Template system of irregular lattice beam plate

By using the method of combining polystyrene foam block filling and steel cage in the lattice beam plate formwork system, the problems of diversified changes in the size of secondary beams and irregular distribution are solved, and rapid installation and multiple use are achieved, reducing construction difficulty and waste of board materials, suitable for a variety of beam and slab structures.

CN222184107UActive Publication Date: 2024-12-17CHINA CIVIL ENG CONSTR CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420864088.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-12-17
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

During construction, the existing grid beam slab formwork system has a variety of changes in beam sizes and irregular distribution, resulting in complex processes and difficult construction, and the cut formwork cannot be reused, resulting in waste of plates.

Method used

Polystyrene foam blocks are used to fill in the horizontal steel cage, combined with vertical steel formwork and wooden formwork to form a cutable irregular grid-shaped beam and plate formwork system. Polystyrene foam blocks can be filled with areas of different cross-sections at will, quickly Equip the main beam and the secondary beam side formwork.

Benefits of technology

It significantly improves the speed of formwork installation, reduces the weight of concrete slabs, reduces the requirements for support systems and foundations, and is suitable for flat-top or vaulted lattice beams and slabs of various cross-sections and spans, and polystyrene foam blocks can be used repeatedly. Meets the requirements of energy conservation and consumption reduction and green construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222184107U_ABST
    Figure CN222184107U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of template system construction, and discloses a template system of an irregular lattice beam slab, which comprises a bottom floor slab, a top floor slab arranged at the top of the bottom floor slab, and a wall body arranged between the top floor slab and the bottom floor slab, a scaffold is arranged between the bottom floor and the top floor, a transverse steel formwork is laid on the top of the scaffold, a transverse reinforcement cage is arranged on the top of the transverse steel formwork, and a plurality of polystyrene foam blocks are arranged in the outline of the transverse reinforcement cage. A vertical steel formwork is arranged between part of adjacent polystyrene foam blocks to guarantee construction of reserved floor holes near a cross beam, wood formworks are vertically arranged at the tops of part of the polystyrene foam blocks to guarantee construction of reserved floor holes in the area, except for the cross beam, of a floor, and a main beam is arranged on one side of each polystyrene foam block. And secondary beams are arranged on one side of the main beam at intervals.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of template system construction, in particular to a template system of irregular lattice beam slabs. Background Art

[0002] At present, in order to save land and reduce investment costs, some new railway projects have designed high and medium voltage substations, traction substations, and step-down substations as single-story multi-story buildings. Multiple power distribution equipment, such as transformers, rectifiers, inverters, high and medium voltage control cabinets, and communication cabinets, will be arranged on the same floor of the substation (station). Different types of equipment have different requirements for floor loads. Therefore, in addition to the main beam, the secondary beams of the lower support beam layer of the floor are arranged according to the actual location of the equipment, resulting in large differences in the floor section and span between the secondary beams, uneven distribution, and the overall irregular grid beam-slab structure at the bottom of the floor.

[0003] Because the beams under the lattice beam slab are crisscrossed, wooden formwork, plywood formwork, plastic formwork or steel-bamboo formwork is often used in the concrete pouring construction of the floor slab, main beam and secondary beam, supplemented by miscellaneous wood boards, wooden beams, wooden slats, etc. to make the side formwork and bottom formwork of the secondary beam, and wooden formwork, steel formwork or steel-wood formwork is used as the bottom formwork of the main beam and floor slab. The above-mentioned parts are assembled and reinforced to form a cast-in-place floor slab formwork system. The design and construction difficulty of this formwork system is directly related to the specifications, dimensions and distribution patterns of the main beams and secondary beams under the floor slab.

