Steel box girder support construction structure

The steel box girder support construction structure enables efficient installation of supports in narrow spaces by pre-setting and hoisting the support bracket and wedge block, simplifying the process and reducing time and effort.

CN222294711UActive Publication Date: 2025-01-03SHANGHAI CIVIL ENG GRP CO LTD OF CREC +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420646138.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2025-01-03
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

The installation of steel box girder supports is challenging in narrow spaces due to site conditions like small construction space and the inability to use traditional lifting equipment, making it difficult to install supports after sliding the steel box girder.

Method used

A steel box girder support construction structure comprising a support bracket, support, wedge block, and horse plate, allowing the support to be pre-set at the installation position, with the support and wedge block arranged on the support bracket, and installed using a hoisting device after sliding, followed by sequential shim casting and support removal.

Benefits of technology

Facilitates easy and efficient installation of supports in narrow spaces by allowing pre-setting and horizontal hoisting, saving time and effort, and enabling construction between upper and lower steel box girders.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222294711U_ABST
    Figure CN222294711U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel box girder support construction structure, and relates to the technical field of steel structure construction. The utility model provides a steel box girder support construction structure. The steel box girder support construction structure comprises a supporting bracket, a support, a wedge-shaped block and a horse plate, the upper steel box girder and the lower steel box girder are oppositely arranged in the vertical direction; the supporting bracket is arranged on the lower steel box girder, and the support is arranged on the supporting bracket; the wedge-shaped block is arranged between the support and the upper steel box girder, and the horse plate surrounds the wedge-shaped block and is connected with the support. Before sliding construction of the upper steel box girder, the support is arranged on one side of the installation position in advance, and the supporting bracket is arranged at the installation position to serve as a supporting structure of the support. After sliding construction of the upper steel box girder, the support is placed at the installation position in a horizontal hoisting mode, and cushion stone pouring, support installation and the like are sequentially carried out. And finally, relevant supporting structures are dismantled. Operation is easy and convenient, time and labor are saved, and construction in the narrow space between the upper steel box girder and the lower steel box girder is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel structure construction, and more specifically, to a steel box girder support construction structure. Background Art

[0002] Steel box girder is a type of bridge structure, mainly made of steel and shaped like a closed box. This structure is widely used in the construction of long-span bridges due to its excellent strength and stiffness, large load-bearing capacity and good stability.

[0003] In the prior art, when installing steel box girders, sliding technology is often used due to site conditions, such as small construction space, busy traffic, and inability to use traditional lifting equipment (such as large cranes or bridge erection machines). However, the sliding track occupies the position of the support. If the support is installed after sliding, the space is small and the installation is difficult. Utility Model Content

[0004] In view of this, the utility model provides a steel box girder support construction structure, which can install the support in a narrow space after the steel box girder slides.

[0005] The utility model provides a steel box beam support construction structure, comprising: a support bracket, a support, a wedge block and a horse plate;

[0006] The upper steel box girder and the lower steel box girder are arranged opposite to each other in the vertical direction; the support bracket is arranged on the lower steel box girder, and the support is arranged on the support bracket;

[0007] The wedge block is arranged between the support and the upper steel box beam, and the horse plate surrounds the wedge block and is connected to the support.

[0008] In a possible implementation manner, along the vertical direction, the projection of the support falls within the range of the projection of the supporting bracket.

[0009] In a possible implementation, the wedge blocks include a plurality of wedge blocks that are evenly arranged along a circumference of the top of the support.

[0010] In a possible implementation, a pad stone steel bar is provided on the lower steel box girder, and the pad stone steel bar and the support are located in the same vertical direction;

[0011] The support bracket is arranged around the pad stone reinforcement.

[0012] In a possible implementation, before the sliding construction of the upper steel box girder, the support and the wedge block are arranged on one side of the supporting bracket;

[0013] After the sliding construction of the upper steel box girder, the support and the wedge block are arranged on the top of the supporting bracket.

[0014] In a possible implementation, a temporary pad is provided on one side of the supporting bracket, and the temporary pad is equal to the height of the supporting bracket.

[0015] In a possible implementation, before the sliding construction of the upper steel box girder, the support and the wedge block are arranged on top of the temporary pad.

[0016] In a possible implementation, after the sliding construction of the upper steel box girder, the support and the wedge block are connected to a hoisting device with a stretching direction close to one side of the supporting bracket.

[0017] In a possible implementation, it also includes a pad stone template;

[0018] The pad stone template is arranged around the pad stone reinforcement.

