Smoke experiment device for cutting oil production
By directly transferring the heat medium to heat the cutting oil in the smoke experimental device, and cooling it through the cold medium after the experiment is completed, the problem of low heating efficiency in the prior art is solved, the experimental efficiency and safety are improved, and the cutting is reduced Oil waste and difficulty in cleaning.
Patent Information
- Application Number
- CN202420576228.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-22
AI Technical Summary
In the existing smoke experimental device for cutting oil production, the electric heater is arranged outside the heat exchange pipeline, resulting in low heating efficiency of cutting oil and reducing the experimental efficiency.
The coil is used to transfer the heat from the heat medium directly to the experimental cylinder, heat the cutting oil to achieve efficient heating, and heat and cool the cutting oil through the heat medium circulation supply mechanism to avoid high-temperature smoke emissions.
The heating efficiency of cutting oil is improved, the experimental efficiency is improved, high-temperature scalding accidents and ambient temperature rise are avoided, and the waste of cutting oil and cleaning area is reduced.
Smart Images

Figure CN222125141U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of smoke experiments, and in particular relates to a smoke experiment device for cutting oil production. Background Art
[0002] Cutting oil is a cooling lubricant used in metal processing. It is composed of base oil and water-insoluble additives. After the cutting oil is produced, the finished cutting oil needs to undergo a smoke test.
[0003] Chinese Patent No. 202321961451.2 discloses a smoke test device for cutting oil production, wherein a detection oil tank is arranged inside the smoke test box, an oil pipe extending into the detection oil tank is arranged outside the smoke test box, a smoke collection, detection and purification discharge mechanism is arranged on the top of the detection oil tank, a heat exchange pipeline is arranged on the outer wall of the detection oil tank, a water supply mechanism for supplying water to the heat exchange pipeline is arranged outside the smoke test box, an electric heater is arranged outside the heat exchange pipeline, a water supply and cleaning mechanism is arranged between the water supply mechanism and the detection oil tank, a cutting oil recovery mechanism connected to the detection oil tank is arranged outside the smoke test box, and a heat exchange pipeline connected to the detection oil tank is arranged outside the smoke test box. The cleaning wastewater recovery mechanism is connected. When the smoke experiment device is conducting an experiment, the cutting oil is added to the test oil tank through the oil pipe, the electric heater heats the cutting oil in the test oil tank, and the water supply mechanism provides low-temperature medium to the heat exchange pipeline to neutralize the cutting oil temperature in the test oil tank until the cutting oil reaches a suitable temperature. The cutting oil is atomized and vaporized to produce smoke, which is collected and tested by the smoke collection, detection and purification and emission mechanism, and the excess smoke is purified and discharged. After the experiment is completed, the cutting oil is recovered by the cutting oil recovery mechanism, and the water supply and cleaning mechanism supplies water to the test oil tank for cleaning, and the cleaning wastewater is recovered by the cleaning wastewater recovery mechanism.
