Internal arc experiment device of switch cabinet
The arc experiment device in switch cabinets addresses installation and positioning issues by using sliding blocks and threaded connections, enhancing flexibility and adaptability for diverse functional elements.
Patent Information
- Application Number
- CN202323299420.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-05
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2033-12-05
AI Technical Summary
Existing arc test devices in switch cabinets have inconvenient installation and inflexible indicator positioning, increasing the risk of arc testing.
An arc experiment device with adjustable indicators, featuring sliding blocks, bolts, and threaded connections to facilitate flexible installation and adaptation to different sizes of functional elements.
Enables convenient and flexible installation of indicators, accommodating various sizes and improving the adaptability of the device for arc experiments.
Smart Images

Figure CN222190113U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of arc experiments in high-voltage switch cabinets, in particular to an arc experiment device inside a switch cabinet. Background Art
[0002] The switch cabinet is an electrical equipment. The external line of the switch cabinet first enters the main control switch inside the cabinet, and then enters the sub-control switch. Each branch is set according to its needs, such as instruments, automatic control, motor magnetic switches, various AC contactors, etc. Some also have high-voltage and low-voltage switch cabinets, with high-voltage busbars, such as power plants, etc. Some also have low-frequency load reducers to protect the main equipment.
[0003] The main function of the switchgear is to open and close, control and protect electrical equipment in the process of power generation, transmission, distribution and energy conversion in the power system. The components in the switchgear mainly include circuit breakers, disconnectors, load switches, operating mechanisms, transformers and various protective devices. Switchgear above AC1000V is called high-voltage switchgear.
[0004] During the use of the switch cabinet, the contacts in the arc extinguishing chamber of the high-voltage circuit breaker will generate arcs during the breaking process. The arc generation process is accompanied by changes in parameters such as arc temperature and arc shape. Studying the changes in these parameters has very important guiding significance for optimizing the design of high-voltage circuit breakers. Arc tests are generally carried out using arc test devices, but the indicators of some existing arc test devices are inconvenient to install and the position of the indicators cannot be flexibly adjusted, resulting in an increased risk of arc tests. For this reason, we propose an internal arc test device for the switch cabinet. Utility Model Content
[0005] Technical problem to be solved: The indicators of some existing arc test devices are inconvenient to install and the position of the indicators cannot be flexibly adjusted, which increases the risk of arc testing.
[0006] In view of the deficiencies in the prior art, the utility model provides an arc experiment device inside a switch cabinet, which solves the problems mentioned in the background technology.
[0007] Technical solution:
[0008] In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
[0009] A switch cabinet internal arc experiment device comprises: a simulated floor, a simulated wall is arranged on the top of the simulated floor, a first functional unit and a second functional unit are arranged on the upper surface of the simulated floor, a cable is arranged between the first functional unit and the second functional unit, the cable is connected to an external power supply room, a first installation component is arranged on the outer side of the simulated wall, the first installation component is arranged around the first functional unit and the second functional unit, and a second installation component is arranged on the top of the simulated wall.
[0010] In a possible implementation, the first installation component includes a first indicator, a first fixing block is arranged on the top side of the first indicator, the first installation component also includes a side slide groove, the side slide groove is the outer side of the simulated wall, a first slide rod is arranged inside the side slide groove, and the first indicator is made of black printed cotton cloth.
[0011] In a possible implementation, the first sliding rod passes through the first fixed block and is slidably connected to the first fixed block. A plurality of first threaded holes are provided on the outside of the simulated wall. A first bolt is provided inside the first threaded hole. The first bolt passes through the first threaded hole and extends to the outside of the first fixed block. The first bolt is threadedly connected to the first threaded hole. A positioning groove is provided on one side of the first fixed block close to the first indicator. The top of the first indicator is matched and connected to the positioning groove. The first indicator is arranged in a 7-shape.
[0012] In a possible implementation, the first mounting assembly further includes a transverse slide groove, which is located on the upper surface of the simulated base plate, a second slide rod is disposed inside the transverse slide groove, a second fixed block is slidably connected to the surface of the second slide rod, a positioning groove is disposed on the top of the second fixed block, and the bottom of the first indicator is matched and connected to the positioning groove.
[0013] In one possible implementation, the second mounting component includes a mounting top plate, which is located above the interior of the simulated wall. A second indicator is disposed at the bottom of the mounting top plate, and the second indicator is made of black printed cotton cloth. The second mounting component also includes a top slide, and a sliding rod is disposed inside the top slide.
