Lifting device for coring in geotechnical engineering survey

By designing an automatic clamping placement mechanism and a fast lifting mechanism in the lifting device for geotechnical engineering survey and core extraction, the problem of cumbersome operation of traditional devices is solved, and the shipping rate of the geotechnical core and the convenience and stability of the equipment are improved. sex.

CN222292704UActive Publication Date: 2025-01-03SHANGHAI JIANKE TECHN ASSESSMENT OF CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421055500.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2025-01-03
Estimated Expiration
2034-05-15

AI Technical Summary

Technical Problem

The lifting device for traditional geotechnical engineering surveying and core collection is complicated to operate when shipping and collecting geotechnical cores, which reduces the shipping rate and convenience of the equipment.

Method used

A lifting device for geotechnical engineering survey core extraction including a placement mechanism and a lifting mechanism is designed. The placement mechanism automatically clamps and fixes the geotechnical core through rotating plates, buckles, soft rubber pads and relay rods. The lifting mechanism adopts a motor. , sprockets and moving belts achieve rapid lifting.

Benefits of technology

It improves the shipping rate of the geotechnical core and the convenience of the device, and enhances the stability of the device, simplifies the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222292704U_ABST
    Figure CN222292704U_ABST
Patent Text Reader

Abstract

The utility model discloses a lifting device for coring in geotechnical engineering survey, and relates to the technical field of engineering survey. Comprising a rock-soil coring lifting base, a placement mechanism is in contact with the center of the top of the rock-soil coring lifting base, the placement mechanism comprises a plurality of placement boxes, box openings of the placement boxes are located in the tops, fixing blocks are fixed to the two sides of the bottoms of the inner walls of the placement boxes correspondingly, and inclined faces are formed in the tops of the opposite faces of the two fixing blocks correspondingly. According to the rock-soil core loading and transporting device, the placing mechanism is arranged, the rotating plate and the buckling rod are additionally arranged in the placing mechanism, the rotating plate can rotate under the gravity effect of a rock-soil core, at the moment, in the rotating process of the rotating plate, the rotating plate makes contact with the two sides of the top of the rock-soil core, the rock-soil core is clamped and fixed, and the loading and transporting speed of the rock-soil core is increased; and the convenience of the device is also improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering survey, in particular to a lifting device for coring in geotechnical engineering survey. Background Art

[0002] In geotechnical engineering surveys, it is often necessary to lift and transport geotechnical cores, so a lifting device is needed for geotechnical engineering survey coring.

[0003] For example, the patent publication number CN220265136U is a lifting device for geotechnical engineering survey and coring. It controls the operation of the driving component to make the screw start to rotate, so that the sliding frame drives the limit plate to slide toward the side close to each other, and fixes the geotechnical core in the lifting frame to prevent the geotechnical core from shaking and displacing during the lifting process, thereby causing damage to the geotechnical core.

[0004] However, in actual use of the above-mentioned lifting device for geotechnical engineering survey and coring, each time the geotechnical core is placed, it is necessary to wait for the control mechanism to fix and limit the two sides of the geotechnical core, and manually pry open the protective plate to fix and limit the top of the geotechnical core. When the amount of geotechnical coring is too much, the speed of geotechnical core transportation is reduced, and the convenience of the device is also reduced. For this reason, the applicant proposed a lifting device for geotechnical engineering survey and coring. Utility Model Content

[0005] The utility model aims to provide a lifting device for geotechnical engineering survey and coring to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a lifting device for geotechnical engineering survey and coring, comprising a geotechnical coring lifting base, a placement mechanism in contact with the top center of the geotechnical coring lifting base, the placement mechanism comprising a plurality of placement boxes, the box opening of the placement box is located at the top, fixed blocks are respectively fixed on both sides of the bottom of the inner wall of the placement box, the tops of the opposite surfaces of the two fixed blocks are respectively provided with inclined surfaces, a plurality of soft rubber pads are respectively fixed on the inclined surfaces of the two fixed blocks, a soft board is fixed at the center of the bottom of the inner wall of the placement box, a relay rod is fixed at the center of the top of the soft board, two rotating plates are rotatably connected on both sides of the inner wall of the placement box, buckle rods are respectively fixed on the tops of the opposite surfaces of the two rotating plates, fixed rods are respectively fixed on the bottoms of the opposite back surfaces of the two rotating plates, inclined surface rods are respectively fixed on the other two sides of the inner wall of the placement box, and the inclined surfaces of the two inclined surface rods are symmetrical to each other.

