Shock-resistant support for comprehensive pipeline bridge of motor equipment in pharmaceutical workshop

Through integrated installation method and triangular structural design, the problem of insufficient seismic performance of comprehensive pipeline bridge scattered installation and seismic performance in the existing technology is solved, and construction efficiency and seismic performance are improved.

CN222297183UActive Publication Date: 2025-01-03NANTONG TONGBO EQUIP INSTALLATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420740497.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2025-01-03
Estimated Expiration
2034-04-10

AI Technical Summary

Technical Problem

The existing comprehensive pipeline bridge seismic support is divided into multiple components. The fragmented installation makes it difficult for construction personnel to install in a narrow space, slow progress, and insufficient seismic performance.

Method used

Using an integrated installation method, the seismic support and bridge frame of the integrated pipeline bridge are arranged on the same set of seismic support frame, and a triangular structure is formed through the oblique support frame and the fixing mechanism to increase the support frame. Stability and shock resistance.

Benefits of technology

The construction process is simplified, the installation efficiency is improved, the structural stability and seismic resistance of the bracket are enhanced, and the installation needs of different heights and angles are adapted to the installation needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222297183U_ABST
    Figure CN222297183U_ABST
Patent Text Reader

Abstract

The utility model relates to a pharmaceutical workshop motor equipment comprehensive pipeline bridge anti-seismic support, and relates to the technical field of pipeline bridge anti-seismic. The pharmaceutical workshop motor equipment comprehensive pipeline bridge shock-resistant support comprises a first bearing frame and a second bearing frame, the first bearing frame is used for installing a pipeline, the second bearing frame is used for installing a cable bridge, and the tops of the ends, away from each other, of the first bearing frame and the second bearing frame are both connected with vertical supporting frames. The ends, close to each other, of the first bearing frame and the second bearing frame are jointly connected with a shared supporting frame, and the top end of the shared supporting frame and the top end of each vertical supporting frame are used for being connected with a concrete floor. Compared with the prior art, the comprehensive pipeline bridge anti-seismic support has the advantages that an integrated installation method is adopted, the comprehensive pipeline bridge anti-seismic support and a bridge are effectively arranged on the same anti-seismic support, and therefore the adverse effect of installed components on the low position or the same horizontal position on follow-up installation of related personnel is reduced, and construction of the related personnel is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipeline bridge seismic resistance, and in particular to a comprehensive pipeline bridge seismic resistance support for motor equipment in a pharmaceutical workshop. Background Art

[0002] With the continuous development of social economy and the increasing level of science and technology, my country's pharmaceutical industry is also booming. As the main production and manufacturing site for pharmaceutical companies, pharmaceutical workshops play an important role in the pharmaceutical industry. The earthquake resistance of pharmaceutical workshop buildings usually consists of three parts, namely, the earthquake resistance of the building structure, the earthquake resistance of non-structural components of the building, and the earthquake resistance of mechanical and electrical equipment of the building. Since there are many mechanical and electrical equipment used in pharmaceutical workshops and they are of high importance, the brackets used to support the bridge frame generally need to have good earthquake resistance.

[0003] Regarding the above-mentioned related technologies, since the integrated pipe bridge seismic support in the prior art is generally divided into multiple components, and the relevant personnel usually adopt a scattered layout structure to install multiple components in multiple places, this requires the relevant construction personnel to install each component in accordance with the layout structure when installing the integrated pipe bridge seismic support. Since the integrated pipelines of electromechanical equipment in the pharmaceutical workshop are complicated and the space available for construction personnel to work in is relatively small, when the construction personnel install components, they are likely to be disturbed by the components that have been installed below or at the same level, which brings inconvenience to the construction personnel, resulting in slow construction progress and even the inability to construct. Utility Model Content

[0004] In order to facilitate relevant personnel to install the comprehensive pipeline bridge seismic support, the present application provides a comprehensive pipeline bridge seismic support for motor equipment in a pharmaceutical workshop.

[0005] The present application provides a pharmaceutical workshop motor equipment integrated pipeline bridge seismic support, which adopts the following technical solution:

[0006] A seismic-resistant support for an integrated pipeline bridge for motor equipment in a pharmaceutical workshop comprises a first bearing frame and a second bearing frame, wherein the first bearing frame is used for installing pipelines, and the second bearing frame is used for installing cable bridges, the tops of the ends of the first bearing frame and the second bearing frame that are away from each other are both connected to vertical support frames, and the ends of the first bearing frame and the second bearing frame that are close to each other are commonly connected to a common support frame, and the top of the common support frame and the top of each vertical support frame are used for connection to a concrete floor slab.

