Solid pier steel bar mounting and binding operation platform
By designing a solid pier steel bar installation and binding operation platform that can be fully lifted, the problems of high safety risks and low craftsmanship in traditional platforms in harsh environments are solved, and efficient and safe steel bar installation and binding operation are achieved.
Patent Information
- Application Number
- CN202420388020.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-02-28
AI Technical Summary
The traditional solid pier steel bar installation and binding operation platform requires manual scaffolding, which is time-consuming and labor-intensive, and has high safety risks, low craftsmanship and difficult to control in harsh environments.
Design a solid pier steel bar installation and binding operation platform, including setting up a stressed skeleton and an operating platform on the outer mold of the pier body, and a lifting ring on the stressed skeleton. The platform can be hoisted as a whole, simplifying the installation and disassembly process and avoiding high-altitude construction.
It improves installation and disassembly efficiency, enhances safety, reduces construction risks, and improves work efficiency and construction quality.
Smart Images

Figure CN222160946U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of bridge construction, in particular to a solid pier reinforcement installation and binding operation platform. Background Art
[0002] The main reinforcement of solid bridge piers is long and heavy, and the installation and binding of the main reinforcement is extremely inconvenient. The traditional two-leg solid pier reinforcement installation and binding work platform mainly uses manual or temporary scaffolding. The construction of scaffolding is time-consuming and labor-intensive. In actual construction, the turnover of a large number of scaffolding brings more safety risks, especially in an environment affected by typhoons, monsoons, and low temperatures. The working environment of workers is poor, the effective working time in the field is limited, the work efficiency is greatly reduced, the safety risks are multiplied, and the construction quality is difficult to control.
[0003] Prior art CN219261688U discloses a solid pier mold turning construction operation platform, including a platform pad, a side plate welded to one side of the platform pad, two diagonal bars welded between the side plate and the platform pad, and columns welded to the four corners of the top of the platform pad, wherein a number of guardrails are fixedly connected between three adjacent groups of columns, and an entrance and exit are reserved between another group of columns; a feeding mechanism is fixedly installed on the outer side of one of the columns near the entrance and exit. This prior art can realize the interaction between ground workers and platform workers, facilitate the transportation of construction materials, improve construction efficiency, and also have high safety. However, it also requires manual installation and disassembly, and is not convenient enough. Utility Model Content
[0004] The utility model aims to provide a solid pier reinforcement installation and binding operation platform in view of the above shortcomings. The platform has a simple structure and can be hoisted as a whole, thereby improving the efficiency of installation and disassembly.
[0005] The purpose of the utility model is achieved in this way:
[0006] A solid pier steel bar installation and binding operation platform, comprising a load-bearing frame arranged above an outer formwork of a pier body on a section of the solid pier, and an operating platform connected to the top of the load-bearing frame, wherein a lifting ring is arranged on the load-bearing frame;
[0007] The load-bearing skeleton comprises a plurality of vertical load-bearing members arranged along the outer formwork of a pier body on a solid pier, and a plurality of horizontal reinforcement rings are arranged at intervals outside the plurality of vertical load-bearing members.
[0008] In certain embodiments, the operating platform includes an outer frame, the outer frame is connected to the load-bearing frame via a crossbeam, and a table surface connected to an upper surface of the crossbeam is laid between the outer frame and the load-bearing frame.
[0009] In certain embodiments, the table top is selected from any one of expanded metal, alloy plate, wooden plate, plastic plate or bamboo plywood.
[0010] In certain embodiments, a diagonal brace is provided between the vertical force bearing member and the cross beam.
[0011] In certain embodiments, a guardrail is disposed above the outer frame.
[0012] In certain embodiments, the suspension rings are evenly arranged on the radial outer surface of the load-bearing frame at the same horizontal plane.
[0013] The beneficial effects of the utility model are:
[0014] The utility model has a simple structure, and the working platform can be prefabricated on the ground in advance, and can be hoisted as a whole onto the outer form of the hollow pier by a crane. When the steel bars are installed and tied, it can be removed as a whole, which greatly improves the working efficiency and has a high safety factor, and has great promotion potential. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a front view structural diagram of a solid pier reinforcement installation and binding operation platform in a preferred embodiment of the utility model;
[0016] Figure 2 It is a BB cross-sectional view of a solid pier reinforcement installation and binding operation platform in a preferred embodiment of the utility model;
[0017] Figure 3 It is an AA cross-sectional view of a solid pier reinforcement installation and binding operation platform in a preferred embodiment of the utility model;
[0018] Figure 4 It is a partially enlarged schematic diagram of the front view structure of a solid pier reinforcement installation and binding operation platform in a preferred embodiment of the utility model;
[0019] In the figure, 1. load-bearing frame, 2. operating platform, 3. lifting ring, 4. vertical load-bearing member, 5. horizontal reinforcement ring, 6. outer frame, 7. crossbeam, 8. table top, 9. diagonal brace, 10. guardrail. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described below in conjunction with the accompanying drawings. In the description of the utility model, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside" and the like indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0021] Example 1
[0022] like Figure 1-3 As shown, this embodiment provides a solid pier steel bar installation and binding operation platform, including a load-bearing frame 1 arranged above the outer formwork of a pier body of the solid pier, and an operating platform 2 connected to the top of the load-bearing frame 1, and a lifting ring 3 is arranged on the load-bearing frame 1;
[0023] The construction of solid piers adopts the mold turning process. When the next section of the pier is constructed, the outer mold of the previous section of the pier is usually not removed. Therefore, the load-bearing frame 1 in the utility model is placed on the outer mold of the previous section of the pier, and the construction workers stand on the operating platform 2 to install and tie the steel bars.