[0007] Preferably, lifting mechanisms are fixed on both sides of the top of the rock and soil coring lifting base, and both sides of the inner wall of the lifting mechanism are rotatably connected to both sides of the outer wall of the placing mechanism.

[0008] Preferably, a plurality of springs are fixed to the inclined surface of the inclined rod, one end of the plurality of springs are commonly fixed to one side of an adjacent fixed rod, slide plates are respectively fixed to the center positions of both sides of the inner wall of the placement box, the slide groove walls of the two slide plates are respectively slidably connected with lifting frames, a movable plate is fixed to the bottom end of the lifting frame, the bottom of the movable plate is in contact with the bottom of the inner wall of the placement box, and connecting blocks are respectively fixed to both sides of the box opening of the placement box.

[0009] Preferably, the soft plate is located between the bottom of the opposite surfaces of the two fixed blocks, the sum of the widths of the laterally adjacent soft rubber pads is less than or equal to the distance between the opposite surfaces of the two fixed blocks, the sum of the heights of the soft plate and the relay pole is less than the height of the fixed block, the two rotating plates are respectively located on the top of the two fixed blocks, and the bottoms of the two rotating plates are located between the opposite surfaces of the two fixed blocks, the lengths of the soft rubber pad, the soft plate and the relay pole are equal, the sum of the length of the soft rubber pad and the length of the two movable plates is equal to the length of the bottom of the inner wall of the placement box, the shortest distance between the two rotating plates is greater than or equal to the width of the slide plate, and the height of the lifting frame is greater than the height of the inner wall of the placement box.

[0010] Preferably, the lifting mechanism includes two outer boxes, the box openings of the two outer boxes correspond to each other, two motors are fixed to one side of the inner wall of the outer box, a main sprocket is fixed to the output end of the motor, a plurality of secondary sprockets are rotatably connected to one side of the inner wall of the outer box, the plurality of secondary sprockets are located between the two main sprockets, the teeth of the two main sprockets and the plurality of secondary sprockets are meshed with a chain, a moving belt is fixed to one side of the chain, a plurality of connecting rods are fixed to the opposite surfaces of the two moving belts, stabilizing blocks are fixed to the bottom ends of the two outer boxes, support plates are fixed to the two sides of the top of the stabilizing blocks, and stabilizing blocks are fixed between the opposite surfaces of adjacent support plates and the adjacent sides of the outer walls of the outer boxes.

[0011] Preferably, the opposite ends of the laterally adjacent connecting rods are rotatably connected to the top ends of two adjacent connecting blocks in the placement mechanism, and the bottoms of the two stabilizing blocks are fixed to both sides of the top of the geotechnical coring lifting base.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] The lifting device for geotechnical engineering survey and coring has a placing mechanism with a rotating plate and a buckle rod added therein. The rotating plate will rotate under the gravity of the geotechnical core. During the rotation of the rotating plate, the rotating plate will contact the two sides of the top of the geotechnical core and clamp the geotechnical core, thereby increasing the loading rate of the geotechnical core and improving the convenience of the device.

[0014] At the same time, soft rubber pads and relay rods are installed in the placement mechanism. The soft rubber pads can clamp and fix the bottom of the geotechnical core, and the relay rods can bear the weight of the geotechnical core, so that the overall center of gravity of the placement box is at the center of the bottom of the inner wall, thereby improving the stability of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a cross-sectional structural schematic diagram of the utility model;

[0016] Figure 2 It is a schematic diagram of the top structure of the utility model;

[0017] Figure 3 This is a schematic diagram of the bottom structure of the utility model;

[0018] Figure 4 This is a schematic diagram of the placement mechanism structure of the utility model;

[0019] Figure 5 for Figure 4 A partial enlarged view of part A;

[0020] Figure 6 It is a schematic diagram of the lifting mechanism structure of the utility model.