[0007] By adopting the above-mentioned technical scheme, compared with the prior art in which the comprehensive pipe bridge seismic support is divided into multiple components and installed in multiple places in a scattered manner, so that relevant personnel have to install from multiple places, the present application adopts an integrated installation method through the setting of the vertical support frame and the common support frame, and effectively sets the comprehensive pipe bridge seismic support and the bridge on the same set of seismic support, so that the relevant personnel only need to install the top of the vertical support frame and the common support frame on the concrete floor, and then install the first bearing frame and the second bearing frame downward, thereby reducing the adverse effects of the installed components below or at the same level on the subsequent installation of the relevant personnel, thereby facilitating the construction of the relevant personnel and effectively increasing the efficiency of installing the seismic support of the present application.

[0008] Preferably, an oblique support frame is also provided on the first supporting frame, and fixing mechanisms are provided on the top and bottom ends of the oblique support frame, the bottom end of the oblique support frame is connected to the end of the first supporting frame away from the second supporting frame through the fixing mechanism, and the top end of the oblique support frame is connected to the concrete floor through the fixing mechanism.

[0009] By adopting the above-mentioned technical scheme, the setting of the oblique support frame can form a triangular structure between the oblique support frame, the first bearing frame and the vertical support frame, thereby increasing the stability of the first bearing frame during hoisting, reducing the probability of the first bearing frame vibrating with a large amplitude when the concrete vibrates, and effectively increasing the overall structural stability and seismic performance of the seismic support of the present application.

[0010] Preferably, the fixing mechanism includes a fixing frame, fixing bolts, a rotating frame and a reinforcement assembly, the fixing frame is connected to the concrete floor or the first bearing frame through the fixing bolts, the fixing frame is rotatably connected to one end of the rotating frame, the other end of the rotating frame is connected to the oblique support frame, and the reinforcement assembly is used to fix the rotating frame and the fixed frame.

[0011] By adopting the above technical solution and the specific setting of the fixing mechanism, relevant personnel can connect the fixing frame with the concrete floor or the first bearing frame by fixing bolts, thereby facilitating the installation of relevant personnel. At the same time, the existence of the rotating frame can also effectively enable the oblique support frame to rotate relative to the fixing frame and the first bearing frame, so that when the installation height of the first bearing frame changes, relevant personnel can adapt to the change of the height of the first bearing frame by rotating the oblique support frame. At the same time, when it is necessary to adjust the angle between the oblique support frame and the first bearing frame, relevant personnel can select an oblique support frame of appropriate length, and then adjust the inclination angle of the oblique support frame to adjust the installation.

[0012] Preferably, the reinforcement assembly includes a driven frame, a sliding frame and a locking bolt, one end of the driven frame is rotatably connected to the rotating frame, the other end of the driven frame is rotatably connected to the sliding frame, the sliding frame is slidably connected to the fixed frame, and the locking bolt is used to fix the sliding frame to the fixed frame.

[0013] By adopting the above technical solution and setting the reinforcement component, when the relevant personnel rotate the rotating frame, the driven frame moves with the rotating frame. At this time, the driven frame drives the sliding frame to slide, thereby adapting to the change of the angle of the driven frame. When the rotation of the driven frame is completed, the relevant personnel can also fix the sliding frame and the fixed frame by locking bolts, thereby locking the rotating frame. At this time, the driven frame and the sliding frame effectively support the rotating frame, thereby increasing the stability of the rotating frame.

[0014] Preferably, the fixing frame is also provided with a plurality of locking grooves for the locking bolts to pass through.

[0015] By adopting the above technical solution, the locking groove is set so that the locking bolt can pass through the locking groove, thereby fixing the sliding frame and the fixed frame. The setting of multiple locking grooves enables relevant personnel to insert the locking bolt into the appropriate locking groove according to specific circumstances, thereby adapting to the rotation of the rotating frame.

[0016] Preferably, a pipe fixing assembly is also provided on the first supporting frame, and the pipe fixing assembly includes a connecting bolt and two fixing clamps, the bottom end of each fixing clamp is connected to the first supporting frame, the two fixing clamps are used to be sleeved on the pipe, and the two fixing clamps are connected by a connecting bolt.