[0019] In a possible implementation, the wedge block is connected to the upper steel box girder.

[0020] Compared with the prior art, the present invention provides at least the following beneficial effects:

[0021] In the embodiment provided by the utility model, before the upper steel box girder is slidably constructed, the support is preset at one side of the installation position, and a support bracket is set at the installation position as a support structure of the support. After the upper steel box girder is slidably constructed, the support is placed at the installation position by horizontal hoisting, and the shim casting and support installation are performed in sequence. Finally, the relevant support structure is removed. The utility model is simple and convenient to operate, saves time and effort, and is more conducive to construction in the narrow space between the upper and lower steel box girders.

[0022] Of course, any product implementing the present utility model does not necessarily need to achieve all of the above-mentioned technical effects at the same time.

[0023] Other features and advantages of the present invention will become apparent from the following detailed description of exemplary embodiments of the present invention with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present invention and, together with the description, serve to explain the principles of the present invention.

[0025] Figure 1 A schematic diagram of the structure of a steel box girder after sliding provided by the utility model;

[0026] Figure 2The utility model provides a structural schematic diagram of a steel box girder before sliding. DETAILED DESCRIPTION

[0027] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangements of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present invention.

[0028] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the present invention, its application, or uses.

[0029] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered as part of the specification.

[0030] In all examples shown and discussed herein, any specific values ​​should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.

[0031] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.

[0032] The utility model embodiment provides a steel box girder support construction structure, referring to Figure 1 and Figure 2 As shown, the steel box girder support construction structure includes: a support bracket 10, a support 20, a wedge block 30 and a horse plate 40;

[0033] The upper steel box girder 01 and the lower steel box girder 02 are arranged opposite to each other in the vertical direction; the support bracket 10 is arranged on the lower steel box girder 02, and the support 20 is arranged on the support bracket 10;

[0034] The wedge block 30 is arranged between the support 20 and the upper steel box girder 01 , and the horse plate 40 surrounds the wedge block 30 and is connected to the support 20 .

[0035] Before the sliding construction of the upper steel box girder 01, the support 20 and the wedge block 30 are arranged on one side of the supporting bracket 10;

[0036] After the sliding construction of the upper steel box girder 01 , the support 20 and the wedge block 30 are arranged on the top of the supporting bracket 10 .

[0037] It is understandable that before the upper steel box girder 01 is slipped, the support 20 is placed next to the location where it needs to be installed, so as not to affect the construction of the upper steel box girder 01. Furthermore, a wedge block 30 is also provided on the top of the support 20. The support bracket 10 is provided at the installation location, that is, before the upper steel box girder 01 is slipped, the support 20 and the support bracket 10 are arranged adjacent to each other.

[0038] Furthermore, a pad stone reinforcement 50 is provided on the lower steel box girder 02, and the pad stone reinforcement 50 and the support 20 are located in the same vertical direction;

[0039] The support bracket 10 is arranged around the pad stone reinforcement 50 .

[0040] The bottom of the installation position of the support 20 is a pad stone. After the upper steel box girder 01 is slidably constructed, the pad stone reinforcement 50 used for casting the pad stone is welded first, and then a rectangular support bracket 10 is welded around the pad stone reinforcement 50.

[0041] Furthermore, after the sliding construction of the upper steel box girder 01 , the support 20 and the wedge block 30 are connected to the lifting device with the stretching direction close to the side of the supporting bracket 10 .

[0042] A temporary pad 60 is provided on one side of the support bracket 10 , and the temporary pad 60 is equal in height to the support bracket 10 .

[0043] Before the sliding construction of the upper steel box girder 01 , the support 20 and the wedge block 30 are arranged on the top of the temporary pad 60 .

[0044] Before the sliding construction of the upper steel box girder 01, the support 20 is placed on one side of the installation position. After the sliding construction of the upper steel box girder 01, the support 20 is hoisted from one side to the installation position by the hoisting device. In the vertical direction, the projection of the support 20 falls within the range of the projection of the support bracket 10. In other words, the support bracket 10 can fully support the support 20. The hoisting device can be a hand winch. At the same time, in order for the support 20 to be able to move horizontally to the installation position, a temporary pad 60 can be set on one side of the support bracket 10. The temporary pad 60 is equal in height to the support bracket 10, which facilitates the hoisting of the support 20. It should be noted that during the hoisting process, the wedge block 30 arranged on the top of the support 20 moves together with the support 20, and the wedge block 30 includes a plurality of wedge blocks 30, which are evenly arranged around the top of the support 20.

