Fabricated steel structure roof sandwich plate

The assembled steel structure roof sandwich panel addresses thermal expansion issues by using a capsule-based foam filler system to automatically fill gaps, enhancing installation efficiency and aesthetics.

CN222161766UActive Publication Date: 2024-12-13THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323454112.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-12-13
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

Prefabricated steel structure roof sandwich panels are susceptible to thermal expansion and contraction, leading to gaps that require labor-intensive and messy foam glue application during installation.

Method used

An assembled steel structure roof sandwich panel with a heat-insulating layer containing a capsule and discharge ports, sealed by a sealing sheet, which releases foam filler upon manual activation to fill gaps.

Benefits of technology

Facilitates efficient and clean gap filling without labor-intensive pouring, preventing overflow and improving appearance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222161766U_ABST
    Figure CN222161766U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of plates, in particular to an assembly type steel structure roof sandwich plate which comprises an upper main plate, a lower main plate arranged below the upper main plate, a heat preservation layer arranged between the upper main plate and the lower main plate in a filling mode, a capsule arranged in the heat preservation layer, a discharging port formed in the surface of the capsule, a sealing piece arranged at the position of the discharging port, and a sealing strip arranged on the sealing piece. The sealing piece is fixedly connected to the pull strip, the periphery of the heat preservation layer is wrapped with a reinforcing frame, the capsule is filled with polystyrene foam filler, the bottom end of the sealing piece is fixedly connected to the bottom end of the pull strip, the top end of the pull strip is fixedly connected to a twitching strip, and a handle is fixed to the top end of the twitching strip. The device has the beneficial effects that the handle is manually shifted to drive the twitching strip and the pull strip to move upwards, so that the sealing piece falls off, the twitching strip, the pull strip and the sealing piece can be pulled out from the through groove, polystyrene foam filler in the capsule can be leaked out to be in contact with moisture in the air and can be rapidly expanded, and gaps between sandwich plates are filled and sealed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of plates, in particular to an assembled steel structure roof sandwich plate. Background Art

[0002] Prefabricated steel structure roof sandwich panels are a material used for building roofs. They are composed of two layers of steel plates and a thermal insulation material in the middle. They are not only light in weight, but also have strong wind resistance, earthquake resistance, corrosion resistance and fire resistance. Prefabricated steel structure roof sandwich panels have been widely used in the construction field, especially in industrial plants, warehouses, commercial complexes and other buildings. Their superior performance and easy processing and installation make them a very popular building material.

[0003] In the prior art, the steel structure roof sandwich panel is very susceptible to temperature because the upper and lower main boards are made of steel, and gaps are generated due to thermal expansion and contraction. In this way, it is necessary to inject foam glue between the two sandwich panels for bonding to block the gaps.

[0004] However, the traditional method of pouring foam glue requires pouring during the installation of the sandwich panel, which is not only time-consuming and labor-intensive, but also causes overflow due to poor control of the amount, affecting the overall appearance and being very difficult to clean. Therefore, the utility model proposes an assembled steel structure roof sandwich panel to solve the above problems. Utility Model Content

[0005] The utility model aims to provide an assembled steel structure roof sandwich panel to solve the problem raised in the above background technology: the steel structure roof sandwich panel is very susceptible to temperature because the upper and lower main boards are made of steel, and gaps are generated due to thermal expansion and contraction. In this case, foam glue needs to be poured between the two sandwich panels for bonding and blocking the gaps. However, the traditional method of pouring foam glue needs to be poured during the installation of the sandwich panels, which is not only time-consuming and labor-intensive, but also causes overflow due to poor control of the amount, affecting the overall appearance and being very difficult to clean.

[0006] To achieve the above object, the utility model provides the following technical solution: an assembled steel structure roof sandwich panel, the assembled steel structure roof sandwich panel comprising: an upper main board, a lower main board is arranged below the upper main board, and an insulation layer is filled and arranged between the upper main board and the lower main board;

[0007] The heat-insulating layer has a capsule arranged in it, a discharge port is opened on the surface of the capsule, a sealing sheet is arranged at the discharge port, and the sealing sheet is fixedly connected to the pull rod.

[0008] Preferably, the upper main board and the lower main board are both made of steel, and the upper main board and the lower main board have the same specifications such as shape and thickness. The upper main board and the lower main board are in the shape of square plates, and a reinforcing frame is provided around the insulation layer.

[0009] Preferably, threaded holes are provided at the upper end of the upper main board near the four corners, and the threaded holes penetrate the upper main board and extend downward through the insulation layer to be connected to the lower main board.

[0010] Preferably, a plurality of positioning holes are provided at the upper end of the upper main board, and the positioning holes are arranged vertically through the upper main board, and the positioning holes are arranged in a circular array near the surrounding positions of the upper end of the upper main board.