[0017] By adopting the above technical solution, the setting of the pipeline fixing assembly enables relevant personnel to put two fixing clamps on the pipeline, and then connect the tops of the two fixing clamps through connecting bolts, so as to clamp the pipeline and fix the pipeline, which effectively increases the stability of the pipeline installation.

[0018] Preferably, the pipe fixing assembly also includes two sliding blocks, which are arranged in a one-to-one correspondence with the fixing clamps, each of the sliding blocks is slidably connected to the first supporting frame, and the bottom end of each fixing clamp is slidably connected to the corresponding sliding block, and the sliding block is also provided with a locking bolt for fixing itself to the first supporting frame.

[0019] By adopting the above technical solution, the sliding block and the locking bolt are set so that the distance between the two sliding blocks can be adjusted, so that relevant personnel can adapt to pipes of different thicknesses by changing the spacing between the two sliding blocks and then replacing fixed clamps of different diameters. The presence of the sliding block effectively increases the scope of application of the present application and also facilitates the installation of the pipeline by relevant personnel.

[0020] Preferably, an oblique reinforcement frame is connected to the upper portion of each vertical support frame, each vertical support frame forms an acute angle with the corresponding oblique reinforcement frame, and the top ends of the oblique reinforcement frames are connected to the concrete floor.

[0021] By adopting the above-mentioned technical solution, the oblique reinforcement frame is set up, so that a triangular structure is formed between the oblique reinforcement frame, the vertical support frame and the concrete floor, thereby effectively increasing the stability of the connection between the vertical support frame and the concrete floor, increasing the seismic performance of the seismic support of the present application, and at the same time effectively ensuring the service life of the present application.

[0022] In summary, the present application includes at least one of the following beneficial technical effects:

[0023] 1. An integrated installation method is adopted to effectively set the integrated pipeline bridge seismic support and the bridge on the same set of seismic support, so that the relevant personnel only need to install the top of the vertical support frame and the common support frame on the concrete floor, and then install the first bearing frame and the second bearing frame downward, reducing the adverse effects of the installed components below or at the same level on the subsequent installation of the relevant personnel, thereby facilitating the construction of the relevant personnel and effectively increasing the efficiency of installing the seismic support of this application;

[0024] 2. The arrangement of the oblique support frame and the fixing mechanism can form a triangular structure between the oblique support frame, the first bearing frame and the vertical support frame, thereby increasing the stability of the first bearing frame during hoisting, effectively increasing the overall structural stability and anti-seismic performance of the seismic support of the present application, so that when the installation height of the first bearing frame changes, relevant personnel can adapt to the change of the height of the first bearing frame by rotating the oblique support frame;

[0025] 3. The setting of the oblique reinforcement frame forms a triangular structure between the oblique reinforcement frame, the vertical support frame and the concrete floor, thereby effectively increasing the stability of the connection between the vertical support frame and the concrete floor, increasing the seismic performance of the seismic support of the present application, and effectively ensuring the service life of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram used to reflect the overall seismic support of the integrated pipeline bridge for motor equipment in the pharmaceutical workshop in the embodiment of the present application.

[0027] Figure 2 It is a structural schematic diagram used to embody the shared support frame in the embodiment of the present application.

[0028] Figure 3 It is a structural schematic diagram used to reflect the installation part in the embodiment of the present application.

[0029] Figure 4 It is a structural schematic diagram used to reflect the reinforcement component in the embodiment of the present application.

[0030] Explanation of the reference numerals in the accompanying drawings: 1. first bearing frame; 11. first bearing sub-frame; 2. second bearing frame; 21. second bearing sub-frame; 3. vertical support frame; 4. common support frame; 41. mounting portion; 5. oblique reinforcement frame; 6. oblique support frame; 7. fixing mechanism; 71. fixing frame; 711. fixing slide rail; 7111. locking groove; 72. fixing bolt; 73. rotating frame; 731. extension portion; 74. reinforcement assembly; 741. driven frame; 742. sliding frame; 743. locking bolt; 8. pipe fixing assembly; 81. sliding block; 82. connecting bolt; 83. fixing clamp ring; 84. locking bolt; 9. adjusting slide rail; 91. locking groove. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1-4 This application is described in further detail.