[0004] The existing formwork system of the lattice beam slab is made of multi-layer plate formwork supplemented by miscellaneous wood boards, wooden beams, etc., which are manually assembled and reinforced. First, the side formwork and bottom formwork of the secondary beam and main beam at the bottom of the floor slab are made, and then the bottom formwork of the floor slab is made. Because the size of the secondary beam varies and the vertical and horizontal distribution is irregular, it is necessary to cut out templates of various specifications and sizes on site to assemble the side formwork and bottom formwork of the secondary beam. The process is complicated and the construction is difficult. Moreover, the cut templates cannot be reused, resulting in a large amount of plate waste. Therefore, the utility model was born. Utility Model Content

[0005] The present application provides a formwork system for irregular lattice beams and slabs to solve the problems of existing formworks.

[0006] In order to solve the above technical problems, the present application provides a formwork system for irregular lattice beams and slabs, comprising: a bottom slab, a top slab arranged on the top of the bottom slab, and a wall arranged between the top slab and the bottom slab; a scaffolding is arranged between the bottom slab and the top slab, a transverse steel formwork is laid on the top of the scaffolding, a transverse steel cage is arranged on the top of the transverse steel formwork, a plurality of polystyrene foam blocks are arranged within the outline of the transverse steel cage, vertical steel formworks are arranged between adjacent polystyrene foam blocks, a wooden formwork is vertically arranged on the top of any polystyrene foam block, a main beam is arranged on one side of the polystyrene foam block, and secondary beams are arranged at intervals on one side of the main beam.

[0007] In some embodiments of the present application, the scaffolding includes multiple bases arranged on the top surface of the bottom floor, vertical poles arranged on the top of the multiple bases, U-shaped top supports arranged on the top of the vertical poles, and cross bars arranged between adjacent vertical poles, and wooden planks are arranged on the U-shaped top supports, and the vertical poles and cross bars are fixedly connected by bowl buckles.

[0008] In some embodiments of the present application, the distance between adjacent poles is 1.0 m.

[0009] In some embodiments of the present application, a plurality of steel cage columns are spaced apart at the edge of the top floor.

[0010] In some embodiments of the present application, the upper surface elevation of the polystyrene foam block is consistent with the bottom surface elevation of the top floor slab, and the lower surface elevation of the polystyrene foam block is consistent with the concrete surface elevation of the bottom of the beam.

[0011] In some embodiments of the present application, a triangular positioning wooden slat is provided on the contour edge of the transverse steel cage, the bottom surface of the triangular positioning wooden slat is attached to the top surface of the transverse steel formwork, and the side surface of the triangular positioning wooden slat is attached to the polystyrene foam block.

[0012] In some embodiments of the present application, the height of the triangular positioning wooden slats is 3 cm.

[0013] Compared with the prior art, the utility model has the following characteristics and beneficial effects:

[0014] The polystyrene foam blocks in the utility model can be arbitrarily filled with irregular beam and slab areas with different cross-sections between the main beam and the secondary beam after being cut on site, and the beam side formwork of the main beam and the secondary beam can be quickly formed; the beam side formwork erection speed is many times higher than that of the traditional technology; the polystyrene foam blocks have light weight, low cost, stable size (will not expand or shrink), good waterproofness, and will not affect the concrete curing process at all, and meet the quality requirements of beam and slab construction; the polystyrene foam blocks can significantly reduce the weight of the concrete slab, reduce the requirements for the support system and the foundation, and achieve higher performance; the polystyrene foam blocks are used for the design and construction of formwork systems for flat-top lattice beams and slabs with various cross-sections and spans, and are also suitable for the design and construction of formwork systems for arched lattice beams and slabs; the construction operation is simple, the pertinence is strong, the adaptability is wide, the polystyrene foam blocks can be repeatedly recycled, meet the requirements of energy saving and consumption reduction and green construction, have significant social and economic benefits, and can produce better results if promoted and used. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a cross-sectional schematic diagram of the template system of the embodiment of the utility model;

[0016] Figure 2 It is a top view schematic diagram of the template system of the embodiment of the utility model;

[0017] Figure 3 This utility model embodiment Figure 1 Enlarged diagram of point "A" in the figure.

