved, and the safety of the pile driving construction is ensured. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The above and / or other aspects and advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings, which are only schematic and do not limit the present invention, wherein:
[0012] Figure 1 It is a structural schematic diagram of an anchor static pressure steel pipe pile pressure construction system involved in the utility model;
[0013] Figure 2 It is a structural schematic diagram of the reaction force column involved in the utility model;
[0014] Figure 3 This is a plan view of the anchor rod involved in the utility model.
[0015] Figure numerals: 1. raft foundation; 2. structural beam; 3. pile driving frame; 301. reaction column; 302. reaction beam; 303. connecting beam; 304. pin hole; 305. latch; 4. lifting assembly; 5. jack; 6. anchor rod; 7. locking nut; 8. pile driving hole; 9. steel pipe pile. DETAILED DESCRIPTION
[0016] In the following, an embodiment of an anchor static pressure steel pipe pile pressure construction system of the utility model will be described with reference to the accompanying drawings. The embodiments recorded herein are specific embodiments of the utility model, which are used to illustrate the concept of the utility model, are explanatory and exemplary, and should not be interpreted as limitations on the implementation methods of the utility model and the scope of the utility model. In addition to the embodiments recorded herein, those skilled in the art can also adopt other obvious technical solutions based on the contents disclosed in the claims and specification of this application, including technical solutions that adopt any obvious replacements and modifications to the embodiments recorded herein.
[0017] In the description of the present invention, it should be noted that the terms "front", "rear", "left", "right", "top", "bottom", "up", "down", "inside", "outside", "horizontal", "longitudinal", "vertical", "oblique" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0018] The drawings of this specification are schematic diagrams, which assist in explaining the concept of the utility model and schematically show the shapes of various parts and their mutual relationships. Please note that in order to clearly show the structure of various components of the embodiments of the utility model, the drawings are not drawn according to the same scale. The same reference numerals are used to represent the same parts.
[0019] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The embodiments are only used to explain the present invention and are not intended to limit the scope of the present invention. Figure 1-3 , the preferred embodiments of the utility model are further described in detail:
[0020] like Figure 1 As shown, the utility model preferably adopts an anchor static pressure steel pipe pile driving construction system, including a pile driving frame 3, a lifting assembly 4 and a jack 5, the pile driving frame 3 includes two vertically arranged reaction columns 301, the bottom ends of the reaction columns 301 are fixed to the raft foundation 1 through anchor rods 6 and locking nuts 7, the top ends of the reaction columns 301 are connected and fixed through a connecting beam 303, the reaction columns 301 and the connecting beam 303 form a portal frame, and the connecting beam 303 abuts against the structural beam 2 or the structural floor slab of the main structure, a reaction beam 302 is arranged between the two reaction columns 301, a jack 5 is arranged at the bottom end of the reaction beam 302, the top end of the jack 5 abuts against the reaction beam 302, and the bottom end is fixedly connected to the steel pile cap sleeved on the top of the steel pipe pile 9 penetrating the pile driving hole 8;
[0021] like Figure 2-3As shown, the reaction column 301 is made of double-jointed channel steel, the two channel steel openings are back to back, and the outer flanges are connected and fixed by steel plate strips welded at intervals, and a gap is formed between the two channel steel webs as a sliding installation space for the reaction beam 302. The channel steel webs can be determined whether to set intervals and add stiffening ribs according to actual construction needs. The reaction column 301 in the form of double-jointed channel steel can provide sufficient structural strength and greatly reduce the deadweight of the structure, which is convenient for on-site construction in narrow spaces. The bottom ends of the two channel steels of the reaction column 301 are welded and fixed with a The supporting foot plate is used as the anchor plate for the anchor rod 6, and a triangular stiffening plate is welded between the supporting foot plate and the channel steel on both sides to ensure that the channel steel and the supporting foot plate are firmly welded. The pile hole 8 is opened in a static way, with a hole depth of 900-1100mm, an upper diameter of 300mm, and a lower diameter of 350mm. Two rows of anchor rods 6 are buried on both sides of the pile hole 8, three in each row, and the burial depth is 400-700mm. The grouting material construction process or the rebar planting glue construction process is adopted. The grouting material injected into the drilling hole should be full. After the rebar planting meets the requirements, a pull-out test should be performed on a spot check;
