Slurry pipe structure based on synchronous construction of connection channel and shield

By designing flexible threaded connections and support mechanisms, the problem of excavation of mud and water pipe blocking contact channels is solved, the excavation efficiency and stability are improved, and the efficient excavation of contact channels is achieved.

CN222184770UActive Publication Date: 2024-12-17CHINA RAILWAY NO 8 ENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420492945.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-12-17
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

The mud-water pipe blocks the excavation of the contact channel during the shield construction process, increasing the difficulty of the contact channel and reducing the excavation efficiency.

Method used

Design a mud pipe structure based on the construction of the contact channel and the shield structure synchronously. Through threaded connection and support mechanism, the flexible docking of the mud pipe joint and the mud pipe body is realized, space for the excavation area of ​​the contact channel is reserved, and the support block and The screw mechanism improves the stability of the joint.

Benefits of technology

It reduces the difficulty of excavation of the contact channel, improves the excavation efficiency, and enhances the stability of the mud pipe joints to avoid collapse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222184770U_ABST
    Figure CN222184770U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tunnel construction, in particular to a slurry pipe structure based on synchronous construction of a contact channel and a shield, which comprises a shield tunnel, a support frame is fixedly connected onto the shield tunnel, and a slurry pipe body is supported on the surface of the support frame. The mud pipe joint is characterized in that the surface of the mud pipe body is in threaded connection with a first screw pipe, the surface of the first screw pipe is in threaded connection with an adapter pipe, the surface of the adapter pipe is in threaded connection with a second screw pipe, and the surface of the second screw pipe is in threaded connection with a mud pipe joint body. Butt joint between the mud pipe joint body and the two sets of mud pipe bodies is completed through the adapter pipe, the mud pipe joint body reserves enough space for an excavation area of a connection channel between the two sets of mud pipe bodies, the excavation difficulty of the connection channel is reduced, and the excavation efficiency of the connection channel is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to a mud pipe structure based on synchronous construction of a communication channel and a shield. Background Art

[0002] The mud and water pipeline is a very critical part, which is used to transport waste materials such as mud and wastewater. The mud and water pipeline is installed on the side wall of the shield segment through a bracket. During the construction of the mud and water shield, the mud pipeline blocks the excavation of the connecting channel, which increases the difficulty of excavation of the connecting channel and reduces the excavation efficiency of the connecting channel. Therefore, a mud pipe structure based on the synchronous construction of the connecting channel and the shield is designed. Utility Model Content

[0003] The purpose of the utility model is to provide a mud pipe structure based on the synchronous construction of a connecting channel and a shield, so as to solve the problem proposed in the above-mentioned background technology that during the construction of a mud-water shield, the mud pipeline blocks the excavation construction of the connecting channel, increases the difficulty of excavating the connecting channel, and reduces the excavation efficiency of the connecting channel.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions, a mud pipe structure based on the synchronous construction of a communication channel and a shield: comprising a shield tunnel, a support frame fixedly connected to the shield tunnel, a mud pipe body supported on the surface of the support frame, characterized in that a first screw is threadedly connected to the surface of the mud pipe body, a transfer tube is threadedly connected to the surface of the first screw, a second screw is threadedly connected to the surface of the transfer tube, a mud pipe joint body is threadedly connected to the surface of the second screw, a supporting mechanism is provided on the lower surface of the mud pipe joint body, the supporting mechanism comprises a fixing rod, the fixing rod is fixedly connected to the lower surface of the mud pipe joint body, a rotating block is rotatably connected to the lower surface of the fixing rod, a threaded barrel is fixedly connected to the lower surface of the rotating block, a screw is threadedly connected to the bottom of the threaded barrel, and a support block is fixedly connected to the bottom of the screw.

[0005] Preferably, the transfer tube is fixedly installed at one end of the shield tunnel via a first screw tube, and the mud pipe joint body is fixedly installed at the end of the transfer tube away from the shield tunnel via a second screw tube.

[0006] Preferably, both ends of the mud pipe joint body are inclined at 45 degrees, and the two ends of the mud pipe joint body are butt-jointed with the mud pipe body through a transfer tube.

[0007] Preferably, the fixing rod is in a "T" shape, the rotating block rotates at the bottom of the mud pipe joint body through the fixing rod, and the threaded barrel rotates at the bottom of the mud pipe joint body through the rotating block.

[0008] Preferably, the screw and the support block rotate synchronously with the threaded barrel, and the screw drives the screw to extend and retract on the threaded barrel by rotating on the threaded barrel.

[0009] Preferably, the support block is moved telescopically on the threaded barrel by the screw, and the screw drives the support block on the threaded barrel to contact and connect the inner surface of the shield tunnel.