[0014] In a possible implementation, a moving block is slidably sleeved on the surface of the sliding rod, and two moving blocks are arranged on the surface of the sliding rod. A connecting rod is arranged on the side of the two moving blocks away from each other, and a positioning rod is arranged on the side of the connecting rod away from the moving rod. Positioning grooves are arranged on both sides of the top of the mounting top plate, and the positioning grooves are matched and connected with the positioning rods. A plurality of second threaded holes are arranged on the top of the simulated wall, and a second bolt is arranged inside the second threaded hole. The second bolt passes through the second threaded hole and extends to the outside of the moving block, and the second bolt is threadedly connected to the second threaded hole.
[0015] Beneficial effects:
[0016] First, by sliding the first fixed block, the first fixed block is made to slide on the surface of the first slide bar, and then by placing the top of the first indicator inside the first fixed block, and passing the first bolt through the outside of the simulated wall and threadedly connected with the first threaded hole, the position of the first fixed block is fixed, and the top of the first indicator is limited at the same time, and then by sliding the second fixed block, the second fixed block is made to slide on the surface of the second slide bar, so that the position of the second fixed block can be adjusted, and after adjusting to a suitable position, the bottom of the first indicator is connected to the second fixed block, so that the installation of the first indicator is more convenient, and the installation position of the first indicator can be flexibly adjusted, so that the device can adapt to arc experiments of functional elements of different sizes;
[0017] Secondly, by pulling the moving block outward, the moving block is made to slide on the surface of the sliding rod, thereby increasing the distance between the two moving blocks, and then placing the mounting top plate and the second indicator between the two moving blocks, and by matching and connecting the positioning rod and the mounting top plate, the second indicator is suspended, and the moving block is slid in the direction of the second indicator to make the moving block adapt to the installation of second indicators of different sizes, and a second bolt is passed through the top of the simulated wall and threadedly connected to the second threaded hole to limit the position of the moving block, thereby further improving the flexibility of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0019] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0020] Figure 2 It is a schematic diagram of the internal structure of the utility model;
[0021] Figure 3 For this utility model Figure 2 Enlarged view of point A in the middle;
[0022] Figure 4 For this utility model Figure 2 Enlarged view of point B in the middle;
[0023] Figure 5 It is a schematic diagram of the test circuit in the utility model.
[0024] Description of reference numerals:
[0025] 1. Simulated floor; 2. First installation component; 21. First indicator; 22. First fixed block; 23. Side slide groove; 24. First slide rod; 25. First threaded hole; 26. First bolt; 27. Horizontal slide groove; 28. Second fixed block; 29. Second slide rod; 3. Second installation component; 31. Mounting top plate; 32. Second indicator; 33. Positioning rod; 34. Connecting rod; 35. Moving block; 36. Top slide groove; 37. Sliding rod; 38. Second threaded hole; 39. Second bolt; 4. First functional unit; 5. Second functional unit; 6. Simulated wall; 7. Cable. DETAILED DESCRIPTION
[0026] The embodiments of the present application solve the problems in the prior art by providing an arc experiment device inside a switch cabinet.
[0027] The technical solution in the embodiment of the present application is to solve the above problems, and the overall idea is as follows:
[0028] The specific structure of this embodiment is as follows: Figure 1-5 As shown, an arc experiment device inside a switch cabinet comprises: a simulated floor 1, a simulated wall 6 is arranged on the top of the simulated floor 1, a first functional unit 4 and a second functional unit 5 are arranged on the upper surface of the simulated floor 1, a cable 7 is arranged between the first functional unit 4 and the second functional unit 5, the cable 7 is connected to the external power supply room, a first installation component 2 is arranged on the outer side of the simulated wall 6, the first installation component 2 is arranged around the first functional unit 4 and the second functional unit 5, and a second installation component 3 is arranged on the top of the simulated wall 6.