[0045] Further, after the support 20 and the wedge block 30 are moved into place, the support 20 and the wedge block 30 are welded, and the horse plate 40 is welded around the wedge block 30 and welded to the bottom of the upper steel box girder 01. After the support is supported by the support bracket 10, the pad stone template is set around the pad stone steel bar 50. Concrete is poured into the pad stone template. After the pad stone concrete is cured, grouting is performed between the pad stone concrete and the support 10. Finally, the horse plate 40 is removed, the support bracket 10 is removed, and the wedge block 30 is connected to the upper steel box girder 01. The support 20 is installed.

[0046] The construction method of the steel box girder support construction structure is as follows:

[0047] ① The upper steel box girder 01 sliding track occupies the support 20 position, cuts off the steel bars that conflict with the pad stone, and retains sufficient lap welding length;

[0048] ② Place the support 20 next to the part where it needs to be installed;

[0049] ③ The upper steel box girder 01 slides into place;

[0050] ④ Remove the upper steel box girder 01 sliding track and install the pad stone reinforcement 50;

[0051] ⑤ Use angle steel to weld a support bracket 10 around the pad stone steel bar 50, use a hand chain hoist to move the side support 20 and the wedge block 30 to the specified position, and support them with the support bracket 10;

[0052] ⑥ Use the horse plate 40 to fix the wedge block 30 and the support 20;

[0053] ⑦Install the pad stone formwork and pour the pad stone concrete;

[0054] ⑧ After the curing of the pad stone concrete is completed, grouting is performed between the pad stone concrete and the support 20;

[0055] ⑨ Remove the horse plate 40, remove the supporting bracket 10, and weld the wedge block 30 to the bottom of the upper steel box beam 01.

[0056] In summary, the steel box girder support construction structure provided by the utility model achieves at least the following beneficial effects:

[0057] In the embodiment provided by the utility model, before the upper steel box girder is slidably constructed, the support is preset at one side of the installation position, and a support bracket is set at the installation position as a support structure of the support. After the upper steel box girder is slidably constructed, the support is placed at the installation position by horizontal hoisting, and the shim casting and support installation are performed in sequence. Finally, the relevant support structure is removed. The utility model is simple and convenient to operate, saves time and effort, and is more conducive to construction in the narrow space between the upper and lower steel box girders.

[0058] Although some specific embodiments of the present invention have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present invention. It should be understood by those skilled in the art that the above embodiments may be modified without departing from the scope and spirit of the present invention. The scope of the present invention is defined by the appended claims.

Claims

1. A steel box girder support construction structure, characterized in that: include: support brackets, bearings, wedges and horse boards; The upper steel box girder and the lower steel box girder are arranged opposite to each other in the vertical direction; the support bracket is arranged on the lower steel box girder, and the support is arranged on the support bracket; The wedge block is arranged between the support and the upper steel box beam, and the horse plate surrounds the wedge block and is connected to the support.

2. The steel box girder support construction structure according to claim 1 is characterized in that: In the vertical direction, the projection of the support falls within the range of the projection of the supporting bracket.

3. The steel box girder support construction structure according to claim 1, characterized in that: The wedge-shaped blocks include a plurality of wedge-shaped blocks which are evenly arranged along a circumference of the top of the support.

4. The steel box girder support construction structure according to claim 1, characterized in that: The lower steel box girder is provided with a pad stone steel bar, and the pad stone steel bar and the support are located in the same vertical direction; The support bracket is arranged around the pad stone reinforcement.

5. The steel box girder support construction structure according to claim 4, characterized in that: Before the sliding construction of the upper steel box girder, the support and the wedge block are arranged on one side of the supporting bracket; After the sliding construction of the upper steel box girder, the support and the wedge block are arranged on the top of the supporting bracket.

6. The steel box girder support construction structure according to claim 5, characterized in that: A temporary pad is provided on one side of the support bracket, and the temporary pad is equal to the height of the support bracket.

7. The steel box girder support construction structure according to claim 6, characterized in that: Before the sliding construction of the upper steel box girder, the support and the wedge block are arranged on the top of the temporary pad block.

8. The steel box girder support construction structure according to claim 7, characterized in that: After the sliding construction of the upper steel box girder, the support and the wedge block are connected to the hoisting device with the stretching direction close to the side of the supporting bracket.

9. The steel box girder support construction structure according to claim 4, characterized in that: Also included are pad stone templates; The pad stone template is arranged around the pad stone reinforcement.

10. The steel box girder support construction structure according to claim 1, characterized in that: The wedge block is connected to the upper steel box girder.