Flower basket type scaffold I-shaped steel dismantling operation platform

By designing a flower basket-type scaffolding I-steel removal operation platform including skeleton, support plate and hook, the problems of poor safety and inconvenience in I-steel removal during construction are solved, and the high strength and convenient movement of the structure are achieved, which improves the improvement of the Construction safety and convenience.

CN222140646UActive Publication Date: 2024-12-10THE FOURTH OF CHINA CONSTR SEVENTH ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420443120.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-07
Publication Date
2024-12-10
Estimated Expiration
2034-03-07

AI Technical Summary

Technical Problem

During construction, during the I-steel removal process of flower basket-type cantilever scaffolding, traditional methods have problems such as poor safety and inconvenient operation, especially the low strength of the wooden springboard and needs to be fixed or removed each time, resulting in inconvenient construction or need to be lifted The lifting scaffolding board is moved, and it is difficult to operate.

Method used

A flower basket-type scaffolding I-steel removal operation platform including a skeleton, support plate, first hook and second hook is designed. Through the fixing device and rotating device of the hook, the stable connection and convenient movement of the scaffolding board are realized, which reduces the Overall weight improves structural strength and safety.

Benefits of technology

The platform ensures construction safety through the combination of the square steel frame with the steel plate surface layer, which facilitates the operation of the scaffolding when moving at high altitude. The convenience and safety are significantly improved, avoiding the lifting in traditional methods and difficulty in movement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222140646U_ABST
    Figure CN222140646U_ABST
Patent Text Reader

Abstract

A flower basket type scaffold I-shaped steel dismantling operation platform relates to the field of scaffolds and comprises a framework, a supporting plate installed on the framework, two sets of first hooks and two sets of second hooks. One end of the first hook is hung at the bottom of the framework, and the other end of the first hook penetrates through the supporting plate; one end of the second hook is fixedly connected to the bottom of the supporting plate, and the other end penetrates through the supporting plate; and the top of the second hook is fixedly connected with the top of the second hook. The problem that the scaffold is inconvenient to move by constructors in the prior art is solved. Through the combination of the square steel framework and the steel plate surface layer, the strength and rigidity of the structure are guaranteed, the overall weight of the scaffold is reduced, and construction is facilitated; through a fixing device of the hook, the stability of the scaffold is guaranteed, and the safety of operators is guaranteed; through a rotating device of the hook, the scaffold board is convenient to move, and the problem that in a traditional method, the scaffold board can be moved backwards only after the whole scaffold board is lifted, and operation of operators is inconvenient is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of scaffolding, in particular to a basket-type scaffolding I-beam dismantling operation platform. Background Art

[0002] During construction, cantilever scaffolding is a common tool that enables construction workers to work safely at height. There are some challenges and risks in the assembly, dismantling and maintenance of cantilever scaffolding, especially during the dismantling stage, when special attention needs to be paid to the safety of construction workers.

[0003] When using a basket-style cantilever scaffold for construction, when the I-beam is removed after the external frame is removed, how to ensure the safety of the workers and the convenience of removal becomes the top priority. The traditional method is to lay a wooden springboard on the steel beam and use ropes to fix the wooden springboard to the steel beam, and the workers remove them one by one. However, this method has poor safety due to the low strength and rigidity of the wooden springboard, and the wooden springboard needs to be fixed or removed every time, which is inconvenient for construction; another method is to weld a hook at the bottom of the steel scaffolding board to hook the I-beam and then remove it in turn. After each steel beam is removed, the scaffolding board needs to be manually lifted and moved backwards. This method ensures the stability and strength of the scaffolding board to a certain extent, but the overall self-weight of the scaffolding board is large, and the workers need to lift the scaffolding board before moving it to the rear steel beam every time they move at high altitude, which is inconvenient to operate. Utility Model Content

[0004] The utility model provides a basket-type scaffold I-beam dismantling operation platform to solve the problem of inconvenience in operation when construction workers move the scaffold in the prior art.

[0005] The utility model provides a basket-type scaffolding I-beam dismantling work platform, comprising a frame and a support plate installed on the frame, and further comprising two groups of first hooks and two groups of second hooks; one end of the first hook is hung on the bottom of the frame, and the other end of the first hook passes through the support plate and extends to the upper part of the support plate; one end of the second hook is fixedly connected to the bottom of the support plate, and the other end passes through the support plate and extends to the upper part of the support plate; the top of the second hook is fixedly connected to the top of the second hook.

[0006] Furthermore, the first hook includes a connecting portion and supporting portions arranged at both ends of the connecting portion; the two supporting portions are symmetrically arranged along the center of the midpoint of the connecting portion; each of the supporting portions is hung on the bottom of the frame to fix the frame and the support plate.