[0029] In some examples, the first mounting assembly 2 includes a first indicator 21, a first fixed block 22 is provided on the top side of the first indicator 21, the first mounting assembly 2 also includes a side slide groove 23, the side slide groove 23 is the outer side of the simulated wall 6, a first slide rod 24 is provided inside the side slide groove 23, the first indicator 21 is made of black printed cotton cloth, the first slide rod 24 passes through the first fixed block 22 and is slidably connected with the first fixed block 22, a plurality of first threaded holes 25 are provided on the outer side of the simulated wall 6, a first bolt 26 is provided inside the first threaded hole 25, the first bolt 26 passes through the first threaded hole 25 and extends to the outer side of the first fixed block 22, the first bolt 26 is threadedly connected with the first threaded hole 25, a positioning groove is provided on one side of the first fixed block 22 close to the first indicator 21, the top of the first indicator 21 is matched and connected with the positioning groove, the first indicator 21 is arranged in a 7-shape, the first mounting assembly 2 also includes a transverse slide groove 27, the transverse slide groove 27 is located on the upper surface of the simulated bottom plate, and a The second slide bar 29 has a second fixed block 28 slidably connected to the surface of the second slide bar 29, and a positioning groove is set on the top of the second fixed block 28. The bottom of the first indicator 21 is matched and connected with the positioning groove. The first fixed block 22 is slid to make the first fixed block 22 slide on the surface of the first slide bar 24, and then the top of the first indicator 21 is placed inside the first fixed block 22, and the first bolt 26 passes through the outside of the simulated wall 6 and is threadedly connected with the first threaded hole 25, so as to fix the position of the first fixed block 22 and limit the top of the first indicator 21 at the same time. Then, the second fixed block 28 is slid to make the second fixed block 28 slide on the surface of the second slide bar 29, so that the position of the second fixed block 28 can be adjusted. After adjusting to the appropriate position, the bottom of the first indicator 21 is connected to the second fixed block 28, so that the installation of the first indicator 21 is more convenient, and the installation position of the first indicator 21 can be flexibly adjusted, so that the device can adapt to the arc experiment work of functional elements of different sizes.
[0030] In some examples, the second mounting component 3 includes a mounting top plate 31, which is located above the inside of the simulated wall 6. A second indicator 32 is provided at the bottom of the mounting top plate 31, and the second indicator 32 is made of black printed cotton cloth. The second mounting component 3 also includes a top slide groove 36, and a sliding rod 37 is provided inside the top slide groove 36. A moving block 35 is slidably sleeved on the surface of the sliding rod 37. Two moving blocks 35 are provided on the surface of the sliding rod 37. A connecting rod 34 is provided on the side away from each other of the two moving blocks 35. A positioning rod 33 is provided on the side of the connecting rod 34 away from the moving rod. Positioning grooves are provided on both sides of the top of the mounting top plate 31, and the positioning grooves are matched and connected with the positioning rod 33. A plurality of second threaded holes 38 are provided on the top of the simulated wall 6, and a second bolt 39 is provided inside the second threaded hole 38. The second The bolt 39 passes through the second threaded hole 38 and extends to the outside of the moving block 35. The second bolt 39 is threadedly connected to the second threaded hole 38. The moving block 35 is pulled outward to slide on the surface of the sliding rod 37, thereby increasing the distance between the two moving blocks 35. The mounting top plate 31 and the second indicator 32 are then placed between the two moving blocks 35. The second indicator 32 is suspended by matching the positioning rod 33 with the mounting top plate 31, and the moving block 35 is slid in the direction of the second indicator 32 to adapt to the installation of second indicators 32 of different sizes. The second bolt 39 passes through the top of the simulated wall 6 and is threadedly connected to the second threaded hole 38, thereby limiting the position of the moving block 35 and further improving the flexibility of the device.
[0031] In a specific application scenario, the device is first installed at a suitable position, and the first functional unit 4 and the second functional unit 5 are placed on the simulated bottom plate 1. Then, the top of the first indicator 21 is placed inside the first fixed block 22, and the first bolt 26 passes through the outside of the simulated wall 6 and is threadedly connected to the first threaded hole 25, so as to fix the position of the first fixed block 22 and limit the top of the first indicator 21. Then, the second fixed block 28 is slid to slide on the surface of the second slide rod 29, so that the position of the second fixed block 28 can be adjusted. After adjusting to a suitable position, the bottom of the first indicator 21 is connected to the second fixed block 28, so that the installation of the first indicator 21 is more convenient. The size of the first indicator 21 can be flexibly adjusted. The moving block 35 is pulled outward to slide on the surface of the sliding rod 37, thereby increasing the distance between the two moving blocks 35. Then, the mounting top plate 31 and the second indicator 32 are placed between the two moving blocks 35. The second indicator 32 is suspended by matching and connecting the positioning rod 33 with the mounting top plate 31. The moving block 35 is slid toward the second indicator 32 to adapt the moving block 35 to the installation of second indicators 32 of different sizes. The second bolt 39 passes through the top of the simulated wall 6 and is threadedly connected to the second threaded hole 38, thereby limiting the position of the moving block 35. After the installation is completed, the detection circuit is installed. Refer to Figure 5 , where G: short-circuit generator, L: regulating reactance, T0: test product, GB: protection switch, MB: operating switch, U: voltage measurement, MS: closing switch, 1: current measurement, so as to carry out arc test.