[0022] Since the jack 5 is effective in one telescopic stroke, in order to more conveniently cooperate with the jack 5 to adjust the position of the reaction beam 302, a plurality of pairs of pin holes 304 are correspondingly opened on the two channel steel webs of the reaction column 301, and the pin holes 304 are arranged at intervals along the length direction of the channel steel web, and the end of the reaction beam 302 extends to the gap between the two channel steel webs of the reaction column 301, and the top ends of the two side ends of the reaction beam 302 are both against the pins 305 penetrated in the pin holes 304, and the top of the middle part of the reaction beam 302 is connected to the lifting component 4 installed on the connecting beam 303. The lifting component 4 is preferably a hand chain hoist or an electric hoist, and the end of the jack 5 cylinder is bolted It is connected to the steel pile cap sleeved on the top of the steel pipe pile 9, and the end of its telescopic rod directly rests on the reaction beam 302 without connection, and the hook of the lifting component 4 is hooked on the lifting ring in the middle of the top of the reaction beam 302. The steel pipe pile 9 is lifted by the lifting component 4 and inserted into the pile pressing hole 8. After that, the jack 5 is adjusted to coincide with the axis of the pile section of the steel pipe pile 9 and the pile pressing hole 8. The 50T→100T→200T oil hydraulic jack 5 is used to pressurize. After the pressure reaches a certain value, it is adjusted again to ensure the verticality of the pile section. The pile sinking amount is the same as the maximum stroke of the jack 5. After one stroke, the telescopic rod of the jack 5 is retracted, and the reaction beam 302 and the latch 305 are moved by the lifting component 4 to continue pile pressing.
[0023] Taking into account the limited contact area between the connecting beam 303 and the main structure, especially for the structural beam 2, in order to avoid excessive stress at the contact point between the two, a steel pad is preferably inserted between the top of the connecting beam 303 and the main structure. Of course, the cross-sectional size of the steel pad needs to be larger than the cross-sectional size of the connecting beam 303 to disperse the stress and avoid stress concentration leading to damage to the local structure.
[0024] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An anchor static pressure steel pipe pile pressure construction system, Features: The invention comprises a pile driving frame (3), a lifting assembly (4) and a jack (5), wherein the pile driving frame (3) comprises two vertically arranged reaction force columns (301), the bottom ends of the reaction force columns (301) are fixed to the raft foundation (1) through anchor rods (6) and locking nuts (7), and the top ends of the reaction force columns (301) are connected and fixed through a connecting crossbeam (303), and the reaction force columns (301) and the connecting crossbeam (303) form a door The invention relates to a type frame, and the connecting beam (303) is against the structural beam (2) or the structural floor of the main structure, a reaction beam (302) is arranged between the two reaction columns (301), a jack (5) is arranged at the bottom end of the reaction beam (302), the top end of the jack (5) is against the reaction beam (302), and the bottom end is fixedly connected to the steel pile cap sleeved on the top of the steel pipe pile (9) inserted into the pile hole (8).
2. According to claim 1, an anchor static pressure steel pipe pile pressure construction system, Features: The reaction column (301) is made of double-jointed channel steels, the openings of the two channel steels are opposite to each other, the outer flanges thereof are connected and fixed by steel plate strips welded at intervals, and a gap is formed between the webs of the two channel steels.
3. According to claim 2, an anchor static pressure steel pipe pile pressure construction system, Features: A plurality of pairs of pin holes (304) are correspondingly provided on the two channel steel webs of the reaction column (301), and the pin holes (304) are arranged at intervals along the length direction of the channel steel webs. The end of the reaction beam (302) extends into the gap between the two channel steel webs of the reaction column (301). The top ends of both sides of the reaction beam (302) abut against the pins (305) passing through the pin holes (304), and the top end of the middle portion of the reaction beam (302) is connected to the lifting assembly (4) installed on the connecting beam (303).
4. The anchor static pressure steel pipe pile pressure construction system according to claim 1, Features: A steel pad is inserted between the top end of the connecting crossbeam (303) and the main structure, and the cross-sectional dimension of the steel pad is larger than the cross-sectional dimension of the connecting crossbeam (303).
5. The anchor static pressure steel pipe pile pressure construction system according to claim 3, Features: The lifting component (4) is a hand chain hoist or an electric hoist.