[0011] Preferably, a firmware is installed in the positioning hole, the firmware is fixedly connected to the upper main board by screws, a through groove is opened in the firmware, and a leak-proof brush is provided at the opening of the through groove.

[0012] Preferably, the interior of the capsule is filled with a foam filler, and two discharge ports are opened on the surface of the capsule. The two discharge ports are sealed by two sealing sheets, the bottom end of the sealing sheet is fixedly connected to the bottom end of the pull rod, and the top end of the pull rod is fixedly connected to the pulling strip.

[0013] Preferably, the twitching bar is arranged in the through groove, a handle is fixed on the top of the twitching bar, the handle is arc-shaped, and a non-slip rubber pad is fixed on the arc-shaped inner surface of the handle.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] The utility model discloses an assembled steel structure roof sandwich panel. By manually turning a handle, a pulling strip and a pulling strip are driven to move upward, so that a sealing sheet falls off. The pulling strip, the pulling strip and the sealing sheet are pulled out from the through groove. The foam filler inside the capsule leaks out and expands rapidly when in contact with moisture in the air, filling the gaps between the sandwich panels. This avoids the problem that the traditional method of pouring foam glue needs to be poured during the installation of the sandwich panel, which is not only time-consuming and labor-intensive, but also causes overflow due to poor control of the amount, affecting the overall appearance and being very difficult to clean. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the positioning hole structure of the utility model;

[0018] Figure 3 This is a schematic diagram of the structure of the twitching bar of the utility model;

[0019] Figure 4 This is a schematic diagram of the structure of the pull rod and the sealing strip of the utility model;

[0020] Figure 5 This is a schematic diagram of the firmware structure of the utility model.

[0021] In the figure: 1. threaded hole; 2. upper main board; 3. insulation layer; 4. lower main board; 5. reinforcement frame; 6. fasteners; 7. screws; 8. pull bar; 9. handle; 10. positioning hole; 11. through groove; 12. anti-leakage brush; 13. anti-slip rubber pad; 14. capsule; 15. sealing sheet; 16. discharge port; 17. pull bar. DETAILED DESCRIPTION

[0022] In order to make the purpose and technical solution of the utility model clearly and completely described, and the advantages more clearly understood, the embodiments of the utility model are further described in detail in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the utility model, not all of the embodiments, and are only used to explain the embodiments of the utility model, and are not used to limit the embodiments of the utility model. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] In the description of the present utility model, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "one", "first", "second", "third", "fourth", "fifth", "sixth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0025] For the purpose of simplicity and illustration, the principles of the embodiments are mainly described by reference to examples. In the following description, many specific details are proposed to provide a thorough understanding of the embodiments. However, it is obvious that for those of ordinary skill in the art, these embodiments may not be limited to these specific details in practice. In some instances, known methods and structures are not described in detail to avoid making these embodiments unnecessarily difficult to understand. In addition, all embodiments can be used in combination with each other.

[0026] Embodiment 1

[0027] See also Figures 1 to 5 The utility model provides a technical solution: an assembled steel structure roof sandwich panel, the assembled steel structure roof sandwich panel comprises: an upper main board 2, a lower main board 4 is arranged below the upper main board 2, and an insulation layer 3 is filled between the upper main board 2 and the lower main board 4; a capsule 14 is arranged in the insulation layer 3, a discharge port 16 is provided on the surface of the capsule 14, a sealing sheet 15 is arranged at the discharge port 16, the sealing sheet 15 is fixedly connected to the pull strip 17, a foam filler is filled in the capsule 14, two discharge ports 16 are provided on the surface of the capsule 14, and the two discharge ports 16 are sealed by two sealing sheets 15, the bottom end of the sealing sheet 15 is fixedly connected to the bottom end of the pull strip 17, the top end of the pull strip 17 is fixedly connected to the twitching strip 8, the sealing sheet 15 can be torn off from the capsule 14, the twitching strip 8 is arranged in the through groove 11, a handle 9 is fixed at the top end of the twitching strip 8, the handle 9 is arc-shaped, and a non-slip rubber pad 13 is fixed on the arc-shaped inner surface of the handle 9;

[0028] When in use, by manually turning the handle 9, the pulling strip 8 and the pull strip 17 will be driven to move upward, so that the sealing sheet 15 will fall off, and the pulling strip 8, the pull strip 17 and the sealing sheet 15 will be pulled out from the through groove 11, and the foam filler inside the capsule 14 will leak out and will expand rapidly when it comes into contact with moisture in the air, filling the gap between the interlayer plates. Two discharge ports 16 are provided on the capsule 14 to increase the filling rate of the foam filler. An anti-slip strip is fixed to the inner surface of the anti-slip rubber pad 13 to avoid slipping when the handle 9 is turned, thereby improving the stability when the handle 9 is turned. The pulling strip 8, the sealing strip and the pull strip 17 are all slidably adapted to the through groove 11, so that the pulling strip 8, the sealing strip and the pull strip 17 can be easily pulled out of the through groove 11.