[0024] In some preferred embodiments, the height of the load-bearing frame 1 is consistent with the height of a single pier section, so that the steel bars at the top of the current pier section can be tied and the main bars of the next pier section can be installed at the same time. Therefore, in this type of embodiment, the main bars of the current pier section are also installed when the steel bars at the top of the previous pier section are tied.
[0025] Through the lifting ring 3, the working platform can be directly lifted and unloaded by a large crane, avoiding the construction of scaffolding at high altitude and improving the safety of construction.
[0026] In some preferred embodiments, the lifting rings 3 are evenly arranged on the radial outer surface of the same horizontal plane of the load-bearing frame 1, so that the working platform can stably pass through the main reinforcement that may exist above the outer mold during lifting, thereby achieving smooth installation.
[0027] The load-bearing skeleton 1 includes a plurality of vertical load-bearing members 4 arranged along the outer formwork of a pier body of an upper section of a solid pier, and a plurality of horizontal reinforcement rings 5 are arranged at intervals outside the plurality of vertical load-bearing members 4 .
[0028] The material of the load-bearing frame 1 is not limited in the present invention, and it can be any one of angle steel, I-beam, square steel or round steel. Square steel is preferred in this embodiment. The specifications are also not limited in the present invention, and those skilled in the art can make reasonable settings according to the bearing capacity requirements.
[0029] A preferred operation process of the solid pier steel bar installation and binding operation platform of the utility model is:
[0030] After the solid pier reinforcement installation and tying work platform is completed on site or in the factory, a large crane is used to hoist it to the outer formwork of the previous pier body. After the connection is stable, the construction personnel are transported to the operating platform to tie the reinforcement of the pier body to be cast, and at the same time, the main reinforcement of the next pier body is installed, and the bottom of the main reinforcement is tied. When the installation and binding are completed, the solid pier reinforcement installation and tying work platform is removed by the crane again. During this period, care is taken to keep it stable and not to touch the main reinforcement of the next pier body. After removal, the outer formwork is installed on the pier body to be cast, and then concrete is poured. After the concrete has solidified for a period of time, the solid pier reinforcement installation and tying work platform is hoisted again to the outer formwork of the cast pier body, and the above steps are repeated to carry out the construction of the next pier body to be cast.
[0031] Example 2
[0032] like Figure 1-3 As shown, this embodiment is carried out on the basis of embodiment 1, and the operating platform 2 includes an outer frame 6, and the outer frame 6 is connected to the load-bearing frame 1 through a crossbeam 7, and a table top 8 connected to the upper surface of the crossbeam 7 is laid between the outer frame 6 and the load-bearing frame 1.
[0033] The table top 8 is selected from any one of steel plate, alloy plate, wood plate, plastic plate or bamboo plywood, and bamboo plywood is preferred in this embodiment.
[0034] The present invention does not limit the material of the outer frame 6 and the cross beam 7, which may be any of angle steel, I-beam, square steel or round steel. Square steel is preferred in this embodiment. The present invention also does not limit the specifications, and those skilled in the art may make reasonable settings based on the bearing capacity requirements.
[0035] Example 3
[0036] like Figure 1-3 As shown, this embodiment is carried out on the basis of Embodiment 1-2, and a diagonal brace 9 is arranged between the vertical force-bearing member 4 and the crossbeam 7; and a guardrail 10 is arranged above the outer frame 6.
[0037] The diagonal brace rods 9 and the guardrails 10 are provided to improve the safety of the working platform. It should be noted that the height of the guardrails 10 should not be less than 1.2 meters.
[0038] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A solid pier steel bar installation and tying operation platform, characterized in that: It comprises a load-bearing frame (1) arranged above the outer formwork of a pier body on a solid pier, and an operating platform (2) connected to the top of the load-bearing frame (1), wherein a lifting ring (3) is arranged on the load-bearing frame (1); The load-bearing frame (1) comprises a plurality of vertical load-bearing members (4) arranged along the outer formwork of a pier body section on the solid pier, and a plurality of horizontal reinforcement rings (5) are arranged at intervals outside the plurality of vertical load-bearing members (4).
2. A solid pier steel bar installation and binding operation platform according to claim 1, characterized in that: The operating platform (2) comprises an outer frame (6), the outer frame (6) being connected to the load-bearing frame (1) via a crossbeam (7), and a tabletop (8) connected to the upper surface of the crossbeam (7) being provided between the outer frame (6) and the load-bearing frame (1).
3. A solid pier steel bar installation and binding operation platform according to claim 2, characterized in that: The table top (8) is selected from any one of steel plate mesh, alloy plate, wooden plate, plastic plate or bamboo plywood.
4. A solid pier steel bar installation and binding operation platform according to claim 2, characterized in that: An oblique support rod (9) is provided between the vertical force-bearing member (4) and the crossbeam (7).
5. A solid pier steel bar installation and binding operation platform according to claim 2, characterized in that: A guardrail (10) is arranged above the outer frame (6).
6. A solid pier reinforcement installation and binding operation platform according to claim 1, characterized in that: The lifting rings (3) are evenly arranged on the radial outer surface of the same horizontal plane of the load-bearing frame (1).