High and steep slope ecological greening device for green mine construction
By dividing the large protective net into a small protective net and adopting a specific structure, the inconvenience of the handling and maintenance of the slope greening device and soil erosion problems in rainy days are solved, and more efficient slope protection and green planting are achieved, which improves the Security.
Patent Information
- Application Number
- CN202420786059.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The existing slope greening device is inconvenient for handling and maintenance, and it also has serious soil erosion in rainy days, so it cannot guarantee safety.
A high-steep slope ecological greening device was designed. By dividing the large protective net into a small protective net, it uses fixed rings, fixing nuts, cushions, partition strips and studs to simplify installation and maintenance, and provides Green planting areas are used to prevent soil erosion.
It improves protection capabilities, simplifies transportation and installation, reduces manpower and material demand, avoids soil erosion and collapse in rainy days, and enhances the safety of slopes.
Smart Images

Figure CN222140079U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of slope greening, in particular to a high and steep slope ecological greening device for green mine construction. Background Art
[0002] In the construction of water conservancy, highways, railways, mining and other construction projects, there is often a large amount of construction excavation, which causes the destruction of the original vegetation and forms large areas of exposed earth slopes, which in turn causes ecological environmental imbalances such as soil erosion, landslides, mud-rock flows, deterioration of local microclimate, light and sound pollution, and destruction of the food chain.
[0003] However, the greening devices currently used mainly cover the slope surface through a protective net, and the protective net itself is large in area and weight, making it inconvenient to carry and subsequently maintain. At the same time, the slope suffers from severe soil erosion on rainy days, and the protective net cannot guarantee safety.
[0004] In view of this, research and improvements are conducted on the existing problems, and an ecological greening device for steep slopes used in green mine construction is provided. The device has a reasonable structural design, and integrates fixed stability, green plant planting, and convenient replacement. It reduces manpower and material resources and greatly improves work efficiency. The purpose is to solve problems and improve practical value through this technology. Utility Model Content
[0005] The purpose of the utility model is to solve the shortcomings in the prior art and to propose a high steep slope ecological greening device for green mine construction.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: an ecological greening device for high and steep slopes for green mine construction, comprising a first protective net, a second protective net being movably connected to one side of the first protective net, a third protective net being movably connected to the bottom of the second protective net, a fourth protective net being arranged on one side of the third protective net, a dividing strip being fixedly connected to the top of the second protective net, a fixing ring being fixedly connected to the outer wall of the first protective net, a fixing bolt being movably connected to the inside of the fixing ring, a fixing nut being movably connected to one side of the fixing bolt, a cushion being sleeved on the outer wall of the fixing nut, a nut being movably connected to the top of the cushion, a triangular cone being fixedly connected to the bottom of the fixing bolt, a barb being arranged on the outer wall of the triangular cone, a slope being movably connected to the bottom of the first protective net, an inner soil layer being arranged inside the slope, and an outer soil layer being arranged on the front of the first protective net.
[0007] As a further description of the above technical solution:
[0008] The outer walls of the first protective net, the second protective net, the third protective net and the fourth protective net are all provided with fixing rings, and the adjacent fixing rings of the protective nets are connected by using fixing nuts.
[0009] As a further description of the above technical solution:
[0010] The fixing nut, the soft pad and the nut form a fixing structure, and the fixing structure is only located adjacent to the protective net.
[0011] As a further description of the above technical solution:
[0012] The soft pad is made of rubber material and is located between the bottom of the nut and the two groups of protection nets.
[0013] As a further description of the above technical solution:
[0014] The fixing bolt, the triangular cone and the barb form a bolt, and the bolt is located at the four corners of the outer wall of the protective net.
[0015] As a further description of the above technical solution:
[0016] The partition strip is made of rubber material, and the appearance of the partition strip is a cross.
[0017] The utility model has the following beneficial effects:
[0018] In the utility model, by combining fixed stability, green plant planting, and easy replacement, the protection capacity of the high and steep slope ecological greening device is greatly improved. By dividing the traditional large-scale protection net into small-scale protection nets, it is convenient for subsequent transportation and installation when the area is insufficient, and it is more convenient to use and also convenient for subsequent maintenance. In addition, the outer wall of the protection net is provided with partition strips to provide an area for the growth of green plants and the filling of soil, thereby avoiding the situation that soil erosion easily occurs on the slope on rainy days and causes collapse. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the overall structure of a high and steep slope ecological greening device for green mine construction proposed by the utility model;
[0020] Figure 2 A schematic diagram of a protective net assembly of a high-steep slope ecological greening device for green mine construction proposed by the utility model;
[0021] Figure 3 A schematic diagram of a single protective net of a high and steep slope ecological greening device for green mine construction proposed by the utility model;
[0022] Figure 4 This is a schematic diagram of the connection of the protective net of a high and steep slope ecological greening device for green mine construction proposed by the utility model;
[0023] Figure 5This is a schematic diagram of a fixing bolt of a high and steep slope ecological greening device for green mine construction proposed by the utility model;
[0024] Figure 6 This is a partial installation schematic diagram of a high and steep slope ecological greening device for green mine construction proposed by the utility model.