[0010] Compared with the prior art, the beneficial effects of the utility model are:

[0011] The second screw tube is rotated on the mud pipe joint body, so that the transfer tube is installed on the mud pipe joint body through the second screw tube, and the first screw tube is rotated on the mud pipe body, so that the transfer tube is installed on the mud pipe body through the first screw tube. The mud pipe joint body completes the docking between the two groups of mud pipe bodies through the transfer tube. The mud pipe joint body reserves enough space for the excavation area of ​​the communication channel, reduces the difficulty of excavating the communication channel, and improves the efficiency of excavating the communication channel.

[0012] The rotating block rotates at the bottom of the mud pipe joint body through the fixed rod, and the rotating block drives the threaded barrel to rotate at the bottom of the mud pipe joint body, so that the threaded barrel rotates to a vertical horizontal plane at the bottom of the mud pipe joint body. At this time, the screw is rotated at the bottom of the threaded barrel, so that the screw drives the support block to contact the surface of the shield tunnel. The support block supports the mud pipe joint body through the screw and the threaded barrel, thereby improving the stability of the mud pipe joint body during use. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a front view and cutaway perspective diagram of the structure of the utility model;

[0014] Figure 2 It is a schematic diagram of a top view and cross-section of the structure of the utility model;

[0015] Figure 3 It is a schematic diagram of the structure of the utility model;

[0016] Figure 4 It is a front view and cross-sectional perspective schematic diagram of the connection structure of the structural shield tunnel and the mud pipe body of the utility model;

[0017] Figure 5 It is a three-dimensional schematic diagram of the support mechanism of the utility model when viewed from the front or bottom;

[0018] Figure 6 For this utility model Figure 5 Schematic diagram of the enlarged structure at point A in the middle.

[0019] In the figure: 1. shield tunnel; 11. support frame; 12. mud pipe body; 2. first screw pipe; 21. transfer pipe; 22. second screw pipe; 23. mud pipe joint body; 3. fixing rod; 31. rotating block; 32. threaded barrel; 33. screw rod; 34. support block. DETAILED DESCRIPTION

[0020] See also Figure 1-6 , an embodiment provided by the utility model:

[0021] A mud pipe structure based on synchronous construction of a communication channel and a shield machine comprises a shield tunnel 1, a support frame 11 is fixedly connected to the shield tunnel 1, a mud pipe body 12 is supported on the surface of the support frame 11, a first screw tube 2 is threadedly connected to the surface of the mud pipe body 12, a switching tube 21 is threadedly connected to the surface of the first screw tube 2, a second screw tube 22 is threadedly connected to the surface of the switching tube 21, a mud pipe joint body 23 is threadedly connected to the surface of the second screw tube 22, a horizontal straight line side where the mud pipe joint body 23 is located is the excavation location of the communication channel, the mud pipe joint body 23 reserves space for the communication channel, reduces the difficulty of excavating the communication channel, and improves the efficiency of excavating the communication channel.

[0022] Furthermore, a supporting mechanism is provided on the lower surface of the mud pipe joint body 23, and the supporting mechanism includes a fixing rod 3, which is fixedly connected to the lower surface of the mud pipe joint body 23, and a rotating block 31 is rotatably connected to the lower surface of the fixing rod 3, and a threaded barrel 32 is fixedly connected to the lower surface of the rotating block 31, and a screw 33 is threadedly connected to the bottom of the threaded barrel 32, and a supporting block 34 is fixedly connected to the bottom of the screw 33. Due to the excavation of the communication channel, the side of the mud pipe joint body 23 cannot be supported by the installation of the mud pipe joint body 23 on the side. The supporting mechanism supports the mud pipe joint body 23 at the bottom of the shield tunnel 1 to ensure the stability of the mud pipe joint body 23 and prevent the mud pipe joint body 23 from collapsing.

[0023] Furthermore, external threads are provided on the surfaces of the mud pipe body 12 and the mud pipe joint body 23, and external threads are also provided on both ends of the adapter tube 21. The adapter tube 21 is fixedly installed at one end of the shield tunnel 1 through the first screw tube 2, and the mud pipe joint body 23 is fixedly installed at the end of the adapter tube 21 away from the shield tunnel 1 through the second screw tube 22. The mud pipe joint body 23 connects the two groups of mud pipe bodies 12 together through the adapter tube 21, thereby realizing the transportation of waste materials such as mud and wastewater.

[0024] Furthermore, both ends of the mud pipe joint body 23 are inclined at forty-five degrees, and the two ends of the mud pipe joint body 23 are connected to the mud pipe body 12 through the transfer tube 21. The mud pipe joint body 23 and the mud pipe body 12 are overall in an "S" shape, and the mud pipe joint body 23 reserves sufficient space in the area of ​​​​excavation of the communication channel on the shield tunnel 1.

