Desulfurizing tower with rapid drainage structure

The desulfurization tower with a rapid drainage structure addresses water accumulation issues by using a water collecting tank and rotating push plate to enhance drainage efficiency and improve desulfurization performance.

CN222143106UActive Publication Date: 2024-12-10HEBEI YONGSHEN ENVIRONMENTAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420503061.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-12-10
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

Traditional desulfurization towers face issues with water accumulation due to excessive liquid use, which affects desulfurization efficiency and gas emission quality.

Method used

A desulfurization tower with a rapid drainage structure featuring a water collecting tank, rotating push plate, and spiral guide grooves to manage water flow and enhance drainage efficiency.

Benefits of technology

The structure facilitates quick water discharge and reduces accumulation, improving desulfurization efficiency and gas emission quality by distributing water flow and utilizing a rotating mechanism.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222143106U_ABST
    Figure CN222143106U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of desulfurizing towers, in particular to a desulfurizing tower with a quick drainage structure. According to the technical scheme, the device comprises a tower body, a water collecting tank and a fixing disc, the water collecting tank is fixedly installed on the outer side of the tower body, a water pump is fixedly installed at the top of the water collecting tank on one side of the tower body, and a drainage pipe extending into the water collecting tank is fixedly installed on the outer side of the bottom of the tower body; a fixed disc is fixedly mounted in the tower body at the top of the push plate, a flow guide seat is fixedly mounted at the top of the fixed disc, and a spraying pipe is fixedly mounted in the tower body at the top of the flow guide seat. Through combination of various structures, the device can quickly drain accumulated water in the tower body, through rotation of the push plate, the circulation effect of water flow can be improved, the drainage efficiency is improved, the water flow spirally flows along the spiral flow guide groove, the water flow flowing into the bottom of the tower body can be slowed down, and the drainage efficiency is improved. And the water accumulation condition is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of desulfurization towers, in particular to a desulfurization tower with a rapid drainage structure. Background Art

[0002] With the rapid development of industry, the emission of sulfur oxides in coal-fired flue gas has continued to increase, seriously polluting the atmospheric environment. In order to reduce the emission of sulfur oxides, flue gas desulfurization technology has been widely used. The desulfurization tower is the core equipment of flue gas desulfurization technology, and its performance directly affects the desulfurization efficiency. However, the desulfurization tower still has many defects in actual use. For example, when treating flue gas, the traditional desulfurization tower needs to spray a large amount of liquid to desulfurize the flue gas, which will cause water accumulation in the tower. If the accumulated water in the tower is not discharged quickly, it will easily affect the desulfurization effect and the quality of flue gas emissions. Therefore, it is necessary to design a desulfurization tower with a rapid drainage structure. Utility Model Content

[0003] The purpose of the utility model is to provide a desulfurization tower with a rapid drainage structure to solve the problems raised in the above background technology.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a desulfurization tower with a rapid drainage structure, comprising a tower body, a water collecting tank and a fixed plate, a water collecting tank is fixedly installed on the outside of the tower body, a water pump is fixedly installed on the top of the water collecting tank on one side of the tower body, a drainage pipe extending into the water collecting tank is fixedly installed on the outside of the bottom of the tower body, a rotating rod is rotatably installed at the bottom end of the tower body, a push plate is fixedly installed on one side of the rotating rod, a fixed plate is fixedly installed in the tower body at the top of the push plate, a guide seat is fixedly installed on the top of the fixed plate, and a spray pipe is fixedly installed in the tower body at the top of the guide seat.

[0005] The flue gas is transported into the tower body, and the spray liquid in the water collecting tank is extracted by a water pump and transported to the spray pipe, which is convenient for flue gas desulfurization operation. The water flow into the bottom of the tower body is slowed down by the guide seat, which can reduce the accumulation of water at the bottom of the tower body. By distributing multiple drainage pipes around the bottom of the tower body, the accumulated water inside the tower body can be discharged more quickly. The push plate is driven to rotate by the rotating rod, which can increase the circulation effect of the water flow and improve the drainage efficiency.

[0006] Preferably, a water inlet is fixedly installed on the top of the water collecting tank, and a water outlet is fixedly connected to one side of the water collecting tank. The spray liquid required for desulfurization can be conveniently introduced into the water collecting tank through the water inlet, and the spray liquid can be conveniently replaced through the water outlet.

[0007] Preferably, a suction pipe extending into the water collecting tank is fixedly installed at the water suction end of the water pump, and a delivery pipe is fixedly connected between the water discharge end of the water pump and the spray pipe. The water pump is used to extract the spray liquid in the water collecting tank through the suction pipe and deliver it to the spray pipe through the delivery pipe.

