Foundation pit water level detector

By using a floating platform and screw structure in the foundation pit water level detector, the electrical connection between the electrical housing and the guide cylinder is activated, the warning light is solved, and the problem of low automation in the existing technology is achieved, and a timely warning of water level changes is achieved. , improve construction safety.

CN222188477UActive Publication Date: 2024-12-17BEIJING RUIKONG AUTOMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421030598.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-13
Publication Date
2024-12-17
Estimated Expiration
2034-05-13

AI Technical Summary

Technical Problem

The existing deep foundation pit water level detector has low automation and cannot call the alarm in time, which may cause workers to fail to deal with the situation of excessive groundwater level due to omissions, affecting construction safety.

Method used

A foundation pit water level detector is designed, including fixtures, guides and detectors. Through the mechanical structure of the floating platform and screw, the electrical connection between the electrical shell and the guide cylinder is driven, and the warning light is activated to issue a warning of water level change. Ensure workers are informed of water level changes in a timely manner.

Benefits of technology

Real-time automatic monitoring and warning of changes in foundation pit water level is realized, construction safety is improved, and potential safety risks are avoided due to omissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222188477U_ABST
    Figure CN222188477U_ABST
Patent Text Reader

Abstract

The foundation pit water level detector comprises a fixing piece, a guiding piece and a detecting piece, the fixing piece comprises a hole plate, the hole plate is horizontally and fixedly arranged at an opening of a foundation pit, the guiding piece comprises a guiding cylinder, the guiding cylinder is vertically fixed to the bottom face of the hole plate, and a plurality of power connection rings are fixed to the outer circumferential face of the guiding cylinder in the vertical direction in a penetrating mode; the detection part comprises a second screw, an insulating plate is fixed to the top end of the second screw, a power connection shell is fixed to the insulating plate of the second screw, a floating platform is horizontally connected to the bottom end of the second screw, and the power connection shell is fixed to the bottom end of the floating platform. And a floating block is fixed on the bottom surface of the floating platform, so that the problems that workers cannot be reminded in time, the workers cannot operate in time under the conditions of omission and overhigh underground water level due to various problems, and the safety of later construction is influenced are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water level detectors, and more specifically to a foundation pit water level detector. Background Art

[0002] A deep foundation pit refers to an excavation with a depth of more than three basement floors, or a project with a depth of less than 5 meters but with particularly complex geological conditions, surrounding environment and underground pipelines. There are more and more deep foundation pit projects in construction projects, especially in areas with high groundwater levels. It is necessary to conduct water level testing on the groundwater inside the foundation pit. After the test, based on data analysis, it is determined whether the water level in the foundation pit exceeds the ideal water level and whether there will be any damage to the foundation pit, in order to facilitate construction.

[0003] The existing announcement number is CN207959223U, and the name is a water level monitoring device for foundation pit construction. After the water level detection device is moved to a suitable position by a walking mechanism, the water level monitoring device is fixed, and then the first gear is driven to rotate by the output shaft of the second driving device, thereby driving the second gear to move, and then driving the rotating rod to rotate. While the rotating rod rotates, it drives the carrying box to rotate on the rotating rod, so that the carrying box rotates. Since the upper end of the carrying box is fixed with a first driving device, the first bevel gear is driven to move under the drive of the first driving device. Since the first bevel gear and the second bevel gear are engaged with each other, and because the second bevel gear is fixed on the screw rod, the screw rod is driven to rotate. Since one end of the screw rod is threadedly sleeved in the casing, the casing is driven to move on the screw rod, and then the position of the casing is adjusted. Since a connecting plate is fixed at one end of the casing, a winder is fixed at the lower end of the connecting plate, a pull rope is wound on the winder, and a water level detector is fixed at the lower end of the pull rope to detect the water level in the foundation pit.

[0004] However, the above-mentioned real-time water level detector for observation wells in deep foundation pits has a low degree of automation in detection. It cannot automatically alarm when the water level is too high and cannot remind the workers in time. Since the workers may omit due to various problems, they cannot operate in time when the groundwater level is too high, which affects the safety of later construction. Utility Model Content

[0005] 1. Technical problems to be solved

[0006] In view of the problems existing in the prior art, the purpose of the utility model is to provide a foundation pit water level detector, which overcomes the above-mentioned technical defects.

[0007] 2. Technical solution

[0008] To solve the above problems, the utility model adopts the following technical solutions.

[0009] A foundation pit water level detector comprises a fixing part, a guide part and a detection part, wherein the fixing part comprises an orifice plate, the orifice plate is horizontally fixedly arranged at the opening of the foundation pit, the guide part comprises a guide cylinder, the guide cylinder is vertically fixed on the bottom surface of the orifice plate, and a plurality of power connection rings are vertically penetrated and fixed on the outer circumferential surface of the guide cylinder, and the guide cylinder is made of insulating material, a power transmission pole is vertically fixed upward on the outer walls of the plurality of power connection rings, and a warning light is electrically fixed to the top of the power transmission pole, the detection part comprises a second screw rod, an insulating plate is fixed to the top end of the second screw rod, and a power connection shell is fixed to the insulating plate of the second screw rod, the bottom end of the second screw rod is horizontally connected to a floating platform, and a floating block is fixed to the bottom surface of the floating platform.