[0004] The inventors of the present application discovered that the above-mentioned smoke experiment device for cutting oil production is provided with an electric heater and a heat exchange pipeline, wherein the electric heater is arranged outside the heat exchange pipeline, and the heat generated by the electric heater can be transferred to the detection oil tank through the heat exchange pipeline to heat the cutting oil in the detection oil tank to atomize and vaporize it to generate smoke for the experiment. The heating efficiency of the cutting oil is slow, which reduces the experimental efficiency of the device. Utility Model Content
[0005] To solve the problems raised in the above background technology, the utility model provides a smoke test device for cutting oil production, which has the characteristics that the heat of the heat medium can be directly transferred to the test cylinder through the coil to heat the cutting oil in the test chamber, the cutting oil heating efficiency is fast, and the test efficiency of the device can be improved.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a smoke experiment device for cutting oil production, comprising: an experimental cylinder, a valved feed pipe, a first valved smoke inlet pipe and a valved smoke outlet pipe are fixedly connected to the top of the experimental cylinder along the circumferential direction, a smoke purifier is fixedly connected to the end of the valved smoke outlet pipe away from the experimental cylinder, an experimental cavity connected to the valved feed pipe, the first valved smoke inlet pipe and the valved smoke outlet pipe is opened in the middle of the experimental cylinder, a valved outlet connected to the experimental cavity is opened at the bottom of the experimental cylinder, an auxiliary cavity is opened outside the experimental cavity, and the auxiliary cavity A coil is fixedly sleeved inside the auxiliary chamber near the side wall of the experimental chamber, the medium inlet end of the coil penetrates the experimental cylinder and extends to the outside to be connected to a heat medium inlet pipe, the medium outlet end of the coil is connected to a heat medium outlet pipe, a programmable controller is fixedly connected to the outer wall of the experimental cylinder near the operation side, a smoke detector is fixedly connected to one side of the outer wall of the experimental cylinder, the first smoke inlet pipe with a valve is fixedly connected to the smoke inlet end of the smoke detector away from the end of the experimental cylinder, four supporting legs are fixedly connected to the bottom end of the experimental cylinder at equal intervals along the circumferential direction, and the valved feed pipe, the first smoke inlet pipe with a valve, the valved smoke outlet pipe, the smoke purifier, the valved outlet and the smoke detector are electrically connected to the programmable controller.
[0007] Furthermore, the coil is a copper tube.
[0008] Furthermore, the medium inlet end of the coil passes through the experimental cylinder and extends to the outside and is fixedly connected to a first electric three-way valve. The medium inlet end of the coil is fixedly connected to one valve port of the first electric three-way valve, the heat medium inlet pipe is fixedly connected to the second valve port of the first electric three-way valve, the three valve ports of the first electric three-way valve are fixedly connected to the cold medium inlet pipe, the medium outlet end of the coil is connected to a third electric three-way valve, the medium outlet end of the coil is connected to one valve port of the third electric three-way valve, the heat medium outlet pipe is fixedly connected to the second valve port of the third electric three-way valve, the three valve ports of the third electric three-way valve are fixedly connected to the cold medium outlet pipe, and the first electric three-way valve and the third electric three-way valve are electrically connected to a programmable controller.
[0009] Furthermore, a second smoke inlet pipe with a valve is fixedly connected to the smoke outlet of the smoke purifier, the second smoke inlet pipe with a valve is fixedly connected to the experimental cylinder at one end away from the smoke purifier and is connected to the auxiliary cavity, and a smoke discharge pipe with a valve connected to the auxiliary cavity is fixedly connected to the top of the experimental cylinder, and the second smoke inlet pipe with a valve and the smoke discharge pipe with a valve are electrically connected to the programmable controller.
[0010] Furthermore, a second electric three-way valve is fixedly connected to the medium outlet end of the coil, and the coil is fixedly connected to a valve port of the second electric three-way valve. A spray pipe is arranged at the bottom end of the interior of the experimental chamber, one end of the spray pipe passes through the experimental cylinder and extends into the auxiliary chamber and is fixedly connected to the two valve ports of the second electric three-way valve, and the other end of the spray pipe is fixedly connected to the wall of the experimental cylinder. A plurality of one-way nozzles are fixedly connected to the top and bottom ends of the spray pipe at equal intervals, and the three valve ports of the second electric three-way valve are fixedly connected to a medium connecting pipe, and the end of the medium connecting pipe away from the second electric three-way valve passes through the experimental cylinder and extends to the outside and is fixed to a valve port of the third electric three-way valve, and the second electric three-way valve is electrically connected to the programmable controller.
