Hydraulic system of loading machine
By adopting the parallel structure of the boom main valve and the bucket main valve in the loader hydraulic system, the problem of the simultaneous operation of the boom oil cylinder and the bucket oil cylinder in the prior art is solved, and the coordination of the boom and bucket is achieved Movement ensures the accuracy of the composite movement and the stability of the system.
Patent Information
- Application Number
- CN202420317517.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-21
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-02-21
AI Technical Summary
The existing wheel loader hydraulic system cannot realize the simultaneous and composite actions of the boom cylinder and the bucket cylinder, resulting in inconsistent actions.
The parallel structure of the boom main valve and the main valve of the turntable bucket is adopted, and the boom oil cylinder and the turntable bucket cylinder are connected through the oil inlet and return pipes, and the accuracy and stability of the operation are ensured through components such as the secondary valve and the relief valve.
The simultaneous operation of the boom cylinder and the bucket cylinder in the loader hydraulic system is realized, ensuring the accuracy of the composite operation and the stability of the system.
Smart Images

Figure CN222120375U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering machinery, and in particular to a hydraulic system of a loader. Background Art
[0002] The main valves of the current wheel loader working hydraulic system mostly adopt a two-link series open center structure, one link controls the boom cylinder and the other controls the bucket cylinder. When one link is in motion, the other link cannot be in motion, and simultaneous and compound actions cannot be achieved. Utility Model Content
[0003] The utility model aims to provide a loader hydraulic system for the above problems, which can realize the simultaneous operation of boom cylinders.
[0004] To achieve the above-mentioned purpose, the utility model discloses a loader hydraulic system, which includes an oil tank and an oil pump, the output end of the oil pump is connected to an oil inlet pipe, and the oil tank is connected to an oil return pipe. The utility model is characterized in that it also includes a boom main valve and a bucket main valve, the input end of the boom main valve is connected to the oil inlet pipe, the output end of the boom main valve is connected to the boom cylinder, the input end of the bucket main valve is connected to the oil inlet pipe, and the output end of the bucket main valve is connected to the bucket cylinder.
[0005] When in use, the boom main valve and the bucket main valve adopt a parallel structure to achieve simultaneous operation of the boom cylinder and the bucket cylinder and ensure the accuracy of the compound action.
[0006] Preferably, the boom main valve has a first oil inlet P11 of the boom main valve, a second oil inlet P12 of the boom main valve, a third oil inlet P13 of the boom main valve, a first working oil port A11 of the boom main valve, a second working oil port B11 of the boom main valve, a first oil return port T11 of the boom main valve, and a second oil return port T12 of the boom main valve. The first oil inlet P11 of the boom main valve can be connected to the second oil inlet P12 of the boom main valve, the second oil return port T12 of the boom main valve can be connected to the third oil inlet P13 of the boom main valve, the second working oil port B11 of the boom main valve, and the first working oil port A11 of the boom main valve at the same time, the first oil return port T11 of the boom main valve can be connected to the first working oil port A11 of the boom main valve, and the third oil inlet P13 of the boom main valve can be connected to the second working oil port B11.
[0007] It also includes a boom auxiliary valve, which has a boom auxiliary valve oil inlet P31, a boom auxiliary valve working oil port A31, a boom auxiliary valve oil return port T31, a boom auxiliary valve first pre-pressure oil port a3, and a boom auxiliary valve second pre-pressure oil port b3. The boom auxiliary valve oil inlet P31 can be connected to the boom auxiliary valve working oil port A31, or to the boom auxiliary valve working oil port A31 and the boom auxiliary valve oil return port T31 at the same time.
[0008] The second oil inlet P12 of the boom main valve is connected to the first pre-pressure oil port a3 of the boom auxiliary valve and the oil inlet P31 of the boom auxiliary valve. The third oil inlet P13 of the boom main valve is connected to the working oil port A31 of the boom auxiliary valve.
[0009] The first oil inlet P11 of the boom main valve is connected to the oil inlet pipe, the first working oil port A11 of the boom main valve and the second working oil port B11 of the boom main valve are connected to the boom cylinder, the second pre-pressure oil port b3 of the boom auxiliary valve and the return oil port T31 of the boom auxiliary valve are connected to the intermediate pipe, and the intermediate pipe is connected to the return oil pipe.
[0010] When in use, the boom main valve controls the boom movement to ensure the accuracy of the compound action.