[0025] Legend:
[0026] 1. The first protective net; 2. The second protective net; 3. The third protective net; 4. The fourth protective net; 5. The dividing strip; 6. The fixing ring; 7. The fixing bolt; 8. The fixing nut; 9. The cushion; 10. The nut; 11. The triangular cone; 12. The barb; 13. The slope; 14. The inner soil layer; 15. The outer soil layer. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance. In addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0029] Reference Figure 1-6The utility model provides an embodiment: an ecological greening device for steep slopes used in green mine construction, comprising a first protective net 1, a second protective net 2 is movably connected to one side of the first protective net 1, a third protective net 3 is movably connected to the bottom of the second protective net 2, and a fourth protective net 4 is arranged on one side of the third protective net 3, which is convenient for subsequent transportation and maintenance and effectively protects the safety of the slope 13. A partition bar 5 is fixedly connected to the top of the second protective net 2 to facilitate the planting of green plants. A fixed ring 6 is fixedly connected to the outer wall of the first protective net 1, and the inside of the fixed ring 6 A fixing bolt 7 is movably connected to facilitate the installation and fixation of multiple groups of protective nets. A fixing nut 8 is movably connected to one side of the fixing bolt 7. A soft pad 9 is sleeved on the outer wall of the fixing nut 8 to disperse the fixing pressure and prevent loosening. A nut 10 is movably connected to the top of the soft pad 9. A triangular cone 11 is fixedly connected to the bottom of the fixing bolt 7 to facilitate the installation of the protective net on the slope 13. A barb 12 is provided on the outer wall of the triangular cone 11. The bottom of the first protective net 1 is movably connected to the slope 13. An inner soil layer 14 is provided inside the slope 13, and an outer soil layer 15 is provided on the front of the first protective net 1.
[0030] Specifically, the outer walls of the first protection net 1 , the second protection net 2 , the third protection net 3 , and the fourth protection net 4 are all provided with fixing rings 6 , and adjacent protection net fixing rings 6 are connected using fixing nuts 8 , which facilitates the installation and subsequent disassembly and maintenance of the protection nets.
[0031] Specifically, the fixing nut 8, the soft pad 9, and the nut 10 form a fixing structure, and the fixing structure is only located adjacent to the protective net, which is convenient for the installation of multiple groups of protective nets and the subsequent disassembly.
[0032] Specifically, the soft pad 9 is made of rubber material, and is located between the bottom of the nut 10 and the two groups of protection nets to buffer the pressure of fixing the protection nets to prevent loosening.
[0033] Specifically, the fixing bolt 7 , the triangular cone 11 , and the barb 12 constitute a bolt, and the bolt is located at the four corners of the outer wall of the protection net, so as to fix the protection net on the slope 13 .
[0034] Specifically, the dividing strip 5 is made of rubber material, and the dividing strip 5 has a cross-shaped appearance, which is convenient for the subsequent planting of green plants.
[0035] Working principle: When in use, place the first protective net 1 and the second protective net 2 together, then place the fixed ring 6 on the right side of the first protective net 1 and the fixed ring 6 on the left side of the second protective net 2 together, then insert the fixing nut 8 into the two sets of fixing rings 6, and fix them with the nut 10. If the area of the protective net is not enough, install it according to the above steps, then place the assembled protective net on the slope 13 and use the fixing bolt 7 to fix the slope 13, then place the outer soil layer 15 to fill the dividing strip 5 and plant green plants to avoid soil erosion on the slope 13 on rainy days.
[0036] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A high steep slope ecological greening device for green mine construction, comprising a first protective net (1), characterized in that: The first protective net (1) is movably connected to a second protective net (2) at one side, the second protective net (2) is movably connected to a third protective net (3) at the bottom, a fourth protective net (4) is arranged at one side of the third protective net (3), a partition bar (5) is fixedly connected to the top of the second protective net (2), a fixing ring (6) is fixedly connected to the outer wall of the first protective net (1), a fixing bolt (7) is movably connected inside the fixing ring (6), a fixing nut (8) is movably connected to one side of the fixing bolt (7), a soft pad (9) is sleeved on the outer wall of the fixing nut (8), a nut (10) is movably connected to the top of the soft pad (9), a triangular cone (11) is fixedly connected to the bottom of the fixing bolt (7), a barb (12) is arranged on the outer wall of the triangular cone (11), a side slope (13) is movably connected to the bottom of the first protective net (1), an inner soil layer (14) is arranged inside the side slope (13), and an outer soil layer (15) is arranged on the front of the first protective net (1).
2. The high and steep slope ecological greening device for green mine construction according to claim 1 is characterized by: The outer walls of the first protection net (1), the second protection net (2), the third protection net (3) and the fourth protection net (4) are all provided with fixing rings (6), and the adjacent protection net fixing rings (6) are connected using fixing nuts (8).
3. The high steep slope ecological greening device for green mine construction according to claim 1 is characterized by: The fixing nut (8), the soft pad (9) and the nut (10) form a fixing structure, and the fixing structure is only located adjacent to the protective net.
4. The high steep slope ecological greening device for green mine construction according to claim 1 is characterized by: The soft pad (9) is made of rubber material and is located between the bottom of the nut (10) and the two groups of protection nets.
5. The high and steep slope ecological greening device for green mine construction according to claim 1 is characterized by: The fixing bolt (7), the triangular cone (11) and the barb (12) form a bolt, and the bolt is located at the four corners of the outer wall of the protective net.