[0011] Furthermore, an electric cylinder is fixedly connected to the top of the experimental cylinder, a scraper is arranged at the top of the inside of the experimental cavity, the output shaft of the electric cylinder passes through the experimental cylinder, extends into the experimental cavity and is fixedly connected to the scraper, through holes are respectively opened on the scraper corresponding to the positions of the valved feed pipe, the first valved smoke inlet pipe and the valved smoke outlet pipe, the bottom ends of the valved feed pipe, the first valved smoke inlet pipe and the valved smoke outlet pipe are respectively connected to the experimental cavity through the through holes at corresponding positions, and the electric cylinder is electrically connected to the programmable controller.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. The utility model is provided with an experimental chamber and an auxiliary chamber, and a coil is fixedly sleeved in the auxiliary chamber near the experimental chamber side, that is, the heat of the heat medium can be directly transferred to the experimental cylinder through the coil to heat the cutting oil in the experimental chamber. The cutting oil heating efficiency is fast, which can improve the experimental efficiency of the device.
[0014] 2. The medium inlet and outlet ends of the coil of the utility model are simultaneously connected with hot medium and cold medium circulation supply mechanisms, which can not only heat the cutting oil for smoke experiments, but also cool the cutting oil after the experiment is completed, avoiding high temperature scalding accidents that may occur during the discharge of the cutting oil.
[0015] 3. In the utility model, excess smoke can enter the auxiliary cavity through the second smoke inlet pipe with a valve to be cooled, and then be discharged through the smoke exhaust pipe with a valve, which can avoid the high temperature smoke discharge causing the surrounding temperature to increase and cause discomfort to the operator.
[0016] 4. The utility model is provided with a scraping mechanism and a cleaning mechanism, which can not only avoid the waste of cutting oil, but also reduce the cleaning area, thereby improving the cleaning efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a three-dimensional diagram of the utility model;
[0018] Figure 2 It is a vertical cross-sectional view of the utility model;
[0019] Figure 3 For this utility model Figure 2 Enlarged view of point A in the middle;
[0020] In the figure: 1. experimental cylinder; 2. programmable controller; 3. supporting leg; 4. first smoke inlet pipe with valve; 5. through hole; 6. scraper; 7. smoke detector; 8. experimental chamber; 9. one-way nozzle; 10. spray pipe; 11. outlet with valve; 12. auxiliary chamber; 13. coil; 14. hot medium inlet pipe; 15. first electric three-way valve; 16. cold medium inlet pipe; 17. second smoke inlet pipe with valve; 18. smoke purifier; 19. feed pipe with valve; 20. smoke outlet pipe with valve; 21. electric cylinder; 22. smoke discharge pipe with valve; 23. second electric three-way valve; 24. medium connecting pipe; 25. third electric three-way valve; 26. hot medium outlet pipe; 27. cold medium outlet pipe. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] Embodiment 1
[0023] See also Figure 1-3The utility model provides the following technical solutions: a smoke experiment device for cutting oil production, comprising: an experimental cylinder 1, a valved feed pipe 19, a first valved smoke inlet pipe 4 and a valved smoke outlet pipe 20 are fixedly connected to the top of the experimental cylinder 1 along the circumferential direction, a smoke purifier 18 is fixedly connected to the end of the valved smoke outlet pipe 20 away from the experimental cylinder 1, and an experimental chamber connected to the valved feed pipe 19, the first valved smoke inlet pipe 4 and the valved smoke outlet pipe 20 is opened in the middle of the experimental cylinder 1 8, the inside of the experimental cylinder 1 is located at the bottom of the experimental cavity 8 and is provided with a discharge port 11 with a valve connected to the experimental cavity 8, the inside of the experimental cylinder 1 is located outside the experimental cavity 8 and is provided with an auxiliary cavity 12, the inside of the auxiliary cavity 12 is close to the side wall of the experimental cavity 8 and is fixedly sleeved with a coil 13, the medium inlet end of the coil 13 passes through the experimental cylinder 1 and extends to the outside and is connected to a heat medium inlet pipe 14, the medium outlet end of the coil 13 is connected to a heat medium outlet pipe 26, and a heat medium circulation supply device is installed between the heat medium inlet pipe 14 and the heat medium outlet pipe 26 The heat medium circulation supply mechanism comprises a heat medium supply outlet pipe, a heat medium circulation pump, a heat medium storage box, a heater and a heat medium supply inlet pipe. The heat medium supply outlet pipe is divided into two, one heat medium supply outlet pipe is fixedly connected to the heat medium inlet pipe 14, a heat medium circulation pump is