[0025] Furthermore, the fixing rod 3 is in a "T" shape, the rotating block 31 rotates at the bottom of the mud pipe joint body 23 through the fixing rod 3, and the threaded barrel 32 rotates at the bottom of the mud pipe joint body 23 through the rotating block 31. The threaded barrel 32 needs to be rotated to a horizontal vertical at the bottom of the mud pipe joint body 23, so that the screw rod 33 is horizontally perpendicular to the horizontal plane, so that the threaded barrel 32 and the screw rod 33 can more effectively support the mud pipe joint body 23.

[0026] Furthermore, the screw 33 and the support block 34 rotate synchronously with the threaded barrel 32. The screw 33 rotates on the threaded barrel 32 to drive the screw 33 to extend and retract on the threaded barrel 32. The screw 33 approaches the surface of the shield tunnel 1 by extending and retracting. The screw 33 supports the threaded barrel 32 on the surface of the shield tunnel 1, and the threaded barrel 32 supports the mud pipe joint body 23.

[0027] Furthermore, the support block 34 is telescopically moved on the threaded barrel 32 by the screw 33, and the screw 33 drives the support block 34 on the threaded barrel 32 to contact the inner surface of the shield tunnel 1. The support block 34 is restricted at this time, so that the threaded barrel 32 and the screw 33 cannot rotate at the bottom of the mud pipe joint body 23.

[0028] Working principle: when it is necessary to excavate a communication channel on the side wall of the tunnel, the second screw tube 22 is rotated on the mud pipe joint body 23, so that the transfer tube 21 is installed on the mud pipe joint body 23 through the second screw tube 22, and the first screw tube 2 is rotated on the mud pipe body 12, so that the transfer tube 21 is installed on the mud pipe body 12 through the first screw tube 2. The mud pipe joint body 23 completes the docking with the two groups of mud pipe bodies 12 through the transfer tube 21. The mud pipe joint body 23 reserves enough space for the excavation area of ​​the communication channel, which reduces the difficulty of excavating the communication channel and improves the efficiency of excavating the communication channel.

[0029] When the mud pipe joint body 23 is installed, the rotating block 31 rotates at the bottom of the mud pipe joint body 23 through the fixing rod 3, and the rotating block 31 drives the threaded barrel 32 to rotate at the bottom of the mud pipe joint body 23, so that the threaded barrel 32 rotates to a vertical horizontal plane at the bottom of the mud pipe joint body 23. At this time, the screw 33 is rotated at the bottom of the threaded barrel 32, so that the screw 33 drives the supporting block 34 to contact the surface of the shield tunnel 1. The supporting block 34 supports the mud pipe joint body 23 through the screw 33 and the threaded barrel 32, thereby improving the stability of the mud pipe joint body 23 during use.

Claims

1. A slurry pipe structure based on synchronous construction of a communication channel and a shield, comprising a shield tunnel, a support frame fixedly connected to the shield tunnel, a slurry pipe body supported on the surface of the support frame, characterized in that: A first spiral tube is threadedly connected on the surface of the mud pipe body, a transfer tube is threadedly connected on the surface of the first spiral tube, a second spiral tube is threadedly connected on the surface of the transfer tube, a mud pipe joint body is threadedly connected on the surface of the second spiral tube, a supporting mechanism is provided on the lower surface of the mud pipe joint body, the supporting mechanism includes a fixing rod, the fixing rod is fixedly connected to the lower surface of the mud pipe joint body, a rotating block is rotatably connected to the lower surface of the fixing rod, a threaded barrel is fixedly connected to the lower surface of the rotating block, a screw is threadedly connected to the bottom of the threaded barrel, and a supporting block is fixedly connected to the bottom of the screw.

2. A slurry pipe structure based on synchronous construction of a communication channel and a shield according to claim 1, characterized in that: The transfer tube is fixedly installed at one end of the shield tunnel through a first screw tube, and the mud pipe joint body is fixedly installed at one end of the transfer tube away from the shield tunnel through a second screw tube.

3. A slurry pipe structure based on synchronous construction of a communication channel and a shield according to claim 2, characterized in that: Both ends of the mud pipe joint body are inclined at 45 degrees, and the two ends of the mud pipe joint body are butt-jointed with the mud pipe body through a transfer tube.

4. A slurry pipe structure based on synchronous construction of a communication channel and a shield according to claim 3, characterized in that: The fixing rod is in a "T" shape, the rotating block is rotated at the bottom of the mud pipe joint body through the fixing rod, and the threaded barrel is rotated at the bottom of the mud pipe joint body through the rotating block.

5. A slurry pipe structure based on synchronous construction of a communication channel and a shield according to claim 4, characterized in that: The screw rod and the support block rotate synchronously with the threaded barrel, and the screw rod drives the screw rod to extend and retract on the threaded barrel by rotating on the threaded barrel.

6. A slurry pipe structure based on synchronous construction of a communication channel and a shield according to claim 5, characterized in that: The support block is moved by the extension and contraction of the screw on the threaded barrel, and the screw drives the support block on the threaded barrel to contact and connect the inner surface of the shield tunnel.