Platform structure of floating type pile stabilizing platform
By designing the branch support frame and lifting structure of the floating pile stabilization platform, the construction safety hazards and difficulty of the offshore photovoltaic power generation system in harsh environments are solved, and rapid construction and efficient construction are achieved.
Patent Information
- Application Number
- CN202323448087.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2033-12-18
AI Technical Summary
In the harsh marine environment, when the wind and waves are high, there are safety hazards for construction personnel to operate, and it is difficult to build existing floating platforms, which affects construction efficiency and safety.
Design a platform structure of a floating pile stabilization platform, including two branch support frames, through prefabricated assembly and lifting lug design, quickly build a floating platform, increase support strength and simplify the lifting process.
Reduce construction risks, improve construction speed, reduce operation difficulty, and enhance the stability and safety of the platform.
Smart Images

Figure CN222161261U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pile stabilization platforms, in particular to a platform structure of a floating pile stabilization platform. Background Art
[0002] Solar energy is a renewable and unlimited energy source, so the energy source of offshore photovoltaic power generation is very rich and can meet a large amount of energy demand. The ocean covers most of the earth's area. By building offshore photovoltaic power stations, we can reduce our dependence on traditional energy. Offshore photovoltaic power generation systems are usually composed of photovoltaic panels, brackets, cables and power electronic equipment. Among them, photovoltaic panels are the core components for converting solar energy into electrical energy. When the sun shines on the photovoltaic panels, the light energy will be converted into electrical energy, which will be transmitted to the power electronic equipment through cables and finally converted into usable electricity.
[0003] Pile foundation is a type of foundation, which is mainly used in situations with poor geological conditions or high construction requirements. Before building an offshore photovoltaic power station, the foundation piles need to be anchored on the seabed or riverbed. The existing construction methods of pile-based fixed-surface photovoltaics generally refer to the surface photovoltaic construction methods of inland rivers, lakes, and sheltered seas, and use floating platforms for piling operations. During the construction of offshore photovoltaic foundation piles, the marine environment is harsh and the wind and waves are strong. It is not easy to build a floating platform on the sea surface. When the wind and waves are strong, there are safety hazards in the operation process of construction personnel. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a platform structure of a floating pile-stabilizing platform, which solves the problems mentioned in the above background.
[0005] The utility model provides the following technical solution: a platform structure of a floating pile-stabilizing platform, comprising: two sub-support frames, the two sub-support frames are butt-jointed and installed together by bolts;
[0006] The sub-support frame includes two main steel pipes, a first connecting steel pipe and two second connecting steel pipes. The connecting steel pipe and the two main steel pipes are arranged parallel to each other, the first connecting steel pipe and the two second connecting steel pipes are arranged parallel to each other, and the first connecting steel pipe and the two second connecting steel pipes are vertically connected between the two main steel pipes. The surfaces of the first connecting steel pipe and the two second connecting steel pipes are connected to the surface of the connecting steel pipe. Two branch pipes are arranged on both sides of the connecting steel pipe, and the branch pipes are respectively connected to the two first connecting steel pipes.
[0007] Preferably, a positioning fixing frame and a walkway are provided on the top of the two sub-support frames, fender steel pipes are provided on both sides of the sub-support frames, and operating platforms are symmetrically provided on the top of the two sub-support frames.
[0008] Preferably, the positioning fixing frame is arranged on the top of one of the main steel pipes, a diagonal brace is arranged on the surface of the positioning fixing frame, one end of the diagonal brace is connected to the surface of the main steel pipe, a positioning ear plate is arranged on the top of the positioning fixing frame, and double plates are connected to both sides of the positioning ear plate.
[0009] Preferably, the walkway includes a steel mesh plate and a guardrail, and the tops of the main steel pipe, the connecting steel pipe, the first connecting steel pipe and the two second connecting steel pipes are all provided with mounting frames, the steel mesh plate is laid on the top of the mounting frame, and the guardrail is connected to the top of the mounting frame.
[0010] Preferably, the fender steel pipe is connected to the surface of the main steel pipe, and the diameter of the fender steel pipe is 50 mm.
[0011] Preferably, multiple first reinforcement tubes are arranged between the first connecting steel pipe and the second connecting steel pipe, and the first reinforcement tubes are located below the operating platform, and one end of each branch pipe is symmetrically provided with a second reinforcement tube, one end of one of the second reinforcement tubes is connected to the surface of the main steel pipe, and one end of another second reinforcement tube is connected to the surface of the second connecting steel pipe.
[0012] Preferably, the surfaces of the main steel pipe and the first connecting steel pipe are both provided with cable piles, the surfaces of the cable piles are provided with a plurality of reinforcing ribs, and the surfaces of the reinforcing ribs are connected to the main steel pipe.