fixedly connected between the two heat medium supply outlet pipes, the other heat medium supply outlet pipe is fixedly connected to the heat medium storage box, the heater is fixedly connected in the heat medium storage box, both ends of the heat medium supply inlet pipe are fixedly connected to the heat medium storage box and the heat medium outlet pipe 26, a programmable controller 2 is fixedly connected to the outer wall of the experimental cylinder 1 close to the operation side, a smoke detector 7 is fixedly connected to one side of the outer wall of the experimental cylinder 1, the first smoke inlet pipe 4 with a valve is fixedly connected to the smoke inlet end of the smoke detector 7 away from the experimental cylinder 1, four supporting legs 3 are fixedly connected to the bottom end of the experimental cylinder 1 at equal intervals along the circumferential direction, a valved feed pipe 19, a first smoke inlet pipe 4 with a valve, a valved smoke outlet pipe 20, a smoke purifier 18, a valved outlet 11 and the smoke detector 7 are electrically connected to the programmable controller 2.
[0024] Specifically, the coil 13 is a copper tube.
[0025] See attached Figure 1-3When the smoke experiment device for cutting oil production is used, the valve of the valve feed pipe 19 is controlled to be opened through the programmable controller 2, and the cutting oil is added to the experimental chamber 8 through the valve feed pipe 19 until the cutting oil in the experimental chamber 8 is added to an appropriate amount. The valve of the valve feed pipe 19 is controlled to be closed through the programmable controller 2, and the heat medium circulation pump is started to supply the heat medium in the heat medium storage box to the coil 13 through the two heat medium supply outlet pipes and the heat medium inlet pipe 14. The heat of the heat medium is transferred to the coil 13, and then transferred to the experimental cylinder 1 by the coil 13 to heat the cutting oil in the experimental chamber 8. The heat medium after heat loss is discharged through the heat medium outlet pipe 26 and the heat medium supply inlet pipe It flows back to the heat medium storage box, and repeats this process to realize the cyclic heating of the cutting oil in the experimental chamber 8. After being heated, the cutting oil is atomized and vaporized to generate smoke. The valve of the first smoke inlet pipe 4 with a valve is controlled to be opened through the programmable controller 2. The smoke enters the smoke detector 7 through the first smoke inlet pipe 4 with a valve. The smoke is detected and analyzed by the smoke detector 7 to realize the smoke experiment of the cutting oil. The valve of the smoke outlet pipe 20 with a valve is controlled to be opened through the programmable controller 2. The excess smoke is purified by the smoke purifier 18 and then discharged. After the smoke experiment is completed, the valve of the valve outlet port 11 with a valve is controlled to be opened through the programmable controller 2, and the cutting oil is discharged from the valve outlet port 11 for collection.
[0026] Embodiment 2
[0027] The difference between this embodiment and the first embodiment is that:
[0028] Specifically, the medium inlet end of the coil 13 passes through the experimental cylinder 1 and extends to the outside and is fixedly connected to the first electric three-way valve 15. The medium inlet end of the coil 13 is fixedly connected to one valve port of the first electric three-way valve 15. The hot medium inlet pipe 14 is fixedly connected to the second valve port of the first electric three-way valve 15. The third valve port of the first electric three-way valve 15 is fixedly connected to the cold medium inlet pipe 16. The medium outlet end of the coil 13 is connected to the third electric three-way valve 25. The medium outlet end of the coil 13 is connected to one valve port of the third electric three-way valve 25. The hot medium outlet pipe 26 is fixedly connected to the second valve port of the third electric three-way valve 25. The third valve port of the third electric three-way valve 25 is fixedly connected to the cold medium outlet pipe 27. A cold medium circulation supply mechanism is installed between the pipe 16 and the cold medium outlet pipe 27. The cold medium circulation supply mechanism includes a cold medium supply outlet pipe, a cold medium circulation pump, a cold medium storage box, a refrigerator and a cold medium supply inlet pipe. The cold medium supply outlet pipe is divided into two, one cold medium supply outlet pipe is fixedly connected to the cold medium inlet pipe 16, a cold medium circulation pump is fixedly connected between the two cold medium supply outlet pipes, and the other cold medium supply outlet pipe is fixedly connected to the cold medium storage box. The refrigerator is fixedly connected in the cold medium storage box, and both ends of the cold medium supply inlet pipe are fixedly connected to the cold medium storage box and the cold medium outlet pipe 27. The first electric three-way valve 15 and the third electric three-way valve 25 are electrically connected to the programmable controller 2.