[0029] Embodiment 2

[0030] On the basis of the first embodiment, in order to facilitate the installation of the firmware 6, a plurality of positioning holes 10 are provided at the upper end of the main board 2. The positioning holes 10 are arranged vertically through the upper main board 2. The positioning holes 10 are arranged in a circular array at the upper end of the upper main board 2 near the surrounding positions. The firmware 6 is installed in the positioning holes 10. The firmware 6 is fixedly connected to the upper main board 2 by screws 7. A through groove 11 is provided in the firmware 6. A leak-proof brush 12 is provided at the opening of the through groove 11.

[0031] When in use, the fixing member 6 is inserted into the positioning hole 10, and then the fixing member 6 is fixedly connected to the upper main board by means of the screw 7. The anti-leakage brush 12 can effectively prevent the foam filler from leaking out of the through groove 11.

[0032] Embodiment 3

[0033] On the basis of the second embodiment, in order to facilitate the installation and fixation of the sandwich panel, threaded holes 1 are provided at the upper end of the upper main board 2 near the four corners. The threaded holes 1 penetrate the upper main board 2 and extend downward through the insulation layer 3 to connect with the lower main board 4.

[0034] During use, when the sandwich panel needs to be fixed on the beam, first drill a threaded mounting hole corresponding to the threaded hole 1 on the beam, and use bolts to fix the sandwich panel and the beam through the threaded hole 1 and the threaded mounting hole. In this way, the installation of the sandwich panel is completed. In this way, multiple sandwich panels can be installed and fixed on the beam by reciprocating, which is more convenient.

[0035] Working principle: During actual use, by manually turning the handle 9, the pulling strip 8 and the pull strip 17 will be driven to move upward, causing the sealing sheet 15 to fall off, and the pulling strip 8, the pull strip 17 and the sealing sheet 15 will be pulled out from the through groove 11, and the foam filler inside the capsule 14 will leak out and expand rapidly when it comes into contact with moisture in the air, filling the gaps between the sandwich panels. This avoids the traditional method of pouring foam glue, which requires pouring during the installation of the sandwich panels, which is not only time-consuming and labor-intensive, but also causes overflow due to poor control of the amount, affecting the overall appearance and being very difficult to clean.

[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An assembled steel structure roof sandwich panel, characterized in that: The assembled steel structure roof sandwich panel comprises: an upper main board (2), a lower main board (4) is arranged below the upper main board (2), and a heat preservation layer (3) is filled and arranged between the upper main board (2) and the lower main board (4); A heat-insulating layer (3) is provided with a capsule (14) in the heat-insulating layer (3), a discharge port (16) is provided on the surface of the capsule (14), a sealing sheet (15) is provided at the discharge port (16), and the sealing sheet (15) is fixedly connected to the pull rod (17).

2. The assembled steel structure roof sandwich panel according to claim 1, characterized in that: The upper main board (2) and the lower main board (4) are both made of steel. The upper main board (2) and the lower main board (4) have the same specifications such as shape and thickness. The upper main board (2) and the lower main board (4) are in the shape of square plates. A reinforcing frame (5) is provided around the thermal insulation layer (3).

3. The assembled steel structure roof sandwich panel according to claim 2, characterized in that: Threaded holes (1) are provided at the upper end of the upper main board (2) near the four corners, and the threaded holes (1) penetrate the upper main board (2) and extend downward through the thermal insulation layer (3) to be connected to the lower main board (4).

4. The assembled steel structure roof sandwich panel according to claim 3, characterized in that: A plurality of positioning holes (10) are provided at the upper end of the upper main board (2). The positioning holes (10) are arranged vertically through the upper main board (2). The positioning holes (10) are arranged in a circular array near the upper end of the upper main board (2) at surrounding positions.

5. The assembled steel structure roof sandwich panel according to claim 4, characterized in that: A fixing piece (6) is installed in the positioning hole (10), and the fixing piece (6) is fixedly connected to the upper main board (2) by means of screws (7). A through groove (11) is provided in the fixing piece (6), and a leak-proof brush (12) is provided at the opening of the through groove (11).

6. The assembled steel structure roof sandwich panel according to claim 1, characterized in that: The interior of the capsule (14) is filled with a foam filler, and the surface of the capsule (14) is provided with two discharge ports (16), which are sealed by two sealing sheets (15), the bottom end of the sealing sheet (15) is fixedly connected to the bottom end of the pull strip (17), and the top end of the pull strip (17) is fixedly connected to the pulling strip (8), and the sealing sheet (15) can be torn off the capsule (14).

7. The assembled steel structure roof sandwich panel according to claim 6, characterized in that: The twitching bar (8) is arranged in the through groove (11), a handle (9) is fixed at the top end of the twitching bar (8), the handle (9) is arc-shaped, and a non-slip rubber pad (13) is fixed on the arc-shaped inner surface of the handle (9).