[0021] In the figure: 1. geotechnical coring lifting base; 2. placing mechanism; 201. placing box; 202. fixing block; 203. soft rubber pad; 204. soft board; 205. relay rod; 206. rotating plate; 207. buckle rod; 208. fixing rod; 209. inclined rod; 210. spring; 211. slide plate; 212. lifting frame; 213. moving plate; 214. connecting block; 3. lifting mechanism; 301. outer box; 302. motor; 303. main sprocket; 304. secondary sprocket; 305. chain; 306. moving belt; 307. connecting rod; 308. stabilizing block; 309. supporting plate; 310. stabilizing block. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] In engineering surveys, it is often necessary to perform coring operations on rock and soil. After coring, in order to facilitate the collection of the cores by the workers on the ground, the rock and soil cores need to be lifted and transported. Therefore, a lifting device for geotechnical engineering survey coring is needed. In actual use, most of the traditional geotechnical engineering survey coring lifting devices are cumbersome to operate during the loading and collection of the device, which reduces the speed of rock and soil core transportation and the convenience of the device. For this reason, the applicant proposes a lifting device for geotechnical engineering survey coring.

[0024] like Figure 1-Figure 6As shown, the utility model provides a technical solution: a lifting device for coring in geotechnical engineering survey, comprising a geotechnical coring lifting base 1, a placing mechanism 2 is in contact with the top center of the geotechnical coring lifting base 1, the placing mechanism 2 comprises a plurality of placing boxes 201, the box opening of the placing box 201 is located at the top, and fixing blocks 202 are respectively fixed on both sides of the bottom of the inner wall of the placing box 201, and the tops of the opposite surfaces of the two fixing blocks 202 are respectively provided with inclined surfaces, and the inclined surfaces of the two fixing blocks 202 are respectively fixed with a plurality of soft rubber pads 203, and a soft board 204 is fixed at the center of the bottom of the inner wall of the placing box 201, and the top center of the soft board 204 is located at the top center of the soft board 204. A relay rod 205 is fixed to the placement box 201, and two rotating plates 206 are connected to rotate together on both sides of the inner wall of the placement box 201. Buckle rods 207 are fixed to the tops of the opposite surfaces of the two rotating plates 206, and fixed rods 208 are fixed to the bottoms of the opposite back surfaces of the two rotating plates 206. Inclined rods 209 are fixed to the other two sides of the inner wall of the placement box 201, and the inclined surfaces of the two inclined rods 209 are symmetrical to each other. Lifting mechanisms 3 are fixed to both sides of the top of the geotechnical coring lifting base 1, and the inner walls of the lifting mechanisms 3 are connected to the outer walls of the placement mechanism 2. A plurality of springs 210 are fixed to the inclined surfaces of the inclined rods 209. One end of the spring 210 is fixed to one side of an adjacent fixed rod 208. A slide plate 211 is fixed to the center of both sides of the inner wall of the placement box 201. The slide groove walls of the two slide groove plates 211 are slidably connected with a lifting frame 212. A movable plate 213 is fixed to the bottom end of the lifting frame 212. The bottom of the movable plate 213 contacts the bottom of the inner wall of the placement box 201. Connecting blocks 214 are fixed to both sides of the box opening of the placement box 201. The soft board 204 is located between the bottoms of the opposite surfaces of the two fixed blocks 202. The sum of the widths of the adjacent soft rubber pads 203 in the horizontal direction must be less than or equal to the distance between the opposite surfaces of the two fixed blocks 202. The sum of the heights of the plate 204 and the relay rod 205 must be smaller than the height of the fixed block 202. The two rotating plates 206 are respectively located on the top of the two fixed blocks 202, and the bottoms of the two rotating plates 206 are located between the opposite surfaces of the two fixed blocks 202. The lengths of the soft rubber pad 203, the soft plate 204 and the relay rod 205 are all equal. The sum of the length of the soft rubber pad 203 and the length of the two movable plates 213 must be equal to the length of the bottom of the inner wall of the placement box 201. The shortest distance between the two rotating plates 206 must be greater than or equal to the width of the slide plate 211. The height of the lifting frame 212 must be greater than the height of the inner wall of the placement box 201.