[0029] See attached Figure 2-3 After the smoke experiment is completed and before the cutting oil is discharged, the first electric three-way valve 15 and the third electric three-way valve 25 are switched by the programmable controller 2, so that the cold medium inlet pipe 16 is connected to the medium inlet end of the coil 13, and the cold medium outlet pipe 27 is connected to the medium outlet end of the coil 13. The cold medium is circulated and supplied according to the above-mentioned hot medium circulation supply method. The cold amount of the cold medium is transferred to the coil 13 through the coil 13, and then transferred to the experimental cylinder 1 by the coil 13, so as to cool the cutting oil in the experimental chamber 8. After cooling, it is discharged through the valve outlet 11, which can avoid the occurrence of high temperature scalding accidents for operators.
[0030] Embodiment 3
[0031] The difference between this embodiment and the second embodiment is that:
[0032] Specifically, the smoke outlet of the smoke purifier 18 is fixedly connected to a second smoke inlet pipe 17 with a valve, the end of the second smoke inlet pipe 17 with a valve away from the smoke purifier 18 is fixedly connected to the experimental cylinder 1 and is connected to the auxiliary chamber 12, the top of the experimental cylinder 1 is fixedly connected to a smoke discharge pipe 22 with a valve connected to the auxiliary chamber 12, and the second smoke inlet pipe 17 with a valve and the smoke discharge pipe 22 with a valve are electrically connected to the programmable controller 2.
[0033] See attached Figure 2 Before the excess smoke is discharged, the valves of the second smoke inlet pipe 17 with a valve and the smoke discharge pipe 22 with a valve are controlled to open by the programmable controller 2, and the purified smoke enters the auxiliary chamber 12 through the second smoke inlet pipe 17 with a valve. At this time, the cold medium of the coil 13 is simultaneously transferred to the auxiliary chamber 12, so that the auxiliary chamber 12 presents a low temperature environment. The smoke enters the auxiliary chamber 12 for cooling, and the cooled smoke is discharged through the smoke discharge pipe 22 with a valve, which can avoid the high temperature smoke discharge causing the surrounding temperature to increase and cause discomfort to the operator.
[0034] Embodiment 4
[0035] The difference between this embodiment and the third embodiment is that:
[0036] Specifically, a second electric three-way valve 23 is fixedly connected to the medium outlet end of the coil 13, and the coil 13 is fixedly connected to a valve port of the second electric three-way valve 23. A spray pipe 10 is arranged at the bottom end of the interior of the experimental chamber 8, one end of the spray pipe 10 passes through the experimental cylinder 1 and extends into the auxiliary chamber 12 and is fixedly connected to two valve ports of the second electric three-way valve 23, and the other end of the spray pipe 10 is fixedly connected to the wall of the experimental cylinder 1, and a plurality of one-way nozzles 9 are fixedly connected to the top and bottom ends of the spray pipe 10 at equal intervals, and the three valve ports of the second electric three-way valve 23 are fixedly connected to a medium connecting pipe 24, and one end of the medium connecting pipe 24 is away from the second electric three-way valve 23 and passes through the experimental cylinder 1 and extends to the outside and is fixed to a valve port of the third electric three-way valve 25, and the second electric three-way valve 23 is electrically connected to the programmable controller 2.