[0032] The present application embodiment discloses a pharmaceutical workshop motor equipment integrated pipeline bridge seismic support. Figure 1 and Figure 2 The anti-seismic support of the integrated pipeline bridge for motor equipment in the pharmaceutical workshop includes a first bearing frame 1 and a second bearing frame 2. The first bearing frame 1 is used to install pipelines, and the second bearing frame 2 is used to install cable bridges. The tops of the ends of the first bearing frame 1 and the second bearing frame 2 that are far away from each other are both connected with a vertical support frame 3, and the ends of the first bearing frame 1 and the second bearing frame 2 that are close to each other are commonly connected with a common support frame 4. The top of the common support frame 4 and the top of each vertical support frame 3 are used to connect to the concrete floor.

[0033] Reference Figure 1 and Figure 2 The first bearing frame 1 includes two first bearing sub-frames 11, and a vertical support frame 3 is provided on one end of each first bearing sub-frame 11 away from the second bearing frame 2. The second bearing frame 2 includes two second bearing sub-frames 21, and a vertical support frame 3 is provided on one end of each second bearing sub-frame 21 away from the first bearing frame 1. The top end of each vertical support frame 3 is fixedly connected to the bottom of the concrete floor slab through expansion bolts. The bottom end of each vertical support frame 3 is fixedly connected to the top end of the corresponding first bearing frame 1 or second bearing frame 2 through bolts.

[0034] Reference Figure 1 and Figure 2, one end of each first load-bearing sub-frame 11 close to the second load-bearing sub-frame 21 is located directly below one end of the corresponding second load-bearing sub-frame 21 close to the first load-bearing sub-frame 11. The number of common support frames 4 is set to two, and they are respectively located on two second load-bearing sub-frames 21. The top of each common support frame 4 is fixedly connected to the bottom of the concrete floor through expansion bolts, and the bottom of each common support frame 4 is fixedly connected to the corresponding first load-bearing sub-frame 11 through bolts.

[0035] Reference Figure 2 and Figure 3 A mounting portion 41 is also provided in the middle of each common support frame 4, and each mounting portion 41 is integrally formed with the corresponding common support frame 4. Each mounting portion 41 is T-shaped, and one end of each second bearing sub-frame 21 close to the first bearing sub-frame 11 is sleeved outside the corresponding mounting portion 41, and is fixedly connected by bolts.

[0036] Reference Figure 1 and Figure 2 Each common support frame 4 is vertically arranged with the vertical support frame 3. An oblique reinforcement frame 5 is arranged on each vertical support frame 3, and the extension direction of each oblique reinforcement frame 5 forms an acute angle with the vertical direction. The top of each oblique reinforcement frame 5 is fixedly connected to the bottom of the concrete floor slab by expansion bolts, and the bottom of each oblique reinforcement frame 5 is fixedly connected to the corresponding vertical support frame 3 by bolts.

[0037] Reference Figure 2 and Figure 4 Each first bearing sub-frame 11 is provided with an oblique support frame 6, and each oblique support frame 6 is located at an end of the corresponding first bearing sub-frame 11 away from the second bearing sub-frame 21, and the length direction of each oblique support frame 6 forms an acute angle with the vertical direction. Each oblique support frame 6 is provided with a fixing mechanism 7 at both ends along its length direction, and each fixing mechanism 7 includes a fixing frame 71, a fixing bolt 72, a rotating frame 73 and a reinforcing assembly 74.

[0038] Reference Figure 2 and Figure 4 One end of each rotating frame 73 is inserted into the corresponding end of the corresponding oblique support frame 6 and fixedly connected to the corresponding oblique support frame 6 by bolts. Two extensions 731 are extended from one end of each rotating frame 73 close to the corresponding oblique support frame 6, and the extensions 731 are integrally formed with the rotating frame 73. The two extensions 731 are respectively located on both sides of the corresponding oblique support frame 6. The other end of each rotating frame 73 is rotatably connected to the corresponding fixed frame 71 by a pin shaft.

[0039] Reference Figure 2 and Figure 4The rotating frame 73 on the end of each oblique support frame 6 away from the first bearing sub-frame 11 is fixedly connected to the concrete wall panel by a fixing bolt 72. In the embodiment of the present application, the fixing bolt 72 is configured as an expansion bolt. The rotating frame 73 on the end of each oblique support frame 6 close to the first bearing sub-frame 11 is fixedly connected to the corresponding first bearing sub-frame 11 by a fixing bolt 72.