[0025] It should be noted that: first, the device is placed in the corresponding position. After completing the geotechnical engineering survey and coring, the geotechnical core is placed in the placement box 201. As the geotechnical core is placed in the placement box 201, the rotating plate 206 will rotate due to the weight of the geotechnical core. At this time, the buckle rod 207 will limit and fix the top two sides of the geotechnical core. At the same time, the two groups of soft rubber pads 203 will also deform due to the weight of the geotechnical core, and one side of the two groups of soft rubber pads 203 will contact the bottom two sides of the geotechnical core. In addition, the inclined surfaces of the opposite surfaces of the two fixing blocks 202 are used to adjust the rock. The two sides of the bottom of the soil core are limited and fixed. At the same time, when the geosoil core is completely inside the placement box 201, the bottom of the geosoil core will also contact the relay rod 205. At this time, the relay rod 205 will bear the weight of the geosoil core and make the center of the placement box 201 at the center position of the bottom of the inner wall. During transportation, the stability of the placement box 201 can be ensured. When taking out the geosoil core, only the two lifting frames 212 need to be lifted to take out the geosoil core, and then the two rotating plates 206 will be reset under the action of two sets of springs 210.

[0026] like Figure 6 As shown, the utility model provides a technical solution: a lifting device for coring in geotechnical engineering survey, including a lifting mechanism 3, the lifting mechanism 3 includes two outer boxes 301, the box openings of the two outer boxes 301 correspond to each other, two motors 302 are fixed to one side of the inner wall of the outer box 301, a main sprocket 303 is fixed to the output end of the motor 302, one side of the inner wall of the outer box 301 is rotatably connected to a plurality of secondary sprockets 304, the plurality of secondary sprockets 304 are located between the two main sprockets 303, the teeth of the two main sprockets 303 and the plurality of secondary sprockets 304 are meshed with a chain 305, the chain 305 A moving belt 306 is fixed on one side, and a number of connecting rods 307 are fixed on the opposite surfaces of the two moving belts 306. Stabilizing blocks 308 are fixed to the bottom ends of the two outer boxes 301, and support plates 309 are fixed on both sides of the top of the stabilizing blocks 308. Stabilizing blocks 310 are fixed between the opposite surfaces of adjacent support plates 309 and the outer walls of the adjacent outer boxes 301. The opposite ends of the transversely adjacent connecting rods 307 are rotatably connected to the tops of the two adjacent connecting blocks 214 in the placing mechanism 2, and the bottoms of the two stabilizing blocks 308 are fixed to the two sides of the top of the geotechnical coring lifting base 1.

[0027] It should be noted that: when lifting, first the two sets of motors 302 will control the two sets of main sprockets 303 to rotate, and the two sets of main sprockets 303 will drive the two chains 305 to move. At this time, the two sets of secondary sprockets 304 will also rotate, so as to improve the stability of the chains 305 during operation. Due to the movement of the two chains 305, the two moving belts 306 will also be driven to move. At this time, the two sets of connecting rods 307 on the two moving belts 306 will drive the placement mechanism 2 to perform lifting and lowering movements.

[0028] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is limited by the attached embodiments and their equivalents.