[0011] Preferably, a first one-way valve and a second overflow valve are installed between the second working oil port B11 of the boom main valve and the oil return pipe, and the first one-way valve and the second overflow valve are arranged in parallel.
[0012] When in use, the oil overflowing from the second working oil port B can enter the oil return pipe through the second overflow valve to improve stability.
[0013] Preferably, a third relief valve is installed between the boom auxiliary valve working oil port A31 and the oil return pipe.
[0014] When in use, the oil overflowing from the working oil port A of the boom auxiliary valve can enter the oil return pipe through the third overflow valve to improve stability.
[0015] Preferably, the bucket main valve has a first oil inlet P21, a second oil inlet P22, a third oil inlet P23, a first working oil port A21, a second working oil port B21, a first oil return port T21 and a second oil return port T22 of the bucket main valve.
[0016] The first oil inlet P21 of the bucket main valve can be connected with the second oil inlet P22 of the bucket main valve, the second oil return port T22 of the bucket main valve can be connected with the third oil inlet P23 of the bucket main valve, the second working oil port B21 of the bucket main valve and the first working oil port A21 of the bucket main valve at the same time, or can be connected with the third oil inlet P23 of the bucket main valve, the second working oil port B21 of the bucket main valve, the first working oil port A21 of the bucket main valve and the first oil return port T21 of the bucket main valve at the same time, the first oil return port T21 of the bucket main valve can be connected with the first working oil port A21 of the bucket main valve, and the third oil inlet P23 of the bucket main valve can be connected with the second working oil port B21 of the bucket main valve.
[0017] It also includes a bucket auxiliary valve, which has a bucket auxiliary valve oil inlet P41, a bucket auxiliary valve working oil port A41, a bucket auxiliary valve oil return port T41, a bucket auxiliary valve first pre-pressure oil port a4, and a bucket auxiliary valve second pre-pressure oil port b4. The bucket auxiliary valve oil inlet P41 can be connected to the bucket auxiliary valve working oil port A41, or at the same time to the bucket auxiliary valve working oil port A41 and the bucket auxiliary valve oil return port T41.
[0018] The second oil inlet P22 of the bucket main valve is connected to the first pre-pressure oil port a4 of the bucket auxiliary valve and the oil inlet P41 of the bucket auxiliary valve. The third oil inlet P23 of the bucket main valve is connected to the working oil port A41 of the bucket auxiliary valve.
[0019] The first oil inlet P21 of the bucket main valve is connected to the oil inlet pipe, the first working oil port A21 of the bucket main valve and the second working oil port B21 of the bucket main valve are connected to the bucket cylinder, and the second pre-pressure oil port b4 of the bucket auxiliary valve and the return oil port T41 of the bucket auxiliary valve are connected to the intermediate pipe.
[0020] When in use, the main valve of the bucket controls the movement of the bucket to ensure the accuracy of the compound action.
[0021] Preferably, a second one-way valve is installed between the second working oil port B21 of the bucket main valve and the oil return pipe.
[0022] Preferably, a fourth overflow valve is installed between the intermediate pipe and the oil return pipe.
[0023] Preferably, a compensation valve is installed between the intermediate pipe and the oil return pipe.
[0024] Preferably, it also includes a cartridge valve, wherein two working oil ports of the cartridge valve are respectively connected to the oil inlet pipe and the oil return pipe, and the control oil port of the cartridge valve is connected to the intermediate pipe.
[0025] Preferably, a first overflow valve is installed between the end of the oil inlet pipe and the end of the oil return pipe.
[0026] In summary, the beneficial effect of the utility model is that when in use, the boom main valve and the bucket main valve adopt a parallel structure, so as to realize simultaneous operation of the boom cylinder and the bucket cylinder and ensure the accuracy of the compound action. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 The utility model is a structural schematic diagram of a hydraulic system of a loader.
[0028] Figure 2 The utility model is a structural schematic diagram of a boom cylinder in a hydraulic system of a loader.
[0029] Figure 3 The utility model is a structural schematic diagram of a bucket transfer cylinder in a hydraulic system of a loader.
[0030] In the figure: 1. Oil tank. 2. Oil pump. 3. Boom oil cylinder. 4. Bucket oil cylinder. 5. Boom main valve. 6. Boom auxiliary valve. 7. Bucket main valve. 8. Bucket auxiliary valve. 9. First overflow valve. 10. Second overflow valve. 11. Third overflow valve. 12. Fourth overflow valve. 13. First check valve. 14. Second check valve. 15. Cartridge valve. 16. Compensation valve. 17. Oil inlet pipe. 18. Oil return pipe. 19. Intermediate pipe. DETAILED DESCRIPTION
[0031] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0032] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0033] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.