[0018] In the figure, 100, bottom floor; 200, top floor; 210, steel cage column; 300, wall; 400, scaffolding; 410, base; 420, vertical pole; 430, U-shaped top support; 440, cross bar; 450, wooden square; 460, bowl buckle; 500, horizontal steel formwork; 510, polystyrene foam block; 520, triangular positioning wooden slats; 600, vertical steel formwork; 700, wooden formwork; 800, main beam; 900, secondary beam. DETAILED DESCRIPTION

[0019] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0020] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0021] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0022] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0023] like Figure 1-3 As shown, according to some embodiments of the present application, a formwork system for an irregular lattice beam slab includes: a bottom slab 100, a top slab 200 arranged on the top of the bottom slab 100, and a wall 300 arranged between the top slab 200 and the bottom slab 100; a scaffolding 400 is arranged between the bottom slab 100 and the top slab 200, a transverse steel formwork 500 is laid on the top of the scaffolding 400, a transverse steel cage is arranged on the top of the transverse steel formwork 500, a plurality of polystyrene foam blocks 510 are arranged within the contour of the transverse steel cage, a vertical steel formwork 600 is arranged between adjacent polystyrene foam blocks 510, a wooden formwork 700 is vertically arranged on the top of any polystyrene foam block 510, a main beam 800 is arranged on one side of the polystyrene foam block 510, and a secondary beam 900 is arranged at intervals on one side of the main beam 800.

[0024] It should be noted here that vertical steel formworks 600 are arranged between some adjacent polystyrene foam blocks 510 to ensure the construction of reserved floor holes near the beams, and wooden formworks 700 are arranged vertically on the tops of some polystyrene foam blocks 5010 to ensure the construction of reserved floor holes in the floor except the beam area.

[0025] According to some embodiments of the present application, the scaffolding 400 includes a plurality of bases 410 disposed on the top surface of the bottom floor 100, vertical poles 420 disposed on the top of the plurality of bases 410, U-shaped top supports 430 disposed on the top of the vertical poles 420, and horizontal bars 440 disposed between adjacent vertical poles 420, wooden planks 450 are disposed on the U-shaped top supports 430, and the vertical poles 420 and the horizontal bars 440 are fixedly connected by bowl buckles 460.

[0026] According to some embodiments of the present application, the distance between adjacent poles 420 is 1.0 m.

[0027] According to some embodiments of the present application, a plurality of steel cage columns 210 are arranged at intervals at the edge of the top floor slab 200 .

[0028] According to some embodiments of the present application, the upper surface elevation of the polystyrene foam block 510 is consistent with the bottom surface elevation of the top floor slab 200 , and the lower surface elevation of the polystyrene foam block 510 is consistent with the concrete surface elevation of the bottom of the beam.

[0029] According to some embodiments of the present application, a triangular positioning wooden slat 520 is provided at the contour edge of the transverse steel cage, the bottom surface of the triangular positioning wooden slat 520 is attached to the top surface of the transverse steel formwork 500, and the side surface of the triangular positioning wooden slat 520 is attached to the polystyrene foam block 510.

[0030] According to some embodiments of the present application, the detailed steps of the design and construction method of the irregular lattice beam and slab formwork system are as follows: Step 1, design of the formwork system of the lattice beam and slab: ① Collect the types, specifications, and physical and mechanical performance parameters of the formwork materials planned to be used at the construction site; ② Understand the cross-sectional dimensions, spacing, elevations and other information of the main beam 800 and secondary beam 900 at the construction site; ③ Understand the foundation type and drainage conditions at the location of the support system on the spot; ④ According to the above conditions and parameters, use the architectural drawings and structural drawings of the lattice beam and slab as the base map to design the formwork system of the lattice beam and slab, and the design elements include: on the plan view, mark the main beam 800, secondary beam 900 number, cross-sectional dimensions, spacing and polystyrene foam block 510 plane dimensions and other information, and consider the thickness of the concrete protective layer outside the beam reinforcement cage; on the cross-sectional view, draw the elevation of each layer, the bottom formwork laying position and direction, the beam cross-sectional dimensions and elevation, the cast-in-place slab thickness, the cross-sectional dimensions of the polystyrene foam block 510 filling area and other information; ⑤ Order or rent polystyrene foam blocks 510 according to the design drawing of the formwork system of the lattice beam and slab.