[0007] Furthermore, a hook ear plate is provided on each side of the first hook near the support part; the hook ear plates are symmetrically arranged along the midpoint center of gravity of the connecting part; a scaffolding ear plate is provided on one side of the second hook passing through the support plate; the hook ear plate located at the top of the support plate is fixed to the scaffolding ear plate by high-strength bolts.

[0008] Furthermore, the length of the support plate is greater than the distance between two adjacent frames; the spacing between two adjacent first hooks is adapted to the distance between two adjacent frames; and the support parts of the two first hooks are arranged opposite to each other.

[0009] Furthermore, a rotation hole is provided at the center of the connection portion of the first hook; a rotation fixing screw is inserted into the rotation hole; and the rotation fixing screw is fixedly connected to the bottom of the support plate.

[0010] Furthermore, two limit slots are provided on the support plate; each first hook and the connected second hook pass through the corresponding limit slot; the width of the limit slot is smaller than the length of the rotating fixing screw and larger than the sum of the diameter of the first hook and the diameter of the second hook; the length of the limit slot is smaller than the length of the connecting part of the first hook.

[0011] Beneficial effects of the present invention:

[0012] The utility model provides a basket-type scaffolding I-beam dismantling operation platform, which not only ensures the strength and rigidity of the structure, but also reduces the overall weight of the scaffolding, making construction easier.

[0013] The utility model provides a basket-type scaffolding I-beam dismantling operation platform, which has a hook fixing device to ensure the stability of the scaffolding and the safety of the operators;

[0014] The utility model provides a basket-type scaffolding I-beam dismantling operation platform, which makes it convenient to move the scaffolding board through a rotating device of a hook, thereby avoiding the problem that the scaffolding board needs to be lifted as a whole before it can be moved backwards in the traditional method, which makes it inconvenient for operators to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0016] Figure 1 This is a schematic diagram of the structure of a basket-type scaffolding I-beam dismantling work platform of the utility model;

[0017] Figure 2 This is a schematic diagram of the first hook structure of a basket-type scaffolding I-beam dismantling work platform of the utility model;

[0018] Figure 3 This is a schematic diagram of the assembly of the first hook and the second hook of a basket-type scaffolding I-beam dismantling work platform of the utility model;

[0019] Among them: 1-skeleton, 2-support plate, 21-limiting groove, 3-first hook, 31-connecting part, 32-supporting part, 33-hook ear plate, 34-rotation hole, 35-rotation fixing screw, 4-second hook, 41-scaffolding ear plate, 5-high-strength bolt. DETAILED DESCRIPTION

[0020] The utility model provides a basket-type scaffolding I-beam dismantling work platform, comprising a frame 1, a support plate 2 installed on the frame 1, two first hooks 3 and two second hooks 4; the frame 1 is made of I-beam, and the assembly of the frame 1 is a conventional technical means, which will not be repeated here. The support plate 2 is composed of a patterned steel plate welded on a frame composed of square steel welded.

[0021] Each first hook 3 includes a connecting portion 31 and a supporting portion 32 connected to both ends of the connecting portion 31; the two supporting portions 32 are symmetrically arranged along the midpoint of the connecting portion 31; the supporting portion 32 is used to be movably connected to the bottom of the frame 1; when the supporting portion 32 at one end is movably connected to the bottom of the frame 1, the other end passes through the supporting plate 2. The spacing between the two first hooks 3 is adapted to the distance between two adjacent frames 1. One end of each second hook 4 is connected to the bottom of the supporting plate 2, and the other end passes through the supporting plate 2. The first hook 3 passes through one side of the supporting plate 2 and is fixedly connected to the top of the second hook 4.

[0022] A hook lug plate 33 is provided at each side of the first hook 3 near the support portion 2; the hook lug plates 33 are symmetrically arranged along the center of the midpoint of the connection portion 31; a scaffolding lug plate 41 is provided on one side of the top of the second hook 4; the hook lug plate 33 and the scaffolding lug plate 41 are located at the top of the support plate 2. A rotation hole 34 is provided at the center of the connection portion 31 of the first hook 3, and a rotation fixing screw 35 is inserted in the rotation hole 34. The rotation fixing screw 35 is fixedly connected to the bottom of the support plate 2, and the first hook 3 can rotate through the rotation fixing screw 35. Two limiting grooves 21 are provided on the support plate 2, and each first hook 3 and the second hook 4 connected thereto pass through the corresponding limiting groove (21); the width of the limiting groove 21 is less than the length of the rotation fixing screw 35, and greater than the sum of the diameter of the first hook 3 and the diameter of the second hook 4; the length of the limiting groove 21 is greater than the length of the connection portion 31 of the first hook 3. The first hook 3 and the second hook 4 are made of grade 3 steel with a diameter of not less than 18 mm. The hook lug plate 33 and the scaffolding lug plate 41 are stamped lug plates. The first hook 3 and the second hook 4 can be integrally stamped, or the hook ear plate 33 and the scaffolding ear plate 41 can be punched and then welded to the first hook 3 and the second hook 4. The hook ear plate 33 and the scaffolding ear plate 41 are positioned in the same way to ensure that the high-strength bolts 5 are effectively inserted and fixed. Each first hook 3 and the connected second hook 4 pass through the corresponding limiting groove 21; each rotating fixing screw 35 is fixed below the limiting groove 21 and fixed by the bolts at the bottom of the support plate 2. The spiral fixing screw 35 passes through the bolts and is perpendicular to the limiting groove 21. The connecting parts of the two first hooks 3 are arranged opposite to each other.