[0008] Preferably, the tower body and the water collecting tank are fixedly installed by a support frame, and a spray head is fixedly installed at the bottom of the spray pipe. The support frame can conveniently support the tower body, and the spray liquid is sprayed out by the spray head, which can conveniently react with the flue gas.

[0009] Preferably, a protective shell is fixedly installed at the bottom of the tower body, and a motor corresponding to the rotating rod is fixedly installed inside the protective shell. The protective shell can conveniently protect the motor, and the motor can conveniently drive the rotating rod to rotate.

[0010] Preferably, a spiral guide groove is provided on the surface of the guide seat, and a water guide port is provided on the surface of the fixed plate outside the guide seat. The spray liquid flows along the spiral guide groove in a spiral manner, which can slow down the flow of water into the bottom of the tower body and reduce the accumulation of water at the bottom of the tower body. The spray liquid is guided to the fixed plate through the spiral guide groove and can flow downward to the bottom of the tower body through the water guide port.

[0011] Preferably, an air outlet pipe is fixedly installed on the top of the tower body, and an air inlet pipe is fixedly connected to one side of the tower body. The air inlet pipe can conveniently introduce the flue gas to be shed into the tower body, and the air outlet pipe can conveniently guide the flue gas after spray desulfurization.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. Through the cooperation between the water collecting box, the drainage pipe and the push plate, multiple drainage pipes can be distributed around the bottom of the tower body, so that the accumulated water inside the tower body can be discharged more quickly. At the same time, the push plate has an inclined angle, and the push plate can be rotated to quickly push the accumulated water at the bottom to the drainage pipe, which can effectively increase the circulation effect of the water flow, and can quickly discharge the accumulated water inside the tower body to the water collecting box for collection, thereby improving the drainage efficiency.

[0014] 2. By setting up the fixed plate, the guide seat and the spiral guide groove, the guide seat is in a cone shape, which can make the sprayed water be introduced into the spiral guide groove. The water flows in a spiral along the spiral guide groove, which can effectively slow down the flow of water into the bottom of the tower body and reduce the accumulation of water at the bottom of the tower body. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the main structure of the utility model;

[0016] Figure 2 This is a schematic cross-sectional structural diagram of a water collecting tank of the utility model;

[0017] Figure 3 This is a schematic diagram of the cross-sectional structure of the tower body of the utility model;

[0018] Figure 4 This is a schematic diagram of the structure of the guide seat of the utility model;

[0019] Figure 5 It is a schematic diagram of the push plate structure of the utility model.

[0020] In the figure: 1. tower body; 101. air outlet pipe; 102. air inlet pipe; 103. drain pipe; 104. support frame; 2. water pump; 201. delivery pipe; 202. water suction pipe; 3. water collecting tank; 301. water filling port; 302. water outlet; 4. spray pipe; 401. spray head; 5. fixing plate; 501. water guide port; 502. guide seat; 503. spiral guide groove; 6. protective shell; 601. motor; 602. rotating rod; 7. push plate. DETAILED DESCRIPTION

[0021] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments. Embodiment 1

[0022] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the desulfurization tower with a rapid drainage structure proposed by the utility model includes a tower body 1, a water collecting box 3 and a fixed plate 5. The water collecting box 3 is fixedly installed on the outside of the tower body 1, and a water pump 2 is fixedly installed on the top of the water collecting box 3 on one side of the tower body 1. A drainage pipe 103 extending into the water collecting box 3 is fixedly installed on the outside of the bottom of the tower body 1. A rotating rod 602 is rotatably installed at the bottom end of the tower body 1, and a push plate 7 is fixedly installed on one side of the rotating rod 602. A fixed plate 5 is fixedly installed in the tower body 1 on the top of the push plate 7, and a guide seat 502 is fixedly installed on the top of the fixed plate 5. A spray pipe 4 is fixedly installed in the tower body 1 on the top of the guide seat 502;

[0023] A suction pipe 202 extending into the water collecting tank 3 is fixedly installed at the water suction end of the water pump 2, and a delivery pipe 201 is fixedly connected between the water outlet end of the water pump 2 and the spray pipe 4. The tower body 1 and the water collecting tank 3 are fixedly installed through a support frame 104, a spray head 401 is fixedly installed at the bottom of the spray pipe 4, a spiral guide groove 503 is provided on the surface of the guide seat 502, and a water guide port 501 is provided on the surface of the fixed plate 5 outside the guide seat 502.