[0034] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection. It can be a mechanical connection or an electrical connection. It can be directly connected or indirectly connected through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0035] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments:
[0036] like Figures 1 to 3As shown, a loader hydraulic system includes an oil tank 1 and an oil pump 2, the output end of the oil pump 2 is connected to an oil inlet pipe 17, the oil tank 1 is connected to an oil return pipe 18, and also includes a boom main valve 5 and a bucket main valve 7, the input end of the boom main valve 5 is connected to the oil inlet pipe 17, the output end of the boom main valve 5 is connected to the boom cylinder 3, the input end of the bucket main valve 7 is connected to the oil inlet pipe 17, and the output end of the bucket main valve 7 is connected to the bucket cylinder 4.
[0037] When in use, the boom main valve 5 and the bucket main valve 7 adopt a parallel structure to achieve simultaneous operation of the boom cylinder 3 and the bucket cylinder 4 and ensure the accuracy of the compound action.
[0038] The boom main valve 5 has a first boom main valve oil inlet P11, a second boom main valve oil inlet P12, a third boom main valve oil inlet P13, a first boom main valve working oil port A11, a second boom main valve working oil port B11, a first boom main valve oil return port T11, and a second boom main valve oil return port T12. The first boom main valve oil inlet P11 can be connected to the second boom main valve oil inlet P12, the second boom main valve oil return port T12 can be connected to the third boom main valve oil inlet P13, the second boom main valve working oil port B11, and the first boom main valve working oil port A11 at the same time, the first boom main valve oil return port T11 can be connected to the first boom main valve working oil port A11, and the third boom main valve oil inlet P13 can be connected to the second working oil port B11.
[0039] It also includes a boom auxiliary valve 6, which has a boom auxiliary valve oil inlet P31, a boom auxiliary valve working oil port A31, a boom auxiliary valve oil return port T31, a boom auxiliary valve first pre-pressure oil port a3, and a boom auxiliary valve second pre-pressure oil port b3. The boom auxiliary valve oil inlet P31 can be connected to the boom auxiliary valve working oil port A31, or to the boom auxiliary valve working oil port A31 and the boom auxiliary valve oil return port T31 at the same time.
[0040] The second oil inlet P12 of the boom main valve is connected to the first pre-pressure oil port a3 of the boom auxiliary valve and the oil inlet P31 of the boom auxiliary valve. The third oil inlet P13 of the boom main valve is connected to the working oil port A31 of the boom auxiliary valve.
[0041] The first oil inlet P11 of the boom main valve is connected to the oil inlet pipe 17, the first working oil port A11 of the boom main valve and the second working oil port B11 of the boom main valve are connected to the boom cylinder 3, the second pre-pressure oil port b3 of the boom auxiliary valve and the return oil port T31 of the boom auxiliary valve are connected to the intermediate pipe 19, and the intermediate pipe 19 is connected to the return oil pipe 18.
[0042] When in use, the boom main valve 5 controls the movement of the boom to ensure the accuracy of the compound action.
[0043] A first one-way valve 13 and a second relief valve 10 are installed between the second working oil port B11 of the boom main valve and the oil return pipe 18 . The first one-way valve 13 and the second relief valve 10 are arranged in parallel.
[0044] When in use, the oil overflowing from the second working oil port B11 can enter the oil return pipe 18 through the second overflow valve 10, thereby improving stability.
[0045] A third relief valve 11 is installed between the boom auxiliary valve working oil port A31 and the oil return pipe 18 .
[0046] When in use, the oil overflowing from the working oil port A31 of the boom auxiliary valve can enter the oil return pipe 18 through the third overflow valve 11, thereby improving stability.
[0047] The bucket main valve 7 has a first oil inlet P21, a second oil inlet P22, a third oil inlet P23, a first working oil port A21, a second working oil port B21, a first oil return port T21 and a second oil return port T22 of the bucket main valve.
[0048] The first oil inlet P21 of the bucket main valve can be connected with the second oil inlet P22 of the bucket main valve, the second oil return port T22 of the bucket main valve can be connected with the third oil inlet P23 of the bucket main valve, the second working oil port B21 of the bucket main valve and the first working oil port A21 of the bucket main valve at the same time, or can be connected with the third oil inlet P23 of the bucket main valve, the second working oil port B21 of the bucket main valve, the first working oil port A21 of the bucket main valve and the first oil return port T21 of the bucket main valve at the same time, the first oil return port T21 of the bucket main valve can be connected with the first working oil port A21 of the bucket main valve, and the third oil inlet P23 of the bucket main valve can be connected with the second working oil port B21 of the bucket main valve.