Claims

1. A lifting device for coring in geotechnical engineering survey, comprising a lifting base for coring (1), characterized in that: The top center of the rock and soil coring lifting base (1) contacts a placement mechanism (2), the placement mechanism (2) comprises a plurality of placement boxes (201), the box opening of the placement box (201) is located at the top, and fixed blocks (202) are respectively fixed on both sides of the bottom of the inner wall of the placement box (201), and the tops of the opposite surfaces of the two fixed blocks (202) are respectively provided with inclined surfaces, and the inclined surfaces of the two fixed blocks (202) are respectively fixed with a plurality of soft rubber pads (203), and the bottom center of the inner wall of the placement box (201) is fixed. A soft board (204) is provided, a relay rod (205) is fixed at the center position of the top of the soft board (204), two rotating plates (206) are connected to the inner wall of the placement box (201) for common rotation, buckle rods (207) are fixed to the tops of the opposite surfaces of the two rotating plates (206), fixing rods (208) are fixed to the bottoms of the opposite back surfaces of the two rotating plates (206), and inclined rods (209) are fixed to the other two sides of the inner wall of the placement box (201), and the inclined surfaces of the two inclined rods (209) are symmetrical to each other.

2. The lifting device for geotechnical engineering survey and coring according to claim 1, characterized in that: Lifting mechanisms (3) are fixed to both sides of the top of the rock and soil coring lifting base (1), and both sides of the inner wall of the lifting mechanism (3) are rotatably connected to both sides of the outer wall of the placement mechanism (2).

3. The lifting device for geotechnical engineering survey and coring according to claim 2, characterized in that: A plurality of springs (210) are fixed to the inclined surface of the inclined rod (209), one end of each of the springs (210) is fixed to one side of an adjacent fixed rod (208), a slide plate (211) is fixed to the center positions of both sides of the inner wall of the placement box (201), and a lifting frame (212) is slidably connected to the slide wall of the two slide plates (211), a movable plate (213) is fixed to the bottom end of the lifting frame (212), and the bottom of the movable plate (213) is in contact with the bottom of the inner wall of the placement box (201), and connecting blocks (214) are fixed to both sides of the box opening of the placement box (201).

4. The lifting device for geotechnical engineering survey and coring according to claim 3 is characterized in that: The soft board (204) is located between the bottoms of the opposite surfaces of the two fixed blocks (202); the sum of the widths of the soft rubber pads (203) adjacent to each other in the transverse direction is less than or equal to the distance between the opposite surfaces of the two fixed blocks (202); the sum of the heights of the soft board (204) and the relay pole (205) is less than the height of the fixed blocks (202); the two rotating boards (206) are respectively located on the tops of the two fixed blocks (202); and the bottoms of the two rotating boards (206) are located between the two fixed blocks (202). 202), the lengths of the soft rubber pad (203), the soft board (204) and the relay rod (205) are equal, the sum of the length of the soft rubber pad (203) and the length of the two movable boards (213) is equal to the length of the bottom of the inner wall of the placement box (201), the shortest distance between the two rotating boards (206) is greater than or equal to the width of the slide plate (211), and the height of the lifting frame (212) is greater than the height of the inner wall of the placement box (201).

5. The lifting device for geotechnical engineering survey and coring according to claim 3, characterized in that: The lifting mechanism (3) comprises two outer boxes (301), the box openings of the two outer boxes (301) correspond to each other, two motors (302) are fixed on one side of the inner wall of the outer box (301), a main sprocket (303) is fixed on the output end of the motor (302), a plurality of secondary sprockets (304) are rotatably connected to one side of the inner wall of the outer box (301), the plurality of secondary sprockets (304) are located between the two main sprockets (303), and the two main sprockets (303) and the plurality of secondary sprockets (304) are rotatably connected to each other. ) are meshed with teeth of a chain (305), a moving belt (306) is fixed on one side of the chain (305), a plurality of connecting rods (307) are fixed on opposite surfaces of the two moving belts (306), stabilizing blocks (308) are fixed on the bottom ends of the two outer boxes (301), support plates (309) are fixed on both sides of the top of the stabilizing blocks (308), and stabilizing blocks (310) are fixed between opposite surfaces of adjacent support plates (309) and both sides of the outer walls of adjacent outer boxes (301).

6. The lifting device for geotechnical engineering survey and coring according to claim 5, characterized in that: The opposite ends of the laterally adjacent connecting rods (307) are rotatably connected to the top ends of two adjacent connecting blocks (214) in the placement mechanism (2), and the bottoms of the two stabilizing blocks (308) are fixed to both sides of the top of the rock and soil coring lifting base (1).