[0024] The working principle of the desulfurization tower with a rapid drainage structure based on Example 1 is as follows: by conveying the flue gas into the tower body 1, using the water pump 2 to extract the spray liquid in the water collecting box 3 through the water suction pipe 202, conveying it to the spray pipe 4 through the conveying pipe 201, and using the spray head 401 to spray the spray liquid, which can react with the flue gas conveniently and desulfurize the flue gas conveniently. The desulfurized spray liquid will flow downward and fall on the guide seat 502. The guide seat 502 is conical in shape, so that the spray liquid can be introduced into the spiral guide groove 503. The spray liquid flows in a spiral along the spiral guide groove 503, which can effectively slow down the flow of water into the bottom of the tower body, and reduce the accumulation of water at the bottom of the tower body. The spray liquid is drained to the fixed plate 5 through the spiral guide groove 503, and can flow downward to the bottom of the tower body 1 through the water guide port 501;

[0025] By distributing multiple drainage pipes 103 around the bottom of the tower body 1, the accumulated water inside the tower body 1 can be discharged more quickly. At the same time, the push plate 7 has a certain inclination angle and can be driven to rotate by the rotating rod 602, so that the accumulated water at the bottom can be quickly transferred to the drainage pipe 103, which can effectively increase the circulation effect of the water flow, and the accumulated water inside the tower body 1 can be quickly discharged to the water collecting tank 3 for collection, thereby improving the drainage efficiency. Embodiment 2

[0026] like Figure 1 , Figure 2 , Figure 3 As shown, the desulfurization tower with a rapid drainage structure proposed by the utility model, compared with the first embodiment, this embodiment also includes: a water inlet 301 is fixedly installed on the top of the water collecting box 3, and a water outlet 302 is fixedly connected to one side of the water collecting box 3, a protective shell 6 is fixedly installed on the bottom of the tower body 1, and a motor 601 corresponding to the rotating rod 602 is fixedly installed inside the protective shell 6, an air outlet pipe 101 is fixedly installed on the top of the tower body 1, and an air inlet pipe 102 is fixedly connected to one side of the tower body 1.

[0027] In this embodiment, Figure 1 As shown, the spray liquid required for desulfurization can be conveniently introduced into the water collecting tank 3 through the water injection port 301, and the spray liquid can be conveniently replaced through the water outlet 302; Figure 3 As shown, the protective shell 6 can conveniently protect the motor 601, and the motor 601 can conveniently drive the rotating rod 602 to rotate; Figure 2 As shown, the flue gas to be removed can be conveniently introduced into the tower body 1 through the air inlet pipe 102, and the flue gas after spray desulfurization can be conveniently discharged through the air outlet pipe 101.

[0028] The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.

Claims

1. A desulfurization tower with a rapid drainage structure, comprising a tower body (1), a water collecting tank (3) and a fixing plate (5), characterized in that: A water collecting tank (3) is fixedly mounted on the outside of the tower body (1), a water pump (2) is fixedly mounted on the top of the water collecting tank (3) on one side of the tower body (1), a drainage pipe (103) extending into the water collecting tank (3) is fixedly mounted on the outside of the bottom of the tower body (1), a rotating rod (602) is rotatably mounted at the bottom end of the tower body (1), a push plate (7) is fixedly mounted on one side of the rotating rod (602), a fixed plate (5) is fixedly mounted in the tower body (1) at the top of the push plate (7), a guide seat (502) is fixedly mounted on the top of the fixed plate (5), and a spray pipe (4) is fixedly mounted in the tower body (1) at the top of the guide seat (502).

2. The desulfurization tower with a rapid drainage structure according to claim 1, characterized in that: A water inlet (301) is fixedly mounted on the top of the water collecting tank (3), and a water outlet (302) is fixedly connected to one side of the water collecting tank (3).

3. The desulfurization tower with a rapid drainage structure according to claim 1, characterized in that: A water suction pipe (202) extending into the water collecting tank (3) is fixedly installed at the water suction end of the water pump (2), and a delivery pipe (201) is fixedly connected between the water outlet end of the water pump (2) and the spray pipe (4).

4. The desulfurization tower with a rapid drainage structure according to claim 1, characterized in that: The tower body (1) and the water collecting tank (3) are fixedly mounted via a support frame (104), and a spray head (401) is fixedly mounted at the bottom of the spray pipe (4).

5. The desulfurization tower with a rapid drainage structure according to claim 1, characterized in that: A protective shell (6) is fixedly mounted on the bottom of the tower body (1), and a motor (601) corresponding to the rotating rod (602) is fixedly mounted inside the protective shell (6).

6. The desulfurization tower with a rapid drainage structure according to claim 1, characterized in that: The surface of the flow guide seat (502) is provided with a spiral flow guide groove (503), and the surface of the fixed plate (5) outside the flow guide seat (502) is provided with a water guide port (501).

7. The desulfurization tower with a rapid drainage structure according to claim 1, characterized in that: An air outlet pipe (101) is fixedly mounted on the top of the tower body (1), and an air inlet pipe (102) is fixedly connected to one side of the tower body (1).