[0013] Preferably, each of the sub-support frames is provided with four lifting ears, two of which are symmetrically arranged on the surface of the second connecting steel pipe, and the other two lifting ears are respectively arranged on the surfaces of the two branch pipes.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] 1. The platform structure of the floating pile-stabilizing platform is provided with two sub-support frames, which are prefabricated and assembled on land. The two sub-support frames are assembled together to form a supporting body, so that the floating platform can be quickly built, the construction risk can be reduced, and the construction speed can be increased.
[0016] 2. The platform structure of the floating pile-stabilized platform is convenient for lifting the sub-support frame by setting lifting lugs.
[0017] 3. The platform structure of the floating pile-stabilizing platform is provided with a first reinforcing pipe and a second reinforcing pipe, and the first reinforcing pipe and the second reinforcing pipe respectively reinforce the concentrated part of the sub-support frame to improve the supporting strength of the sub-support frame. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the structure of the utility model;
[0019] Figure 2 This is a schematic diagram of the sub-support frame structure of the utility model;
[0020] Figure 3 This is a schematic diagram of the structure of the walkway and operating platform of the utility model;
[0021] Figure 4 For this utility model Figure 3 Schematic diagram of the side section structure at the middle AA position;
[0022] Figure 5 It is a schematic diagram of the structure of the utility model;
[0023] Figure 6 It is a schematic diagram of the structure of the utility model;
[0024] Figure 7 It is a schematic diagram of the structure of the utility model;
[0025] Figure 8 It is a schematic diagram of the structure of the utility model.
[0026] In the figure: 1. sub-support frame; 2. main steel pipe; 3. connecting steel pipe; 4. first connecting steel pipe; 5. second connecting steel pipe; 6. branch pipe; 7. positioning fixing frame; 8. walkway; 81. steel mesh plate; 82. guardrail; 83. mounting frame; 9. fender steel pipe; 10. operating platform; 11. diagonal brace; 12. positioning ear plate; 13. double plate; 14. first reinforcing pipe; 15. second reinforcing pipe; 16. cable pile; 17. lifting ear. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] See also Figure 1 , a platform structure of a floating pile-stabilized platform, comprising: two sub-support frames 1, the two sub-support frames 1 are butt-jointed and bolted together;
[0029] The sub-support frame 1 includes two main steel pipes 2, a connecting steel pipe 3, a first connecting steel pipe 4 and two second connecting steel pipes 5. The connecting steel pipe 3 and the two main steel pipes 2 are arranged parallel to each other, the first connecting steel pipe 4 and the two second connecting steel pipes 5 are arranged parallel to each other, and the first connecting steel pipe 4 and the two second connecting steel pipes 5 are vertically connected between the two main steel pipes 2. The surfaces of the first connecting steel pipe 4 and the two second connecting steel pipes 5 are connected to the surfaces of the connecting steel pipe 3. Two branch pipes 6 are arranged on both sides of the connecting steel pipe 3, and the branch pipes 6 are respectively connected to the two first connecting steel pipes 4.
[0030] See also Figure 2-4 A positioning fixing frame 7 and a walkway 8 are provided on the top of the two sub-support frames 1, fender steel pipes 9 are provided on both sides of the sub-support frames 1, and an operating platform 10 is symmetrically provided on the top of the two sub-support frames 1.
[0031] See also Figure 5 The positioning fixing frame 7 is arranged on the top of one of the main steel pipes 2, and an oblique support rod 11 is arranged on the surface of the positioning fixing frame 7, one end of the oblique support rod 11 is connected to the surface of the main steel pipe 2, and a positioning ear plate 12 is arranged on the top of the positioning fixing frame 7, and double plates 13 are connected on both sides of the positioning ear plate 12.
[0032] See also Figure 6-8 The walkway 8 includes a steel mesh plate 81 and a guardrail 82. The tops of the main steel pipe 2, the connecting steel pipe 3, the first connecting steel pipe 4 and the two second connecting steel pipes 5 are all provided with mounting frames 83. The steel mesh plate 81 is laid on the top of the mounting frame 83, and the guardrail 82 is connected to the top of the mounting frame 83.
[0033] The fender steel pipe 9 is connected to the surface of the main steel pipe 2, and the diameter of the fender steel pipe 9 is 50 mm.
[0034] Among them, multiple first reinforcement tubes 14 are arranged between the first connecting steel pipe 4 and the second connecting steel pipe 5, and the first reinforcement tubes 14 are located below the operating platform 10, and one end of each branch pipe 6 is symmetrically arranged with a second reinforcement tube 15, one end of one second reinforcement tube 15 is connected to the surface of the main steel pipe 2, and one end of the other second reinforcement tube 15 is connected to the surface of the second connecting steel pipe 5, and the surfaces of the main steel pipe 2 and the first connecting steel pipe 4 are both provided with cable piles 16, and the surfaces of the cable piles 16 are provided with multiple reinforcement ribs, and the surfaces of the reinforcement ribs are connected to the main steel pipe 2.