[0031] Step 2. Design and construction of 400 support system for lattice beam and slab scaffolding: ① Determine the calculation unit for bearing capacity demand verification according to the provisions of the building structure load code: including floor slab, main beam 800, secondary beam 900, formwork system, etc. The floor slab should consider the upper additional layer, such as floor tiles, leveling layer, etc.; ② Design the support system of the lattice beam and slab and verify the bearing capacity demand. The main design elements include floor slab thickness, steel bar diameter, formwork material, contact area between concrete and formwork, formwork height, area of ​​holes on the slab, etc. The area of ​​the side wall formwork for reserved holes in the floor slab is included in the calculation of the formwork engineering quantity; the engineering quantity of the full-floor scaffolding 400 is calculated according to the net area of ​​the indoor floor slab (horizontal projection area). When the height is between 3.6m-5.2m, the basic layer is calculated. When it exceeds 5.2m, each additional 1.2m is calculated as an additional layer (when it exceeds but is less than 0.6m, it is ignored). The floor height is based on the distance from the indoor floor surface to the bottom of the floor; the expression is as follows: the additional layer of the full-floor scaffolding 400 = [indoor net height-5.2] / 1.2 (m); ③ Build the full-floor scaffolding 400 system according to the design plan of the beam and slab scaffolding 400 support system;

[0032] Step 3: Laying the bottom formwork of the lattice beam slab: Use steel formwork, steel-wood formwork 700 or other material formwork to lay the entire layer of bottom formwork. The elevation of the upper surface of the bottom formwork should be consistent with the elevation of the concrete surface at the bottom of the beam;

[0033] Step 4: Positioning and setting out the main beam 800 and secondary beam 900 and making the steel cage: ① According to the center line of the vertical and horizontal axis of the civil engineering, position and set out the main elements of the floor slab such as the main beam 800, secondary beam 900, and various reserved holes on the bottom template of the whole floor; ② Make the steel cage of the main beam 800 and secondary beam 900, and evenly place the steel protection layer pads; ③ Check the quality of the steel cage production and make adjustments;

[0034] Step 5: Making and fixing the triangular positioning wooden slats 520: ① Making triangular positioning wooden slats 520 with a cross-sectional height of 3 cm; ② Checking the positions of the main beam 800, the secondary beam 900, the reserved holes, and the formwork system according to the center lines of the longitudinal and transverse axes of the civil engineering and the formwork system design drawings; ③ Fixing the triangular positioning wooden slats 520 on the bottom formwork of the lattice beam slab to prepare for placing and positioning the polystyrene foam blocks 510;

[0035] Step 6, cutting and positioning of polystyrene foam blocks 510: ① Accurately cut the length, width and height of each polystyrene foam block 510 according to the beam-slab cross-section between the main beam 800 and the secondary beam 900, the beam body height, and the spatial position of the beam reinforcement cage; ② Wrap the polystyrene foam block 510 with a plastic gel coat to complete the surface treatment; ③ Place the polystyrene foam block 510 at the corresponding position of the lattice beam and clamp it between the triangular positioning wooden slats 520; the triangular positioning wooden slats 520 can ensure that the polystyrene foam block 510 does not shift when the beam-slab concrete is poured;

[0036] Step 7: Concrete pouring and curing of beam and slab: ① Use steel formwork, steel-wood formwork 700 or other material formwork to set up the reserved hole formwork of the floor slab; ② Lay and fix the steel wire mesh of the concrete slab; ③ According to the quality control standards for beam and slab concrete construction, concrete raw materials and performance requirements, pour the beam and slab concrete according to the construction plan, and perform curing according to the construction quality specifications;