[0023] The working process of the utility model is as follows: when dismantling the I-beam, place the support plate 2 on the frame 1; hook the support parts 32 of the two opposite first hooks 3 onto the I-beam, the left support part 32 hooks the left side of the corresponding I-beam, and the right support part 32 hooks the right side of the corresponding I-beam; align the hook ear plate 33 of each first hook 31 with the scaffolding ear plate 41 of the corresponding second hook, and then fix the high-strength bolt 5. The worker can remove the adjacent I-beam on the support plate 2. After the dismantling operation is completed here, the staff does not need to lift the support to move; after the high-strength bolt 5 is contacted and fixed, rotate the two first hooks 3 to make the support part 32 detach from the frame; the first hook 3 on the left rotates clockwise, and the first hook 3 on the right rotates counterclockwise; push the support plate 2 to the next position beyond the working position, repeat the installation steps, and the construction personnel can remove the I-beam under the support plate of the previous working position. The reliability of the support plate 2 fixed to the frame 1 in each operation can be guaranteed, which greatly improves the convenience and safety of the workers' operation.

Claims

1. A basket-type scaffolding I-beam dismantling work platform, comprising a frame (1) and a support plate (2) mounted on the frame (1), characterized in that: It also comprises two groups of first hooks (3) and two groups of second hooks (4); one end of the first hook (3) is hooked on the bottom of the frame, and the other end of the first hook (3) passes through the support plate (2) and extends to the upper part of the support plate (2); one end of the second hook (4) is fixedly connected to the bottom of the support plate (2), and the other end passes through the support plate (2) and extends to the upper part of the support plate (2); the top of the first hook (3) is fixedly connected to the top of the second hook (4).

2. A basket-type scaffolding I-beam dismantling work platform according to claim 1, characterized in that: The first hook (3) comprises a connecting portion (31) and supporting portions (32) arranged at both ends of the connecting portion (31); the two supporting portions (32) are symmetrically arranged along the center of the midpoint of the connecting portion (31); each supporting portion (32) is hooked to the bottom of the frame (1) and is used to fix the frame (1) and the support plate (2).

3. A basket-type scaffolding I-beam dismantling work platform according to claim 2, characterized in that: A hook ear plate (33) is respectively arranged at a position close to the support portion (32) on both sides of the first hook (3); the hook ear plates (33) are symmetrically arranged along the center of gravity of the midpoint of the connecting portion (31); a scaffolding ear plate (41) is arranged on one side of the second hook (4) passing through the support plate (2); the hook ear plate (33) located at the top of the support plate (2) is fixed to the scaffolding ear plate (41) by means of high-strength bolts (5).

4. The basket-type scaffolding I-beam dismantling work platform according to claim 3 is characterized in that: The length of the support plate (2) is greater than the distance between two adjacent frames; the spacing between two adjacent first hooks (3) is adapted to the distance between two adjacent frames; and the support portions (32) of the two first hooks (3) are arranged relative to each other.

5. The basket-type scaffolding I-beam dismantling work platform according to claim 2 is characterized in that: A rotation hole (34) is provided at the center of the connection portion (31) of the first hook (3); a rotation fixing screw (35) is inserted into the rotation hole (34); and the rotation fixing screw (35) is fixedly connected to the bottom of the support plate (2).

6. The basket-type scaffolding I-beam dismantling work platform according to claim 5 is characterized in that: The support plate (2) is provided with two limiting grooves (21); each first hook (3) and the second hook (4) connected thereto pass through the corresponding limiting groove (21); the width of the limiting groove (21) is smaller than the length of the rotating fixing screw (35) and larger than the sum of the diameter of the first hook (3) and the diameter of the second hook (4); the length of the limiting groove (21) is smaller than the length of the connecting portion (31) of the first hook (3).