[0049] It also includes a bucket auxiliary valve 8, which has a bucket auxiliary valve oil inlet P41, a bucket auxiliary valve working oil port A41, a bucket auxiliary valve return oil port T41, a bucket auxiliary valve first pre-pressure oil port a4, and a bucket auxiliary valve second pre-pressure oil port b4. The bucket auxiliary valve oil inlet P41 can be connected to the bucket auxiliary valve working oil port A41, or to the bucket auxiliary valve working oil port A41 and the bucket auxiliary valve return oil port T41 at the same time.
[0050] The second oil inlet P22 of the bucket main valve is connected to the first pre-pressure oil port a4 of the bucket auxiliary valve and the oil inlet P41 of the bucket auxiliary valve. The third oil inlet P23 of the bucket main valve is connected to the working oil port A41 of the bucket auxiliary valve.
[0051] The first oil inlet P21 of the bucket main valve is connected to the oil inlet pipe 17, the first working oil port A21 of the bucket main valve and the second working oil port B21 of the bucket main valve are connected to the bucket cylinder 4, and the second pre-pressure oil port b4 of the bucket auxiliary valve and the return oil port T41 of the bucket auxiliary valve are connected to the intermediate pipe 19.
[0052] When in use, the bucket main valve 7 controls the bucket movement to ensure the accuracy of the compound action.
[0053] A second one-way valve 14 is installed between the second working oil port B21 of the bucket main valve and the oil return pipe 18 .
[0054] A fourth relief valve 12 is installed between the intermediate pipe 19 and the oil return pipe 18 .
[0055] When in use, the oil overflowing from the intermediate pipe 19 can enter the oil return pipe 18 through the fourth overflow valve 12, thereby improving stability.
[0056] A compensation valve 16 is installed between the intermediate pipe 19 and the oil return pipe 18 .
[0057] It also includes a cartridge valve 15 , two working oil ports of the cartridge valve 15 are respectively connected to an oil inlet pipe 17 and an oil return pipe 18 , and a control oil port of the cartridge valve 15 is connected to an intermediate pipe 19 .
[0058] A first overflow valve 9 is installed between the end of the oil inlet pipe 17 and the end of the oil return pipe 18 .
[0059] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principle of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.
Claims
1. A loader hydraulic system, comprising an oil tank (1) and an oil pump (2), wherein the output end of the oil pump (2) is connected to an oil inlet pipe (17), and the oil tank (1) is connected to an oil return pipe (18), characterized in that: It also includes a boom main valve (5) and a bucket main valve (7), wherein the input end of the boom main valve (5) is connected to an oil inlet pipe (17), the output end of the boom main valve (5) is connected to a boom oil cylinder (3), the input end of the bucket main valve (7) is connected to an oil inlet pipe (17), and the output end of the bucket main valve (7) is connected to a bucket oil cylinder (4).
2. The loader hydraulic system according to claim 1, characterized in that: The boom main valve (5) comprises a first boom main valve oil inlet P11, a second boom main valve oil inlet P12, a third boom main valve oil inlet P13, a first boom main valve working oil port A11, a second boom main valve working oil port B11, a first boom main valve oil return port T11 and a second boom main valve oil return port T12; the first boom main valve oil inlet P11 can be communicated with the second boom main valve oil inlet P12, the second boom main valve oil return port T12 can be simultaneously communicated with the third boom main valve oil inlet P13, the second boom main valve working oil port B11 and the first boom main valve working oil port A11, the first boom main valve oil return port T11 can be communicated with the first boom main valve working oil port A11, and the third boom main valve oil inlet P13 can be communicated with the second working oil port B11; It also includes a boom auxiliary valve (6), the boom auxiliary valve (6) having a boom auxiliary valve oil inlet P31, a boom auxiliary valve working oil port A31, a boom auxiliary valve oil return port T31, a boom auxiliary valve first pre-pressure oil port a3, and a boom auxiliary valve second pre-pressure oil port b3, the boom auxiliary valve oil inlet P31 being able to communicate with the boom auxiliary valve working oil port A31, or simultaneously with the boom auxiliary valve working oil port A31 and the boom auxiliary valve oil return port T31; The second oil inlet P12 of the boom main valve is connected to the first pre-pressure oil port a3 of the boom auxiliary valve and the oil inlet P31 of the boom auxiliary valve at the same time, and the third oil inlet P13 of the boom main valve is connected to the working oil port A31 of the boom auxiliary valve; The first oil inlet port P11 of the boom main valve is connected to the oil inlet pipe (17), the first working oil port A11 of the boom main valve and the second working oil port B11 of the boom main valve are connected to the boom cylinder (3), the second pre-pressure oil port b3 of the boom auxiliary valve and the oil return port T31 of the boom auxiliary valve are connected to the intermediate pipe (19), and the intermediate pipe (19) is connected to the oil return pipe (18).