[0040] Reference Figure 2 and Figure 4 Each fixed frame 71 is provided with a reinforcement assembly 74, each reinforcement assembly 74 includes a driven frame 741, a sliding frame 742 and a locking bolt 743, and each reinforcement assembly 74 has two driven frames 741 and two locking bolts 743, and the driven frames 741 and the extensions 731 are arranged one-to-one. Each fixed frame 71 is provided with two fixed rails 711, and the fixed rails 711 and the fixed frame 71 are integrally formed, and the fixed rails 711 and the locking bolts 743 are arranged one-to-one. Each fixed rail 711 is provided with a plurality of locking grooves 7111, and the locking grooves 7111 are arranged along the length direction of the fixed rail 711.

[0041] Reference Figure 2 and Figure 4 One end of each driven frame 741 is rotatably connected to the corresponding extension portion 731 through a pin shaft, and the other end of each driven frame 741 is rotatably connected to the corresponding sliding frame 742 through a pin shaft. The sliding frames 742 are sleeved on the corresponding two fixed slide rails 711 and slidably connected to the fixed slide rails 711. Each locking bolt 743 passes through the corresponding fixed frame 71 and the corresponding fixed slide rail 711, so that the fixed frame 71 is fixedly connected to the fixed slide rail 711.

[0042] Reference Figure 2 and Figure 4 When the angle between the rotating frame 73 and the fixed frame 71 needs to be adjusted, the rotating frame 73 rotates, and the rotating frame 73 drives the end of the driven frame 741 that is connected to the rotating frame 73 to move, and the other end of the driven frame 741 also moves. In this process, the sliding frame 742 slides to adapt to the displacement of the driven frame 741. After the angle adjustment between the rotating frame 73 and the fixed frame 71 is completed, the locking bolt 743 is installed on the sliding frame 742 and inserted into the corresponding locking groove 7111, so that the sliding frame 742 is fixedly connected to the fixed slide rail 711, thereby fixing the rotating frame 73.

[0043] Reference Figure 2 and Figure 4Each first bearing sub-frame 11 is provided with a pipe fixing assembly 8, and each pipe fixing assembly includes a sliding block 81, a connecting bolt 82 and a fixing snap ring 83. The number of sliding blocks 81 and the fixing snap ring 83 is set to two, and they are arranged one by one. Each fixing snap ring 83 is a semicircular ring. Each first bearing sub-frame 11 is provided with two adjusting rails 9, and the adjusting rails 9 correspond to the sliding blocks 81 one by one. The extension direction of the two adjusting rails 9 is the same. The adjusting rails 9 are integrally formed with the first bearing sub-frame 11. Each adjusting rail 9 is provided with a plurality of locking grooves 91, and the locking grooves 91 are arranged along the length direction of the adjusting rail 9.

[0044] Reference Figure 2 and Figure 4 Each sliding block 81 is sleeved on the corresponding adjusting rail 9 and is slidably connected with the adjusting rail 9. Each sliding block 81 is provided with a locking bolt 84, and each locking bolt 84 is inserted into the corresponding locking groove 91. Each sliding block 81 is fixedly connected with the corresponding adjusting rail 9 through the corresponding locking bolt 84. The bottom end of each fixing clamp 83 is fixedly connected with the corresponding sliding block 81 by bolts. Each fixing clamp 83 is sleeved outside the pipeline and is attached to the outer wall of the pipeline. The top ends of two adjacent fixing clamps 83 are attached to each other and are fixedly connected by corresponding connecting bolts 82.

[0045] Reference Figure 2 and Figure 4 The relevant personnel can adjust the distance between the two sliding blocks 81 by sliding the sliding block 81, and then clamp the pipes of different diameters by replacing the fixed clamping rings 83 of different sizes, so as to facilitate the installation of the relevant personnel.

[0046] Reference Figure 4 Each second bearing sub-frame 21 is fixedly connected to the cable tray by bolts.