[0010] Furthermore, a wire hole is provided through the center of the orifice plate, and a transmission line is inserted through the wire hole of the orifice plate.

[0011] Furthermore, a second power connection pole is fixed to the top of the power connection shell, and the second power connection pole is electrically connected to the bottom end of the transmission line.

[0012] Furthermore, a first power pole is fixed on the warning light, and the first power pole is electrically connected to the transmission line.

[0013] Furthermore, two screw barrels are symmetrically arranged horizontally on the outer circumferential surface of the orifice plate, and one end of the two screw barrels is fixed on the outer circumferential surface of the orifice plate, and the first screw rod is assembled on the horizontal threads of the two screw barrels.

[0014] Furthermore, the end of the first screw is rotatably connected to a pressing plate.

[0015] Furthermore, a screw shell is threadedly assembled on the second screw rod, and a floating platform is horizontally fixed to the bottom end of the screw shell.

[0016] 3. Beneficial effects

[0017] Compared with the prior art, the advantages of the present invention are:

[0018] During use, the orifice plate on the fixing part is horizontally fixed to the inner top of the foundation pit, and then the screw shell on the second screw is rotated to move vertically, and the floating platform is driven to float in the water level of the foundation pit according to the change of the water level in the foundation pit. Then, when the water level in the foundation pit rises, the floating platform rises and drives the screw rod to rise, lifting the power connection shell on the guide cylinder. When the power connection shell is electrically connected to the power connection ring on the guide cylinder, the current is then conducted to the power connection ring through the power connection shell, and then transmitted to the warning light through the transmission pole on the power connection ring, and the power transmission line of the warning light is connected. The warning light emits a warning of water level change, and according to the change of the water level in the foundation pit, the warning lights at different heights on the guide cylinder are lit in turn, thereby issuing a water level change warning, and timely reminding the workers to avoid the problem that the workers cannot operate in time due to omissions due to various problems and the groundwater level is too high, thereby improving the safety of later construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0020] Figure 2 It is a schematic diagram of the structure of the utility model as a whole in a disassembled state;

[0021] Figure 3 It is a schematic diagram of the structure of the fixing member in the decomposed state in the implementation of the utility model;

[0022] Figure 4 This is a schematic structural diagram of the guide member in the disassembled state in the implementation of the utility model;

[0023] Figure 5 It is a schematic diagram of the structure of the detection component in the decomposed state in the implementation of the utility model.

[0024] Description of the numbers in the figure:

[0025] 1. Fixing member; 11. Orifice plate; 12. Screw barrel; 13. First screw rod; 14. Press plate; 2. Guide member; 21. Guide barrel; 22. Power connection ring; 23. Transmission pole; 24. Warning light; 25. First power connection post; 3. Detection member; 31. Second screw rod; 32. Power connection shell; 33. Second power connection post; 34. Screw shell; 35. Floating platform; 36. Floating block. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.

[0027] See also Figure 1-5A foundation pit water level detector comprises a fixing member 1, a guide member 2 and a detection member 3. The fixing member 1 comprises a hole plate 11, and the hole plate 11 is horizontally fixed at the opening of the foundation pit. The guide member 2 comprises a guide cylinder 21, and the guide cylinder 21 is vertically fixed on the bottom surface of the hole plate 11. A plurality of power rings 22 are vertically penetrated and fixed on the outer circumference of the guide cylinder 21. The guide cylinder 21 is made of insulating material. A transmission pole 2 is vertically fixed upward on the outer wall of the plurality of power rings 22. 3, and the top of the transmission pole 23 is electrically fixed with a warning light 24, the detection member 3 includes a second screw 31, the top of the second screw 31 is fixed with an insulating plate, and the insulating plate of the second screw 31 is fixed with a power connection shell 32, the bottom end of the second screw 31 is horizontally connected to a floating platform 35, and a floating block 36 is fixed on the bottom surface of the floating platform 35, the second screw 31 is threadedly assembled with a screw shell 34, and the bottom end of the screw shell 34 is horizontally fixed with the floating platform 35, and the orifice plate on the fixing member 1 is used. 11 is fixed horizontally on the inner top of the foundation pit, and then the screw shell 34 on the second screw rod 31 is rotated to move vertically, and the floating platform 35 is driven to float in the water level of the foundation pit according to the change of the water level in the foundation pit. Then, when the water level in the foundation pit rises, the floating platform 35 rises and drives the screw rod 31 to rise, lifting the power connection shell 32 to rise on the guide cylinder 21. When the power connection shell 32 is electrically connected with the power connection ring 22 on the guide cylinder 21, the current is then conducted to the power connection ring 22 through the power connection shell 32, and then transmitted to the warning light 24 through the power transmission pole 23 on the power connection ring 22, and the power transmission line of the warning light 24 is connected. The warning light 24 emits light to warn of the water level change, so that according to the change of the water level in the foundation pit, the warning lights 24 at different heights on the guide cylinder 21 are lit in turn, thereby issuing a water level change warning, and timely reminding the workers to avoid the problem that the workers cannot operate in time due to omissions due to various problems and the groundwater level is too high, thereby improving the safety of the later construction.