3. The loader hydraulic system according to claim 2, characterized in that: A first one-way valve (13) and a second overflow valve (10) are installed between the second working oil port B11 of the boom main valve and the oil return pipe (18), and the first one-way valve (13) and the second overflow valve (10) are arranged in parallel.
4. The loader hydraulic system according to claim 3, characterized in that: A third relief valve (11) is installed between the boom auxiliary valve working oil port A31 and the oil return pipe (18).
5. The loader hydraulic system according to claim 2, characterized in that: The bucket main valve (7) comprises a first oil inlet P21 of the bucket main valve, a second oil inlet P22 of the bucket main valve, a third oil inlet P23 of the bucket main valve, a first working oil port A21 of the bucket main valve, a second working oil port B21 of the bucket main valve, a first oil return port T21 of the bucket main valve and a second oil return port T22 of the bucket main valve; The first oil inlet P21 of the bucket main valve can be communicated with the second oil inlet P22 of the bucket main valve, the second oil return port T22 of the bucket main valve can be simultaneously communicated with the third oil inlet P23 of the bucket main valve, the second working oil port B21 of the bucket main valve and the first working oil port A21 of the bucket main valve, or simultaneously communicated with the third oil inlet P23 of the bucket main valve, the second working oil port B21 of the bucket main valve, the first working oil port A21 of the bucket main valve and the first oil return port T21 of the bucket main valve, the first oil return port T21 of the bucket main valve can be communicated with the first working oil port A21 of the bucket main valve, and the third oil inlet P23 of the bucket main valve can be connected with the second working oil port B21 of the bucket main valve; The invention also comprises a bucket auxiliary valve (8), wherein the bucket auxiliary valve (8) has a bucket auxiliary valve oil inlet P41, a bucket auxiliary valve working oil port A41, a bucket auxiliary valve oil return port T41, a bucket auxiliary valve first pre-pressure oil port a4, and a bucket auxiliary valve second pre-pressure oil port b4, wherein the bucket auxiliary valve oil inlet P41 can be connected to the bucket auxiliary valve working oil port A41, or simultaneously to the bucket auxiliary valve working oil port A41 and the bucket auxiliary valve oil return port T41; The second oil inlet P22 of the bucket main valve is connected to the first pre-pressure oil port a4 of the bucket auxiliary valve and the oil inlet P41 of the bucket auxiliary valve, and the third oil inlet P23 of the bucket main valve is connected to the working oil port A41 of the bucket auxiliary valve; The first oil inlet P21 of the bucket main valve is connected to the oil inlet pipe (17), the first working oil port A21 of the bucket main valve and the second working oil port B21 of the bucket main valve are connected to the bucket cylinder (4), and the second pre-pressure oil port b4 of the bucket auxiliary valve and the oil return port T41 of the bucket auxiliary valve are connected to the intermediate pipe (19).
6. The loader hydraulic system according to claim 5, characterized in that: A second one-way valve (14) is installed between the second working oil port B21 of the bucket main valve and the oil return pipe (18).
7. The loader hydraulic system according to any one of claims 2 to 6, characterized in that: A fourth overflow valve (12) is installed between the intermediate pipe (19) and the oil return pipe (18).
8. The loader hydraulic system according to claim 7, characterized in that: A compensating valve (16) is installed between the intermediate pipe (19) and the oil return pipe (18).
9. The loader hydraulic system according to claim 7, characterized in that: It also includes a cartridge valve (15), wherein two working oil ports of the cartridge valve (15) are respectively connected to an oil inlet pipe (17) and an oil return pipe (18), and a control oil port of the cartridge valve (15) is connected to an intermediate pipe (19).
10. The loader hydraulic system according to any one of claims 1 to 6, characterized in that: A first overflow valve (9) is installed between the end of the oil inlet pipe (17) and the end of the oil return pipe (18).