[0032] By adopting the above technical solution, the installation position of the indicator can be flexibly adjusted, so that the device can adapt to arc experiment work of functional elements of different sizes, thereby increasing the flexibility of the device.
[0033] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. A switch cabinet internal arc test device, comprising a simulated floor (1), characterized in that: A simulated wall (6) is arranged on the top of the simulated floor (1); a first functional unit (4) and a second functional unit (5) are arranged on the upper surface of the simulated floor (1); a cable (7) is arranged between the first functional unit (4) and the second functional unit (5); the cable (7) is connected to an external power supply room; a first installation component (2) is arranged on the outside of the simulated wall (6); the first installation component (2) is arranged around the first functional unit (4) and the second functional unit (5); and a second installation component (3) is arranged on the top of the simulated wall (6).
2. The switch cabinet internal arc test device according to claim 1, characterized in that: The first installation component (2) comprises a first indicator (21), a first fixing block (22) is arranged on the top side of the first indicator (21), the first installation component (2) further comprises a side slide groove (23), the side slide groove (23) is the outer side of the encounter simulated wall (6), a first slide rod (24) is arranged inside the side slide groove (23), and the first indicator (21) is made of black printed cotton cloth.
3. The switch cabinet internal arc test device according to claim 2, characterized in that: The first sliding rod (24) passes through the first fixing block (22) and is slidably connected to the first fixing block (22); a plurality of first threaded holes (25) are arranged on the outer side of the simulated wall (6); a first bolt (26) is arranged inside the first threaded hole (25); the first bolt (26) passes through the first threaded hole (25) and extends to the outer side of the first fixing block (22); the first bolt (26) is threadedly connected to the first threaded hole (25); a positioning groove is arranged on one side of the first fixing block (22) close to the first indicator (21); the top of the first indicator (21) is matched and connected to the positioning groove; the first indicator (21) is arranged in a 7-shaped manner.
4. The switch cabinet internal arc test device according to claim 2, characterized in that: The first mounting assembly (2) further comprises a transverse slide groove (27), wherein the transverse slide groove (27) is located on the upper surface of the simulated base plate, a second slide rod (29) is arranged inside the transverse slide groove (27), a second fixed block (28) is slidably connected to the surface of the second slide rod (29), a positioning groove is arranged on the top of the second fixed block (28), and the bottom of the first indicator (21) is matched and connected to the positioning groove.
5. The switch cabinet internal arc test device according to claim 1, characterized in that: The second mounting assembly (3) comprises a mounting top plate (31), the mounting top plate (31) being located above the inside of the simulated wall (6), a second indicator (32) being arranged at the bottom of the mounting top plate (31), the second indicator (32) being made of black printed cotton cloth, and the second mounting assembly (3) further comprises a top slide groove (36), a sliding rod (37) being arranged inside the top slide groove (36).
6. The switch cabinet internal arc test device according to claim 5, characterized in that: A moving block (35) is slidably sleeved on the surface of the sliding rod (37), and two moving blocks (35) are arranged on the surface of the sliding rod (37). A connecting rod (34) is arranged on the side of the two moving blocks (35) away from each other, and a positioning rod (33) is arranged on the side of the connecting rod (34) away from the moving rod. Positioning grooves are arranged on both sides of the top of the mounting top plate (31), and the positioning grooves are matched and connected with the positioning rods (33). A plurality of second threaded holes (38) are arranged on the top of the simulated wall (6), and a second bolt (39) is arranged inside the second threaded hole (38). The second bolt (39) passes through the second threaded hole (38) and extends to the outside of the moving block (35), and the second bolt (39) is threadedly connected to the second threaded hole (38).