[0028] See also Figure 3 and Figure 5 A wire hole is opened through the center of the orifice plate 11, and a power transmission line is inserted into the wire hole of the orifice plate 11, a second power connection post 33 is fixed to the top of the power connection shell 32, and the second power connection post 33 is electrically connected to the bottom end of the power transmission line, a first power connection post 25 is fixed on the warning light 24, and the first power connection post 25 is electrically connected to the power transmission line, the wire hole on the orifice plate 11 passes through the bottom end of the power transmission line and is electrically connected to the second power connection post 33 on the power connection shell 32, and at the same time, the first power connection post 25 on the warning light 24 is electrically connected to the power transmission line, which is used to transmit power to the warning light 24.

[0029] See also Figure 3Two screw barrels 12 are symmetrically and horizontally arranged on the outer circumferential surface of the orifice plate 11, and one end of the two screw barrels 12 is fixed on the outer circumferential surface of the orifice plate 11, and the two screw barrels 12 are horizontally threadedly assembled with a first screw rod 13, and the end of the first screw rod 13 is rotatably connected to a pressure plate 14. During use, the screw barrel 12 on the first screw rod 13 on the outer wall of the orifice plate 11 is rotated, and the thread drives the pressure plate 14 to press against the outer wall of the foundation pit, thereby fixing the orifice plate 11 at the port of the foundation pit.

[0030] During use, the orifice plate 11 on the fixing member 1 is horizontally fixed to the inner top of the foundation pit, and then the screw shell 34 on the second screw rod 31 is rotated to move vertically, and the floating platform 35 is driven to float in the water level of the foundation pit according to the change of the water level in the foundation pit. Then, when the water level in the foundation pit rises, the floating platform 35 rises and drives the screw rod 31 to rise, lifting the power connection shell 32 to rise on the guide cylinder 21. When the power connection shell 32 is electrically connected to the power connection ring 22 on the guide cylinder 21, the current is then conducted to the power connection ring 22 through the power connection shell 32, and then transmitted to the warning light 24 through the transmission pole 23 on the power connection ring 22, and the power transmission line of the warning light 24 is connected, and the warning light 24 emits light to warn of the water level change.

[0031] The above is only a preferred specific implementation of the utility model; however, the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and improved ideas of the utility model within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model.

Claims

1. A foundation pit water level detector, characterized in that: The invention comprises a fixing member (1), a guide member (2) and a detection member (3), wherein the fixing member (1) comprises a perforated plate (11), wherein the perforated plate (11) is horizontally fixedly arranged at the opening of a foundation pit, and the guide member (2) comprises a guide cylinder (21), wherein the guide cylinder (21) is vertically fixed on the bottom surface of the perforated plate (11), and a plurality of power connection rings (22) are vertically penetrated and fixed on the outer circumferential surface of the guide cylinder (21), and the guide cylinder (21) is made of insulating material, wherein the plurality of power connection rings (22) are A power transmission pole (23) is fixed vertically upward on the outer wall of the power connection ring (22), and a warning light (24) is electrically fixed to the top of the power transmission pole (23). The detection member (3) comprises a second screw rod (31), an insulating plate is fixed to the top of the second screw rod (31), and a power connection shell (32) is fixed on the insulating plate of the second screw rod (31). The bottom end of the second screw rod (31) is horizontally connected to a floating platform (35), and a floating block (36) is fixed to the bottom surface of the floating platform (35).

2. A foundation pit water level detector according to claim 1, characterized in that: A wire hole is provided through the center of the orifice plate (11), and a power transmission line is inserted through the wire hole of the orifice plate (11).

3. A foundation pit water level detector according to claim 2, characterized in that: A second power connection post (33) is fixed to the top of the power connection shell (32), and the second power connection post (33) is electrically connected to the bottom end of the transmission line.

4. A foundation pit water level detector according to claim 1, characterized in that: A first power connection post (25) is fixed on the warning light (24), and the first power connection post (25) is electrically connected to the power transmission line.

5. The foundation pit water level detector according to claim 1, characterized in that: Two screw barrels (12) are symmetrically arranged horizontally on the outer circumferential surface of the orifice plate (11), one end of the two screw barrels (12) is fixed on the outer circumferential surface of the orifice plate (11), and the first screw rods (13) are horizontally threadedly assembled on the two screw barrels (12).

6. A foundation pit water level detector according to claim 5, characterized in that: The end of the first screw rod (13) is rotatably connected to a pressing plate (14).

7. A foundation pit water level detector according to claim 1, characterized in that: A screw shell (34) is threadedly assembled on the second screw rod (31), and a floating platform (35) is horizontally fixed at the bottom end of the screw shell (34).