[0037] See attached Figure 2-3 After the cutting oil is drained, the heat medium supply is switched (for example, the heat medium is hot water). At the same time, the programmable controller 2 controls the switching of the second electric three-way valve 23 to connect the medium outlet of the coil 13 with the inlet of the spray pipe 10. The heat medium enters the spray pipe 10 and is then sprayed out by multiple one-way nozzles 9 to clean the experimental chamber 8.
[0038] Embodiment 5
[0039] The difference between this embodiment and the fourth embodiment is that:
[0040] Specifically, an electric cylinder 21 is fixedly connected to the top of the experimental cylinder 1, a scraper 6 is arranged at the top of the inside of the experimental chamber 8, the output shaft of the electric cylinder 21 passes through the experimental cylinder 1 and extends into the experimental chamber 8 and is fixedly connected to the scraper 6, through holes 5 are respectively opened on the scraper 6 at positions corresponding to the valved feed pipe 19, the first valved smoke inlet pipe 4 and the valved smoke outlet pipe 20, the bottom ends of the valved feed pipe 19, the first valved smoke inlet pipe 4 and the valved smoke outlet pipe 20 are respectively connected to the experimental chamber 8 through the through holes 5 at corresponding positions, and the electric cylinder 21 is electrically connected to the programmable controller 2.
[0041] See attached Figure 2 After the cutting oil is drained, the electric cylinder 21 is started by the programmable controller 2, the electric cylinder 21 drives the output shaft to extend, and the output shaft of the electric cylinder 21 drives the scraper 6 to move downward, and the scraper 6 scrapes the cutting oil adhered to the inner wall of the experimental chamber 8 and discharges it together, thereby reducing the waste of cutting oil and cleaning the inner wall of the experimental chamber 8. When the scraper 6 moves down to the set height, the above-mentioned spraying method is used for cleaning, which can reduce the cleaning area and speed up the cleaning speed.
[0042] The valves of the valved feed pipe 19, the first valved smoke inlet pipe 4, the valved smoke outlet pipe 20, the valved outlet 11, the second valved smoke inlet pipe 17 and the valved smoke discharge pipe 22 are all electric valves, and the electric valves, smoke purifier 18, programmable controller 2, smoke detector 7, first electric three-way valve 15, third electric three-way valve 25, second electric three-way valve 23 and electric cylinder 21 are all conventional instruments, and their working principles, sizes and models are irrelevant to the functions of this application, so they are not described in detail.
[0043] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A smoke test device for cutting oil production, characterized in that: include: An experimental cylinder (1), wherein the top end of the experimental cylinder (1) is fixedly connected with a valved feed pipe (19), a first valved smoke inlet pipe (4) and a valved smoke outlet pipe (20) along the circumferential direction, and the valved smoke outlet pipe (20) is fixedly connected with a smoke purifier (18) at one end away from the experimental cylinder (1). An experimental chamber (8) connected to the valved feed pipe (19), the first valved smoke inlet pipe (4) and the valved smoke outlet pipe (20) is provided in the middle of the experimental cylinder (1). A valved outlet (11) connected to the experimental chamber (8) is provided at the bottom end of the experimental chamber (8). An auxiliary chamber (12) is provided outside the experimental chamber (8). A coil (12) is fixedly sleeved on the inside of the auxiliary chamber (12) near the side wall of the experimental chamber (8). 3), the medium inlet end of the coil (13) passes through the experimental cylinder (1) and extends to the outside and is connected to a heat medium inlet pipe (14), the medium outlet end of the coil (13) is connected to a heat medium outlet pipe (26), the outer wall of the experimental cylinder (1) is fixedly connected to a programmable controller (2) near the operation side, one side of the outer wall of the experimental cylinder (1) is fixedly connected to a smoke detector (7), the first smoke inlet pipe (4) with a valve is fixedly connected to the smoke inlet end of the smoke detector (7) at one end away from the experimental cylinder (1), four supporting legs (3) are fixedly connected to the bottom end of the experimental cylinder (1) at equal intervals along the circumferential direction, and the valve feed pipe (19), the first smoke inlet pipe (4) with a valve, the smoke outlet pipe (20) with a valve, the smoke purifier (18), the valve outlet (11) and the smoke detector (7) are electrically connected to the programmable controller (2).