[0035] Each sub-support frame 1 is provided with four lifting ears 17, two of which are symmetrically arranged on the surface of the second connecting steel pipe 5, and the other two lifting ears 17 are respectively arranged on the surfaces of the two branch pipes 6.
[0036] The sub-support frame 1 is welded by a main steel pipe 2, a connecting steel pipe 3, a first connecting steel pipe 4 and two second connecting steel pipes 5. During assembly, the lifting ears 17 on the two sub-support frames 1 are docked with the lifting equipment, and the two sub-support frames 1 are adjusted to be docked and connected together with bolts. The floating platform can be quickly built, the construction risk is reduced, and the construction speed is increased. The positioning fixing frame 7 on the sub-support frame 1 is convenient for docking with the construction ship, so as to facilitate the positioning of the platform structure.
[0037] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A platform structure of a floating pile-stabilized platform, characterized in that: include: Two sub-support frames (1), the two sub-support frames (1) are butt-jointed and mounted together by bolts; The sub-support frame (1) comprises two main steel pipes (2), a connecting steel pipe (3), a first connecting steel pipe (4) and two second connecting steel pipes (5); the connecting steel pipe (3) and the two main steel pipes (2) are arranged in parallel with each other; the first connecting steel pipe (4) and the two second connecting steel pipes (5) are arranged in parallel with each other; and the first connecting steel pipe (4) and the two second connecting steel pipes (5) are vertically connected between the two main steel pipes (2); the surfaces of the first connecting steel pipe (4) and the two second connecting steel pipes (5) are connected to the surfaces of the connecting steel pipe (3); two branch pipes (6) are arranged on both sides of the connecting steel pipe (3), and the branch pipes (6) are respectively connected to the two first connecting steel pipes (4).
2. The platform structure of a floating pile-stabilized platform according to claim 1, characterized in that: The tops of the two sub-support frames (1) are both provided with positioning fixing frames (7) and walkways (8), fender steel pipes (9) are both provided on both sides of the sub-support frames (1), and operating platforms (10) are both symmetrically provided on the tops of the two sub-support frames (1).
3. The platform structure of a floating pile-stabilized platform according to claim 2, characterized in that: The positioning fixing frame (7) is arranged on the top of one of the main steel pipes (2); a diagonal brace (11) is arranged on the surface of the positioning fixing frame (7); one end of the diagonal brace (11) is connected to the surface of the main steel pipe (2); a positioning ear plate (12) is arranged on the top of the positioning fixing frame (7); and double plates (13) are connected to both sides of the positioning ear plate (12).
4. The platform structure of a floating pile-stabilized platform according to claim 2, characterized in that: The walkway (8) comprises a steel mesh plate (81) and a guardrail (82); the tops of the main steel pipe (2), the connecting steel pipe (3), the first connecting steel pipe (4) and the two second connecting steel pipes (5) are all provided with a mounting frame (83); the steel mesh plate (81) is laid on the top of the mounting frame (83); and the guardrail (82) is connected to the top of the mounting frame (83).
5. The platform structure of a floating pile-stabilized platform according to claim 2, characterized in that: The fender steel pipe (9) is connected to the surface of the main steel pipe (2), and the diameter of the fender steel pipe (9) is 50 mm.
6. The platform structure of a floating pile-stabilized platform according to claim 2, characterized in that: A plurality of first reinforcing tubes (14) are arranged between the first connecting steel tube (4) and the second connecting steel tube (5), and the first reinforcing tubes (14) are located below the operating platform (10). A second reinforcing tube (15) is symmetrically arranged at one end of each branch tube (6), wherein one end of one of the second reinforcing tubes (15) is connected to the surface of the main steel tube (2), and one end of another of the second reinforcing tubes (15) is connected to the surface of the second connecting steel tube (5).
7. The platform structure of a floating pile-stabilized platform according to claim 1, characterized in that: The surfaces of the main steel pipe (2) and the first connecting steel pipe (4) are both provided with cable piles (16), and the surfaces of the cable piles (16) are provided with a plurality of reinforcing ribs, and the surfaces of the reinforcing ribs are connected to the main steel pipe (2).
8. The platform structure of a floating pile-stabilized platform according to claim 1, characterized in that: Each of the sub-support frames (1) is provided with four lifting ears (17), two of which are symmetrically arranged on the surface of the second connecting steel pipe (5), and the other two lifting ears (17) are respectively arranged on the surfaces of the two branch pipes (6).