[0047] The implementation principle of the seismic support of an integrated pipeline bridge for motor equipment in a pharmaceutical workshop according to an embodiment of the present application is as follows: by adopting an integrated installation method, the seismic support of the integrated pipeline bridge and the bridge are arranged on the same set of seismic supports, so that relevant personnel only need to install the top ends of the vertical support frame 3, the common support frame 4 and the oblique support frame 6 on the concrete floor, and then install the second support frame 2 and the first support frame 1 downward in sequence, thereby reducing the adverse effects of the installed parts on the subsequent installation by relevant personnel, facilitating the construction of relevant personnel, and effectively increasing the efficiency of relevant personnel in installing the seismic support of the present application.

[0048] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A pharmaceutical workshop motor equipment integrated pipeline bridge seismic support, comprising a first bearing frame (1) and a second bearing frame (2), wherein the first bearing frame (1) is used to install pipelines, and the second bearing frame (2) is used to install cable bridges, characterized in that: The tops of the ends of the first bearing frame (1) and the second bearing frame (2) that are far away from each other are both connected to a vertical support frame (3), and the ends of the first bearing frame (1) and the second bearing frame (2) that are close to each other are commonly connected to a common support frame (4), and the top of the common support frame (4) and the top of each vertical support frame (3) are used to be connected to the concrete floor slab.

2. According to claim 1, the seismic support for the integrated pipeline bridge of the pharmaceutical workshop motor equipment is characterized by: The first bearing frame (1) is also provided with an oblique support frame (6), and fixing mechanisms (7) are provided on the top and bottom ends of the oblique support frame (6), the bottom end of the oblique support frame (6) is connected to an end of the first bearing frame (1) away from the second bearing frame (2) via the fixing mechanism (7), and the top end of the oblique support frame (6) is connected to the concrete floor slab via the fixing mechanism (7).

3. The seismic support for integrated pipeline bridge for motor equipment in pharmaceutical workshop according to claim 2 is characterized by: The fixing mechanism (7) comprises a fixing frame (71), fixing bolts (72), a rotating frame (73) and a reinforcement assembly (74); the fixing frame (71) is connected to the concrete floor or the first bearing frame (1) via the fixing bolts (72); the fixing frame (71) is rotatably connected to one end of the rotating frame (73); the other end of the rotating frame (73) is connected to the oblique support frame (6); and the reinforcement assembly (74) is used to fix the rotating frame (73) and the fixing frame (71).

4. The seismic support for integrated pipeline bridge for motor equipment in pharmaceutical workshop according to claim 3 is characterized by: The reinforcement assembly (74) comprises a driven frame (741), a sliding frame (742) and a locking bolt (743); one end of the driven frame (741) is rotatably connected to the rotating frame (73); the other end of the driven frame (741) is rotatably connected to the sliding frame (742); the sliding frame (742) is slidably connected to the fixed frame (71); and the locking bolt (743) is used to fix the sliding frame (742) to the fixed frame (71).

5. The seismic support for integrated pipeline bridge for motor equipment in pharmaceutical workshop according to claim 4 is characterized by: The fixing frame (71) is also provided with a plurality of locking grooves (7111) through which the locking bolts (743) pass.

6. The seismic support for integrated pipeline bridge for motor equipment in pharmaceutical workshop according to claim 1 is characterized by: The first carrier frame (1) is also provided with a pipeline fixing assembly (8), the pipeline fixing assembly (8) comprising a connecting bolt (82) and two fixing clamps (83), the bottom end of each fixing clamp (83) being connected to the first carrier frame (1), the two fixing clamps (83) being used to be sleeved on the pipeline, and the two fixing clamps (83) being connected via the connecting bolt (82).

7. The seismic support for integrated pipeline bridge for motor equipment in pharmaceutical workshop according to claim 6 is characterized by: The pipeline fixing assembly (8) further comprises two sliding blocks (81), wherein the sliding blocks (81) are arranged in a one-to-one correspondence with the fixing clamps (83), each of the sliding blocks (81) is slidably connected to the first supporting frame (1), and the bottom end of each fixing clamp (83) is slidably connected to the corresponding sliding block (81), and the sliding block (81) is also provided with a locking bolt (84) for fixing itself to the first supporting frame (1).

8. The seismic support for integrated pipeline bridge for motor equipment in pharmaceutical workshop according to claim 1 is characterized by: The upper part of each vertical support frame (3) is connected to an oblique reinforcement frame (5), and the angle between each vertical support frame (3) and the corresponding oblique reinforcement frame (5) is an acute angle, and the top end of each oblique reinforcement frame (5) is connected to the concrete floor slab.