[0037] Step 8. Dismantling of beam and slab concrete formwork system: ① After the performance of beam and slab concrete reaches the design requirements, dismantle the beam bottom formwork and scaffolding 400 system. The dismantling process follows the general procedure: dismantle the later supports first, and the earlier supports last; dismantle the non-load-bearing parts first, and then the load-bearing parts, and do not damage the components or formwork; ② Remove the polystyrene foam blocks 510 to complete the beam and slab construction.

[0038] In summary, the utility model relates to the technical field of formwork system construction, and discloses a formwork system of irregular lattice beams and slabs, comprising: a bottom slab, a top slab arranged on the top of the bottom slab, and a wall arranged between the top slab and the bottom slab; a scaffold is arranged between the bottom slab and the top slab, a transverse steel formwork is laid on the top of the scaffold, a transverse steel cage is arranged on the top of the transverse steel formwork, a plurality of polystyrene foam blocks are arranged within the contour of the transverse steel cage, vertical steel formworks are arranged between adjacent polystyrene foam blocks, a wooden formwork is vertically arranged on the top of any polystyrene foam block, a main beam is arranged on one side of the polystyrene foam block, and secondary beams are arranged at intervals on one side of the main beam.

[0039] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principle of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.

Claims

1. A formwork system for irregular lattice beams and slabs, comprising: A bottom floor (100), a top floor (200) arranged on the top of the bottom floor (100), and a wall (300) arranged between the top floor (200) and the bottom floor (100); characterized in that a scaffold (400) is arranged between the bottom floor (100) and the top floor (200), a transverse steel formwork (500) is laid on the top of the scaffold (400), a transverse steel cage is arranged on the top of the transverse steel formwork (500), a plurality of polystyrene foam blocks (510) are arranged within the contour of the transverse steel cage, a vertical steel formwork (600) is arranged between adjacent polystyrene foam blocks (510), a wooden formwork (700) is vertically arranged on the top of any polystyrene foam block (510), a main beam (800) is arranged on one side of the polystyrene foam block (510), and a secondary beam (900) is arranged at intervals on one side of the main beam (800).

2. The formwork system of irregular lattice beam-slab according to claim 1, characterized in that: The scaffold (400) comprises a plurality of bases (410) arranged on the top surface of the bottom floor (100), vertical poles (420) arranged on the top of the plurality of bases (410), a U-shaped top support (430) arranged on the top of the vertical poles (420), and a cross bar (440) arranged between adjacent vertical poles (420), a wooden square (450) is arranged on the U-shaped top support (430), and the vertical poles (420) and the cross bar (440) are fixedly connected by a bowl buckle (460).

3. The formwork system for irregular lattice beam-slab according to claim 2, characterized in that: The distance between adjacent vertical poles (420) is 1.0 m.

4. The formwork system for irregular lattice beam-slab according to claim 1, characterized in that: A plurality of steel cage columns (210) are arranged at intervals at the edge of the top floor (200).

5. The formwork system for irregular lattice beam-slab according to claim 1, characterized in that: The elevation of the upper surface of the polystyrene foam block (510) is consistent with the elevation of the bottom surface of the top floor (200), and the elevation of the lower surface of the polystyrene foam block (510) is consistent with the elevation of the concrete surface at the bottom of the beam.

6. The formwork system for irregular lattice beam-slab according to claim 1, characterized in that: A triangular positioning wooden slat (520) is provided at the contour edge of the transverse steel cage, the bottom surface of the triangular positioning wooden slat (520) is attached to the top surface of the transverse steel formwork (500), and the side surface of the triangular positioning wooden slat (520) is attached to the polystyrene foam block (510).

7. The formwork system for irregular lattice beam-slab according to claim 6, characterized in that: The height of the triangular positioning wooden slats (520) is 3 cm.