2. A smoke test device for cutting oil production according to claim 1, characterized in that: The coil (13) is a copper tube.
3. A smoke test device for cutting oil production according to claim 1, characterized in that: The medium inlet end of the coil (13) passes through the experimental cylinder (1) and extends to the outside and is fixedly connected to a first electric three-way valve (15); the medium inlet end of the coil (13) is fixedly connected to one valve port of the first electric three-way valve (15); the hot medium inlet pipe (14) is fixedly connected to two valve ports of the first electric three-way valve (15); the three valve ports of the first electric three-way valve (15) are fixedly connected to a cold medium inlet pipe (16); the medium outlet end of the coil (13) is connected to a third electric three-way valve (25); the medium outlet end of the coil (13) is connected to one valve port of the third electric three-way valve (25); the hot medium outlet pipe (26) is fixedly connected to two valve ports of the third electric three-way valve (25); the three valve ports of the third electric three-way valve (25) are fixedly connected to a cold medium outlet pipe (27); the first electric three-way valve (15) and the third electric three-way valve (25) are electrically connected to the programmable controller (2).
4. A smoke test device for cutting oil production according to claim 1, characterized in that: The smoke outlet of the smoke purifier (18) is fixedly connected to a second smoke inlet pipe (17) with a valve, and one end of the second smoke inlet pipe (17) with a valve away from the smoke purifier (18) is fixedly connected to the experimental cylinder (1) and is connected to the auxiliary chamber (12). The top of the experimental cylinder (1) is fixedly connected to a smoke discharge pipe (22) with a valve connected to the auxiliary chamber (12), and the second smoke inlet pipe (17) with a valve and the smoke discharge pipe (22) with a valve are electrically connected to the programmable controller (2).
5. A smoke test device for cutting oil production according to claim 3, characterized in that: A second electric three-way valve (23) is fixedly connected to the medium outlet end of the coil (13), and the coil (13) is fixedly connected to a valve port of the second electric three-way valve (23). A spray pipe (10) is arranged at the bottom end of the interior of the experimental chamber (8). One end of the spray pipe (10) passes through the experimental cylinder (1), extends into the auxiliary chamber (12), and is fixedly connected to two valve ports of the second electric three-way valve (23). The other end of the spray pipe (10) is fixedly connected to the wall surface of the experimental cylinder (1). A plurality of one-way nozzles (9) are fixedly connected to the top and bottom ends of the spray pipe (10) at equal intervals. The three valve ports of the second electric three-way valve (23) are fixedly connected to a medium connecting pipe (24). One end of the medium connecting pipe (24) away from the second electric three-way valve (23) passes through the experimental cylinder (1), extends to the outside, and is fixedly connected to a valve port of a third electric three-way valve (25). The second electric three-way valve (23) is electrically connected to the programmable controller (2).
6. A smoke test device for cutting oil production according to claim 1, characterized in that: An electric cylinder (21) is fixedly connected to the top of the experimental cylinder (1), a scraper (6) is arranged at the top of the interior of the experimental chamber (8), an output shaft of the electric cylinder (21) passes through the experimental cylinder (1) and extends into the experimental chamber (8) and is fixedly connected to the scraper (6), through holes (5) are respectively opened on the scraper (6) at positions corresponding to the valved feed pipe (19), the first valved smoke inlet pipe (4) and the valved smoke outlet pipe (20), the bottom ends of the valved feed pipe (19), the first valved smoke inlet pipe (4) and the valved smoke outlet pipe (20) are respectively connected to the experimental chamber (8) through the through holes (5) at corresponding positions, and the electric cylinder (21) is electrically connected to the programmable controller (2).